Loading...
HomeMy WebLinkAboutNC0025721_Historical information_20111231 (2)Regards, 2 From: siemens Sent: Wednesday, March 07, 2012 4:52 PM To: Kathryn Baker Subject: Weldon Kathryn, The torque tube (Item 0008) is scheduled to ship 3/9/12. Feel free to contact me if you have any questions or require further information. Regards, Important notice: This e-mail and any attachment thereof contain corporate proprietary information. If you have received it by mistake, please notify us immediately by reply e-mail and delete this e-mail and its attachments from your system. Thank you. Kathryn Baker Municipal Parts & Service Heyward incorporated 2101-A Cambridge Beltway Drive Charlotte, NC 28273 DoubleCheck identified this as CLEAN. Give feedbacl Phone: (704)583-2305 Fax: (704) 583-2900 www.heyward.net For Municipal Accounts: http://www.heyward.net/municipal.htm Siemens Industry, Inc. Customer Services Division 2607 N. Grandview Blvd, Suite 130 Waukesha Wl 53188 March 14,2012 RE: Clarifier Improvements Mr. Elks, $12,500.00Total Price: $16,565.00Total Price: Best regards, Charles R. Underwood Inc. As always we appreciate the opportunity' to work with you on this project. If we can be of further service, or if you have any questions, please contact us. We are pleased to provide you with this quotation to provide repairs to your Rex clarifier. At this time the clarifier is down until a new gearbox arrives. After inspection, we propose the following repairs, broken out as requested. Zach C. Hinnant Project Manager Item #3: Blast and Paint All Metal ■ Sandblast all exposed metal. ■ Epoxy paint all blasted metal. ■ Clean up debris. ■ Re-caulk and level weirs. ■ Includes all labor, paint, scaffolding, boom truck and other equipment needed. Mr. Jeff Elks Town of Weldon 109 Washington Avenue Weldon, NC 27890 Charles R. Underwood, Inc. Pump Sales & Sendee Item #1: Install new gear box, turnbuckles, bolts, rubbers, and adjust. ■ Provide labor and equipment required to install new gear box (provided by Weldon). o Includes modification of gearbox base to accommodate old mount. o Gearbox oil to be provided by Weldon. ■ Install new stainless steel turnbuckles on existing rods. ■ Change all bolts on center tube with stainless steel nuts, bolts, and washers. ■ Replace rubber on screed aim and center tube. ■ Adjust and level scraper aims. 1 March 14,2012 Terms & Conditions Disclosure: Acceptance: Accepted by:Date:P.O. #: 2 A purchase order number must be issued or a copy of this quotation must be signed and returned to our office for us to begin work on this project. Payment for materials is due upon receipt. All other costs will be billed upon completion of job. All figures, dimensions, attachments, specifications, engineering and any designs included in and with this quote are property of Charles R. Underwood, Inc. until project is awarded to Charles R. Underwood, Inc. If the information provided with this quote is used to solicit competitive bids without express permission of Charles R. Underwood, Inc. a design/quote fee will be invoiced to the holder of this quotation. This quotation is based upon all information available to us at the time of preparation of such quotation. Changes or additions not known to Charles R. Underwood Inc. may cause this quote to be subject to re­ quote or may result in a change order if quote has already been accepted. Prices include applicable tax and freight, any item not specifically mentioned is excluded. Bid is good for 30 days. Material costs are based on market prices taken on the day of quotation only and are subject to change at any time. HaJI, Mandy FYI Hi Jeff, It's going in the paint booth this afternoon and, if sufficiently dry, will ship tomorrow. Did you and Zach have a chance to discuss the turnbuckles yet? Is he taking care of that for you? I’ll keep you informed as much as possible. Let me know if you think of anything else. 1 From: jeffelks@hotmail.com To: dlcrowder@hotmail.com Subject: FW: Town of Weldon, NC WTP // Siemens (Envirex) 10328 Primary Clarifier, F15LT Gearbox DOWN Date: Mon, 12 Mar 2012 15:23:31 -0400 From: kbaker@heyward.net To: jeffelks@hotmail.com CC: tmencome@heyward.net; khall@heyward.net Subject: RE: Town of Weldon, NC WTP // Siemens (Envirex) 10328 Primary Clarifier, F15LT Gearbox DOWN Date: Mon, 12 Mar 2012 18:32:54 +0000 From: Sent: To: Subject: I just got an e-mail from Siemens indicating that the torque tube did not ship last Friday as was anticipated. Once again I have to apologize for the delay. I hope it is safe for me to assume that by now you have all of the other items on this order. From: Kathryn Baker Sent: Wednesday, March 07, 2012 6:53 PM To: 'Jeff Elks' Cc: Tony Mencome; Keith Hall Subject: Town of Weldon, NC WTP // Siemens (Envirex) 10328 Primary Clarifier, F15LT Gearbox DOWN Jeff - I’m told the torque tube will ship on 3/9/12. I spoke to Zach earlier today and he confirmed that he thinks he can get those turnbuckles quickly and not from Siemens. So, I’m waiting to hear back from Siemens with their estimate of lead time. If you get confirmation from Zach that he can get them in two weeks or less before we hear from Siemens I would go with whatever he can get... .as long as it works from a technical standpoint. I’m afraid I’m not in a position at the moment to give advice on that particular point, but I trust Zach knows what he’s doing. He says he thinks he made some notes when he was out there with regard to measurements. When I spoke to him he was travelling and thought he’d be able to check at the office later tonight. Donald Crowder [dlcrowder@hotmail.com] Wednesday, March 14, 2012 2:12 PM Hall, Mandy FW: Town of Weldon. NC WTP // Siemens (Envirex) 10328 Primary Clarifier, F15LT Gearbox DOWN (704) 5S3-23O5 Hall, Mandy Hi Mandy. Please except this email as notice that I am no longer the ORC for the Town of Weldon WWTP.. Yes, Thanks I am have a great time. Hope you are doing well. Jay Hi Jay, Hope you are enjoying your new job!! Please send me an email removing yourself from designation as ORC at the Weldon WWTP. Thank you! www.ncwaterquality.org i From: Sent: To: Cc: Subject: mail correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed third parties unless the content is exempt by statute orother regulation Jay Van hoose [jayvanhoose@rocketmail.com] Wednesday, March 14, 2012 1:28 PM Hall, Mandy Heather Adams Re: ORC Designation Mandy Tingen Hall WWTP Consultant NCDENR-DWQ-SWP 919-791-4254 P 919-788-7159 F 3800 Barrett Drive Raleigh NC 27609 From: "Hall, Mandy" <mandy.hall@ncdenr.gov > To: Jay Van hoose <jayvanhoose@rocketmail.com > Sent: Wednesday, March 14, 2012 12:07 PM Subject: ORC Designation V1 v EPA yr/mo/dayNPDES NC0025721 12/12/06 I I I |6£I I I I I I I I I I I I I Entry Time/Date Permit Effective Date 12/08/0109:53 AM 12/12/06 Weldon WWTP Permit Expiration DateExit Time/Date 17/03/3111:37 AM 12/12/06 Other Facility Data Name, Address of Responsible Official/Title/Phone and Fax Number Donald L Crowder,PO Box 551 Weldon NC 278900551//252-536-3478/2525364104 Records/ReportsOperations & Maintenance Effluent/Receiving WatersFacility Site Review Other (See attachment summary) DateAgency/Office/Phone and Fax NumbersName(s) and Signature(s) of Inspector(s) RRO WQ//919-791-4200/Mack K Wiggins Page #1 3I US Hwy 301 Weldon NC 27890 United States Environmental Protection Agency Washington, D C. 20460 Contacted No QA 72UJ Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) /// Inspection Work Days 671 I 69 Form Approved. OMB No. 2040-0057 Approval expires 8-31-98 Remarks 21| | I I I I I I I I I I I I I I I I I I I I I I I I I I I I Signatui .(/ Section C: Areas Evaluated During Inspection (Check only those areas evaluated) ij Flow Measurement Sludge Handling Disposal Facility Self-Monitoring Evaluation Rating 70 LI J11 Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include POTW name and NPDES permit Number) J17 Fac Type 20J Inspector 19|s] Inspection Type ,8L,2l 73l I I74 Bl 71IJ Permit fl Self-Monitoring Program Laboratory Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) Transaction Code 1 W 2 Li tune of ManagemenL-d A Reviews! / Agency/Office/Phonaand Fax Numbers Date —. EPA Form 3560/5 (Rev 9-94) Previous editions are obsolete Water Compliance Inspection Report Section A: National Data System Coding (i.e., PCS) —Reserved------------------------ 75| I I I I I I I 80 Permit: NC0025721 Yes No NA NEOther Comment: ■ (If the present permit expires in 6 months or less). Has the permittee submitted a new application? ■ o Is the facility as described in the permit? ■ o # Are there any special conditions for the permit? ■ ODOIs access to the plant site restricted to the general public? ■ oIs the inspector granted access to all areas for inspection? Comment:Copy of current permit was faxed to Mr. Donald Crowder ORC. Operations & Maintenance Yes No NA NE ■ O OIs the plant generally clean with acceptable housekeeping? Comment: Record Keeping Yes No NA NE ■ O O Are records kept and maintained as required by the permit? ■ Is all required information readily available, complete and current? ■ oAre all records maintained for 3 years (lab. reg. required 5 years)? ■ oAre analytical results consistent with data reported on DMRs? ■ Is the chain-of-custody complete? Dates, times and location of sampling Name of individual performing the sampling Results of analysis and calibration Dates of analysis Name of person performing analyses Transported COCs ■ Are DMRs complete: do they include all permit parameters? ■ Has the facility submitted its annual compliance report to users and DWQ? O ■ 0(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator on each shift? ■ o o Is the ORC visitation log available and current? ■ oIs the ORC certified at grade equal to or higher than the facility classification? ■ Is the backup operator certified at one grade less or greater than the facility classification? Page #3 Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable Solids, pH, DO, Sludge ■ O D Judge, and other that are applicable? Owner - Facility: Weldon WWTP Inspection Type: Compliance EvaluationInspection Date: 12/06/2012 Permit: NC0025721 Inspection Date: 12/06/2012 Yes No NA NERecord Keeping ■ is a copy of the current NPDES permit available on site? ■ 0 Facility has copy of previous year's Annual Report on file for review? Copy of current permit was faxed to Mr. Donald Crowder ORC.Comment: Yes No NA NEEffluent Pipe ■ O Is right of way to the outfall properly maintained? ■ o Are the receiving water free of foam other than trace amounts and other debris? ■ If effluent (diffuser pipes are required) are they operating properly? Effluent was clear with very little to no foam at the time of the inspection.Comment: Yes No NA NEFlow Measurement - Influent ■ # Is flow meter used for reporting? ■ oIs flow meter calibrated annually? ■ Is the flow meter operational? ■ (If units are separated) Does the chart recorder match the flow meter? Comment: Yes No NA NEFlow Measurement - Effluent ■ o # Is flow meter used for reporting? ■ Is flow meter calibrated annually? ■ 0Is the flow meter operational? ■ (If units are separated) Does the chart recorder match the flow meter? Comment: Yes No NA NEPump Station - Influent ■ Is the pump wet well free of bypass lines or structures? ■ o Is the wet well free of excessive grease? ■ o Are all pumps present? ■ o Are all pumps operable? ■ Are float controls operable? ■ ODDIs SCADA telemetry available and operational? ■ o oIs audible and visual alarm available and operational? Comment:Pump station utilizes three pumps. Auto-dialer operational. Yes No NA NEOxidation Ditches Page #4 Owner - Facility: Weldon WWTP Inspection Type: Compliance Evaluation Permit: NC0025721 Inspection Date: 12/06/2012 Oxidation Ditches Yes No NA NE ■ Are the aerators operational? ■ o o Are the aerators free of excessive solids build up? ■ # Is the foam the proper color for the treatment process? ■ Does the foam cover less than 25% of the basin’s surface? ■ Is the DO level acceptable? ■ Are settleometer results acceptable (> 30 minutes)? ■ Is the DO level acceptable?(1.0 to 3.0 mg/l) ■ Are settelometer results acceptable?(400 to 800 ml/l in 30 minutes) Comment: Secondary Clarifier Yes No NA NE ■ O Is the clarifier free of black and odorous wastewater? ■ Is the site free of excessive buildup of solids in center well of circular clarifier? ■ o Are weirs level? ■ Is the site free of weir blockage? ■ Is the site free of evidence of short-circuiting? ■ oIs scum removal adequate? ■ Is the site free of excessive floating sludge? ■ ODDIs the drive unit operational? ■ Is the return rate acceptable (low turbulence)? ■ o Is the overflow clear of excessive solids/pin floc? ■ Is the sludge blanket level acceptable? (Approximately % of the sidewall depth) Comment: Aerobic Digester Yes No NA NE ■ OIs the capacity adequate? ■ O Is the mixing adequate? ■ o Is the site free of excessive foaming in the tank? ■ # Is the odor acceptable? ■ # Is tankage available for properly waste sludge? Comment: SolidsJHandling Equipment Yes No NA NE Page #5 Owner - Facility: Weldon WWTP Inspection Type: Compliance Evaluation Permit: NC0025721 Inspection Date: 12/06/2012 Solids Handling Equipment Yes No NA NE ■ Is the equipment operational? ■ Is the chemical feed equipment operational? ■ o Is storage adequate? ■ Is the site free of high level of solids in filtrate from filter presses or vacuum filters? o ■ Is the site free of sludge buildup on belts and/or rollers of filter press? ■ Is the site free of excessive moisture in belt filter press sludge cake? ■ o The facility has an approved sludge management plan? Comment: Yes No NA NE GasType of system ? ■ 000Is the feed ratio proportional to chlorine amount (1 to 1)? ■ 0 Is storage appropriate for cylinders? ■ DOO# Is de-chlorination substance stored away from chlorine containers? D O ■ Are the tablets the proper size and type? Comment:Uses Sulfer Dioxide to de-chlorinate. O D ■ DAre tablet de-chlorinators operational? Number of tubes in use? Uses Sulfer Dioxide to de-chlorinate.Comment: Yes No NA NEDisinfection-Tablet o ■ oAre tablet chlorinators operational? ■ oAre the tablets the proper size and type? Number of tubes in use? ■ Is the level of chlorine residual acceptable? ■ o Is the contact chamber free of growth, or sludge buildup? ■ oIs there chlorine residual prior to de-chlorination? Utilizes chlorine gas to disinfect.Comment: Yes No NA NEBar Screens Type of bar screen a.Manual b.Mechanical Page #6 Synagro collects the slude and land applies. De-chlorination Owner - Facility: Weldon WWTP Inspection Type: Compliance Evaluation Bar Screens Yes No NA NE ■ O Are the bars adequately screening debris? ■ DOOIs the screen free of excessive debris? ■ ODDIs disposal of screening in compliance? ■ □00Is the unit in good condition? Comment: Laboratory Yes No NA NE Are field parameters performed by certified personnel or laboratory? ■ 000Are all other parameters(excluding field parameters) performed by a certified lab? ■ ODD# Is the facility using a contract lab? ■ 0 0 o# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees Celsius)? 0 0 ■ 0Incubator (Fecal Coliform) set to 44.5 degrees Celsius*/- 0.2 degrees? □■□Incubator (BOD) set to 20.0 degrees Celsius +/-1.0 degrees? Comment: Yes No NA NE ■ ODOIs automatically activated standby power available? ■ OODIs the generator tested by interrupting primary power source? ■ ODDIs the generator tested under load? ■ ODDWas generator tested & operational during the inspection? ■ 000Do the generator(s) have adequate capacity to operate the entire wastewater site? ■ O Is there an emergency agreement with a fuel vendor for extended run on back-up power? ■ ODDIs the generator fuel level monitored? Comment: Yes No NA NE ■ ODOIs containment adequate? ■ onnIs storage adequate? ■ ODDAre backup pumps available? ■ 000Is the site free of excessive leaking? Comment:Uses Sulfer Dioxide to dechlorinate. Pumps-RAS-WAS Yes No NA NE ■ ODDAre pumps in place? Page #7 Generator tested once per week. The WWTP uses a local vendor for fuel. Chemical Feed Owner - Facility: Weldon WWTP Inspection Type: Compliance Evaluation Permit: NC0025721 Inspection Date: 12/06/2012 Samples are stored and pick up by contract lab. Standby Power Y Permit: NC0025721 Inspection Date: 12/06/2012 Yes No NA NEPumps-RAS-VVAS ■ Are pumps operational? ■ Are there adequate spare parts and supplies on site? Comment: Page #8 L Owner - Facility: Weldon WWTP Inspection Type: Compliance Evaluation 71 Reg^ial Inspectors’ Checklist fo eld Parameters i. TEMP DO SC SETT SZkYes No Nos Noes NoYes No Are results reported between the facility’s permit lij If value is less than the low standard, report asy^S IK Yes Yes Yes Yes Yes Yes Yes No No No No J No No □, Yes 3-Yes No No No No Are the following items documented (a/ where applicable): Item_____________________________ Date of sample collection*__________ Time of sample collection*__________ Sample collector’s initials or signature Date of sample analysis*___________ Time of sample analysis*___________ Analyst initials or signature_________ Sample location___________________ ‘Date and time of sample collection and analysis may be the pH r 14^- game for in sflu or on-site measurements. TRC Regional Plant Inspector: Regional Inspector Contact #: Region: z Date: /2-^Z 2^/ 2— Check the parameter(s) performed at this site for reporting purposes. otal Residual Chlorine (TRC) Temperature (TEMP) Specific Conductivity (SC) H Dissolved Oxygen (DO) Settleable Residue (SETT) III. Total Residual Chlorine________________ Total Residual Chlorine meter make and model: Is a check standard analyzed each day of use? (Circle one: gel or liquid standard)_______ What is the assigned/observed value of the daily check standard? _________ Is a 5-point calibration verification performed? Note date of last verification: Alternatively, does the lab construct a linear regression, usinq 5 standards, to calculate results? Note date of,last calibration curve constructed: *7/ J / l ——______________True values: Jo-pg/L mg/L • Obtained values: pg/L Q mg/L What program are samples analyzed on? da_ Are results reported in proper units? Check one: ^^qig/L mg/L «--------ix—.