HomeMy WebLinkAbout960063_Inspection_20240930Division of Water Resources
Facility Number O Division of Soil and Water Conservation
O Other Agency
Type of Visit: ID Compliance Inspection 0 Operation Review O Structure Evaluation O Technical Assistance
Reason for Visit: ® Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access
Date of Visit: Arrival Time: P7�_76—1 Departure Time: County: l Region: "421
Farm Name: Owner 7'��]y/r/y a— Owner Email:
Owner Name: /'?C(S�btitltidr Xj Phone:
Mailing Address:
Facility Contact:/�.lri� /lam
Onsite Representative:
Integrator:
Phone:
Certified Operator: 4��, ¢�j_�y�i.en Certification Number:
Back-up Operator:
Location of Farm:
Swine
Wean to Finish
Wean to Feeder
Feeder to Finish
Farrow to Wean
Farrow to Feedei
Farrow to Finish
Boars
Other
Certification Number:
Latitude:
Design Current Design Current
Capacity Pop. Wet Poultry Capacity Pop.
Layer
Von -Laser
Design Current
Dry Poultry Capacity Pop.
Layers
Non -Layers
Pallets
Turkeys
Turkey Poults
Other
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (If yes, notify D WR)
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
Longitude:
Design Current
Cattle Capacity Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
❑ Yes U(No ❑ NA ❑ NE
❑ Yes ❑ No ❑ NA
❑ Yes ❑ No ❑ NA
❑ Yes o ❑ NA
❑ Yes No ❑ NA
❑ Yes No ❑ NA
❑ NE
❑ NE
❑ NE
❑ NE
❑ NE
Page I of 511212020 Continued
Facili Number: jDate of Ins ection:
Waste Collection & Treatment �
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes U No
a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No
Structure..1 Structure 2
Identifier:
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in):
❑ NA ❑ NE
❑ NA ❑ NE
Structure 3 Structure 4 Structure 5 Structure 6
5. Are there any immediate threats to the integrity of any of the structures observed?
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
waste management or closure plan?
❑ Yes No ❑ NA ❑ NE
[—]Yes dNo ❑ NA ❑ NE
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes � o ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes [ f�No ❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes [No ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
[:]Yes No
❑ NA
❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below.
❑ Yes No
❑ NA
❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
❑ Yes VNo
❑ NA
❑ NE
15. Does the receiving crop and/or land application site need improvement?
❑ Yes No
❑ NA
❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
❑Yes No
❑ NA
❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes [� No
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes f No
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes No
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes No
❑ NA
❑ NE
the appropriate box.
❑ WUP ❑Checklists ❑ Design [:]Maps [:]Lease Agreements Dotter:
21. Does record keeping need improvement? If yes, check the appropriate box below. [:]Yes No ❑ NA ❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis [:]Soil Analysis ❑ Waste Transfers ❑ Weather Code
❑ Rainfall [:]Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspections ❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE
Page 2 of 511212020 Condnaed
Facili Number: - 47 3 jDate of Inspection: -3 —.-7,54
24. Did the facility fail to calibrate waste application equipment as required by the permit?
❑ Yes
No ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check
❑ Yes
No ❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge?
❑ Yes
o ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification?
❑ Yes
No ❑ NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
❑ Yes
No ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
❑ Yes
[ No ❑ NA ❑ NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
❑ Yes
1]� No ❑ NA ❑ NE
[;No
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Yes
❑ NA ❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
❑ Yes
o ❑ NA ❑ NE
33. Did the Reviewer/inspector fail to discuss review/inspection with an on -site representative?
❑Yes
[�No ❑ NA ❑ NE
34. Does the facility require a follow-up visit by the same agency?
❑ Yes
�No ❑ NA ❑ NE
Comments (refer to question 4)i Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations (use additional pages as necessary).
�'iW-2y = o, 43 76%_-s
Reviewer/Inspector Name:
Reviewer/Inspector Signature:
Page 3 of 3
Phone:
Date:
511212020