HomeMy WebLinkAboutNC0025721_Historical information_20111231 (2)Regards,
2
From: siemens
Sent: Wednesday, March 07, 2012 4:52 PM
To: Kathryn Baker
Subject: Weldon
Kathryn,
The torque tube (Item 0008) is scheduled to ship 3/9/12.
Feel free to contact me if you have any questions or require further information.
Regards,
Important notice: This e-mail and any attachment thereof contain corporate proprietary information. If you have received it by mistake, please notify us immediately
by reply e-mail and delete this e-mail and its attachments from your system. Thank you.
Kathryn Baker
Municipal Parts & Service
Heyward incorporated
2101-A Cambridge Beltway Drive
Charlotte, NC 28273
DoubleCheck identified this as CLEAN. Give feedbacl
Phone: (704)583-2305
Fax: (704) 583-2900
www.heyward.net
For Municipal Accounts: http://www.heyward.net/municipal.htm
Siemens Industry, Inc.
Customer Services Division
2607 N. Grandview Blvd, Suite 130
Waukesha Wl 53188
March 14,2012
RE: Clarifier Improvements
Mr. Elks,
$12,500.00Total Price:
$16,565.00Total Price:
Best regards,
Charles R. Underwood Inc.
As always we appreciate the opportunity' to work with you on this project. If we can be of further service, or if you
have any questions, please contact us.
We are pleased to provide you with this quotation to provide repairs to your Rex clarifier. At this time the clarifier is
down until a new gearbox arrives. After inspection, we propose the following repairs, broken out as requested.
Zach C. Hinnant
Project Manager
Item #3: Blast and Paint All Metal
■ Sandblast all exposed metal.
■ Epoxy paint all blasted metal.
■ Clean up debris.
■ Re-caulk and level weirs.
■ Includes all labor, paint, scaffolding, boom truck and other equipment needed.
Mr. Jeff Elks
Town of Weldon
109 Washington Avenue
Weldon, NC 27890
Charles R. Underwood, Inc.
Pump Sales & Sendee
Item #1: Install new gear box, turnbuckles, bolts, rubbers, and adjust.
■ Provide labor and equipment required to install new gear box (provided by Weldon).
o Includes modification of gearbox base to accommodate old mount.
o Gearbox oil to be provided by Weldon.
■ Install new stainless steel turnbuckles on existing rods.
■ Change all bolts on center tube with stainless steel nuts, bolts, and washers.
■ Replace rubber on screed aim and center tube.
■ Adjust and level scraper aims.
1
March 14,2012
Terms & Conditions
Disclosure:
Acceptance:
Accepted by:Date:P.O. #:
2
A purchase order number must be issued or a copy of this quotation must be signed and returned to our
office for us to begin work on this project. Payment for materials is due upon receipt. All other costs will
be billed upon completion of job.
All figures, dimensions, attachments, specifications, engineering and any designs included in and with
this quote are property of Charles R. Underwood, Inc. until project is awarded to Charles R. Underwood,
Inc. If the information provided with this quote is used to solicit competitive bids without express
permission of Charles R. Underwood, Inc. a design/quote fee will be invoiced to the holder of this
quotation.
This quotation is based upon all information available to us at the time of preparation of such quotation.
Changes or additions not known to Charles R. Underwood Inc. may cause this quote to be subject to re
quote or may result in a change order if quote has already been accepted. Prices include applicable tax
and freight, any item not specifically mentioned is excluded. Bid is good for 30 days. Material costs are
based on market prices taken on the day of quotation only and are subject to change at any time.
HaJI, Mandy
FYI
Hi Jeff,
It's going in the paint booth this afternoon and, if sufficiently dry, will ship tomorrow.
Did you and Zach have a chance to discuss the turnbuckles yet? Is he taking care of that for you?
I’ll keep you informed as much as possible. Let me know if you think of anything else.
1
From: jeffelks@hotmail.com
To: dlcrowder@hotmail.com
Subject: FW: Town of Weldon, NC WTP // Siemens (Envirex) 10328 Primary Clarifier, F15LT Gearbox DOWN
Date: Mon, 12 Mar 2012 15:23:31 -0400
From: kbaker@heyward.net
To: jeffelks@hotmail.com
CC: tmencome@heyward.net; khall@heyward.net
Subject: RE: Town of Weldon, NC WTP // Siemens (Envirex) 10328 Primary Clarifier, F15LT Gearbox DOWN
Date: Mon, 12 Mar 2012 18:32:54 +0000
From:
Sent:
To:
Subject:
I just got an e-mail from Siemens indicating that the torque tube did not ship last Friday as was anticipated. Once again I
have to apologize for the delay. I hope it is safe for me to assume that by now you have all of the other items on this
order.
