Loading...
HomeMy WebLinkAboutNCC222972_NOT Closeout Documents_20241025 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall,Washington,NC 27889 (252)946-6481 County: Craven Project: New Bern Township 7 PH 3 River basin: Neuse Person financially responsible:City of New Bern-Foster Hughes,Interim City Project#: CRAVE-2022-018 Manager Address: 300 Pollocks St.,New Bern,NC 28560 1. Project Location: Varies,NEW BERN Pictures: No 2. Weather and soil conditions: Raining/Warm/Wet Initial inspection: Yes 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Title: Inspection report: Sent Report Date given/sent: September 20,2024 9. Corrective action needed: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the 10. Comments: SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at:https://edocs.dea.nc.Rov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Amber Rights Others present: Date of inspection: September 19,2024 Time arriving on site: 2:00 PM Time leaving site: 2:30 PM CC: