HomeMy WebLinkAboutNCC243114_Site Plan or Location Map_20241009 PROJECT NARRATIVE PROJETHE PROPOSED SAWMILL 100 KV PROJECT IS LOCATED IN CALDWELL COUNTY,NORTH CAROLINA.THE PROJECT LOCATIONT INVOLVES ASSOCIATED LINE WORK REQUIRED TO REBUILD DUKE ENERGY'S EXISTING SAWMILL 100KV TRANSMISSION �� �:■■��� i�,�. LINE(LINE INDEX 4S4173)FROM RHODHISS TIE 1 TO A GOOGLE DATA CENTER(708 LYNHAVEN DR LENOIR,NC 28645).THE PROJECT IS LOCATED WITHIN DUKE ENERGY'S MOWED AND MAINTAINED RIGHT OF WAY.THE „� * �411Y MEeNipir ' PROPOSED OR E OF TOACCESS ARE R T7 ACRES. ORDER ACCOUNTENGFORAY CONSTRUCTION JACE � � =���■��� METHODS THEDINEED T ACCESS OTHER TOWERS 9.3 WITHINRE THE DUKE ENERGY RIGHT-OF-WAYFORAOTL AND/OR ADJACENT ���������� � ACCESS,AN .THE OTLDISTURBANCELENGTH THE AREA OF ILL 100KV TRANSMISSIONS HAS BEEN I NE DIS FOR A TOTAL HE PRIOR USE OF �_ 1 SITE103. I ACRES. ISE ONTOTALINR STRU T REE SAND THE L ROJE WILNOCH LINEG 11.15 MILES.THE PRIOR O OF THE ������� SITE IS TRANSMISSION INFRASTRUCTURE AND THE PROJECT WILL NOT CHANGE THE EXISTING LAND USE.PRIOR TO 1110,4 CONSTRUCTION,A DUKE ENERGY CONSTRUCTION LIMITS. CONTRACTOR WILL INSTALL EROSION TIOS ILL R MEASURES TO ��� DUKE ENCOMPASS B THE ANTICIPATED D CONSTRUCTION T OF ANT CONDITIONS A WILL BE RESTORED AND THE ���� ��� AREA WILL BE STABILIZED PRIOR TO COMPLETION OF CONSTRUCTION.AN AVOIDANCE AND MINIMIZATION OF DISTURBANCE APPROACH HAS BEEN INCORPORATED INTO THE DESIGN OF THE EROSION CONTROL MEASURES BY UTILIZING EXISTING ACCESS POINTS AND STABILIZED RIGHT-OF-WAY ACCESS ROUTES,WHENEVER POSSIBLE. EROSION CONTROL MEASURES ARE INDICATED HEREIN FOR PERMITTING USE ONLY BY NCDEQ.THE INITIAL PROJECT DURATION IS ANTICIPATED TO START IN SUMMER 2024 AND BE COMPLETED IN WINTER 2025. 10444 4 GENERAL NOTES r rt 1. APPROXIMATE STRUCTURE LOCATIONS WERE PROVIDED BY DUKE ENERGY LINE ENGINEER AND ARE FOR 44r040, ® REFERENCE ONLY.THESE DRAWINGS SHALL NOT BE USED FOR LINE CONSTRUCTION. Sr ENERGY 2. BASE DRAWINGS WERE CREATED BY GIS DATA OBTAINED FROM VARIOUS SOURCES.AERIAL PHOTOGRAPHY WAS OBTAINED FROM AUTOCAD CIVIL 3D SOFTWARE AND NC ONEMAP.ACTUAL FIELD CONDITIONS MAY VARY FRRESPONSIBILITY TOA CAROLI NAS 3. NOT ALL EXISTING UTILITIES ARE SHOWN.LOCATIONS SHOWN ARE APPROXIMATE. IT IS THE CONTRACTOR'S OTALLS TO ACCURATELY LOCATE,BOTH VERTICAL AND HORIZONTAL,EXISTING UTILITIES PRIOR TO THE START OF CONSTRUCTION.THE CONTRACTOR SHALL NOTIFY NC 811 PRIOR TO EXCAVATION.CONTRACTOR NORTH & SOUTH CAROLINA STATE tfAP SHALL NOTIFY DUKE ENERGY IMMEDIATELY IN THE EVENT OF ENCOUNTERING ANY UNDERGROUND OBSTACLE REQUIRING DEVIATION FROM THE PLAN.COST TO REPAIR DAMAGED UTILITIES SHALL BE BORNE BY THE - CONTRACTOR. SAWMILL 100 KV 4. ALL UTILITIES SHALL BE PROTECTED AND REMAIN ACTIVE UNLESS OTHERWISE NOTED.CONTRACTOR SHALL NOTT DISTURB UTILITY POLES,GUY WIRES,OR ANCHORS WITHOUT PERMISSION FROM DUKE ENERGY. 5. THE PROJECT IS LOCATED IN THE CATAWBA RIVER BASIN.THE PROJECT IS NOT SUBJECT TO STATE-REGULATED RIPARIAN BUFFER REQUIREMENTS. 