HomeMy WebLinkAboutNCS000429_MS4 Annual Report (2023-24 FY)_20241007 (3) STABILUS STORMWATER PERMIT REQUIREMENT USSE
SPPP TIER RESPONSE LOG
Outfall No. 1 Tier one Response Documentation for Stabilus-Gastonia,NC
•utfall No. 1 Tulip Drive Area (North Side)
Maintenance Maintenance
Sample Period Benchmark Benchmark Exceeded Tier Status and Person(s) Required? Completed Report
Requirement Sample Date Limits Red Text Date Conducting Inspection Results/Comments Updated Update by:
Inspection
Actions Taken (Date)
Tier III S.Parris/ T. Outfall service area inspected.Conditions found unchanged.No Collectable/
Jul-23 No Sample Taken None required 8/3/2023 T.Ledford
8/4/2021 Ledford measureable rain event occurred during this period.
Aug-23 8/3/2023 Cu:0.0053mg/L Tier III S.Parris/ T. Outfall service area inspected.Conditions found unchanged. None required 8/29/2023 T.Ledford
Zn:0.066mg/L 8/4/2021 Ledford
Tier III S.Parris/ T. Outfall service area inspected.Conditions found unchanged.No Collectable/
Sep-23 No Sample Taken None required 9/14/2023 T.Ledford
8/4/2021 Ledford measureable rain event occurred during this period.
Oct-23 No Sample Taken Tier III S.Parris/ T. Outfall service area inspected.Conditions found unchanged.No Collectable/ None required 10/25/2023 T.Ledford
8/4/2021 Ledford measureable rain event occurred during this period.
Tier III S.Parris/ T. Outfall service area inspected.Conditions found unchanged.No Collectable/
Nov-23 No Sample Taken None required 11/18/2023 T.Ledford
8/4/2021 Ledford measureable rain event occurred during this period.
Dec-23 No Sample Taken Tier III S.Parris/ T. Outfall service area inspected.Conditions found unchanged.No Collectable/ None required 12/20/2023 T.Ledford
8/4/2021 Ledford measureable rain event occurred during this period.
Cu:0.0030mg/L Out of Tier S.Parris T.
Jan-24 1/9/2024 Outfall service area inspected.Conditions found unchanged. None required 1/9/2024 T.Ledford
7n:0.048mg/L Status Ledford
Out of Tier S.Parris/ T. Outfall service area inspected.Conditions found unchanged.No Collectable/
Feb-24 No Sample Taken None required 2/15/2024 P.Chapman
Status Ledford measureable rain event occurred during this period.
Out of Tier S.Parris/ T. Outfall service area inspected.Conditions found unchanged.No Collectable/
Mar-24 No Sample Taken None required 3/17/2024 P.Chapman
Status Ledford measureable rain event occurred during this period.
Out of Tier S.Parris/ T. Outfall service area inspected.Conditions found unchanged.No Collectable/
Apr-24 No Sample Taken None required 4/12/2024 P.Chapman
Status Ledford measureable rain event occurred during this period.
Cu:0.0081mg/L Out of Tier S.Parris/ T.
May-24 5/15/2024 Outfall service area inspected.Conditions found unchanged. None required 5/31/2024 P.Chapman
Zn:0.093mg/L Status Ledford
Out of Tier S.Parris/ T.
Jun-24 No Sample Taken Outfall service area inspected.Conditions found unchanged. None required 6/18/2024 P.Chapman
Status Ledford
STABILUS STORM WATER PERMIT REQUIREMENTS USSE
SPPP TIER RESPONSE LOG
Stabilus-Gastonia, NC
Tier One Response Documentation for Outfall # 2
Maintenance Maintenance
Sample Period Benchmark Benchmark Exceeded Tier Status Person(s) Required? Completed Report
Requirement Sample Date Limits Red Text and Date Conducting Inspection Results/Comments Updated Update by:
Inspection Actions
(Date)
Taken
Jul,Aug 2023 8/3/2023 In Compliance None S. Parris/ Outfall service area inspected. Conditions found None 8/29/2023 T.Ledford
T. Ledford unchanged. required
S.Parris/ Outfall service area inspected.Conditions found unchanged.No None
Sep-23 No Sample Taken None 9/14/2023 T.Ledford
T. Ledford Collectable/measureable rain event occurred during this period. required
S.Parris/ Outfall service area inspected.Conditions found unchanged.No None
Oct-23 No Sample Taken None T. Ledford Collectable/measureable rain event occurred during this period. required 10/25/2023 T.Ledford
S.Parris/ Outfall service area inspected.Conditions found unchanged.No None
Nov-23 No Sample Taken None 11/18/2023 T.Ledford
T. Ledford Collectable/measureable rain event occurred during this period. required
S.Parris/ Outfall service area inspected.Conditions found unchanged.No None
Dec-23 No Sample Taken None 12/20/2023 T.Ledford
T. Ledford Collectable/measureable rain event occurred during this period. required
Cu:0.0082mg/L S.Parris/ None
Jan-24 1/9/2024 None Outfall service area inspected.Conditions found unchanged. 1/9/2024 T.Ledford
Zn:0.020mg/L T. Ledford required
Outfall service area inspected.Conditions found unchanged.
