Loading...
HomeMy WebLinkAbout20150955 Ver 2_B-4929 GP31 PCN Rev 09Feb16_20160210C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): � Wetlands ❑ Streams - tributaries ❑ Buffers � Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non-404, other) (acres) Temporar T W1 � P❑ T roadway riparian � Yes � Corps 0.01 ❑ No ❑ DWQ roadway, riparian & coastal � Yes � Corps W2 � P❑ T infiltration basin, 0.16 bridge approach marsh ❑ No ❑ DWQ W3 � P❑ T roadway riparian � Yes � Corps 0.55 ❑ No ❑ DWQ W4 � P❑ T bridge coastal marsh � Yes � Corps 0.04 � No ❑ DWQ W4 ❑ P� T bridge coastal marsh � Yes � Corps 0.03 � No ❑ DWQ W5 � P❑ T pipe outlet coastal marsh � Yes � Corps 0.01 � No ❑ DWQ pipe outlet ❑ Yes � Corps W6 � P❑ T coastal marsh <0.01* cleanout � No ❑ DWQ pipe outlet ❑ Yes � Corps W7 � P❑ T coastal marsh <0.01" cleanout � No ❑ DWQ 0.77 permanent 2g. Total wetland impacts 0.03 temporary 2h. Comments: See attached Permit Drawings and Wetland Permit Impact Summary for additional detail. Overhead power line relocations will result in <0.01 acre of impacts and 0.41 acre of hand cleaing in riparian and coastal wetlands. * Sites 6& 7 only include Hand Clearing, totaling 0.01 acre for pipe outlet cleanouts Page 5 of 11 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: 0 linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold 4d. Buffer mitigation requested (DWQ only): 0 square feet 4e. Riparian wetland mitigation requested: 1.44 acres 4f. Non-riparian wetland mitigation requested: 0 acres 4g. Coastal (tidal) wetland mitigation requested: 0.1 acres 4h. Comments: NCDMS Acceptence Letter will be forwarded upon receipt 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes � No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3(2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page8of11