From: Kathryn Baker
Sent: Wednesday, March 07, 2012 6:53 PM
To: 'Jeff Elks'
Cc: Tony Mencome; Keith Hall
Subject: Town of Weldon, NC WTP // Siemens (Envirex) 10328 Primary Clarifier, F15LT Gearbox DOWN
Jeff - I’m told the torque tube will ship on 3/9/12. I spoke to Zach earlier today and he confirmed that he thinks he
can get those turnbuckles quickly and not from Siemens. So, I’m waiting to hear back from Siemens with their
estimate of lead time. If you get confirmation from Zach that he can get them in two weeks or less before we hear
from Siemens I would go with whatever he can get... .as long as it works from a technical standpoint. I’m afraid I’m
not in a position at the moment to give advice on that particular point, but I trust Zach knows what he’s doing. He
says he thinks he made some notes when he was out there with regard to measurements. When I spoke to him he
was travelling and thought he’d be able to check at the office later tonight.
Donald Crowder [dlcrowder@hotmail.com]
Wednesday, March 14, 2012 2:12 PM
Hall, Mandy
FW: Town of Weldon. NC WTP // Siemens (Envirex) 10328 Primary Clarifier, F15LT Gearbox
DOWN
(704) 5S3-23O5
Hall, Mandy
Hi Mandy.
Please except this email as notice that I am no longer the ORC for the Town of Weldon WWTP..
Yes, Thanks I am have a great time.
Hope you are doing well.
Jay
Hi Jay,
Hope you are enjoying your new job!!
Please send me an email removing yourself from designation as ORC at the Weldon WWTP.
Thank you!
www.ncwaterquality.org
i
From:
Sent:
To:
Cc:
Subject:
mail correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed
third parties unless the content is exempt by statute orother regulation
Jay Van hoose [jayvanhoose@rocketmail.com]
Wednesday, March 14, 2012 1:28 PM
Hall, Mandy
Heather Adams
Re: ORC Designation
Mandy Tingen Hall
WWTP Consultant
NCDENR-DWQ-SWP
919-791-4254 P
919-788-7159 F
3800 Barrett Drive
Raleigh NC 27609
From: "Hall, Mandy" <mandy.hall@ncdenr.gov >
To: Jay Van hoose <jayvanhoose@rocketmail.com >
Sent: Wednesday, March 14, 2012 12:07 PM
Subject: ORC Designation
V1 v
EPA
yr/mo/dayNPDES
NC0025721 12/12/06
I I I |6£I I I I I I I I I I I I I
Entry Time/Date Permit Effective Date
12/08/0109:53 AM 12/12/06
Weldon WWTP
Permit Expiration DateExit Time/Date
17/03/3111:37 AM 12/12/06
Other Facility Data
Name, Address of Responsible Official/Title/Phone and Fax Number
Donald L Crowder,PO Box 551 Weldon NC 278900551//252-536-3478/2525364104
Records/ReportsOperations & Maintenance
Effluent/Receiving WatersFacility Site Review
Other
(See attachment summary)
DateAgency/Office/Phone and Fax NumbersName(s) and Signature(s) of Inspector(s)
RRO WQ//919-791-4200/Mack K Wiggins
Page #1
3I
US Hwy 301
Weldon NC 27890
United States Environmental Protection Agency
Washington, D C. 20460
Contacted
No
QA
72UJ
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Inspection Work Days
671 I 69
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Remarks
21| | I I I I I I I I I I I I I I I I I I I I I I I I I I I I
Signatui
.(/
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
ij Flow Measurement
Sludge Handling Disposal
Facility Self-Monitoring Evaluation Rating
70 LI
J11
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES permit Number)
J17
Fac Type
20J
Inspector
19|s]
Inspection Type
,8L,2l
73l I I74
Bl
71IJ
Permit
fl Self-Monitoring Program
Laboratory
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Transaction Code
1 W 2 Li
tune of ManagemenL-d A Reviews! / Agency/Office/Phonaand Fax Numbers Date —.
EPA Form 3560/5 (Rev 9-94) Previous editions are obsolete
Water Compliance Inspection Report
Section A: National Data System Coding (i.e., PCS)
—Reserved------------------------
75| I I I I I I I 80
Permit: NC0025721
Yes No NA NEOther
Comment:
■ (If the present permit expires in 6 months or less). Has the permittee submitted a new application?
