Loading...
HomeMy WebLinkAboutSW6240902_O&M Agreement/Plan_20241023 Operation & Maintenance Agreement Project Name: Sanctuary Subdivision Project Location: Daydream Crossing, Harnett County, NC Cover Page Maintenance records shall be kept on the following SCM(s). This maintenance record shall be kept in a log in a known set location. Any deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the SCM(s). The SCM(s)on this project include(check all that apply&corresponding O&M sheets will be added automatically): Infiltration Basin Quantity: Location(s): Infiltration Trench Quantity: Location(s): Bioretention Cell Quantity: Location(s): Wet Pond Quantity: 2 Location(s): NW and SE Corner of Property Stormwater Wetland Quantity: Location(s): Permeable Pavement Quantity:_ Location(s): Sand Filter Quantity: Location(s): Rainwater Harvesting Quantity: Location(s): Green Roof Quantity: Location(s): Level Spreader- Filter Strip Quantity: Location(s): Proprietary System Quantity: Location(s): Treatment Swale Quantity: Location(s): Dry Pond Quantity: Location(s): Disconnected Impervious Surface Present: No Location(s): User Defined SCM Present: No Location(s): Low Density Present: No Type: ..LICK TO UPDATE O&M MANUAL I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each SCM above, and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to the system or responsible party. Responsible Party: GFC Sanctuary, LLC/Yang Song Title &Organization: Manager Street address: 8601 Six Forks Road, Suite 270 City, state, zip: Raleighm NC 27615 Phone number(s): 919-418-9042 Email: ysong@greenfieldcommunities.com Signature: - Date: 0 9703 72-2..it I. -SV' %VIVA Sat- , a Notary Public for the State of IV61WTrf CPPYZCL lvt4 County of W RIcC , do hereby certify that 1?IkN Fi S!SV1 (--k personally appeared before me this T'V day of Stf2At 6eAr 2021-( and acknowledge the due execution of the O erations and Maintenance Agreement t Witness�a►y F 1ike_o�itle ,official seal, I & A161.4-G. t 1,e .o issio�• 149\ r • 4OTA/�y QN j%8L1G i if I.� �• if., 19 ./VAS Co .'� Seal My commission expires S i I S IS,j7.41 STORM-EZ 8/29/2024 Version 1.5 O&M Agreement Page 1 of 1 Wet Pond Maintenance Requirements Important operation and maintenance proce Immediately after the wet detention basin is established, the plantson the - vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks) No portion of the wet pond should be fertilized after the initial fertilization that is required to establish the plants on the vegetated shelf. Stable groundcoverwill be maintained in the drainage area to reduce the - sediment load to the wet pond. If the pond must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain will be minimized as much as At least once annually, a dam safety expert will inspect the embankment. Any problems that are found will be repaired immediately. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into /-NILCI IIIC WCl pUIIC] iD CSIdUIIS ICU II Will UC IIIS�7C(�ICU l.�Udlleily dllU WIL11111 T+ IIUUIS liter every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance shall be kept in a known set location and shall be available upon fact :ion activities shall be performed as follows. Any problemsthat are found shall be repaired immel SCM element: Potential problem: How to remediate the problem: The entire wet pond n�Qain}`uli'" Remove the trash/debris. Areas of bare soil Regrade the soil if necessary to remove the gully, The perimeter of the and/or erosive gullies plant ground cover and water until it is established wet pond have formed. Provide lime and a one-time fertilizer application. The inlet pipe is clogged (if Unclog the pipe. Dispose of the sediment off-site I ll iiiiCL jJI la cracked or otherwise The inlet dev ice damaged (if Repair or replace the pipe annlirohlol Erosion is occurring Regrade the swale if necessary and provide erosion in the swale (if control devices such as reinforced turF matting or applicable). riprap to avoid future problems with erosion. Sediment has Search for the source of the sediment and remedy accumulated to a the problem if possible. Remove the sediment and depth greater than dispose of it in a location where it will not cause the original design impacts to streams or the SCM. The forebay depth for sediment Provide additional erosion protection such as Erosion has occurred reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than Wet Pond Maintenance Requirements (Continued) SCM element: Potential problem: How to remediate the problem: Sediment has Search for the source of the sediment and remedy accumulated to a the problem if possible. Remove the sediment and depth greater than dispose of it in a location where it will not cause the original design impacts to streams or the SCM. The main treatment sediment storaae area Algal growth covers Consult a professional to remove and control the over 50% of the algal growth Cattails, phragmites or other invasive Remove the plants by wiping them with pesticide plants cover 50% of (do not spray). the basin surface. Best professional practices show that pruning is needed to Prune according to best professional practices maintain optimal ,plant health. The vegetated shelf Determine the source of the problem: soils, Plants are dead, hydrology, disease, etc. Remedy the problem and diseased or dying replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than Shrubs have started to grow on the Remove shrubs immediately embankment. Evidence of muskrat Consult a professional to remove muskrats or or beaver activity is beavers and repair any holes or erosion The embankment A tree has started to grow on the Consult a dam safety specialist to remove the tree An annual inspection by an appropriate professional shows Make all needed repairs immediately that the embankment needs repair. Clo in has Clean out the outlet device and dispose of any gg g sediment in a location where it will not cause The outlet device occurred. impacts to streams or the SCM. The outlet device is damaged. Repair or replace the outlet device Weeds or volunteer trees are growing on Remove the weeds or trees Floating wetland i !It dnt,irui Lduie iS island (if applicable) damaged, disconnected or Restore the anchor cable to its design state. miccinn Wet Pond Maintenance Requirements (Continued) SCM element: Potential problem: How to remediate the problem: LIU Uil VI IJ IIICI JI IJ.IiA of damage have Repair the damage and improve the flow occurred at the dissipation structure. niiflof The receiving water Discharges from the wet pond are causing erosion or Contact the local NCDEQ Regional Office. sedimentation in the receivina water Wet Detention Pond Design Summary Wet Pond Diagram WET POND ID FOREBAY MAIN POND 1 Permanent Pool El. 350.5 Permanent Pool El. 350.5 Temporary Pool El: 352 Temporary Pool El: 352 Pretreatment No Clean Out Depth: 4 Clean Out Depth: 5 other than Sediment Removal E 346.5 Sediment Removal E 345.5 Has Veg.Filter? No Bottom Elevation: 345.5 _ Bottom Elevation: 344.5 ATTACH ADDITIONAL SHEETS IF NECESSARY Wet Pond Maintenance Requirements Important operation and maintenance proce Immediately after the wet detention basin is established, the plants on the - vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks) No portion of the wet pond should be fertilized after the initial fertilization that is required to establish the plants on the vegetated shelf. Stable groundcoverwill be maintained in the drainage area to reduce the sediment load to the wet pond. If the pond must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain will be minimized as much as At least once annually, a dam safety expert will inspect the embankment. Any - problems that are found will be repaired immediately. The measuring device used to determine the sediment elevation shall be such - that it will give an accurate depth reading and not readily penetrate into /11tCt Lne 9Vl:l pullU ISeStdUliSIICU, IL Will UC InSpCC,LeU quaflerry dilu WiuhllI Li} rlOUWS alter every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance shall be kept in a known set location and shall be available upon ranuocf :ion activities shall be performed as follows. Any problems that are found shall be repaired immel SCM element: Potential problem: How to remediate the problem: I I W I/UCUIIS IS The entire wet pond .,r, ,+ Remove the trash/debris. Areas of bare soil Regrade the soil if necessary to remove the gully, The perimeter of the wet pond and/or erosive gullies plant ground cover and water until it is established. have formed. Provide lime and a one-time fertilizer application The inlet pipe is clogged (if Unclog the pipe. Dispose of the sediment off-site i II Wit!. pipe IS cracked or otherwise The inlet device damaged (if Repair or replace the pipe. annlir-�hI \ Erosion is occurring Regrade the swale if necessary and provide erosion in the swale (if control devices such as reinforced turf matting or applicable). riprap to avoid future problems with erosion. Sediment has Search for the source of the sediment and remedy accumulated to a the problem if possible. Remove the sediment and depth greater than dispose of it in a location where it will not cause the original design impacts to streams or the SCM. The forebay depth for sediment Provide additional erosion protection such as Erosion has occurred reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than Wet Pond Maintenance Requirements (Continued) SCM element: Potential problem: How to remediate the problem: Sediment has Search for the source of the sediment and remedy accumulated to a the problem if possible. Remove the sediment and depth greater than dispose of it in a location where it will not cause the original design impacts to streams or the SCM. The main treatment sediment storage area Algal growth covers Consult a professional to remove and control the over 50% of the algal growth. Cattails, phragmites or other invasive Remove the plants by wiping them with pesticide plants cover 50% of (do not spray). the basin surface. Best professional practices show that pruning is needed to Prune according to best professional practices. maintain optimal plant health. The vegetated shelf Determine the source of the problem: soils, Plants are dead, hydrology, disease, etc. Remedy the problem and diseased or dying replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than Shrubs have started to grow on the Remove shrubs immediately embankment. Evidence of muskrat Consult a professional to remove muskrats or or beaver activity is beavers and repair any holes or erosion, The embankment A tree has started to grow on the Consult a dam safety specialist to remove the tree, An annual inspection by an appropriate professional shows Male all needed repairs immediately, that the embankment needs repair. Clogging has Clean out the outlet device and dispose of any occurred. sediment in a location where it will not cause The outlet dev ice impacts to streams or the SCM The outlet device is damaged. Repair or replace the outlet device. Weeds or volunteer trees are growing on Remove the weeds or trees. Floating wetland ne anLnui UdIJIC is island (if applicable) damaged, disconnected or Restore the anchor cable to its design state micci nn Wet Pond Maintenance Requirements (Continued) SCM element: Potential problem: How to remediate the problem: CIUNUII Ur UuFUi b1l�.lIS of damage have Repair the damage and improve the flow occurred at the dissipation structure. niitlAt The receiving water Discharges from the wet pond are causing erosion or Contact the local NCDEQ Regional Office sedimentation in the receiving water. Wet Detention Pond Design Summary Wet Pond Diagram WET POND ID FOREBAY MAIN POND 2 Permanent Pool El. 371.5 Permanent Pool El 371.5 Temporary Pool El: 373 Temporary Pool El 373 Pretreatment No Clean Out Depth: 2.5 Clean Out Depth: 4.5 other than Sediment Removal E 369 Sediment Removal E 367 Has Veg Filter? No Bottom Elevation: 368 Bottom Elevation: 366 ATTACH ADDITIONAL SHEETS IF NECESSARY