—x__. i__x.-------x.__ ------and the compliance limit of 50 pg/L? ' ’here x=low standard cone.________ Are samples analyzed within 15 minutes of collection?_______________________________ IV. pH______________________________________________________________________ pH meter make and model: Is the pH meter calibrated with at least 2 buffers per mfg's instructions each day of use? Note buffers used: _________________________ Is the pH meter calibration checked with an additional buffer each day of use? Note check buffer used: Does the check buffer read within ±0.1 S.U. of the known value? Yes Are the following items documented:_______________ Meter calibration?_____________________________ Check buffer reading?_________________________ Are samples analyzed within 15 minutes of collection? Are sample results reported to 0.1 pH units? Facility Name: NPDES#: Field Lab Certification #: ______________ Lab Contact: )C II. General Laboratory (note any exceptions in section XI)_________________ Are instruments, meters, probes, photometric cells, etc, maintained in good condition? Are standards, reagents and consumables used within manufacturer expiration dates? [TRC gel standard is exempt.] Yes No Yes No Yes No Yes No Yes Q No IX. YesX. XI.Additional comments: Electronic copies may be emailed to linda.chavis@ncdenr.qov. Revision 04/20/2012 Please submit a copy of this completed form to the Laboratory Certification program at: DWQ Lab Certification, Chemistry Lab, Courier# 52-01-01 Yes Yes Yes Yes Yes Yes Yes Yes No No No No No No No No No No No Yes Yes Yes Yes ZJ Yes Yes ZlYes r No No No No No No No •V. 1 Temperature What instrument(s) is used to measure temperature? Check all that apply: pH meter DO meter Conductivity meter Digital thermometer Glass thermometer_____ Is the instrument/thermometer calibration checked at least annually against a NIST traceable or NIST certified thermometer?______________________________________ Are temperature corrections (even if zero) posted on the instrument/thermometer?______ Are samples measured in situ or on-site? [REQUIRED - there is no holding time for temperature]_______________________ Are sample results reported in degrees C?_____________________________________ VI. Dissolved Oxygen__________________________________________________ DO meter make and model:_________________________________________________ Is the air calibration of the DO meter performed each day of use?___________________ Are the following items documented:__________________________________________ Meter calibration?_______________________________________________________ Are samples analyzed within 15 minutes of collection?____________________________ Are results reported in mg/L?________________________________________________ VII. Conductivity______________________________________________________ Conductivity meter make and model:__________________________________________ Is the meter calibrated daily according to the manufacturer’s instructions? Note standard used (this is generally a one-point calibration):___________________________________ Is a daily check standard analyzed? Note value:_________________________________ Are the following items documented:__________________________________________ Meter calibration?_______________________________________________________ Are samples analyzed within 28 days of collection?_______________________________ Are results reported in pmhos/cm (some meters display equivalent pS/cm units)?_______ VIII. Settleable Residue_________________________________________________ Does the laboratory have an Imhoff Cone in good condition?_______________________ Is the sample settled for 1 hour?______________________________________________ Is the sample agitated after 45 minutes?_______________________________________ Are the following items documented:___________________________________________ Volume of sample analyzed? Note volume analyzed:____________________________ Date and time of sample analysis (settling start time)?___________________________ Time of agitation after 45 minutes of settling?_________________________________ Sample analysis completion (settling end time)?_______________________________ Are samples analyzed within 48 hours of collection?______________________________ Are results reported in ml/L?_________________________________________________ Was a paper trail (comparing contract lab and on-site data to DMR) performed? If so, list months reviewed: iFfollow-up by the Laboratory Certification program recommended?