Loading...
HomeMy WebLinkAboutNC0021865_Application (ATC) Plans_20240919 (3)a_ LO O N O) O O) O vi N T N O N J T m Q) z O Q_ +: N N r fN N O U (_ N O PO N O N O) O) O Ld J T m N O (N 41 O J 3 4% N N L (N N O U U N O 0 c .21 U) 0 0 00 / 01 0 O O 00 / U O a a) U) �o E co �Z mw.. co O¢ o_ �w a_ I J PO OUJ M I N 0_ � J O r UJ J X FOR THE COLUMBUS COUNTY, NORTH CAROLINA COUNTY LOCATION MAP NTS Project No: SRP-W-ARP 03 TOWN COUNCIL Mayor - Phillip C. Britt Mayor Pro-Tem - Tony C. Jordan Council Member - Colene K. Faulk Council Member - Shannon M. Britt Council Member - Rashad A. Roberts Council Member - Danny W. Clewis, SR. Town Manager - J. Cason Robinson Public Utilities Director - Steven Price FINAL DRAWING - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION Cover Sheet.dwg: Layout=Cover Sheet o M � a w �J � F- O = N T Z It O �a mi cm o E a- E 7 a U c N O N N CM rC V)._ 0 ao No+ N L� 0 0 00 ,, ,p o+ rn c CY) 'C) 0 o� J O 0 00 m N 4. >E 0 V)> 0 N d J E o+ E N � N 0 a ' rD V) r� N •� C1 U � N 0° �3 N N O N c O 3 N 0 p` I O O m N I u O f/l rLL. iLLJ J X LEGEND —x—x—x—x— EXISTING CHAINLINK FENCE NEW WATER MAIN — — EXISTING R W OR PROPERTY BOUNDARY / AO NEW COMBINATION AIR/VAC RELEASE VALVE — — — — — — — NEW UTILITY EASEMENT NEW SANITARY SEWER AND MANHOLE N NEW GATE VALVE — — — — — — — NEW UTILITY EASEMENTS NEW FIRE HYDRANT ASSEMBLY — — — — — — — NEW TEMPORARY UTILITY EASEMENT 2" FM EXISTING FORCE MAIN NEW PLUG �+4 NEW TEE 0c0 EXISTING SEWER CLEANOUT MH � NEW 90' BEND OO EXISTING SANITARY SEWER AND MANHOLE x+_ NEW 45' BEND EXISTING WOODS LINE NEW LIMIT OF CLEARING BUILDING EXISTING BUILDING EXISTING ASPHALT ROAD/DRIVE EXISTING GRAVEL DRIVE °O°o TEMPORARY 669opp� CONSTRUCTION ENTRANCE Vs(j0zUR_011kVR1U* EXISTING RIPRAP ---------------- EXISTING DRAINAGE CULVERT 14" W EXISTING WATER MAIN 2" G EXISTING NATURAL GAS PIPELINE EXISTING DITCH/STREAM FLOWLINE FIRE H YD. EXISTING FIRE HYDRANT MWV EXISTING WATER VALVE WM o EXISTING WATER METER LP EXISTING LIGHT POLE P � EXISTING POWER POLE DTP EXISTING TELEPHONE POLE GUYWIRE C EXISTING GUYWIRE TEL. PED. 0 EXISTING TELEPHONE PEDESTAL EIP O EXISTING IRON PIN R/W MON. El EXISTING RIGHT—OF—WAY MONUMENT NAIL SURVEY TRAVERSE NAIL BORE EXISTING BORE LOCATION F.O. MARKER EXISTING FIBER—OPTIC MARKER UFO EXISTING UNDERGROUND FIBER OPTIC CABLE -O—°_=::::�O—°— SILT FENCE AND OUTLET TD 10 TD 10 TEMPORARY DIVERSION SWALE i0000000XX ENKA MAT SLOPE/SWALE PROTECTION & AND ® AT < LESS THAN <= LESS THAN OR EQUAL TO = EQUAL(S) > GREATER THAN f PLUS OR MINUS, APPROXIMATELY ' DEGREE A.B. ANCHOR BOLT A.F.F. ABOVE FINISHED FLOOR ABC AGGREGATE BASE COURSE AC. ACOUSTIC ACT. ACTUAL ADA AMERICANS WITH DISABILITIES ACT OF 1990 (U.S.) ADD'L ADDITIONAL AFF ABOVE FINISH FLOOR AIR/VAC AIR RELEASE AND VACUUM RELIEF ALT ALTERNATE ALUM. ALUMINUM AMP AMPERES ANSI AMERICAN NATIONAL STANDARDS INSTITUTE ARCH. ARCHITECTURAL ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS BF BLIND FLANGE BFV BUTTERFLY VALVE BLDG BUILDING BTUH BRITISH THERMAL UNIT HOUR C.I.P. CAST —IN —PLACE C.M.U. CONCRETE MASONRY UNIT C.O. CLEAN OUT CAP. CAPACITY 1]Mr_ATThilImU21921:1212[4 1Smile]=4:1l121219j DRAWING IDENTIFICATION DETAIL DRAWING TITLE (BLANK IF LETTER OR NUMBER OPTIONAL LOCATION IS UTILIZED) UNIQUELY PAIRED WITH PUMP STATION SECTIONAL PLAN SHEET NUMBER ON WHICH DETAIL DRAWING TYPE: DETAIL, SECTION, DETAIL DRAWING OCCURS A D ETAI L PLAN, or ELEVATION. (OPTIONAL LOCATION OF DETAIL DRAWING TITLE) C-12 NOT TO SCALE SHEET NUMBER ON WHICH DETAIL DRAWING SCALE DETAIL DRAWING OCCURS NOTE: NUMERIC SCALE IS TRUE or "NOT TO SCALE" FOR FULL SIZE PRINTS ONLY! REFER TO BAR SCALES ON REDUCED SIZE PRINTS. rA_" AR� B C D �127C-127 � �12 �12 �12 DETAIL REFERENCE SECTION CUT OTHER END OF SECTION CUT INTERIOR EXTERIOR (EITHER TYPE) ELEVATION ELEVATION REFERENCE REFERENCE X O IT�... i.. .. c........ IN •..�' �� . x PROJ ECT LOCATION10 TM $v WWTP ADDRESS: -;;.q,� 5275 Chadbourn Hwy Chadbourn t Chadbourn, NC 23 �::�. 7sF. Broadway �. . . CO PROJECT VICINITY MAP ABBREVIATIONS, ACRONYMS, AND SYMBOLS CFM CUBIC FEET PER MINUTE F.F.E. FINISH FLOOR ELEVATION LAB LABORATORY PSI POUNDS PER SQUARE INCH STD STANDARD CRAM. CHAMFER FAB. FABRIC, FABRICATION LB-ABS. POUND/POUNDS PVC POLYVINYL CHLORIDE STL. STEEL CHAN. CHANNEL FIG. FIGURE MAS. MASONRY QTY. QUANTITY STRUCT. STRUCTURAL CHEM. CHEMICAL FL FLOWLINE MATL MATERIAL R RADIUS SUPT. SUPPORT CLR. CLEAR FLEX. FLEXIBLE MAX. MAXIMUM RAS RETURN ACTIVATED SLUDGE SW SOUTHWEST CO. COMPANY FLG FLANGE MCJ MASONRY CONTROL JOINT RCP REINFORCED CONCRETE PIPE T/ TOP OF COL. COLUMN FM FORCE MAIN MECH. MECHANICAL REBAR CONCRETE REINFORCING BAR TCJ TEMPORARY CONSTRUCTION CONC. CONCRETE FRP FIBERGLASS REINFORCED MFR MANUFACTURER RED. REDUC(ER)(ING) JOINT COND. CONDUIT PLASTIC MH MANHOLE REF. REFERENCE TEMP. TEMPORARY CONSTR. CONSTRUCTION FT. FOOT, FEET MIL ONE THOUSANDTH REINF. REINFORC(E)(ED)(ING) THK. THICKNESS CONT. CONTINUOUS FTG. FOOTING MIN. MINIMUM REQ'D REQUIRED THRD. THREAD(ED)(S) COORD. COORDINATE GA. GAUGE MJ MECHANICAL JOINT RESTR. RESTRAIN(ED)(ING) TOS TOP OF SLAB CTRD CENTERED GAL. GALLON MPH MILES PER HOUR RJ RESTRAINED JOINT TOW TOP OF WALL q CENTERLINE GALV. GALVANIZED N NORTH RPM REVOLUTIONS PER MINUTE TYP• TYPICAL D DIAMETER GFI GROUND FAULT INTERRUPT N.C. NORTH CAROLINA RW RECLAIMED