7. SEE T FOR EROSION AND SEDIMENTATION APPR CONTROL G CE AND TINGIOF THESE SCHEDULE. CALDWELL COUNTY' NC 7. STREAMS EXTEND BEYOND THE RIGHT-OF-WAY.APPROPRIATE BRIDGING AND MATTING OF THESE FEATURES IS REQUIRED SHOULD THE CONTRACTOR USE ANY ACCESS ROUTES LOCATED OUTSIDE OF THE RIGHT-OF-WAY. 8. ANY ALTERNATE ACCESS PLANNED BY THE CONTRACTOR SHALL BE APPROVED BY DUKE ENERGY PERMITTING AND NCDEQ PRIOR TO USE. 9. CONSTRUCTION ENTRANCES ARE SHOWN FOR REFERENCE ONLY.HEAVY MATS MAYBE USED IN LIEU OF ROCK CONSTRUCTION ENTRANCES IF DEEMED SUFFICIENT BY A DUKE ENERGY REPRESENTATIVE. START END SHEET LIST: 10. WETLAND MATTING SHALL BE COMPOSITE MATS.NO LATTICE OR TWO-PLY MATTING SHALL BE USED IN JURISDICTIONAL WETLANDS AND/OR STREAMS. LATITUDE: N35°46'37" LATITUDE: N35°53'33" 11. NO OIL/FUEL-FILLED EQUIPMENT SHALL BE STORED OVERNIGHT WITHIN 125 FEET OF WETLANDS OR SURFACEWATER WITHOUT CONTAINMENT. TITLE SHEET SHEET PTL-01 12. SITE SHOULD BE"STORM READY"AT THE END OF EACH WORK DAY. LONGITUDE: W81°26'11" LONGITUDE: W81°32'31" EROSION AND SEDIMENT CONTROL NOTES SHEET PEN-01 13. SECURE WRITTEN ACCESS AGREEMENT IS REQUIRED FOR ALL 3RD PARTY ACCESS AND PRIVATE DRIVES NOT EROSION AND SEDIMENT CONTROL NOTES SHEET PEN-02 INCLUDED IN ROW DOCUMENTATION PRIOR TO BEGINNING CONSTRUCTION. EROSION AND SEDIMENT CONTROL NOTES SHEET PEN-03 14. ALL DISTURBED AREAS SHALL BE RESTORED TO SAME OR BETTER CONDITION.PERMANENT GROUND COVER SHALL BE USED FOR STABILIZATION. PROJECT LAYOUT SHEET SHEET PLA-01 15. CONTRACTOR TO PROVIDE LAYDOWN AREA. PROJECT LAYOUT SHEET SHEET PLA-02 16. MULCHING WILL BE UTILIZED WHERE PRACTICAL TO IMPEDE EROSION AND CREATE IMMEDIATE STABILIZATION PROJECT LAYOUT SHEET SHEET PLA-03 WHILE ALLOWING VEGETATION FROM SEEDING TO BE ESTABLISHED. ._,.c71 PROJECT LAYOUT SHEET SHEET PLA-04 PROJECT LAYOUT SHEET SHEET PLA-05 E',D , EROSION&SEDIMENT CONTROL PLAN SHEET P1 EROSION&SEDIMENT CONTROL PLAN SHEET P2 EROSION&SEDIMENT CONTROL PLAN SHEET P3 `^e, EROSION&SEDIMENT CONTROL PLAN SHEET P4 EROSION&SEDIMENT CONTROL PLAN SHEET P5 EROSION&SEDIMENT CONTROL PLAN SHEET P6 MIGRATORY BIRD HOTLINE \ EROSION&SEDIMENT CONTROL PLAN SHEET P7 STATE AND FEDERAL LAWS PROTECT ALL SPECIES OF NATIVE BIRDS FOUND THROUGHOUT THE DUKE \ EROSION&SEDIMENT CONTROL PLAN SHEET P8 ENERGY SERVICE AREA.INTERACTIONS OF BIRDS WITH GENERATING FACILITIES,TRANSMISSION AND EROSION&SEDIMENT CONTROL PLAN SHEET P9 DISTRIBUTIONS,SUBSTATIONS,OTHER STRUCTURES AND EQUIPMENT,AND OPERATIONS ARE EROSION&SEDIMENT CONTROL PLAN SHEET P10 POTENTIALLY HARMFUL OR FATAL TO BIRDS. DUKE ENERGY OPERATES THESE 24-HOUR MIGRATORY EROSION&SEDIMENT CONTROL PLAN SHEET P11 BIRD HOTLINES TO ASSIST EMPLOYEES AND CONTRACTORS WITH RELATED INCIDENTS THAT OCCUR - - EROSION&SEDIMENT CONTROL PLAN SHEET P12 DURING WORK ACTIVITIES. .1 - EROSION&SEDIMENT CONTROL PLAN SHEET P13 • 4 CAROLINAS:JAMES PARTAKEN 704.996.8671 � EROSION&SEDIMENT CONTROL PLAN SHEET P15 _*� EROSION&SEDIMENT CONTROL PLAN SHEET P15 r'') o• v` '^ Tii-1•.' r EROSION&SEDIMENT CONTROL PLAN SHEET P16 SPILL REPORTING HOTLINE f, ,r ti A1l'P,'ILL _ EROSION&SEDIMENT CONTROL PLAN SHEET P17 EROSION&SEDIMENT CONTROL PLAN SHEET P18 IN ORDER TO ENSURE THE PROTECTION OF HUMAN HEALTH AND THE ENVIRONMENT,FEDERAL AND •• _ • 1 GO KV EROSION&SEDIMENT CONTROL PLAN SHEET P19 STATE LAWS REQUIRE THAT CERTAIN TYPES OF SPILLS AND UNPERMITTED RELEASES BE REPORTED .1 • f ,•t - EROSION&SEDIMENT CONTROL PLAN SHEET P20 TO THE PROPER REGULATORY AGENCIES AS SOON AS POSSIBLE FOLLOWING IDENTIFICATION. - -�. .xx L S.;';'.'/7I L�S� EROSION&SEDIMENT CONTROL PLAN SHEET P21 << i.".:.1 Y EROSION&SEDIMENT CONTROL PLAN SHEET P22 IMMEDIATELY NOTIFY YOUR SUPERVISOR AND THE FIELD ENVIRONMENTAUEHS PROFESSIONAL "'F .; 4'1i -f:.' v J� Y ''�' EROSION&SEDIMENT CONTROL PLAN SHEET P23 WHEN A SPILL OR UNPERMITTED RELEASE IS DISCOVERED.IF YOU ARE UNABLE TO REACH THE FIELD �+- f ; ' EROSION&SEDIMENT CONTROL PLAN SHEET P24 ENVIRONMENTAUEHS PROFESSIONAL,CONTACT ONE OF THE DUKE ENERGY SPILL REPORTING ,r,}} - + 1 \ -� I:;K:;�i 3.`JIi EROSION&SEDIMENT CONTROL PLAN SHEET P25 HOTLINES AT: •i%, v. t.�`e "" • .A Jr,1 i•;' H / ':� \�'•�'nC �r • • 1,K� / - e - EROSION AND SEDIMENT CONTROL DETAILS SHEET PED-01 CAROLINAS:800.527.3853 •;� {"](�` • �' /// s 'S EROSION AND SEDIMENT CONTROL DETAILS SHEET PED-02 if *. V - \ .� + _ EROSION AND SEDIMENT CONTROL DETAILS SHEET PED-03 CONTACTS •r " I••7, ic 7, t! ' ", • '�1+ - `� EROSION AND SEDIMENT CONTROL DETAILS SHEET PED-04 OWNER: ENGINEER: RESPONSIBLE FOR MAINTENANCE: ;11'_ �.1-• -.. _ - ' DUKE ENERGY CAROLINAS HDR ENGINEERING INC. ERIC SHOOK �. . ( .J. _ JEFF GOTO,PE CADEN GIGLIOTTI,PE PH:(336)416-9168 • RHODHISS 525 SOUTH TRYON ST. 440 S.CHURCH ST. eric.shook@duke-energy.com LAKE y f W CHARLOTTE,NC 28202 SUITE 1200 ,{ 4 PH:(704)382-6383 CHARLOTTE,NC 28202 __ FAX:(704)382-6542 caden.gigliotti@hdrinc.com - - - t - Y jeff.goto@duke-energy.com (n4 z 0 U) VICINITY MAP co SCALE: 1"=6000' U) H e 81 811 . . CONTRACTOR SHALL NOTIFY "NORTH CAROLINA ONE CALL' J (811) OR (1-800-632-4949) AT LEAST 48 HOURS PRIOR TO _IBEGINNING CONSTRUCTION OR EXCAVATION TO HAVE EXISTING R11 RR ANY L UTILITIES THHATTPROVIDEDR THEIR RCAN LOCASHALLOTOR SERVICES NTACT CAL NC811!0••GI DISCREPINDEPENAENT OR NCIES ESTO THE ENGINEELINA ONE CALI2.R IMMEDIATELY. REPORT ANY Q U) TITLE DUKE a+�N TAO°•''. e ' SI /•• SAWMILL TRANSMISSION LINE HDR Engineering Inc. ` ENERGY SEAL _ or the Cnrolinns ENERGY® TITLE SHEET10 889 F-a 440 S CHURCH ST.STE 1200 AUG 2024 ISSUED FOR PERMITTING MAB CPG BA c {/lQc1 9W 3 Charlotte.NC 28202-2075 CAROLINAS 'So t� •NGItl Gv� 704.338.6700 526 SOUTH CHURCH STREET SEPT 2023 90%FOR CLIENT REVIEW MAB CPG BA �,y p"""""'""GV�`� CHARLOTTE N.C.28202 UNE INDEX: DRAWING SHEET wNETERr r •`` TELEPHONE NO. REV FILE NO. DATE REVISION DRAWN CHECKED APPROVED a (704)382-2741 4S4173 10337914 PTL-01