HomeMy WebLinkAboutNCC223119_Annual Fee NOD Letter (2024 Fee)_20241016 ROY COOPER
Governor
MARY PENNY KELLEY s�..
se"-y
WILLIAM E.TOBY VINSON,JR NORTH CA MUNA
marrn D7ermr EnvUonmentolQuultfy
10/16/2024
G and J Development, LLC
Attn:Austin Gardner
2265 Benson Road
Angier, NC 27501-7452
Subject: Notice of Deficiency-Failure to Pay Annual Fee
Invoice No. NCC223119-2024
Dear Permittee:
You are receiving a Notice of Deficiency because the annual fee of$120 for coverage under NPDES General Stormwater Permit
NCG010000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4).The annual fee
was billed on 9/1/2024 and was due on 10/1/2024.The annual fee applies to the following construction site:
Edison Acres
SR1250-Tim Currin Rd, Upper Little River, NC
Harnett County
Certificate of Coverage No. NCC223119
NC Reference No. NCG01-2022-3119
If the project was closed out prior to the invoice due date, please request a Notice of Termination. Follow the instructions on the
NPDES Construction Program website(deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice due date,
please pay the permit fee using the Stormwater ePayment website(deq.nc.gov/SW-ePayments).
Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil
penalty assessment of up to$25,000 per day for failing to maintain permit coverage. If you have any questions or concerns,
please contact Kieu Tran at kieu.tran@deq.nc.gov.
Sincerely,
William E.Vinson,Jr., PE,CPESC,CPM
Interim Director
Division of Energy, Mineral,and Land Resources
D_E Q� M-h C-4—Dr•�a,—,n1 Cn.rm� -td Q�:Wl DM,i,rt Cnrry \lm-1 and Lund Rr,--
Sl2 N,tlh S,hb,-Sheet 11o12 Moil 5---C-1,, 0.ekgh.Nv O,Cu 1,-27e991612
+-� •---� 919.7079200