WATER U.L. UNDERWRITERS LABORATORIES D.I. DUCTILE IRON GV GATE VALVE N.T.S. NOT TO SCALE S SOUTH, SEWER UON UNLESS OTHERWISE NOTED D.I.P. DUCTILE IRON PIPE H.D.G. HOT DIP GALVANIZE(D) N/A NOT APPLICABLE S.S. STAINLESS STEEL UV ULTRAVIOLET D.O.T. DEPARTMENT OF HDWR. HARDWARE NEMA NATIONAL ELECTRICAL S.Y.P. SOUTHERN YELLOW PINE V. VOLT TRANSPORTATION HEX HEXAGONAL MANUFACTURERS ASSOCIATION SBR SEQUENCING BATCH REACTOR VERT VERTICAL DIA. DIAMETER HK HOOK NIC NOT IN CONTRACT SCFM STANDARD CUBIC FEET PER VFD VARIABLE FREQUENCY DRIVE DIM. DIMENSION HORIZ. HORIZONTAL NO. NUMBER MINUTE W WEST, WATER DWGS DRAWINGS HP HIGH POINT NOM. NOMINAL SCH. SCHEDULE W/ WITH DWLS DOWELS HR. HOUR NPT NATIONAL PIPE THREAD SD STORM DRAIN W/0 WITHOUT E EAST HT. HEIGHT NW NORTHWEST SDR STANDARD DIMENSION RATIO WAS WASTE ACTIVATED SLUDGE EA. EACH HWL HIGH WATER LEVEL 0 OXYGEN SF SQUARE FEET WL WATER LEVEL EF EACH FACE HYD. HYDRANT 0 DIAMETER SHT. SHEET WWF WELDED WIRE FABRIC EFFL. EFFLUENT HZ HERTZ O.C. ON CENTER SHWR SHOWER WWTP WASTEWATER TREATMENT EL. ELEVATION I.D. INSIDE DIAMETER O.D. OUTSIDE DIAMETER SIM. SIMILAR PLANT EQ EQUALIZATION INV. INVERT OPNG OPENING SPA SPACE XFMR TRANSFORMER EQUIP. EQUIPMENT JT. JOINT OZ OUNCE SPECS SPECIFICATIONS YH YARD HYDRANT EW EACH WAY K KILO, THOUSAND PE PLAIN END SQ. SQUARE EXIST. EXISTING KVA KILOVOLT —AMPERE PED. PEDESTAL SR STATE ROAD EXP. EXPANSION KW KILOWATT PLCS PLACES SS SANITARY SEWER EXT. EXTENSION L.F. LINEAR FEET PSF POUNDS PER SQUARE FOOT STA STATION SYM. Sheet List Table SHEET SHEET TITLE NUMBER GENERAL G.1 Cover Sheet G.2 Sheet Index CIVIL C.1 Existing & Demolition Site Plan C.2 Proposed Site Plan MECHANICAL M.1 Hydraulic Profile M.2 Aeration Basin Demolition Plan M.3 Proposed Aeration Basin No. 1 Plan M.4 Proposed Aeration Basin No. 1 Sections M.5 Aeration Basin No.1 Details M.6 Air Piping Details STRUCTURAL REVISIONS DESCRIPTION DATE BY % M Z; L zz — =—MIM 0M 0 m,1- O v 0 ..Voo�O �1 N •� �1 CL i �U�M.i s Z , (V V) 0 (VZ .00 V) w Q 0 IL (V J U � Q J w 0 \ v t = Q � •= a i LV V J Proposed Aeration Basin Structural S.1 Design Criteria & Notes S 2 Proposed Aeration Basin No.1 Plan and Section S.3 Proposed Aeration Basin No.1 Section r2: S.4 Proposed Aeration Basin No.1 Typical Details DETAILS D.1 MISCELLANEOUS DETAILS D.2 EROSION CONTROL DETAILS r L � c� �' O U i E s z .+~U0 s c� 4— c N CL LL O U PL_ E O 2 U DATE: February, 2024 DESIGNED: UP DRAWN: DJN CHECKED: LJP at G.2 Sheet Index.dwg: Layout=Sheet Index m N N Lh O N 1-1 O vi a� 0 J m 0 0 0 fN m C N X LLI - M O M N O N O W J m 0 J 3 v m c o of 0 iN Li v+ 0 C Q X s 3 O v ri CL N I I 03 U Uj �3 N O p� U C_ O o I O C LO °' I U N � L O_ U � N / y p+ m c C o 0 4_ (D � V) ID E U C 0 a n 0).X c' W O c m v c o O X Lm W Qo c� 3� O O m wi N I 0 v o r LL. J X 10 0 20 SCALE IN FEET CHAIN LINK FENCE PROPERTY LINE - - -- -- -- -- -- -- -- -- -- -- -- -- -- -- MH / / / STORAGE BUILDING JG\ CONTRACTOR SHALL DEMOLISHED EXISTING AERATION BASIN NO.1 AND OLD METERING STRUCTURE AND DISPOSE OF OFF -SITE. =R i TO AIN \ I F I C E w I ,. CHLORINE CONTACT CHAMBER I I t\ �\ N GENERATOR CHAIN LINK FENCE DOUBLE SWING GATE z FINAL CLARIFIER lil All REVISIONS SYM. DESCRIPTION I I I l I 1'' �I II I EX. 6" WATER MAIN J� i I I;, GRAVEL ACCESS ROAD I II I WATER LINE TO REMAIN DOUBLE SWING ENTRANCE GATE I r �, - - - - - - - - - - - PP \ \ 60 I \ 3 AERATION BASIN NO. 1 DATE I I I I I I I I I I \\ I i I I � II I I I 8" AIR LINE TO REMAIN i II I ,WATER SERVICE 'TO REMAIN I I LD METERING TRUCTURE I II 1 i I I I ! I BY =U'U) W = LO — rn Dal �0rn�0 u0 _ u 00 0 • l— N rL i �U(.1QM.i s Z ,1- 1-0 0 z (v V) , o p (v V) J u 0 Q J � v V Q v •= a i W � J Jx --------►-----6„-------\ r rm \ / GRIT REMOVAL I UNIT \ I 1 I SLUDGE II STABILIZATION SLUDGE STABILIZATION N0. 1 N0. 2 I ---- "----�— — — — - - N II I I O W �4-J O �I 1 I NI II II � ca 4-4J -r I ' ^ AERATION BASIN NO. 2 I I I _ °�--� W L � O a--+ U i E s cd z '� s U 41 cd i — O 4 o N Q LL O u E O U P bruary, 2024 LJP DJN LJP C.I Chad-23.03 Existing Site Plan.dwg: Layout=Existing Site Plan m IL r- N In In 0 N rn O °) 0 ° 0 J � ° m° a) o oZ ILw a p FL (N -° lal �(L CL 0- o CL uJ IL I3 N ° OZ N cy)N �° °) m 0 o ma v U) > 0 a CL fo I_ o� 9 ° U m C p U a� o IL 0) Z -0 V 0 0 a Z 0 CL c O 0° �L0 o� o p t U p, c p m 00 O 0 / fN E U 0 a� 0 CL o m� co o X m Q O C� 3� O O m wi N I 0 v p r LL. J X PROPERTY LINE x x\ x—x�x—x—x—x—x—x—x—x—x—x—x—x—x—x—x MH Lj-X—ZX—X—X— / / STORAGE A/ —BUILDING / / REVISIONS \ SYM. DESCRIPTION � J � 84.00_EX. 6" WATER MAIN � -\ ��\ \\ — \ EX PAVED ACCESS ROAD D.I.P. EFFLUENT \ \ � DOUBLE SWING 12 � I — — — l '� \ \ � \ ENTRANCE GATE \TEMPORARY SILT FENCE, TYP. CHAIN LINK FENCE 12" M.J. 45' BEND � I 8 M.J. 90 BEND, CONNECT - - 83 00 _ \ \ TO EXISTING 8" AIR PIPING � L \ PROPOSED PIPING - - - - - - - - - - ` - - ��--x��x--'x—x x----� x�x�x=x-= Sc—X—x�x—> —x— - o o-o-o-o-o -0-0-0-0-0 0-0-0-0-0-0-0 o-o-o-o-o o-o_CONNECTIONS, SEE P_ x—x—x—x—x—x—x—x x—x—x—x—x—x—x—X�'``�� CONNECT TO EXISTING E -'� _ _SHEET M.3 12" D.I. PIPING o 1 8 D.I. AIR PIPING ---- ►------------ f+----------+� \- o r2--�-------------- ----�� L CLARIFIER PROPOSED AERATION BASIN N0.MH 1 �1 '�y01 Y� �IIIIIIIIIIIIIIIIIII .II \I I I 1 I II DATE BY \� ° 0 En Ln ���//ll11111111\1\\, I I TBM #1 (IRON ROD SET) NL�E: 17398.3823' 171849.7704' VATION: 86.8' I SEE INFLUENT AIR HEADER a M.5 AND PIPING I I C.)