Out of Tier S.Parris/ None
Feb-24 No Sample Taken Status T. Ledford No Collectable/measureable rain event occurred during required 2/15/2024 P.Chapman
this period.
Outfall service area inspected.Conditions found unchanged.
Out of Tier S.Parris/ None
Mar-24 No Sample Taken Status T. Ledford No Collectable/measureable rain event occurred during required 3/17/2024 P.Chapman
this period.
Outfall service area inspected.Conditions found unchanged.
Out of Tier S.Parris/ None
Apr-24 No Sample Taken Status T. Ledford No Collectable/measureable rain event occurred during required 4/12/2024 P.Chapman
this period.
Cu:0.0079mg/L S.Parris/ None
May-24 5/15/2024 None Outfall service area inspected.Conditions found unchanged. 5/31/2024 P.Chapman
Zn:0.067mg/L T. Ledford required
Out of Tier S.Parris/ None
Jun-24 No Sample Taken Outfall service area inspected.Conditions found unchanged. 6/18/2024 P.Chapman
Status T. Ledford required
STABILUS STORMWATER PERMIT REQUIREMENTS USSE
SPPP TIER RESPONSE LOG
Stabilus-Gastonia, NC
Tier One Response Documentation for Outfall # 2
Maintenance Maintenance
Benchmark Person(s) Required? Completed
Sample Period Benchmark Tier Status Report
Exceeded Conducting Inspection Results/Comments Update by:
Requirement Sample Date and Date Updated
Limits Red Text Inspection Actions Taken (Date)
Jul,Aug 2023 8/3/2023 In Compliance None S. Parris I Outfall service area inspected.Conditions found None required 8/29/2023 T.Ledford
T.Ledford unchanged.
Tier Ill S.Parris/ Outfall service area inspected.Conditions found unchanged.No
Sep-23 No Sample Taken None required 9/14/2023 T.Ledford
8/4/2021 T.Ledford Collectable/measureable rain event occurred during this period.
Tier Ill S.Parris/ Outfall service area inspected.Conditions found unchanged.No
Oct-23 No Sample Taken None required 10/25/2023 T.Ledford
8/4/2021 T.Ledford Collectable/measureable rain event occurred during this period.
Tier III S.Parris/ Outfall service area inspected.Conditions found unchanged.No
Nov-23 No Sample Taken None required 11/18/2023 T.Ledford
8/4/2021 T.Ledford Collectable/measureable rain event occurred during this period.
Tier Ill S.Parris/ Outfall service area inspected.Conditions found unchanged.No
Dec-23 No Sample Taken None required 12/20/2023 T.Ledford
8/4/2021 T.Ledford Collectable/measureable rain event occurred during this period.
Jan-24 1/9/2024 Cu:0.0031mg/L Out of Tier S.Parris/ Outfall service area inspected.Conditions found unchanged. None required 1/9/2024 T.Ledford
Zn:0.056mg/L Status T.Ledford
Out of Tier S.Parris/ Outfall service area inspected.Conditions found unchanged.No
Feb-24 No Sample Taken None required 2/15/2024 P.Chapman
Status T.Ledford Collectable/measureable rain event occurred during this period.
Out of Tier S.Parris/ Outfall service area inspected.Conditions found unchanged.No
Mar-24 No Sample Taken None required 3/17/2024 P.Chapman
Status T.Ledford Collectable/measureable rain event occurred during this period.
Out of Tier S.Parris/ Outfall service area inspected.Conditions found unchanged.No
Apr-24 No Sample Taken None required 4/12/2024 P.Chapman
Status T.Ledford Collectable/measureable rain event occurred during this period.
May-24 1/9/2024 Cu:0.0052mg/L Out of Tier S.Parris/ Outfall service area inspected.Conditions found unchanged. None required 5/31/2024 P.Chapman
Zn:0.057mg/L Status T.Ledford
Out of Tier S.Parris/ Outfall service area inspected.Conditions found
Jun-24 No Sample Taken None required 6/18/2024 P.Chapman
Status T.Ledford unchanged.