■ o Is the facility as described in the permit?
■ o # Are there any special conditions for the permit?
■ ODOIs access to the plant site restricted to the general public?
■ oIs the inspector granted access to all areas for inspection?
Comment:Copy of current permit was faxed to Mr. Donald Crowder ORC.
Operations & Maintenance Yes No NA NE
■ O OIs the plant generally clean with acceptable housekeeping?
Comment:
Record Keeping Yes No NA NE
■ O O Are records kept and maintained as required by the permit?
■ Is all required information readily available, complete and current?
■ oAre all records maintained for 3 years (lab. reg. required 5 years)?
■ oAre analytical results consistent with data reported on DMRs?
■ Is the chain-of-custody complete?
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported COCs
■ Are DMRs complete: do they include all permit parameters?
■ Has the facility submitted its annual compliance report to users and DWQ?
O ■ 0(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator on each shift?
■ o o Is the ORC visitation log available and current?
■ oIs the ORC certified at grade equal to or higher than the facility classification?
■ Is the backup operator certified at one grade less or greater than the facility classification?
Page #3
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable Solids, pH, DO, Sludge ■ O D
Judge, and other that are applicable?
Owner - Facility: Weldon WWTP
Inspection Type: Compliance EvaluationInspection Date: 12/06/2012
Permit: NC0025721
Inspection Date: 12/06/2012
Yes No NA NERecord Keeping
■ is a copy of the current NPDES permit available on site?
■ 0 Facility has copy of previous year's Annual Report on file for review?
Copy of current permit was faxed to Mr. Donald Crowder ORC.Comment:
Yes No NA NEEffluent Pipe
■ O Is right of way to the outfall properly maintained?
■ o Are the receiving water free of foam other than trace amounts and other debris?
■ If effluent (diffuser pipes are required) are they operating properly?
Effluent was clear with very little to no foam at the time of the inspection.Comment:
Yes No NA NEFlow Measurement - Influent
■ # Is flow meter used for reporting?
■ oIs flow meter calibrated annually?
■ Is the flow meter operational?
■ (If units are separated) Does the chart recorder match the flow meter?
Comment:
Yes No NA NEFlow Measurement - Effluent
■ o # Is flow meter used for reporting?
■ Is flow meter calibrated annually?
■ 0Is the flow meter operational?
■ (If units are separated) Does the chart recorder match the flow meter?
Comment:
Yes No NA NEPump Station - Influent
■ Is the pump wet well free of bypass lines or structures?
■ o Is the wet well free of excessive grease?
■ o Are all pumps present?
■ o Are all pumps operable?
■ Are float controls operable?
■ ODDIs SCADA telemetry available and operational?
■ o oIs audible and visual alarm available and operational?
Comment:Pump station utilizes three pumps. Auto-dialer operational.
Yes No NA NEOxidation Ditches
Page #4
Owner - Facility: Weldon WWTP
Inspection Type: Compliance Evaluation
Permit: NC0025721
Inspection Date: 12/06/2012
Oxidation Ditches Yes No NA NE
■ Are the aerators operational?
■ o o Are the aerators free of excessive solids build up?
■ # Is the foam the proper color for the treatment process?
■ Does the foam cover less than 25% of the basin’s surface?
■ Is the DO level acceptable?
■ Are settleometer results acceptable (> 30 minutes)?
■ Is the DO level acceptable?(1.0 to 3.0 mg/l)
■ Are settelometer results acceptable?(400 to 800 ml/l in 30 minutes)
Comment:
Secondary Clarifier Yes No NA NE
■ O Is the clarifier free of black and odorous wastewater?
■ Is the site free of excessive buildup of solids in center well of circular clarifier?
■ o Are weirs level?
■ Is the site free of weir blockage?
■ Is the site free of evidence of short-circuiting?
■ oIs scum removal adequate?
■ Is the site free of excessive floating sludge?
■ ODDIs the drive unit operational?
■ Is the return rate acceptable (low turbulence)?
■ o Is the overflow clear of excessive solids/pin floc?
■ Is the sludge blanket level acceptable? (Approximately % of the sidewall depth)
Comment:
Aerobic Digester Yes No NA NE
■ OIs the capacity adequate?
■ O Is the mixing adequate?
■ o Is the site free of excessive foaming in the tank?
■ # Is the odor acceptable?
■ # Is tankage available for properly waste sludge?
Comment:
SolidsJHandling Equipment Yes No NA NE
Page #5
Owner - Facility: Weldon WWTP
Inspection Type: Compliance Evaluation
Permit: NC0025721
Inspection Date: 12/06/2012
Solids Handling Equipment Yes No NA NE
■ Is the equipment operational?
