Loading...
HomeMy WebLinkAboutNCC223183_Annual Fee NOD Letter (2024 Fee)_20241016 ROY COOPER Governor MARY PENNY KELLEY s�.. se"-y WILLIAM E.TOBY VINSON,JR NORTH CAROLINA lnterkm Dhemcmr Enrlronmentol Quultfy 10/16/2024 City of Albemarle Attn: Michael Ferris PO Box 190 Albemarle, NC 28001 Subject: Notice of Deficiency-Failure to Pay Annual Fee Invoice No. NCC223183-2024 Dear Permittee: You are receiving a Notice of Deficiency because the annual fee of$120 for coverage under NPDES General Stormwater Permit NCG010000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4).The annual fee was billed on 9/1/2024 and was due on 10/1/2024.The annual fee applies to the following construction site: Sanitary Sewer Rehabilitation, Phase 3 West Main Street,South Second Street, Business 52,Albemarle, NC Stanly County Certificate of Coverage No. NCC223183 NC Reference No. NCG01-2022-3183 If the project was closed out prior to the invoice due date, please request a Notice of Termination. Follow the instructions on the NPDES Construction Program website(deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice due date, please pay the permit fee using the Stormwater ePayment website(deq.nc.gov/SW-ePayments). Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil penalty assessment of up to$25,000 per day for failing to maintain permit coverage. If you have any questions or concerns, please contact Kieu Tran at kieu.tran@deq.nc.gov. Sincerely, William E.Vinson,Jr., PE,CPESC,CPM Interim Director Division of Energy, Mineral,and Land Resources D_E Q� M-h C-4—Dr•�a,—,n1 Cn.r--td Q� Wl DM,i,r� Cnrry \lm-1 and Lund Rr,-- SU N.r1h SA,but,Sheet I I o12?0.11 5---C-1,, 0.ekgh.Nv O,Cut 1,-2ie99;612 +-� •---� 919.7079200