Loading...
HomeMy WebLinkAboutNCC215416_NOT Closeout Documents_20240917 ROY COOPER 44 Governor ELIZABETH S.BISER Secretary - WILLIAM E.TOBY VINSON,JR � .eL`eiVed Interim Director " NORTH-C [tOL161A nv naientdlsQuti(i{ c�� 1 3 TO Utilities Erosion and Sediment Control Inspection Report public Dear Sir or Madam: Attached is a copy of the inspection report prepared following an on-site inspection of the subject site. This report provides you with information concerning the status of the site as it relates to compliance with the North Carolina Sedimentation Pollution Control Act of 1973. Please review this report carefully as it may contain corrective actions needed or comments that will assist you in meeting the required performance standards of the Act. - It is our desire that any and all possible problems be discussed and resolved at the earliest possible time. To facilitate this effort, if you have any questions, please contact the inspector named on the attached inspection report at the address shown or by dialing 704-235-2100 and asking for the inspector. Sincerely e—DocuSigned by: Jtill `-4A35D6B02B02438... Jerry W. Eplin, PE Regional Engineer Land Quality Section Mooresville Regional Office Enclosure: Inspection Report North Carolina Department of Environmental Quality!Division of Energy,Mineral and Land Resources Mooresville Regional Office!610 East Center Avenue,Suite 301 Mooresville,North Carolina 28115 704-235-2100 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301, Mooresville,NC 28115 (704)663-1699 County: Catawba Project: Murray Basin Sanitary Sewer Project River basin: Catawba Person financially responsible:City of Hickory-Warren Wood,City Manager Project#: CATAW-2021-001 Address: 76 North Center Street,PO Box 398,Hickory,NC 28601 1. Project Location: House Road,Hickory Pictures: No 2. Weather and soil conditions: Sunny,workable soils. Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NI'l)ES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Title: Inspection report: Sent Report Date given/sent: September 09,2024 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCGOI)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCGO1-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: William Baummer Others present: Date of inspection: September 04,2024 Time arriving on site: 09:45 AM Time leaving site: 10:00 AM cc: QiCeived SEP 13 2024 Public Utilities