■ Is the chemical feed equipment operational?
■ o Is storage adequate?
■ Is the site free of high level of solids in filtrate from filter presses or vacuum filters?
o ■ Is the site free of sludge buildup on belts and/or rollers of filter press?
■ Is the site free of excessive moisture in belt filter press sludge cake?
■ o The facility has an approved sludge management plan?
Comment:
Yes No NA NE
GasType of system ?
■ 000Is the feed ratio proportional to chlorine amount (1 to 1)?
■ 0 Is storage appropriate for cylinders?
■ DOO# Is de-chlorination substance stored away from chlorine containers?
D O ■ Are the tablets the proper size and type?
Comment:Uses Sulfer Dioxide to de-chlorinate.
O D ■ DAre tablet de-chlorinators operational?
Number of tubes in use?
Uses Sulfer Dioxide to de-chlorinate.Comment:
Yes No NA NEDisinfection-Tablet
o ■ oAre tablet chlorinators operational?
■ oAre the tablets the proper size and type?
Number of tubes in use?
■ Is the level of chlorine residual acceptable?
■ o Is the contact chamber free of growth, or sludge buildup?
■ oIs there chlorine residual prior to de-chlorination?
Utilizes chlorine gas to disinfect.Comment:
Yes No NA NEBar Screens
Type of bar screen
a.Manual
b.Mechanical
Page #6
Synagro collects the slude and land applies.
De-chlorination
Owner - Facility: Weldon WWTP
Inspection Type: Compliance Evaluation
Bar Screens Yes No NA NE
■ O Are the bars adequately screening debris?
■ DOOIs the screen free of excessive debris?
■ ODDIs disposal of screening in compliance?
■ □00Is the unit in good condition?
Comment:
Laboratory Yes No NA NE
Are field parameters performed by certified personnel or laboratory?
■ 000Are all other parameters(excluding field parameters) performed by a certified lab?
■ ODD# Is the facility using a contract lab?
■ 0 0 o# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees Celsius)?
0 0 ■ 0Incubator (Fecal Coliform) set to 44.5 degrees Celsius*/- 0.2 degrees?
□■□Incubator (BOD) set to 20.0 degrees Celsius +/-1.0 degrees?
Comment:
Yes No NA NE
■ ODOIs automatically activated standby power available?
■ OODIs the generator tested by interrupting primary power source?
■ ODDIs the generator tested under load?
■ ODDWas generator tested & operational during the inspection?
■ 000Do the generator(s) have adequate capacity to operate the entire wastewater site?
■ O Is there an emergency agreement with a fuel vendor for extended run on back-up power?
■ ODDIs the generator fuel level monitored?
Comment:
Yes No NA NE
■ ODOIs containment adequate?
■ onnIs storage adequate?
■ ODDAre backup pumps available?
■ 000Is the site free of excessive leaking?
Comment:Uses Sulfer Dioxide to dechlorinate.
Pumps-RAS-WAS Yes No NA NE
■ ODDAre pumps in place?
Page #7
Generator tested once per week. The WWTP uses a local vendor for fuel.
Chemical Feed
Owner - Facility: Weldon WWTP
Inspection Type: Compliance Evaluation
Permit: NC0025721
Inspection Date: 12/06/2012
Samples are stored and pick up by contract lab.
Standby Power
Y
Permit: NC0025721
Inspection Date: 12/06/2012
Yes No NA NEPumps-RAS-VVAS
■ Are pumps operational?
■ Are there adequate spare parts and supplies on site?
Comment:
Page #8
L
Owner - Facility: Weldon WWTP
Inspection Type: Compliance Evaluation
71
Reg^ial Inspectors’ Checklist fo eld Parameters
i.
TEMP DO SC SETT
SZkYes No
Nos
Noes
NoYes
No
Are results reported between the facility’s permit lij
If value is less than the low standard, report asy^S
IK
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
No
No
No
J No
No
□, Yes
3-Yes
No
No
No
No
Are the following items documented (a/ where applicable):
Item_____________________________
Date of sample collection*__________
Time of sample collection*__________
Sample collector’s initials or signature
Date of sample analysis*___________
Time of sample analysis*___________
Analyst initials or signature_________
Sample location___________________
‘Date and time of sample collection and analysis may be the
pH
r
14^-
game for in sflu or on-site measurements.
