Loading...
HomeMy WebLinkAboutNCC243222_(ARPA) DWI Letter of Intent to Fund_20241018 :=--;,:TATE a , '; �� 1. ROY COOPER -- a Governor ° a `ELIZABETH S.BISER a?f Secretary *E4,QUAmv\oto#` SHADI ESKAF NORTH CAROLINA Director Environmental Quality November 4, 2022 Mr. Charles D. Nichols, III, Manager City of Laurinburg Post Office Box 249 Laurinburg,North Carolina 28353 Subject: Letter of Intent to Fund American Rescue Plan Act—Earmark Pump-Stations' Renovations Project(Multiple) Project No.: SRP-W-ARP-0169 Dear Mr. Nichols: The Division of Water Infrastructure (Division) has reviewed your Request for Funding and determined your project is eligible to receive American Rescue Plan Act(ARPA) funding from the State Fiscal Recovery Fund(SFRF) established in Session Law(S.L.) 2022-74. Projects funded from the SFRF must meet applicable federal law and guidance for the ARPA funds. The ARPA project grant will be one- hundred percent(100%) of eligible project costs, up to a maximum of$7,360,000. The first milestone is the submittal of a bid-and-design package by April 1, 2023. Please note that this intent to fund is contingent upon meeting all of the following milestones: Milestone Date Apply for all Necessary Permits* ASAP Bid and Design Package Submittal (obtain all permits) April 1, 2023 Bid and Design Package Approval August 1, 2023 Advertise Project, Receive Bids, Submit Bid Information, and Receive December 1, 2023 Authority to Award Execute Construction Contract(s) January 1, 2024 Receive last reimbursement- Statutory December 31, 2026 *An engineering alternatives analysis(EAA)may be required on certain projects. Failure to meet any milestone may result in the forfeiture of funding for the proposed project. Note that the Division will make no reimbursements of ARPA funds after December 31, 2026. The State Environmental Policy Act exempts projects funded by the State Reserve (such as this project) from state-mandated environmental review. Federal requirements may still apply. [North Carolina General Statute (N.C.G.S.) 113A-12(2)h.] D E A North em of vrm Qlit I Dvirauc 512 N.SalisburyCarolina D Streetpart Tel Mail En Serviceionental Centerua I Raleighy i ,Northsionof CarolinaWaterInf27699str-1633 ture NORTH CAROLINA Department ul enmmnmentai Ouanry 919.707.9160 Mr. Nichols City of Laurinburg 04-Nov-22 Page 2 of 2 Upon detailed review of the project during the funding process, it may be determined that portions of your project are not eligible for funding. US Treasury Requirements Projects with an expected total cost of ten million dollars ($10,000,000) or more must meet US Treasury requirements for prevailing-wage rates, project labor agreements, and related requirements. Recipients can either certify meeting the requirements or provide plans and reports as the State and Local Fiscal Recovery Funds (SLFRF) Compliance and Reporting Guidance (treasury.gov) specifies. If you have any questions,please contact Adrian Eaton by phone at(919) 707-9178 or by e-mail at adrian.eaton@ncdenr.gov. Sincerely, 9.61.1., A.1,2424-Gi Jon Risgaard, Chief State Revolving Fund Section cc: Charles A. Willis, Jr., P.E., BCEE, Willis Engineers, Inc., Consulting Engineer(Charlotte NC) Ken Pohlig, P.E. (DWI, via e-mail) Adrian Eaton(DWI, via e-mail) Mark Hubbard, P.E. (DWI, via e-mail) ARPA Project File (COM_LOIF)