HomeMy WebLinkAboutSW5240202_Supplemental Info Review_20240924 Action History (UTC-05:00)Eastern Time(US&Canada)
Submit by Anonymous User 9/24/2024 11:11:21 AM(Supplemental Submittal)
Accept by bethany.georgoulias 9/30/2024 2:56:04 PM (Supplemental Info Submittal)
• The task was assigned to DEMLR Post-Construction Team 9/24/2024 11:11:22 AM
• bethany.georgoulias reassigned the task to bethany.georgoulias 9/30/2024 9:17:14 AM
=DEQ •
Submittal from 9/24/2024
Permit Information:
Please provide specific permit details below.
................................................................................................................................................................................................................................................................................................................................................................................................
What Type of Permit? Choose one:
* NPDES Industrial or MS4 Permit
State Stormwater(Post-Construction)Permit
Other
Permit Number* SW5240202
Begins with"SW","NCG",or"NCS"
What DEQ Office is Reviewer:Please correct if misidentified,close this review form,and reassign task to the appropriate contact.
the Primary Contact? Central Office
*
Washington Regional Office(Attn: Carl Dunn)
Wilmington Regional Office(Attn:Christine Hall)
................................................................................................................................................................................................................................................................................................................................................................................................
Project Name* Wrenn Villas
Owner/Operator* AIRS Wrenn Estates, LLC
County: Franklin
Submitter Name:* Hampton Smith
Who is submitting this information?
E-mail Address:* Hampton@canterburyconstruction.co
Phone Number* 9193335640
Additional E-mail for (Optional)
Submittal
Confirmation:
State Stormwater (Post-Construction) Information Uploads
Choose file type and upload attachment(Reviewer may remove unnecessary submittals)
File Type* Plansheet-Other
File Upload Click the upload button,or drag and drop files to attach
Wrenn Farms-Response to comments received
140.8KB
20240829.pdf
Wrenn Villas-Response to comments received
140.29KB
20240829.pdf
Wrenn Farms CD-Signed.pdf 66.44MB
Wrenn Villas CD-Signed.pdf 60.77MB
Only PDF files are accepted.
Is this project funded No
with ARPA grant Yes
funds?*
Uploads contain NO
Confidential YES
Information* NOTE:The following information cannot be claimed as confidential:the name and address of any permit applicant
or permittee,permit applications,permits,effluent data,information required by NPDES application forms provided
by the Director inclusive of all forms and attachments[Ref.40 CFR 122.7(b)and(c)].
Notes about the attachments:
* By checking the box and signing box below, I certify that:
• I have given true,accurate,and complete information on this form;
• I agree that submission of this Supplemental Information form is a"transaction"subject to Chapter 66,Article 40 of the
NC General Statutes(the"Uniform Electronic Transactions Act)
• I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes
(the"Uniform Electronic Transactions Act');
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written
signature;AND
d I intend to electronically sign and submit the Supplemental Information Upload form.
Full Name:* Hampton Smith
Signature:
Date Submitted: 09/24/2024
Initial Review
Verify Permit No.* IMPORTANT:REVIEWER SHOULD VERIFY and revise here if necessary.
SW5240202
Who needs a Copy?* Reviewer selections will only be required for offices checked here.
Central Office Staff
Regional Office Stormwater Contact
State Stormwater RO Staff
No Copy Needed
Central Office Reviewer:*
Notifies CO Staff with Email
Brianna Holland
Any Comments or Submitter uploaded everything as'Plansheet-Other', but(since only 4 documents
Added Info for CO were uploaded)I accepted it and will rename the two'Response to Comments'
Staff Reviewer? documents.
Review Date* 09/30/2024