TRC
Regional Plant Inspector:
Regional Inspector Contact #:
Region: z
Date: /2-^Z 2^/ 2—
Check the parameter(s) performed at this site for reporting purposes.
otal Residual Chlorine (TRC) Temperature (TEMP) Specific Conductivity (SC)
H Dissolved Oxygen (DO) Settleable Residue (SETT)
III. Total Residual Chlorine________________
Total Residual Chlorine meter make and model:
Is a check standard analyzed each day of use? (Circle one: gel or liquid standard)_______
What is the assigned/observed value of the daily check standard? _________
Is a 5-point calibration verification performed? Note date of last verification:
Alternatively, does the lab construct a linear regression, usinq 5 standards, to calculate
results? Note date of,last calibration curve constructed: *7/ J / l ——______________True values: Jo-pg/L mg/L •
Obtained values: pg/L Q mg/L
What program are samples analyzed on? da_
Are results reported in proper units? Check one: ^^qig/L mg/L
«--------ix—.—x__. i__x.-------x.__ ------and the compliance limit of 50 pg/L?
' ’here x=low standard cone.________
Are samples analyzed within 15 minutes of collection?_______________________________
IV. pH______________________________________________________________________
pH meter make and model:
Is the pH meter calibrated with at least 2 buffers per mfg's instructions each day of use?
Note buffers used: _________________________
Is the pH meter calibration checked with an additional buffer each day of use? Note check
buffer used:
Does the check buffer read within ±0.1 S.U. of the known value? Yes
Are the following items documented:_______________
Meter calibration?_____________________________
Check buffer reading?_________________________
Are samples analyzed within 15 minutes of collection?
Are sample results reported to 0.1 pH units?
Facility Name:
NPDES#:
Field Lab Certification #: ______________
Lab Contact: )C
II. General Laboratory (note any exceptions in section XI)_________________
Are instruments, meters, probes, photometric cells, etc, maintained in good condition?
Are standards, reagents and consumables used within manufacturer expiration dates?
[TRC gel standard is exempt.]
Yes No
Yes No
Yes No
Yes No
Yes Q No
IX.
YesX.
XI.Additional comments:
Electronic copies may be emailed to linda.chavis@ncdenr.qov.
Revision 04/20/2012
Please submit a copy of this completed form to the Laboratory Certification program at:
DWQ Lab Certification, Chemistry Lab, Courier# 52-01-01
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
No
No
No
No
No
No
No
No
No
No
Yes
Yes
Yes
Yes
ZJ Yes
Yes
ZlYes
r
No
No
No
No
No
No
No
•V. 1 Temperature
What instrument(s) is used to measure temperature? Check all that apply: pH meter
DO meter Conductivity meter Digital thermometer Glass thermometer_____
Is the instrument/thermometer calibration checked at least annually against a NIST
traceable or NIST certified thermometer?______________________________________
Are temperature corrections (even if zero) posted on the instrument/thermometer?______
Are samples measured in situ or on-site? [REQUIRED - there is no holding time for
temperature]_______________________
Are sample results reported in degrees C?_____________________________________
VI. Dissolved Oxygen__________________________________________________
DO meter make and model:_________________________________________________
Is the air calibration of the DO meter performed each day of use?___________________
Are the following items documented:__________________________________________
Meter calibration?_______________________________________________________
Are samples analyzed within 15 minutes of collection?____________________________
Are results reported in mg/L?________________________________________________
VII. Conductivity______________________________________________________
Conductivity meter make and model:__________________________________________
Is the meter calibrated daily according to the manufacturer’s instructions? Note standard
used (this is generally a one-point calibration):___________________________________
Is a daily check standard analyzed? Note value:_________________________________
Are the following items documented:__________________________________________
Meter calibration?_______________________________________________________
Are samples analyzed within 28 days of collection?_______________________________
Are results reported in pmhos/cm (some meters display equivalent pS/cm units)?_______
VIII. Settleable Residue_________________________________________________
Does the laboratory have an Imhoff Cone in good condition?_______________________
Is the sample settled for 1 hour?______________________________________________
Is the sample agitated after 45 minutes?_______________________________________
Are the following items documented:___________________________________________
Volume of sample analyzed? Note volume analyzed:____________________________
Date and time of sample analysis (settling start time)?___________________________
Time of agitation after 45 minutes of settling?_________________________________
Sample analysis completion (settling end time)?_______________________________
Are samples analyzed within 48 hours of collection?______________________________
Are results reported in ml/L?_________________________________________________
Was a paper trail (comparing contract lab and on-site data to DMR)
performed? If so, list months reviewed:
iFfollow-up by the Laboratory Certification program recommended?