SUBJECT: Authorization to Construct
A to C No. 041246A04
Lincoln High School
West Lincoln High School WWTP
NPDES Permit No. NCO041246
Dear Mr. Ramsey:
A letter of request for an Authorization to Construct was received September 4, 2024, by
the Division of Water Resources (Division). With additional information received on September
17, 2024, final plans and specifications for the subject project have been reviewed and found to be
satisfactory. Authorization is hereby granted for the construction of modifications to the existing
0.014 MGD, West Lincoln High School WWTP, with discharge of treated wastewater into the
Indian Creek, in the Catawba River Basin.
This authorization results in no increase in design or permitted capacity and is awarded for
the construction of the following specific modifications:
• One (1) 16,000 gallons Flow Equalization Tank with Two (2) 65 GPM @ 14.6 ft TDH
submersible pumps.
• One (1) 10,000 GPD PL-525 filter for the existing first septic tank.
• Two (2) 53 GPM @ 70.2 ft TDH submersible pumps to replace existing dosing tank
pumps.
• All necessary piping and controls (if applicable); in conformity with the project plans,
specifications, and other supporting documentation comprising the ATC Permit
Application package submitted to the Department of Environmental Quality.
This ATC is issued in accordance with Part III, Paragraph A of NPDES Permit No.
NCO041246 issued effective July 1, 2021 and shall be subject to revocation unless the wastewater
treatment facilities are constructed in accordance with the conditions and limitations specified in
Permit No. NC0041246.
QE North CamalataDeputantofElw �,na,rnt Q1�y I Dnai mofWdaResomes
�� 512North Salisbm7Street 1 16 11 Mul Savice Cade I R;lhi North Cmalza27699.1611
4NORT�HCNORTHCAROLINA */ 919.7079000
Nweo
Uepeltmem m Environmental Qual\
Docusign Envelope ID: 091184FD-BEFO-457C-A198-CF2C76566A77
111VV11V1V L11�"%J1 VL 1Y1C1111LV11U11VV
September 20, 2024.
Page 2 of 4
It is the Owner's responsibility to ensure that the as -constructed project meets the
requirements of all applicable regulations and statutes, the ATC Permit Application package, and all
the requirements contained herein. Failure to comply may result in penalties in accordance with
North Carolina General Statute § 143-215.6A through § 143-215.6C.
The sludge generated from these treatment facilities must be disposed of in accordance with
G.S. 143-215.1 and in a manner approved by the Division.
In the event the facilities fail to perform satisfactorily, including the creation of nuisance
conditions, the Permittee shall take immediate corrective action, including those as may be required
by the Division, such as the construction of additional or replacement wastewater treatment or
disposal facilities.
The Mooresville Regional Office, telephone number 704-235-2100, shall be notified at
least forty-eight (48) hours in advance of operation of the installed facilities so that an on -site
inspection can be made. Such notification to the regional supervisor shall be made during the
normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State
Holidays.
Upon completion of construction and prior to operation of this permitted facility, a
certification must be received from a Professional Engineer certifying that the permitted facility has
been installed in accordance with the NPDES Permit and the ATC Permit Application package.
Mail the Certification to: Division of Water Resources, WQ Permitting — NPDES, 1617 Mail Service
Center, Raleigh, NC 27699-1617. The Engineer's Certification form is included with this submittal.
Upon classification of the facility by the Certification Commission, the Permittee shall
employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the
wastewater treatment facilities. The operator must hold a certificate of the type and grade at least
equivalent to or greater than the classification assigned to the wastewater treatment facilities by the
Certification Commission.
The Permittee must also employ a certified back-up operator of the appropriate type and
grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each
Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding weekends
and holidays, must properly manage the facility, must document daily operation and maintenance of
the facility, and must comply with all other conditions of T15A:8G.0202. All ORC site inspections
must be documented in a log to be on -site and available for review at all times.
A copy of the project plans and specifications shall be maintained on file by the
Permittee for the life of the facility.
During the construction of the proposed additions/modifications, the Permittee shall continue
to properly maintain and operate the existing wastewater treatment facilities at all times, and in such
a manner, as necessary to comply with the effluent limits specified in the NPDES Permit.
Docusign Envelope ID: 091184FD-BEFO-457C-A198-CF2C76566A77
111VV11V1V L11�"%J1 V11Y1C1111�V11U11VV
September 20, 2024.
Page 3 of 4
You are reminded that it is mandatory for the project to be constructed in accordance with
the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina
Dam Safety Act. In addition, the specifications must clearly state what the contractor's
responsibilities shall be in compliance with these Acts.
Prior to entering into any contract(s) for construction, the recipient must have obtained all
applicable permits from the State.
The issuance of this ATC does not preclude the Permittee from complying with any and all
statutes, rules, regulations, or ordinances which may be imposed by other government agencies
(local, state, and federal) which have jurisdiction.
If you have any questions or need additional information, please contact Ori Tuvia at
telephone number (704) 235-2190 or by email at Ori.Tuvia@deq.nc.gov.
Sincerely,
DOCUSignned by:
(...1e—
7900A4FBFCA14FD...
by Nick Coco, PE
Environmental Program Supervisor
Division of Water Resources
cc: NPDES Files
Lincoln County Health
e-copy: Gary MacConnell, PE, MacConnell & Associates, PC.
Email: gary@macconnellandassoc.com
DWR Mooresville Regional Office, Water Quality Programs
Docusign Envelope ID: 091184FD-BEFO-457C-A198-CF2C76566A77
Lincoln High Schools
West Lincoln High School WWTP
041246A04
Issued September 20, 2024
NCO041246
Engineer's Certification
❑ Final Engineering Certification / ❑ Partial Engineering Certification (mark all that apply)
I, , as a duly registered Professional Engineer in the
State of North Carolina, having been authorized to observe (periodically/weekly/full time) the
construction of the modifications and improvements to the West Lincoln High School Wastewater
Treatment Plant, located in Lincoln County, hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the following construction of :
❑ One (1) 16,000 gallons Flow Equalization Tank with Two (2) 65 GPM @ 14.6 ft TDH submersible
PUMPS.
❑ One (1) 10,000 GPD PL-525 filter for the existing first septic tank.
❑ Two (2) 53 GPM @ 70.2 ft TDH submersible pumps to replace existing dosing tank pumps.
❑ All necessary piping and controls (if applicable); in conformity with the project plans, specifications,
and other supporting documentation comprising the ATC Permit Application package submitted to the
Department of Environmental Quality.
I certify that the construction of the above referenced project was observed to be built within
substantia compliance, intent and in conformity with all applicable regulations and statutes and the
project plans, specifications, and other supporting documentation comprising the Authorization to
Construct Permit Application package.
Signature
Date
Registration No.
Mail this Certification to: Attn: Ori Tuvia