Loading...
HomeMy WebLinkAboutNCC233582_NOT Closeout Documents_20241021 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 2090 US Highway 70, Swannanoa,NC 28778 (828)296-4500 County: Buncombe Project: Lake Julian North Abutment Ditch Ext River basin: French Broad Person financially responsible:Duke Energy Progress,LLC Project#: BUNCO-2024-002 Address: 526 South Church Street,Charlotte,NC 28202 1. Project Location: 200 CP and L Dr,Arden Pictures: Yes-Digital 2. Weather and soil conditions: dry pc Initial inspection: Yes 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Joe Wilson Title: Duke Inspection report: Sent Report Date given/sent: September 18,2024 9. Corrective action needed: 10. Comments: Project is complete and the site is stable. Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required. Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Shawna Riddle Others present: Date of inspection: August 28,2024 Time arriving on site: 1:00 PM Time leaving site: 1:15 PM cc: