LETTER OF APPROVAL WITH MODIFICAITONS
Wayne County ABC Board
909 Landmark Drive
Goldsboro, NC 27534
RE: Project Name: Wayne County ABC Store #3
Application ID: PA-007396
Permit Number: WAYNE-2025-0140
Acres Approved: 1.8 Acres
County: Wayne
City: Goldsboro
Address: 103 Adair Drive
River Basin: Neuse
Stream Classification: NSW: Nutrient Sensitive Waters
Plan Type: New Plan - Commercial Building,Associated Parking and Other Infrastructure
Dear Wayne County ABC Board,
This office has reviewed the subject erosion and sedimentation control plan. We hereby issue this
Letter of Approval. Any modifications required for approval are listed in the body of the email that
accompanied this attached letter. The enclosed Certificate of Approval must be posted at the job
site. This plan approval shall expire three (3) years following the date of approval, if no land-
disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities not explicitly exempt are required to complete
and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC)
under the NCG010000 Construction General Permit. After the form is reviewed and found to be
complete,you will receive a link with payment instructions for the annual permit fee. After the fee
is processed,you will receive the COC. As the Financially Responsible Party shown on the FRO form
submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing
activity. The eNOI form may be accessed at deq.nc.gov/NCG01.
DE Q u North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
Washington Regional Office 1943 Washington Square Mall I Washington,North Carolina 27889
Nn
uauarom _
nr of e �o� m 0.114 252.946.6481
Letter of Approval
Wayne County ABC Board
10/29/2024
Page 2 of 4
Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central
office. If the owner/operator of this project changes in the future, the new responsible party must
obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be
kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented,requiring protection
of existing natural resources and adjoining properties. If, following the commencement of this
project, the erosion and sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),
this office may require revisions to the plan and implementation of the revisions to ensure
compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may
also apply to this land-disturbing activity. This approval does not supersede any other permit or
approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form and on the plan, which you provided. You are requested to file an
amended form if there is any change in the information included on the form.
Your cooperation is appreciated.
Sincerely,
1—Signed by:
\) 4tAA-w�-ems
--1 B788953FD9E453...
Ginger Y. Turner, PE for
Samir Dumpor, PE
Regional Engineer
Land Quality Section
Letter of Approval
Wayne County ABC Board
10/29/2024
Page 3 of 4
Modifications
1. Provide design calculations and a plan detail for the riprap outlet stabilization structure. Construction detail for
the outlet stabilization structure is to include a fabric underlayment,the width of the apron at the pipe outlet
and at the end of the apron,the length of the apron,the stone size,and depth of stone.(GS 113A-57(3), 15A
NCAC 04B.0113)
General Comments
1. This permit allows for a land disturbance,as called for on the application plan,not to exceed 1_8
acres. Exceeding that acreage will be a violation of this permit and would require a revised plan and additional
application fee. Any addition in impervious surface,over that already noted on the approved plan,would also
require a revised plan to verify the appropriateness of the erosion control measures and stormwater retention
measures(NCGS 113A-54.1(b)).
2. Additional measures maybe required-the applicant is responsible for the control of sediment on-site. If the
approved erosion and sedimentation control measures prove insufficient,the applicant must take those
additional steps necessary to stop sediment from leaving this site(NCGS 113A-57(3); 15A NCAC 4B.0115). Each
sediment storage device must be inspected after each storm event(NCGS 113A54.1(e)). Maintenance and/or
clean out is necessary anytime the device is at 50%capacity. All sediment storage measures will remain on site
and functional until all grading and final landscaping of the project is complete(15A NCAC 04B.0113).
3. The applicant is responsible for obtaining any and all permits and approvals necessary for the development of
this project prior to the commencement of this land disturbing activity. This could include our agency's
Stormwater regulations and the Division of Water Resources'enforcement requirements within Section 401 of
the Clean Water Act,the U.S.Army Corps of Engineers'jurisdiction of Section 404 of the Clean Water Act,the
Division of Coastal Management's CAMA requirements,the Division of Solid Waste Management's landfill
regulations,the Environmental Protection Agency and/or The U.S.Army Corps of Engineers jurisdiction of the
Clean Water Act,local County or Municipalities'ordinances,or others that may be required. This approval
cannot supersede any other permit or approval;however,in the case of a Cease-and-Desist Order from the
Corps of Engineers,that Order would only apply to wetland areas. All highlands would still have to be in
compliance with the N.C.Sedimentation Pollution Control Act.
4. If any area on site falls within the jurisdiction of Section 401 or 404 of the Clean Water Act,the applicant is
responsible for compliance with the requirements of the Division of Water Resources (DWR),the Corps of
Engineers and the Environmental Protection Agency(EPA) respectively. Any erosion control measures that fall
within jurisdictional wetland areas must be approved by the aforementioned agencies prior to installation. The
Land Quality Section must be notified of a relocation of the measures in question to the transition point between
the wetlands and the uplands to assure that the migration of sediment will not occur. If that relocation presents
a problem or contradicts any requirements of either DWR,the Corps,or the EPA,it is the responsibility of the
applicant to inform the Land Quality Section regional office so that an adequate contingency plan can be made to
assure sufficient erosion control remains on site. Failure to do so will be considered a violation of this approval
(NCGS 113A-54.1(b)).
5. Any off-site borrow and waste required for this project must come from a site with an approved erosion control
plan,a site regulated under the Mining Act of 1971,or a landfill regulated by the Division of Solid Waste
Management. Trash/debris from demolition activities or generated by any activities on site must be disposed of
Letter of Approval
Wayne County ABC Board
10/29/2024
Page 4 of 4
at a facility regulated by the Division of Solid Waste Management or per Division of Solid Waste Management or
Division of Water Resources rules and regulations. [15A NCAC 4B.0110]
6. A graveled construction entrance must be located at each point of access and egress available to construction
vehicles during the grading and construction phases of this project. Access and egress from the project site at a
point without a graveled entrance will be considered a violation of this approval. Routine maintenance of the
entrances is critical(113A-54.1(b)).
7. Because sediment traps and basins are shown on the plan as the primary sedimentation and erosion control
devices on this project,it is necessary that the traps and basins and their collection systems be installed before
any other grading takes place on site,and that every structure that receives more than one acre of drainage is
built so that each dewaters only from the surface (NCG010000). If that proves to be impractical,a revised plan
must be submitted and approved that addresses erosion and sediment control needs during the interim period
until the traps and basins are fully functioning(113A-54.1(b)).
8. Any and all existing ditches on this project site are assumed to be left undisturbed by the proposed development
unless otherwise noted. The removal of vegetation within any existing ditch or channel is prohibited unless the
ditch or channel is to be regraded with side slopes of 2 horizontal to 1 vertical or less steep (15A NCAC
04B.0124 (d)). Bank slopes maybe mowed but stripping of vegetation is considered new earth work and is
subject to the same erosion control requirements as new ditches (NCGS 113A52(6)).
9. As a condition of the NPDES General Stormwater Permit(NCG010000),the financially responsible party shall
comply with the NCG01 Ground Stabilization and Materials Handling requirements that became effective April 1,
2019. The NCG01 Ground Stabilization and Materials Handling standard detail can be printed from the
deq.nc.gov/NCG01 website.
10. As a condition of the NPDES General Stormwater Permit(NCG010000),the financially responsible party shall
comply with the NCG01 Self-Inspection,Recordkeeping and Reporting requirements that became effective April
1,2019. The NCG01 Self-Inspection,Recordkeeping and Reporting standard details can be printed from the
deq.nc.gov/NCG01 website.
11. As a part of routine monitoring of the approved land-disturbing activity,the financially responsible party shall
assure inspections of the area covered by the approved plan after each phase of the plan has been completed
and after establishment of temporary ground cover in accordance with North Carolina General Statute 113A-
54.1(e).
12. The NCG01 has a$120 yearly fee and our office often receives closure inspection requests days prior to yearly
NCG01 fee payment due dates. Be advised the project requires a closure inspection report by DEMLR prior to
filing the Notice of Termination (NOT)to terminate NCG01 coverage. The closure inspection should not be
requested until after the site has achieved full vegetative stabilization and measures have been removed. The
removal of temporary ESC measures,including basins,requires prior approval.Often,a full growing season is
necessary between initial seeding/mulching and removal of measures. Please plan your construction
accordingly to avoid contacting our office prematurely for a closure inspection. Also be advised you may be
asked for representative site pictures prior to a closure inspection.