HomeMy WebLinkAboutNCC222972_NOT Closeout Documents_20241025 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 943 Washington Square Mall,Washington,NC 27889 (252)946-6481
County: Craven Project: New Bern Township 7 PH 3 River basin: Neuse
Person financially responsible:City of New Bern-Foster Hughes,Interim City Project#: CRAVE-2022-018
Manager
Address: 300 Pollocks St.,New Bern,NC 28560
1. Project Location: Varies,NEW BERN
Pictures: No
2. Weather and soil conditions: Raining/Warm/Wet Initial inspection: Yes
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Title:
Inspection report: Sent Report Date given/sent: September 20,2024
9. Corrective action needed:
Permanent ground cover sufficient to restrain erosion has been established.No additional
self-monitoring or self-inspections are required.Project is in compliance and released under the
10. Comments: SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction
Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The
NOT is available at:https://edocs.dea.nc.Rov/Forms/NCG01-Termination.Please note that this
correspondence must be uploaded as part of completing the NOT process.
Reported by: Amber Rights Others present:
Date of inspection: September 19,2024 Time arriving on site: 2:00 PM Time leaving site: 2:30 PM
CC: