Loading...
HomeMy WebLinkAboutNCG140105 DMR SW (2)" t • STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG14 6 l D 5" FACILITY NAME: 141 i06 PERSON COLLECTING SAF41PLES CERTIFIED LABORATORY ,le:-W/,cr AdWl I—_ Lab # 1n43 Lab # OPTIONAL INFO: • i SAMPLE COLLECTION YEAR: SAMPLING PERIOD: ❑ July -December [,January -June CEIVL) COUNTY _ PHONE NO. (25L)&3'i-`+1 MAY 0 1 2015 ADD TO LISTSERVE? []YES ❑NO EMAIL: DISCHARGING TO CLASS: []SA ❑HQW ❑PNA ❑Trout ❑L lo/VftAErLIFr V Part A: 5tormwater ivionnonng Kequ1re1_"e11U- Date Sample Event , Collected PH TSS Duration Outfall No. (Standard (mo/dd/yr OR (mg/L) NO FLOW)t Units) (minutes) I Total Rain (in) In Tier 2 Month! y Monitoring? (y/n) # of Months in Tier 2 2 Sampling _ 6-92 1002' d b ' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the camp a per a ove. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit, Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. ° For each sampled measurable storm event the total precipitation must be recorded using data from an on-site rain gauge. ; Last Revised 7/13/11 Permit Date: 7/1/2011-60/30/2015 Page 1 of 2 • Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month— averaged over a calendar year. Outfall No. pH Date Sample Collected (Standard (mo/dd/yr)' Units} 6-9 TPH using method 1664A SGT -HEM (mg/L) 15 Total Suspended Event Solids Duration (mg/L) (minutes) 100 , - Total New Motor Oil In Tier 2 a of Months a Monthly Rainfall Usage in Tier 2 Monitoring? (in) (gal/month) (y/n) SamplingZ - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEED CES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NOX HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Oriainal and one copy of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample for at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or thoNr rso irectly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. amet here are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Sig ture Permittee) (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2