No preview available
HomeMy WebLinkAbout20221688 Ver 2_Approval Letter_20241007Docusign Envelope ID: E6FBDEFE-503C-49C4-95DE-0AB4AECAD905 ROY COOPER Governor MARY PENNY KELLEY Secretary RICHARD E. ROGERS, JR. Director NORTH CAROLINA Environmental Quality October 7, 2024 DWR # 20221688 v2 Burke County North Carolina Wildlife Resources Commission Attn: Jeff C. Ferguson 1751 Varsity Drive 1720 Mail Service Center Raleigh, NC 27699-1720 Delivered via email to: leff.ferguson@ncwildlife.org Subject: APPROVAL of CATAWBA BASIN RIPARIAN BUFFER IMPACTS WITH ADDITIONAL CONDITIONS North Bend Public Fishing Area Dear Mr. Ferguson: You have our approval for the impacts listed below for the purpose described in your application dated received by the Division of Water Resources (Division) August 13, 2024. These impacts are covered by the Catawba Buffer Rules and the conditions listed below. This Authorization Certificate replaces the Authorization issued on January 13, 2024. This Authorization Certificate is being issued pursuant to a modification request submitted on August 8, 2024, to acknowledge the final design of the public fishing area and account for resulting additional impacts to buffers. This Authorization Certificate does not relieve the permittee of the responsibility to obtain all other required Federal, State, or Local approvals before proceeding with the project, including those required by, but not limited to, Sediment and Erosion Control, Non -Discharge, Water Supply Watershed, and/or Stormwater regulations. The following impacts are hereby approved, provided that all of the Conditions listed below, and all of the conditions of the Catawba Buffer Rules are met. No other impacts are approved, including incidental impacts. [15A NCAC 02B .0611(b)(2)] DE NORTH CAROLINA fl .flm M of EnMrenmen4i W eury North Carolina Department of Environmental Quality I Division of Water Resources Asheville Regional Office 12090 U.S. Highway 70 I Swannanoa, North Carolina 28778 828.296.4500 Docusign Envelope ID: E6FBDEFE-503C-49C4-95DE-0AB4AECAD905 Type of Impact Amount Approved (units) Permanent Amount Approved (units) Temporary Buffers — Zone 1 S1 — Boat Ramp & Riprap Stabilization 1420 (square feet) 0 (square feet) S1 — Boat Ramp & Riprap Stabilization 0 (square feet) 936 (square feet) Buffers — Zone 2 S1 — Boat Ramp & Riprap Stabilization 757 (square feet) 0 (square feet) S1 — Boat Ramp & Riprap Stabilization 0 (square feet) 1032 (square feet) This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of this Authorization Certificate. If you change your project, you must notify the Division and you may be required to submit a new application package. If the property is sold, the new owner must be given a copy of this Authorization Certificate and is responsible for complying with all conditions. [15A NCAC 02B .0611(b)(2)] If you are unable to comply with any of the conditions below, you must notify the Asheville Regional Office within 24 hours (or the next business day if a weekend or holiday) from the time the permittee becomes aware of the circumstances. The permittee shall report to the Asheville Regional Office any noncompliance with the conditions of this Authorization Certificate and/or any violation of state regulated riparian buffer rules [15A NCAC 02B .0614]. Information shall be provided orally within 24 hours (or the next business day if a weekend or holiday) from the time the applicant became aware of the circumstances. Additional Conditions: 1. The Division has received a copy of a receipt dated January 26, 2023, from the NC Division of Mitigation Services (DMS) which satisfies the original mitigation requirements for this project as approved on January 13, 2023, and as specified below. Mitigation for additional impacts must be provided for the proposed impacts as specified in the table below. Mitigation must be provided for the proposed impacts as specified in the table below. The attached Compensatory Mitigation Responsibility Transfer Form (Form) shall be completed and provided to the Division prior to any impacts occurring. If the Mitigation Sponsor specified on the attached Form(s) for the proposed impacts changes after issuance of this Certificate, then the Permittee shall request a revised Compensatory Mitigation Responsibility Transfer Form from the Division. [15A NCAC 02B .0295; 15A NCAC 02B .0267(13) .0614(11)] NO oanaroma.t or Environment& a..1 North Carolina Department of Environmental Quality I Division of Water Resources Asheville Regional Office 12090 U.S. Highway 70 I Swannanoa, North Carolina 28778 828.296.4500 Docusign Envelope ID: E6FBDEFE-503C-49C4-95DE-0AB4AECAD905 Compensatory Mitigation Required River and Sub -basin Number Original Approved Mitigation Requirement Catawba Buffer 3704 square feet (credits) Catawba River, 03050101 Additional Mitigation Requirement resulting from project modifications Catawba Buffer 272 square feet (credits) Catawba River, 03050101 2. The Permittee shall replant the vegetation within temporarily disturbed areas located within Zone 2 (the outer edge of Zone 1 extending 20 feet landward as measured horizontally on a line perpendicular to the river) associated with this project. The Permittee shall also replant the vegetation within temporarily disturbed areas located within Zone 1 (the most landward limit of the top of bank extending landward a distance of 30 feet measured horizontally on a line perpendicular to the river) associated with this project in an "in kind" manner immediately following construction. (Example: Disturbed areas with pre-existing grassed lawns must be replanted with grass. Disturbed areas with pre-existing trees or woody vegetation must be replanted with trees and woody vegetation. Disturbed areas with pre-existing forest vegetation must be replanted with forest vegetation including at least two different native hardwood tree species at a density sufficient to provide 260 trees per acre at maturity. This density can usually be achieved by planting approximately 436 (10 x 10 spacing) to 681 (8 x 8 spacing) trees per acre.) Replanting of trees/shrubs/forest must be completed by the first subsequent planting season (November 1 through March 30). Note, if the tree plantings do not survive, they will need to be replaced such that the density is sufficient to provide 260 trees per acre at maturity. [15A NCAC 02H .0507(c), 15A NCAC 02H .0506(b)(3), 15A NCAC 02B .0611(b)(4), and 15A NCAC 02B .0614(10)(rr)(ii)] 3. Immediately post -construction, bare soils must be stabilized as quickly as possible by providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting. This ground cover is a temporary measure used to address erosion until buffer restoration can be accomplished. [15A NCAC 02H .0507(c), 15A NCAC 02H .0506(b)(3), 15A NCAC 02B .0611(b)(4), and 15A NCAC 02B .0614(10)(rr)(ii)] This approval and its conditions are final and binding unless contested. [G.S. 143-215.5] Upon the presentation of proper credentials, the Division may inspect the property. This Authorization Certificate can be contested as provided in Chapter 150B of the North Carolina General Statutes by filing a Petition for a Contested Case Hearing (Petition) with the North Carolina Office of Administrative Hearings (OAH) within sixty (60) calendar days. Requirements for filing a Petition are set forth in Chapter 150B of the North Carolina General Statutes and Title 26 of the North Carolina Administrative Code. Additional information regarding requirements for filing a Petition and Petition forms may be accessed at nttp://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000. A party filing a Petition must serve a copy of the Petition on: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 NO oanaroma.t or Environment& a..1 North Carolina Department of Environmental Quality I Division of Water Resources Asheville Regional Office 12090 U.S. Highway 70 I Swannanoa, North Carolina 28778 828.296.4500 Docusign Envelope ID: E6FBDEFE-503C-49C4-95DE-0AB4AECAD905 If the party filing the Petition is not the permittee, then the party must also serve the recipient of the Authorization Certificate in accordance with N.C.G.S 150B-23(a). This Authorization Certificate neither grants nor affirms any property right, license, or privilege in any lands or waters, or any right of use in any waters. This Authorization Certificate does not authorize any person to interfere with the riparian rights, littoral rights, or water use rights of any other person, nor does it create any prescriptive right or any right of priority regarding any usage of water. This Authorization Certificate shall not be interposed as a defense in any action respecting the determination of riparian or littoral rights or other rights to water use. No consumptive user is deemed by virtue of this Authorization Certificate to possess any prescriptive or other right of priority with respect to any other consumptive user. This Authorization shall expire five (5) years from the date of this letter. This letter completes the Division's review under the Catawba Basin Riparian Buffer Rules as described in 15A NCAC 02B .0614. Please contact Tyler Hickman at 828-296-4651 or Tvler.Hickman@deq.nc.gov if you have any questions or concerns. Electronic cc: Sincerely, ,—DocuSigned by: `-5C147F587AE9400... Andrew W. Moore, P.G. Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ-ARO Brandee Boggs, USACE Asheville Regulatory Field Office Andre Leslie, North Carolina Wildlife Resources Commission Kelly Williams, NCDEQ Division of Mitigation Services DWR 401 & Buffer Permitting Branch electronic file NO oanaroma.t orevironment& 0..1 Filename: 20241007 NorthBendv2.docx North Carolina Department of Environmental Quality I Division of Water Resources Asheville Regional Office 12090 U.S. Highway 70 I Swannanoa, North Carolina 28778 828.296.4500 Docusign Envelope ID: E6FBDEFE-503C-49C4-95DE-0AB4AECAD905 ROY COOPER Governor MARY PENNY KELLEY Secretary RICHARD E. ROGERS, JR. Director awwte- w,a,. NORTH CAROLINA Environmental Quality COMPENSATORY MITIGATION RESPONSIBILITY TRANSFER FORM October 7, 2024 Permittee: Jeff Ferguson, PE DWR Project #20221688 v2 Project Name: North Bend Public Fishing Area County: Burke The Division has received an acceptance letter from the NC Division of Mitigation Services (DMS) to satisfy the mitigation requirements set forth in the Buffer Authorization issued to Jeff Ferguson and the North Carolina Wildlife Resources Commission, dated October 7, 2024, as provided in the table below. Compensatory Mitigation Required River and Sub -basin Number Catawba Buffer 272 square feet (credits) Catawba River, 03050101 The Permittee must provide a copy of this form to DMS who will then sign the form to verify receipt of payment and the transfer of the mitigation responsibility. Once DMS has signed this form, it is the Permittee's responsibility to ensure that a signed copy of this form is submitted to the Division before conducting any of the authorized impacts. The Division of Mitigation Services verifies that the mitigation requirements (credits) shown above will be debited using approved released or advance credits, and for all stream or wetland credits is in accordance with the signed/approved In -Lieu Fee Instrument dated July 28, 2010. By signing below, DMS is accepting full responsibility for the identified mitigation. As a reminder to the Mitigation Provider, no more than 25 percent of the total mitigation required by Division can be met through preservation, unless requested and approved by the Division Director (15A NCAC 02B .0295). Signature Authority Name (print): Signature: Date: NORTH CAROLINA North Carolina Department of Environmental Quality I Division of Water Resources Asheville Regional Office 12090 U.S. Highway 70 I Swannanoa, North Carolina 28778 828.296.4500 Department of Environmental [Malty