� I IX I l ° L — — — — — — — — — — — — — — — — — — — — — — — — — — — — � OFFICE oN �' T--- ram.. � II 4 " SS w i \ ° W w w - w I 1O" \ // I SLUDGE STABILIZATION /\, N 0. 1 )) P ---- ❑� 0 w I I� I -- wr ,� I-6"-_ -- -X—X—x + C H LOR I N E— I l o \ w 3 v \ u \+ \ CONTACT CHAMBER I /I \ N + \ I I / \ \ Ioz \ +\ \� j fill,FINAL CLARIFIE-01', GENERATOR \0. + \+ I I l \� � NEW GRAVEL ACCESS- CHAIN LINK FENCE I \+ --� \+ I � 1 XI \ / — GRIT REMOVAL UNIT c\ SLUDGE STABILIZATION \� NO. 2\ / I- ---�-$5�� --7 AERATION BASIN NO. 2 1 / o I II / o of o of 10 0 20 I 1 TEMPORARY I \ I / ° STAGING/STOCKPILE °--- SCALE IN FEET DOUBLE SWING GATE I I AREA o / o o SHED o i 0 I I INFLUENT o SAMPLING I 0 x 10 0 0-0-0-0-0-0-0-0-0-0-0-0-0-01 -------------------------------------------- BLOWER BUILDING I I I x 3� 18" II M.J. 90' BEND II I Ix I 18" D.I.P. INFLUENT TO NEW AERATION BASIN NO. 1 h i I I �i i II TBM #2 CL OF STORM GRATE II i N: 17390.2048' II i E: 171849.6646' I ELEVATION:84.12' 1.255 18" X 12" M.J. REDUCER, CONNECT TO EXISTING 12" D.I.P. ZI I� 1 I I 1 N1 II I I II II I I N� ' IO I� I III I J I I I EX. GRAVEL ACCESS I I' I � I' I ICI I I II I I / r ; I YARD INLET, TYP. 1 I'I I II I I / I A I I I I II I I I I � I I 11 I / \ — = —rnM Dal �0rn�0 u0 . V 00 0 �1 r"j �1 i �UrNjM.i s z -,I- ( o (vV) .00 (vz V) wQO� u � J 0 V Q v •= a i W J 4- ateJ Ln O Q O .� o c� ' O �U m s i E s cd z s .� U~U cd c� N Qli O u E O 2 U DATE: February, 2024 DESIGNED: UP DRAWN: DJN CHECKED: LJP at C■2 Chad-23.03 Proposed Site Plan.dwg: Layout=Proposed Site Plan 0 V Q v •= a i W J 4- ateJ Ln O Q O .� o c� ' O �U m s i E s cd z s .� U~U cd c� N Qli O u E O 2 U DATE: February, 2024 DESIGNED: UP DRAWN: DJN CHECKED: LJP at C■2 Chad-23.03 Proposed Site Plan.dwg: Layout=Proposed Site Plan 4- ateJ Ln O Q O .� o c� ' O �U m s i E s cd z s .� U~U cd c� N Qli O u E O 2 U DATE: February, 2024 DESIGNED: UP DRAWN: DJN CHECKED: LJP at C■2 Chad-23.03 Proposed Site Plan.dwg: Layout=Proposed Site Plan DATE: February, 2024 DESIGNED: UP DRAWN: DJN CHECKED: LJP at C■2 Chad-23.03 Proposed Site Plan.dwg: Layout=Proposed Site Plan It N O N 00 N 00 o? w J � mr _ N p) > O) O fN y I J y O� p� C 0 0-o / U � W O � TC O of �W a %a >o _N U =) N C / 0 y O O D 3 t o U o . C .y �Lri O I 0� y U p+ / C J 3 O L;I � Q O O m o, / 3 LLJ c � N E of U d 0CL 3 w a C J .y m 3 C O " x o D Q 0 a rn 3 / I II P o O PO :' N I rn v O f- r � / of J X PEAK FLOW EL 88.74 (AER BASIN #2) AVG FLOW EL 88.37 (AER BASIN #2) PEAK FLOW EL 88.67 (AER BASIN #1) AVG FLOW EL 86.39 (AER BASIN #1) WEIR CREST EL 88.76--� PEAK FLOW EL 89.36 AVG FLOW EL 88.96 TOW EL 90.25 FL EL 78.15 SPUTTER BOX PEAK FLOW EL 86.09 (AER BASIN #1) AVG FLOW EL 86.03 (AER BASIN #1) _PEAK FLOW EL 88.26 (AER BASIN #2) AVG FLOW EL 88.20 (AER BASIN #2) TOW EL 90.25 (AER BASIN #2) TOW EL 88.50 (AER BASIN #1) 12" FL EL 78.15 (AER BASIN #2) WEIR CREST 88.17 (AER BASIN #2) WEIR CREST 86.00 (AER BASIN #1) FL EL 76.00 (AER BASIN #1) FAMMITAMIN MAN IOL\ (AER BASIN #2) PEAK FLOW -AVG EL 85.69 FLOW EL 83.21 (AER BASIN #1) ROW EL 85.45 FPEAK AVG FLOW EL 83.21 WEIR CREST 83.02I PEAK ROW EL 83.18 _AVG_FLOW_EL 83�.10___ ____.....______________..2Q'..________.m TOW EL 84.73 (CLARIFIER �2) TOW EL 84.66 (CLARIFIER #1) 12" 10" D 80� w z FT-1 EL 73.77 (CLARIFIER #1) EL 70.98 (CLARIFIER #2) --70'-----------------------------------------------------------------------------------------------------------------------------------------------------------70----------- FI NAL PI ARIF'IF'RC SYM. REVISIONS DESCRIPTION DATE I BY s - = -rnM Dal 0 can 0 U 0 ..U000 � N rL i(vUrjrn sz�(.0 (vV) 0 avz .00 w QO U- w J U o Q J w 00- (U V Q v •= a QL i Z3 LV V J 2k r L � .� 0 c� �' O c� u i E s z .2 a) s - O 4 0 N Q LL O U E O 2 U DATE: February, 2024 DESIGNED: UP DRAWN: DJN CHECKED: LJP M.1 Hydraulic Profile.dwg: Layout=M.1 Hydraulic Profile at M.l O E c N (� � O c m c O O m o c o Q Q� N X � O .. O �ao of OD W ►� c m O W N a_ O Q N 00 fN N Z) 1-1 co C O O W D J O L m U � I m 00 fN Lcj � I J L J z II C 0 a:p U Z N O N H J O c M 'a5 0 m c c O O o m c Q o C a> Q 3 N c i5 m N c O O y O O N C Q I O � 0 W c X m O o00 I-, O 0 W a, c rn O a- Ld Oo c m � E o U � a as 0)U n- I �o �Lci o; m C t O J Qu a_ c 3m C m �°o o O E Na v I Zo i of J X REVISIONS w�� w • w • ••� ..... •- -RA 1'lrCl`II IIITIl1.1 1'IATr F viw� „ LAIJ I INU HANUKAILJ VALVE SCALE: 3/16 = 1 —0 /� DEMO, TYP. WEIR ELEV: 84.16' TOP OF EXISTING DEMO BASIN CONCRETE WALL 8" STAINLESS / ELEV: 85.54' STEEL AIR PIPING ---> DEMO 2'-6" 1,_6» W L --------------- 2'-6» — CONCRETE 13' COLUMN 1.5 TYP. DEMO 4 " AERATION EXISTING DEMO Q1 DIFFUSER 12" C.I. TO TYP. CLARIFIERS TO REMAIN DEMO "`= SLOPED CONCRETE —SOIL BOTTOM SIDEWALLS DEMO TYP. OF ALL CONCRETE DEMO CONCRETE PIPE SUPPORT 4 SIDES PIPE SUPPORT STRIP UNDER MAIN HEADER STRIPS, TYP. 4" PVC AIR PIPING TYP. 4.. J 108' AERATION BASIN 1 SECTION SCALE: 3/16" = 1'-0" DEMO EXISTING CONCRETE WALKWAY EL: 87.27' DEMO EXISTING CONCRETE PAD TYP. OF 3 SOIL BOTTOM GRAVEL BETWEEN CONCRETE PADS, TYP. w"A BY ov; c(-S wr- Ld ,�vLO ,�ci�ar EMO ?" C.I. FLU ENT EXISTING 12" C.I. INFLUENT — = —rnM Dal 0 rn 0 v 0 ..voo0 N -� i (VOM.r � s Z � (Lc (VV) W o (Vz .op N J u � 00- (u V Q dJ •= a i `V J •� o a--+ 0 u i E s cd z -C.� U~U N Q LL O u E O 2 u DATE: February, 2024 DESIGNED: UP DRAWN: DJN CHECKED: LJP at M.2 M.2 Aeration Basin DEMOLITION PLAN.dwg: Layout=M.2 Aeration Basin Demolition Plan o_ co L6 0 N O) O 1-1 0 fA N Q' O J m N 0 0 6 Z C .y 0 m c O 0 0 Q N O CL O a M a N LP N N O N - O) 0 w J N N m E - > O V) Z Lij N (D J Q v 3 owa a I �a Za c N D_ O J m C p� O 3 o� Q 0 O Z N C O N CL O dm C M O � O •> a U -O N N O O a N O O � U_ °C C t � U U) N N C3 00 N II rn 6 p Z oc 0 .y 0 ° mm !_ E2 U Q 0 a� 0 O CL :-To= o a c m v c o oX Lm a� ao c� 0 om N I u v O f/l r LL. J X 23'-2" 3' CONC ETE HAMMER EAD END WAL 12" EFFLU EN 23'-2" 48' STANDARD SPACING FOR 4" AIR DIFFUSER LEGS 21'-6" EFFLUENT WEIR, SEE DETAIL 12" FABRICATED WALL PIPE 120' APPROX. 290 AIR DIFFUSER HEADS REVISIONS SYM. DESCRIPTION DATE BY O a z; W ° (n 7 LO N V i Ln E Ln =7—rn Dal O can 0 v 0 - U 00 0 � N rL i(vUrjrn s Z -,1- (.0 0 (vV) .oO wz �1 al al �1 V) 1'-2" W Q 0 u J Q - — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — t— V-2" J v v v Q v I •= a i CL :3 W v 4" PVC AIR DIFFUSER PIPING, TYP. 8" PVC AIR PIPING HEADER, SEE DETAILS 8" PVC AIR PIPING HEADER, SEE DETAILS 29' O 1 /-8" MJ 90• BEND ' 60'-4" ' 1 I Q � A G G G G G G G G G G G G G G G G G G G G G G G G G G G I •, c°� M.4 ti ti ti APPROX. 290 AIR DIFFUSER HEADS 1 1 SEE INFLUENT -0 O AIR HEADER 4J Z M.5 AND PIPING Ln •� 1 L CO 1 7- 1'-2" — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — -1'-2" O VFOUNDATION FOOTING, SEE STRUCTURAL m s i E s z '� s � U i — O O N CL LL O U E AERATION BASIN 1 PLAN SCALE: 3/16" = 1'-0" O U DATE: February, 2024 DESIGNED: UP DRAWN: DJN CHECKED: LJP at M"3 M.3 Proposed Aeration Basin No. 1 Plan.dwg: Layout=M.3 Proposed Aeration Basin No. 1 Plan N 0) O rnU) O O ° aa) E N O Z O J w C� m � O Z N C ° a V) O m C o, 3 00 o� Q 0 a N U) C OCL N °m 0_ C O i° •> a N N O O a N O O � U 0 c ° � U m C3 O j N II rn c O p Z o _ C O •y O ° m 00 c 0 (D4' E ° U Q a� a� m 0 O a :-Tt= o o_ C m v C o oX Lm ago c� O Om N I u O f/l rLL. iLLJ J X SYM. 1'-0" 1'-2" TOW ELEV: 88.50' WEIR ELEV. 86.00' GROUND ELEVATION:- 84.00' +/- • e. WEIR PLATE, SEE DETAIL EFF TROUGH BOTTOM ELEV: 82.00, 12" FABRICATED WALL PIPE 12" MJ 90• BEND 1'-6" ey t 8" PVC AIR PIPING HEADER, SEE DETAILS ':- 4" AIR DIFFUSER ASSEMBLY BOTTOM ELEV: 76.00' 4' SPACING, TYP. REVISIONS DESCRIPTION .•' . a, t .. .••. ,.• ... .'! - i•. a .a, ri • .♦ •. q, a !' a .a ( ( '�•r .(. • e . e.•.• • e. y . • eis , , . 1.' e ' ••a , •• .. .. • .. .. ... • • . • • ,. .. w .• . v • .,.�.. •:' ... .r a .. . . e. a ... • . ' ... • e• ,. e••• AERATION BASIN 1 SECTION SCALE: 3/8" = 1'-O" STAINLESS STEEL PIPE SUPPORT (TYP) 8" 900 BEND • e � MAX WL: 86.09' 18" WALL PIPE INV. TBD BY FIELD YVia:: 12" MIN VERIFICATION SEE NOTE 1 8" 304 SS DROP LEG--\ AIR DIFFUSER HEAD ON 4" PVC BRANCHES TYP. 4' SPACING ON 4" PVC BRANCHES 8" 900 BEND ,. .... .; a .. ... a •'• •. .• :'. q r. •. '4 • .. � • .' • :. , .' . • v • _ � .. • .. _ • .. • _ e •• • , . • . _ •L•i .• • • _ .. .. • e , . • a ' •. • � e•. • • � • ,q•.. .. ••. �M • .. a •• • � ' ♦ . • . •' 1 .. "r•• , .. .. � (° t AERATION BASIN 1 SECTION SCALE: 3/8" = 1 '-O" `,,1111111111,1/,�,r''', r DATE BY a Nam; ' O v 0(- _USLO w z; (n 0 ° 7 — = —rnM Dal �Orn 0 u0 .Voo 0 � N v- rL i(v U r,�j ran sZ�1-0 wV) o avz .oO w Q O L- V J u o W •= a i J —8" 900 BEND 8" 150# FLG. S.S. TO 8" DIP FLG CONNECTION °0 0 12" ABOVE GRADE 4-J °u L A 1 Q � -0 ,---8" MJ 900 Ln z BEND 18" MJ TEE 0 c C)° �C: W / 18" INFLUENT FROM SPLITTER 18" MJ PLUG GATE BOX VALVE •� o a--+ ro � s ` V i • o s z }, " U ,� _ 0 4- 0 N Qli O u E O 2 U NOTE: 1.) CONTRACT SHALL POTHOLE EXISTING 12" INFLUENT PIPE AT PROPOSED DATE: February, 2024 CONNECTION POINT SHOWN ON C.2 AND SHOOT GRADE TO DETERMINE EXISTING DESIGNED: LJP ELEVATION OF THE PIPE. NEW WALL DRAWN: DJN PENETRATION AND CONNECTING 18" PIPE CHECKED: LJP SHALL BE INSTALLED TO MATCH EXISTING NO. PIPE ELEVATION. M.4 Proposed Aeration Basin No. 1 Sections.dwg: Layout=M.4 Proposed Aeration Basin No. 1 Sections 0) u) C O ,, N ro O w ._ J N 0 T m m C O �41 (N Q U) N N 9 N O CL O+ O v 2 a o U Z � C ° .o =m C 0 �o •> a U -O i ° a U) O O � C C t � U o� O 0 N II rn c oZ � c O •y O M m m c 0 E2 U Q 0 a� 0 O a :-To= o a C m v C o oX Lm a� ao c� a/ O 0 m r•i N I 0 v O f/l r LL. J X REVISIONS T SYM. DESCRIPTION DATE BY „1111'' `J SOr� d; w� Zt 2 v� En e to V i Ld1 r- (,0E Ld) =—rvm0) Dal 0 m O v CD U oo 0 ^I �srn Z��0 0 (VV) z a�V) 18" MJ 90• BEND w Q p IL (V u 3" 0 CONCRETE COLLAR W/ D1 VALVE Q J BOX ON 18" MJ PLUG VALVE, TYP OF 2 J II I v 0 0 9" 0 AIR DIFFUSER HEAD, TYP. Ij I •i v ir CONCRETE WALL, SEE STRUCTURAL = i LQ V 8" MJ TEE 8" SS 90' BEND I = J 18" MJ TEE 8" MJ 90• BEND 18" MJ TO 0 NEW AERATION BASIN NO.1 8" MJ 90' BEND 4" PVC COUPLING, TYP. 8" SS 90• BEND I 3" MIN (TYP) OPENINGnow 1/8" BEVEL 7/8" WIDE SLOTTED HOLE (TYP) SLOTTED HOLE (TYP) 8" 90• BEND I I VARIES SEE DWGS 8" X 4" TEE, TYP. �---------------� 6" 8" AIR HEADER PIPE I 8" WELDED S.S. 4" 4" AIR DIFFUSER II I PIPING, TYP. — — SLOTS SPACED 1'-8" MAXNo 2'+ (n •� II I 9„ 9„ CO N 4 i p II — — 18" MJ 90' BEND ANCHOR BOLT W/ NUT AND WASHER AT 1'-8" MAX CTRS VARIES •� I � Z NOTE: Q ALL SURFACES OF ALUMINUM IN CONTACT WITH CONCRETE SHALL BE COATED WITH COAL TAR PAINT 4'-0" I STANDARD I FOUNDATION ROOTER, WEIR PATE DETAIL - SPACING I SEE STRUCTURAL 2 WEIR PLATE DETAIL �.5N.T.S '� O INFLUENT AIR HEADER AND PIPING rl-",) m M.5 SCALE: 3/4" = 1'-0" 0 E s c� z o s •}, o4- N Q LL o U Q (v C E O 2 U DATE: February, 2024 DESIGNED: UP DRAWN: DJN CHECKED: LJP NO. M.5 M.1 Hydraulic Profile 1.dwg: Layout=M.1 Proposed Aeration Basin No. 1 Details L6 O N 1-1 rn O fA O J m a� 0 a N .o 0 'a a Q Q ul N N O N 1-1 00 0 J m 0 fN U) N J 01 cm 3 N 0 a a U N O fA 01 0 .21 U) (D U) 0 0+ 0 N p� O c Z ow oQ O� O 00 � 3 c � E� U d 0 3 ww a C J �N m 3 O :r, x oD Qo aIm I li P O� PO N I rn O f- r � UJ J X DE 5/16" 0 STAINLESS kmPS \ `STEEL ROD ANCHOR ASS'Y SEE DETAIL SPANNER WRENCH APPLY A VERY LIGHT COATING (FOR TIGHTENING RETAINER RING) OF SILICONE BASED GREASE (DOW CORNING 111 COMPOUND — SUPPLIED BY SANITAIRE) TO THE UNDERSIDE OF THE TOP SEALING SURFACE OF THE RETAINING RING. ■:4I,2[r REVISIONS SYM. DESCRIPTION W.S. ELEVATION GUIDE SUPPORT FIXED JOINT SEE PLAN VIEWS SEE PLAN VIEWS SEE PLAN VIEW — r-Am P1111rA1c`InA1C` CnD I nnATInAlc /-r'fNM I fNr%AT1fNk1f` T DATE BY -° p 1:1 9 W ! = Ln c� O �OM,I-O v0 Z 00 0 rL w (v V O rn :2s Z � 1-0 O (vV) avz m Ln .oO J u o Q J w � BASE PLATE GUIDE SUPPORT HOLDER V LUBRICATION DETAIL 7'-6" MAXIMUM ============= NOTE: VERTICAL ORIENTATION (ELEVATION) OF SPACING BETWEEN ALL AIR = t :z =====__===`__:. RETAINER z,'"z,':=-.;,.; ;;"'_";;' RING DIFFUSER HEADS RELATIVE TO BASIN FLOOR DISTRIBUTOR SUPPORTS. :t;"'"'_•_;;_"�":=""~-',"S"s' SHALL BE AS RECOMMENDED BY AERATION SEE PLAN VIEW FOR = Q SYSTEM SUPPLIER. DIMENSIONAL LOCATIONS. •� HEX NUT MEMBRANE 0Lu DISC WITH INTEGRAL 0—RING V 3 FLAT WASHER AIR DISTRIBUTOR LOCATING PLATE BASE PLATE DETAIL FB-20A J m i ANCHOR • '' mm mm m" m� JPPORT BASE 3/8" 0 STN. STL WEDGE - TYPE ANCHOR BOLT BY SANITAIRE 1 1 /4" PROJECTION 2 1 /2" EMBEDMENT ASSEMBLY SANITAIRE FOLLOWER FLANGE TO HERE 4 0 6r STD 150# DRILLING 6 o 9r 8" 0 12r 10 � 15r DROPLEG SECTION CENTER FEED STYLE MANIFOLD DETAIL FB-21 B ORIFICE PLUG (REMOVE THIS PLUG BEFORE INSTALLING THE DIFFUSER) )RIFICE (9")NOM. DIA. MEMBRANE DISC DIFFUSER (8) BOLTS FOR THE 14" 0,16" 0 AND 18" 0 DOUBLE BAND CLAMPS (4) BOLTS FOR THE 8" 0,10" 0 AND 12" 0 BAND CLAMPS (2) BOLTS FOR THE 3" 0,4" 0 AND 6" 0 BAND CLAMPS X Q �1 I co \_ STN STL BAND NOTE: EPDM GASKET TORQUE NUTS TO 50-55 FT.LBS CLAMP COUPLING SPIGOT WITH GROOVES RETAINER RING (DO NOT LUBRICATE) SOCKET WITH SPLINES AIR DISTRIBUTOR THREAD (DO NOT LUBRICATE) 0-RING 4" GRAY (DO NOT LUBRICATE THIS 0-RING WITH GREASE. A LIQUID SOAP SOLUTION MAY BE APPLIED FOR EASE OF INSTALLATION) FIXED JOINT TUBING- 1" I.D. EDUCTOR NIPPLE- 3/4" X 31G. SCH. 80 PVC SUCTION TUBE- CLAMP -WORM DRIVE HOSE S.S. ELBOW- 3/4" X 45° SCH. 80 PVC (THR'D) -NIPPLE- 3/4" X 21G. SCH. 80 PVC PURGE SUMP D ETA I L F B -14A 3/4" X 90° PVC ELBOW SKT 3/4" X 3" NIPPLE TA .E. 3/4" 0 PURGE VALVE -3/4" X 3" NIPPLE T.B.E. 3/4" 0 SCH 80 PVC PIPE STN STL CLAMP 3/4" 0 SCH 80 PVC PIPE 3/4"0 SCH 80 45° PVC ELBOW 3/4" 0 X 3" LG PVC NIPPLE — HOSE CLAMP 1 " I.D. PURGE HOSE - 1 "I.D. PURGE HOSE (STENCILED "WATER PURGE") SUMP ASSEMBLY SEE DETAIL PURGE SUMP ASSEMBLY EN a--+ U i E s co z '4-J s U 41 i — O 4 o N Q LL O u E O 2 U DATE: February, 2024 DESIGNED: UP DRAWN: DJN CHECKED: LJP M.6 Air Piping Details.dwg: Layout=M.6 Air Piping Details at M.6 SYM. REVISIONS DESCRIPTION DATE I BY STRUCTURAL DESIGN CRITERIA STRUCTURAL DESIGN BASED ON THE NORTH CAROLINA BUILDING CODE EFFECTIVE JANUARY 1, 2019. LIVE LOADS: SURCHARGE AT GRADE = 100 PSF FLUID IN TANK = 63 PCF (ASSUMED) SOIL LOAD ON WALL = 90 PCF (EQUIV. HYDROSTATIC) DEAD LOADS: USE ACTUAL DEAD LOADS OF MATERIALS SNOW LOADS: GROUND SNOW LOAD (Pg) = 10 PSF FLAT ROOF SNOW LOAD (Pf) = 10 PSF SNOW EXPOSURE FACTOR (Ce) = 1.0 SNOW LOAD IMPORTANCE FACTOR (10 = 1.0 THERMAL FACTOR (Ct) = 1.0 WIND DESIGN DATA: ULTIMATE DESIGN WIND SPEED (Vult) = 135 MPH NOMINAL DESIGN WIND SPEED (Vasd) = 104.6 MPH WIND IMPORTANCE FACTOR (Iw) = 1.0 RISK CATEGORY = II WIND EXPOSURE = C INTERNAL PRESSURE COEFFICIENT = +/- 0.18 BUILDING DESIGNED AS ENCLOSED EARTHQUAKE DESIGN DATA: SITE SOILS CLASS: D - DEFAULT SDs 0.339 SD, 0.155 SEISMIC USE GROUP: II SEISMIC DESIGN CATEGORY: C SEISMIC IMPORTANCE FACTOR: 1.25 BASIC STRUCTURAL SYSTEM: GROUND SUPPORTED TANK BASIC SFRS: ORDINARY REINF. CONC. SHEAR WALLS RESPONSE MODIFICATION FACTOR: R; 2.25 Rc 1.0 ANALYSIS PROCEDURE: ACI-350.3-06 SEISMIC RESPONSE COEF: Ct 0.339 FLOOD DESIGN DATA: THIS PROJECT IS NOT LOCATED IN A FLOOD ZONE AS PER THE FEMA/NC FLOODPLAIN MAPPING PROGRAM. GENERAL STRUCTURAL NOTES: 1. THIS PROJECT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE NORTH CAROLINA BUILDING CODE EFFECTIVE 2019 AND ALL OTHER APPLICABLE BUILDING CODES HAVING JURISDICTION. 2. COORDINATE DIMENSIONS AND CONDITIONS AT THE PROJECT SITE PRIOR TO STARTING WORK AND NOTIFY THE CIVIL ENGINEER IMMEDIATELY OF ANY DISCREPANCIES. NOTIFY THE CIVIL ENGINEER OF ANY EXISTING SITE CONDITIONS THAT ARE NOT CONSISTENT WITH THE CONSTRUCTION DOCUMENTS. 3. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE DESIGN AND ERECTION OF TEMPORARY BRACING AND SHORING AS REQUIRED FOR STABILITY OF THE STRUCTURE DURING ALL PHASES OF CONSTRUCTION. 4. IT IS THE CONTRACTOR'S RESPONSIBILITY TO SUBMIT SHOP DRAWINGS TO THE CIVIL ENGINEER FOR ALL STRUCTURAL COMPONENTS. STRUCTURAL DRAWINGS ARE NOT TO BE REPRODUCED FOR SHOP DRAWINGS, SECTION SHEETS OR ERECTION PLANS. SUBMIT ONE SET OF PRINTS FOR APPROVAL. THE SET OF PRINTS SHALL BE CLEARLY MARKED "FOR STRUCTURAL ENGINEER'S FILE." SHOP DRAWINGS SHALL BE REVIEWED AND APPROVED BY THE CONTRACTOR FOR ALL DIMENSIONS, ELEVATIONS, AND ERECTION PROCEDURES PRIOR TO CIVIL ENGINEER AND STRUCTURAL ENGINEER'S REVIEW, AMPLE TIME AS DETERMINED BY THE STRUCTURAL ENGINEER, SHALL BE ALLOTTED FOR HIS REVIEW OF SHOP DRAWINGS. 5. THE ENGINEER'S APPROVAL OF SHOP DRAWINGS SHALL NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY FOR DEVIATIONS FROM REQUIREMENTS IN THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL NOT BE RELIEVED OF RESPONSIBILITY FOR ERRORS OR OMISSIONS IN SHOP DRAWINGS. CONTRACTOR DEVIATIONS TO THE CONTRACT DOCUMENTS SHALL BE SUBMITTED SEPARATELY FOR APPROVAL. 6. ALL HANDRAILS, STAIRS, & OTHER ARCHITECTURAL ITEMS & THEIR CONNECTIONS NOT SHOWN ON THE STRUCTURAL DRAWINGS SHALL BE DESIGNED BY A REGISTERED ENGINEER, REGISTERED IN THE PROJECT STATE, TO RESIST ALL APPLIED LOADS PER THE LATEST EDITION OF THE APPLICABLE BUILDING CODE(S). THE ADDITIONAL ENGINEERING, MATERIAL AND LABOR COST OF THESE ITEMS SHALL BE PART OF THE CONTRACT. 7. CONTRACTOR TO NOTIFY STRUCTURAL ENGINEER AND CIVIL ENGINEER OF ANY UNUSUAL AND/OR EXCESSIVE LOADS DUE TO EQUIPMENT OR CONSTRUCTION REQUIREMENTS. 8. THESE STRUCTURAL DRAWINGS SHALL BE USED IN CONJUNCTION WITH ANY CIVIL ENGINEERING DRAWINGS AND DOCUMENTS RELATING TO OTHER TRADES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING HIS OWN CHECK AND COORDINATION OF DIMENSIONS, FIELD CONDITIONS, CLEARANCES, ETC. WITH THE WORK OF THE OTHER TRADES. IN THE CASE OF CONFLICT, CONTACT CIVIL ENGINEER FOR WRITTEN RESOLUTION. 9. THE CONTRACTOR SHALL VERIFY SIZES AND LOCATIONS OF ALL SLOTS, PIPE SLEEVES, ANCHOR BOLTS, ETC.. AS REQUIRED FOR ALL TRADES PRIOR TO CONSTRUCTION. 10. WORK NOT INDICATED AS PART OF THE DRAWINGS BUT REASONABLY IMPLIED TO BE SIMILAR TO THAT AT CORRESPONDING PLACES SHALL BE REPEATED. 11. ALL SECTIONS AND DETAILS ARE TYPICAL AT SIMILAR LOCATIONS AND WHERE APPLICABLE. 12. IN CASE OF CONFLICT BETWEEN THE DRAWINGS AND/OR SPECIFICATIONS, THE MORE RIGID REQUIREMENT SHALL BE ASSUMED TO GOVERN UNTIL A RULING IS MADE BY THE CIVIL / STRUCTURAL ENGINEER. 13. CONTRACTOR SHALL MAKE NO DEVIATIONS FROM DESIGN DRAWINGS AND SPECIFICATIONS WITHOUT WRITTEN APPROVAL OF THE CIVIL ENGINEER. 14. THE DESIGN PROFESSIONALS SHALL HAVE NO CONTROL OVER NOR RESPONSIBILITY FOR THE CONTRACTOR'S MEANS, METHODS, SEQUENCE, TECHNIQUES OR PROCEDURES IN PERFORMING THE WORK, SITE SAFETY OR SAFETY PROGRAM IN CONNECTION WITH THE WORK. THESE ARE SOLELY THE RESPONSIBILITIES OF THE CONTRACTOR, WHO IS ALSO RESPONSIBLE FOR COMPLYING WITH ALL HEALTH AND SAFETY PRECAUTIONS AS REQUIRED BY REGULATORY AGENCIES. 15. REFER TO ELECTRICAL AND MECHANICAL PLANS FOR SIZE AND LOCATION OF ALL OPENINGS FOR DUCTS, PIPES, CONDUCTS, ETC. 16. THESE STRUCTURAL DRAWINGS ARE BASED ON THE LATEST INFORMATION/STRUCTURAL DRAWINGS AS OF OUR SUBMITTAL DATE. SOME DIMENSIONS FOUND IN THESE DRAWINGS MAY HAVE BEEN VERBALLY COMMUNICATED BY THE CIVIL ENGINEER OR TAKEN DIRECTLY FROM ELECTRONIC FILES SUPPLIED BY THE CLIENT. GENERAL CONTRACTOR AND SUBCONTRACTORS ARE ADVISED TO USE THE CIVIL ENGINEERING DRAWINGS AS THE PRIMARY BASIS FOR THE DIMENSIONS ON THIS PROJECT. THECIVIL DRAWINGS SHALL BE CONSIDERED AS THE LEAD DRAWINGS FOR THE PROJECT - INCLUDING DIMENSIONS. *** NOTE *** THIS TANK HAS BEEN DESIGNED IN ACCORDANCE WITH ACI 350 TO SAFELY RESIST A MAXIMUM GROUNDWATER ELEVATION OF 78.17 FEET WHEN HALF OF THE TANK IS EMPTY FOR ACCESS TO AERATORS OR OTHER MAINTENANCE. AT NO TIME SHALL THE ENTIRE TANK BE EMPTIED UNLESS UNDER THE DIRECTION OF A QUALIFIED ENGINEER WHO HAS ASSESSED THE UPLIFT POTENTIAL AND DETERMINED THAT IT IS SAFE TO DO SO. THE FOLLOWING NOTE SHALL BE CLEARLY DISPLAYED ON PLACARDS ON ALL FOUR SIDES OF THE TANK IN TEXT AND SIZE THAT WILL BE VISIBLE FROM A DISTANCE OF 40 FEET: "WARNING - TANK MUST NOT BE EMPTIED WITHOUT CONSULTING A QUALIFIED ENGINEER TO DETERMINE THE SAFETY AND STABILITY OF THE TANK UNDER PREVAILING GROUNDWATER CONDITIONS. SEVERE TANK DAMAGE OR CATASTROPHIC FAILURE COULD RESULT IF THE TANK IS EMPTIED DURING HIGH GROUNDWATER CONDITIONS." FOUNDATION NOTES: F1. THE FOUNDATION DESIGN IS BASED ON AN ASSUMED ALLOWABLE SOIL BEARING PRESSURE OF 1800 PSF. F2. THE CONTRACTOR SHALL ENGAGE A GEOTECHNICAL ENGINEER TO VERIFY ADEQUATE FOUNDATION AND SLAB SUPPORT. F3. FOUNDATIONS ARE TO BEAR ON STABLE SOILS CAPABLE OF SUSTAINING LOADS STATED IN THE FOUNDATION NOTES BELOW WITHOUT EXCESSIVE SETTLEMENT OR HEAVE. BE ADVISED FOUNDATION MOVEMENT MAY OCCUR AND THAT DESIGNS CONTAINED HEREIN DO NOT ATTEMPT TO MITIGATE SOIL CONDITIONS. STRUCTURES MAY BE AT RISK OF DAMAGE WHERE UNSTABLE SOILS ARE PRESENT. ATTENTION TO PROPER SOIL PREPARATION, GRADING, AND PROPER DRAINAGE AWAY FROM THE STRUCTURE IS REQUIRED TO REDUCE SOIL MOVEMENT. F4. THE CONTRACTOR SHALL EXTEND FOOTINGS DOWN TO SOLID BEARING MATERIAL. F5. ALL GRADE BEAMS SHALL BEAR ON UNDISTURBED RESIDUAL SOIL OR PROPERLY COMPACTED STRUCTURAL FILL. F6. FOOTINGS SHALL EXTEND DOWN TO A LOWER ELEVATION THAN INDICATED ON THE DRAWINGS IF NECESSARY TO REACH ADEQUATE BEARING MATERIAL. F7. TOP OF FOOTINGS TO BE A MINIMUM OF 12" BELOW FINISHED GRADE UNLESS NOTED OTHERWISE. F8. SLOPE SIDES OF EXCAVATIONS OR SHORE, SHEET, AND BRACE SIDE SLOPES TO ENSURE SLOPE STABILITY AND SAFETY. ADEQUATELY PROTECT ALL EXCAVATION SLOPES. F9. STRIP AND REMOVE ALL TOPSOIL AND ORGANIC MATERIAL TO A MINIMUM 4" DEPTH. STOCKPILE TOPSOIL IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS OR AS DIRECTED BY THE CIVIL ENGINEER. F10. REMOVE ALL MATERIAL CONTAINING ROOTS, DEBRIS, OR OTHER DELETERIOUS MATERIAL FROM THE SITE. F11. PLACE ALL FILL MATERIAL IN LIFTS NOT EXCEEDING 8" IN DEPTH AND COMPACT TO THE FOLLOWING STANDARD PROCTOR DENSITIES IN ACCORDANCE WITH ASTM-D698: UNDER BASIN/TANK FOUNDATIONS: 98% UNDER SLABS ON GRADE: 95% OTHER AREAS OUTSIDE OF TANK FOOTPRINT: 95% F12. ALL FILL MATERIAL UNDER FOUNDATIONS AND SLABS SHALL BE SUITABLE GRANULAR MATERIAL AS APPROVED BY THE GEOTECHNICAL ENGINEER. SUITABLE ON SITE MATERIAL MAY BE USED AS BACKFILL IF APPROVED BY THE GEOTECHNICAL ENGINEER. SLOPE FILL MATERIAL FOR ADEQUATE DRAINAGE. F13. TEST ALL FILL FOR COMPACTION WITH ONE TEST PER EVERY 2500 SQUARE FEET OF FILL PER FOOT DEPTH. TEST LOCATIONS SHALL BE RANDOMLY LOCATED AT THE DISCRETION OF THE GEOTECHNICAL ENGINEER. F14. PROVIDE ADEQUATE DRAINAGE OR DEWATERING MEASURES TO ALLOW PROPER FINISHING OF EXCAVATIONS AND TO KEEP WATER FROM COLLECTING IN THE BOTTOM OF EXCAVATIONS. FOUNDATIONS SHALL BE PLACED IN DRY CONDITIONS. DO NOT PLACE FOOTINGS IN WATER. F15. A GEOTECHNICAL ENGINEER SHALL INSPECT FOUNDATION EXCAVATIONS AND BUILDING PADS. PROVIDE NOTICE AND ALLOW SUFFICIENT TIME FOR FOOTING EXCAVATIONS TO BE INSPECTED PRIOR TO PLACING FOUNDATIONS. F16. CONSTRUCTION JOINTS IN WALL FOOTINGS SHALL BE FORMED VERTICALLY. PROVIDE A KEYWAY AND REINFORCING DOWELS WITH THE REQUIRED LAP LENGTH. F17. PLACE SLABS ON GRADE OVER A MINIMUM OF 12 INCHES OF GRANULAR FILL AND A MINIMUM10 MIL THICK VAPOR BARRIER, UNLESS NOTED OTHERWISE. REINFORCEMENT DEVELOPMENT DISTANCES PER BAR SIZE BAR SIZE MINIMUM DEVELOPMENT LENGTH (IN.) 3,000 PSI 4,000 PSI 5,000 PSI 6,000 PSI #3 17 15 13 12 #4 22 19 17 16 #5 28 24 22 20 #6 33 29 26 24 #7 48 42 38 34 #8 55 48 43 39 #9 62 54 48 44 #10 69 60 54 49 #11 76 66 59 54 #14 96 84 75 68 #18 124 107 96 88 NOTES: MINIMUM LENGTH OF LAP FOR TENSION LAP SPLICES SHALL BE AS REQUIRED FOR CLASS "A" OR "B" SPLICE, BUT NOT LESS THAN 12-IN. WHERE: 1. ALL CLASS "A" LAP SPLICES SHALL BE 1.OId 2. ALL CLASS "B" LAP SPLICES SHALL BE 1.31d STRUCTURAL CONCRETE NOTES 1. ALL CONCRETE SHALL DEVELOP A MINIMUM COMPRESSIVE STRENGTH OF 4000 PSI IN 28 DAYS. 2. UNLESS NOTED OTHERWISE, ALL CONCRETE FLATWORK SHALL CONFORM TO THE FOLLOWING FINISHING TOLERANCES MEASURED AS PER ASTM E1155: OVERALL FLATNESS NUMBER: Ff>20 MINIMUM LOCAL FLATNESS NUMBER: Ff>15 OVERALL LEVELNESS NUMBER: FL15 MINIMUM LOCAL LEVELNESS NUMBER: FL10 3. ALL FOUNDATIONS ARE TO BEAR ON UNDISTURBED NATIVE SOIL OR ON TESTED, STRUCTURAL BACKFILL (98% STANDARD PROCTOR VALUE FOR BACKFILL) TO INCLUDE THE LAYER OF CLEAN WASHED SAND FOR SLABS ON GRADE. 4. STRUCTURAL FOUNDATION DESIGN IS BASED UPON AN ALLOWABLE SOIL BEARING VALUE OF 1500 PSF. THIS MUST BE VERIFIED BY CONTRACTOR PRIOR TO CONSTRUCTION. 5. ALL REINFORCING STEEL SHALL BE GRADE 60 DEFORMED BARS COMPLYING WITH ASTM SECTION A615. REINFORCING STEEL WHICH IS INDICATED ON THE DRAWINGS AS BEING WELDED SHALL COMPLY WITH ASTM SECTION A706, AND SHALL ALSO BE DEFORMED. 6. ALL DETAILING, FABRICATION AND PLACEMENT OF REINFORCING STEEL SHALL COMPLY WITH THE REQUIREMENTS OF THE ACI MANUAL OF STANDARD PRACTICE FOR DETAILING REINFORCED CONCRETE STRUCTURES (ACI-SP-66) 7. ALL REINFORCING BAR SPLICE LENGTHS AND LOCATIONS, EMBEDMENT, LENGTHS, HOOKS, ETC. SHALL BE DONE AS INDICATED ON THE DRAWINGS. NO VARIATION WILL BE ACCEPTED WITHOUT PRIOR APPROVAL OF THE ENGINEER. IF NO DIMENSION IS PROVIDED, THE SPLICE LENGTH SHALL BE CLASS "B" LENGTH AS PER ACI 318, SECTION 12.15. REFER TO TABLES BELOW. 8. THE FOLLOWING MINIMUM CONCRETE COVER SHALL BE PROVIDED FOR REINFORCEMENT. MIN. COVER, IN. 8.1. CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH: 3 8.2. ALL OTHER CONCRETE: 2 9. ALL EMBEDDED STRUCTURAL STEEL, INCLUDING ANCHOR BOLTS, SHALL COMPLY WITH ASTM 307 OR ASTM A36, UNLESS INDICATED DIFFERENTLY ON THESE DRAWINGS. 10. CONSTRUCT FORMS COMPLYING TO SHAPES, LINES, AND DIMENSIONS SHOWN ON DRAWINGS TO OBTAIN AND HOLD ACCURATE ALIGNMENT OF CONCRETE DURING PLACEMENT AND CURING. 11. FABRICATE FORMS FOR EASY REMOVAL WITHOUT HAMMERING OR PRYING AGAINST CONCRETE SURFACES. 12. ROUGHEN ALL EXISTING CONCRETE SURFACES THAT WILL BE IN CONTACT WITH NEW CONCRETE. 13. THOROUGHLY CLEAN FORMS AND ADJACENT SURFACES TO RECEIVE CONCRETE. REMOVE CHIPS, WOOD, SAWDUST, DIRT AND OTHER DEBRIS PRIOR TO CONCRETE PLACEMENT. 14. CLEAN REINFORCING OF LOOSE RUST, MILL SCALE, DIRT, OR ANY OTHER FOREIGN MATERIAL. ACCURATELY POSITION, SUPPORT AND SECURE REINFORCEMENT. 15. PROPORTION AND DESIGN MIXES TO RESULT IN CONCRETE SLUMP AT POINT OF PLACEMENT NOT LESS THAN 3" AND NOT MORE THAN 5". ADDITION OF WATER TO READY -MIX CONCRETE IN THE FIELD SHALL NOT BE ALLOWED. MAXIMUM WATER/CEMENT RATIO SHALL BE 0.45. 16. DEPOSIT CONCRETE IN A CONTINUOUS OPERATION UNTIL THE PLACING OF CONCRETE IS COMPLETE. IF THE POUR IS TO BE DISCONTINUOUS, CONTRACTOR SHALL USE CONSTRUCTION JOINTS. 17. CONCRETE SHALL BE AIR ENTRAINED TO ARCHIVE 4-6% AIR CONTENT. DO NOT OVER -TROWEL AIR -ENTRAINED SLABS. STANDARD 900 HOOK DISTANCES PER BAR SIZE BAR SIZE MINIMUM (IN.) #3 5 #4 6 #5 8 #6 9 #7 11 #8 12 #9 14 #10 15 #11 17 #14 21 #18 27 STANDARD 1800 HOOK DISTANCES PER BAR SIZE BAR SIZE MINIMUM (IN.) #3 2 #4 2 #5 3 #6 3 #7 4 #8 4 #9 6 #10 7 #11 7 #14 11 #18 14 NOTES: THE EXTENSION AFTER THE 180' HOOK MUST BE A MINIMUM OF 4d > 2-1/2"b ABBREVIATIONS AB ANCHOR BOLT AFF ABOVE FINISH FLOOR BLDG BUILDING BLKG BLOCKING BM BEAM BOT,BOTT BOTTOM BRG BEARING C CHANNEL CJ CONTROL JOINT CLG CEILING CLR CLEAR CMU CONCRETE MASONRY UNIT COL COLUMN CONC CONCRETE CONT CONTINUOUS CTR CENTER CU CUBIC DBL DOUBLE DET DETAIL DIA DIAMETER DIAG DIAGONAL D.I.C.A. DRILLED -IN CONCRETE ANCHOR DIM DIMENSION DN DOWN DWG DRAWING EA EACH EJ EXPANSION JOINT EL,ELEV ELEVATION EQ EQUAL EX EXISTING EW EACH WAY FF FINISH FLOOR FLR FLOOR FT FOOT, FEET FTG FOOTING GA GAUGE GALV GALVANIZED HORIZ HORIZONTAL HSS HOLLOW STEEL SECTION HT HEIGHT ID INSIDE DIAMETER JT JOINT L ANGLE LIN LINEAL LLV LONG LEG VERTICAL MAX MAXIMUM MIN MINIMUM M.O. MASONRY OPENING MTL METAL NOM NOMINAL O.C. ON CENTER O.D. OUTSIDE DIAMETER P.T. PRESSURE TREATED PL PLATE PCF POUNDS PER CUBIC FEET PLF POUNDS PER LINEAL FEET PSF POUNDS PER SQUARE FEET PSI POUNDS PER SQUARE INCH REF REFERENCE REINF REINFORCEMENT REQ'D REQUIRED R.O. ROUGH OPENING SECT SECTION SF SQUIRE FOOT/(FEET) SHT SHEET SIM SIMILAR SQ SQUARE STD STANDARD STL STEEL STRUCT STRUCTURAL T&G TONGUE AND GROOVE T.O.F. TOP OF FOOTING T.O.M. TOP OF MASONRY T.O.S. TOP OF STEEL T.O.W. TOP OF WALL TRANSV TRANSVERSE TS STRUCTURAL TUBING LINO UNLESS NOTED OTHERWISE VERT VERTICAL W WIDE FLANGE SECTION W/ WITH WD WOOD WP WORKING POINT WWF WELDED WIRE FABRIC 0 DIAMETER, ROUND @ AT q CENTERLINE FINAL DRAWINGS - FOR REVIEW PURPOSE ONLY NOT RELEASED FOR CONSTRUCTION V i Ln r�l l9 E Ln rn - � r m �0rn1-O 0 v0 ^ �J f 100 r O r Ur,4m a�sZI- �o a) Ln O a� O a) z � 07 a) Lu Q Q L- c: C aJ V J u o Q J r w Q � 0 00 4-0 co Z W Q .� o U Q o 0 Z ^L I..L � L 4-1 0 m � � o .4-J s u 0 4- (3) Qli o Q � � N 0 D Q C) 0 0 0 z >71 u V) 0 u DATE: August, 2024 DESIGNED: TM DRAWN: RC CHECKED: TM S-1 SYM. REVISIONS DESCRIPTION DATE I BY r'dq y� : • 11 WALL DOI MAT, REINFORCIf AND SPACIP 9 3" EXTEND DO) BOTTOM OF S TIE TO REINFORCING SECTION S-3 SCALE: 1" = 1'-0" )TT. OF TANK .EV. = 76.00' #6's @ 11" o.c. EA. WAY - T&B 2" 3" rik T.O.WALL = TIE TO REINFORCING 2 SECTION S-3 SCALE: 1" = 1'-0" T.O.WALL = EL. 88.50' rA rA KA #6 @ 12 #6 @ 12" RANULAR FILL #6's @ 11" o.c. __v EA. WAY - T&B d° d a a CONTINUOUS KEYWAY, 4" x SLAB DEPTH + 1" d a 1'-0" a )TT. OF TANK 2" CLR. .EV. = 76.00' #6's @ 11" o.c. EA. WAY - T&B 3" CLR. EXTEND DOWELS TO BOTTOM OF SLAB AND TIE TO REINFORCING 1'-2" 3 SECTION S-3 SCALE: 1" = 1'-0" WALL BEYOND POUR WALL CONTINUOUS PAST EFF TROUGH SLAB GROOVE, TYP ALL WATERSIDE EDGES OF INTERMEDIATE SLAB FOR COMPLETE SEAL HYDROPHILIC WATERSTOP CONTRACTOR'S OPTION TO PROVIDE DOWELS w/ MECHANICAL THREADED CONNECTORS TO FACILITATE WALL FORMING #6 @ 12" #6 @ 12" WATER SIDE HYDROTITE HYDROPHILIC WATERSTOP (TYP.) KEYED JOINT do A ° d a d ° n e a wa A ° ° v °a ° "I-' < ° ° GRANULAR FILL BOTT. OF TANK OIL ELEV. = 76.00' #6's @ 11" o.c. EA. WAY - T&B FINAL DRAWINGS - FOR REVIEW PURPOSE ONLY NOT RELEASED FOR CONSTRUCTION ,'I- N D Q C) O � r rn M 0 m -0 rn O v0 ��JJ I l 0 r 0 U 0 M i d a�sZ:1- (.0 a) O Q) n .� . aZ N u C) J J � Q L 4.j U Q) Q) Q v •= a i W U � J .c/) co c: r— O O �--+ A--+ C6 U L v! r O 7 O L Q O ^^L L � •� o rd }' O u oEs� zu~U . s rd _r a QLL O u CL E O u DATE: August, 2024 DESIGNED: TM DRAWN: RC CHECKED: TM NO. S-3 a Co Lq Sri 0 N O) O O) O u N N cr O J 00 0 N .o 0 p 0 U °a 0 z C U) a m C O 0 a N O 0- 2 a fn a :tT N O N Z ,w 0a o J 3 ui m 4. �o N L U N � J ~ N v a�Ci r7 p O/ PO N IN REVISIONS SYM. DESCRIPTION DATE BY \�P .•••......., 0 = U : un bi ! (n 0 7 ".0 = —rnM Dal O can 0 v 0 . V 00 0 N rL i(vUrjrn sZ�(.0 0 (vV) .oO (vz �1 dl dl �1 V) w Q 0 3" WIDE DETECTOR TAPE 18" BURY U o J � w FINAL BACKFILL \ (SEE NOTES 4-5) N 4� \ CONTINUOUS #12 SOLID COVER COPPER WIRE ALONG OX W v NONFERROUS PIPE ONLY -__- -\- _- --\ EWERNK/' 12" - - _--=-_ _ --_ \ _ _ _ _ _ .��� 5-3/4 MIN. .. 5-1 /4" PIPE ZONE 4" MIN. 11 PIPE WIDTH AS REQUIRED BELL O.D. + 12" MIN. BELL O.D. + 24" MAX. INITIAL BACKFILL (SEE NOTE 3) BEDDING (SEE NOTE 1) UNDISTURBED SOIL NOTES: 1. LAYING CONDITIONS AS PER AWWA C600 AND C605 STANDARDS. 2. BEDDING MATERIAL SHALL BE 4" MINIMUM THICKNESS, LOOSE SOIL (DEFINED AS NATIVE SOIL EXCAVATED FROM THE TRENCH), FREE FROM ROCKS AND SHALL PROVIDE UNIFORM SUPPORT FOR THE FULL LENGTH OF PIPE. COMPACT TO 95% MAXIMUM DENSITY. 3. INITIAL BACKFILL SHALL BE LIGHTLY CONSOLIDATED IN MAXIMUM 6" LOOSE LIFTS, COMPACTED TO 95% OF MAXIMUM DENSITY. 4. UNDER AREAS TO BE SEEDED OR SODDED, COMPACT SUCCEEDING LAYERS OF FINAL BACKFILL IN 12" LOOSE LIFTS TO 85% MAXIMUM DENSITY. 5. UNDER STRUCTURES, PAVEMENTS AND ROAD SHOULDERS, COMPACT SUCCEEDING LAYERS OF FINAL BACKFILL IN 6" LOOSE LIFTS TO 95% MAXIMUM DENSITY EXCEPT COMPACT TOP 12" OF SUBGRADE TO 98% MAXIMUM DENSITY. 6. PROVIDE #12 INSULATED SOLID COPPER WIRE IN SUFFICIENT LENGTH TO BE CONTINUOUS OVER EACH SEPARATE RUN OF ALL BURIED PVC PIPING. AT VALVE BOXES, BRING WIRE TO WITHIN 6 IN. OF TOP OF BOX AND INSERT INTO BOX THROUGH DRILLED HOLE. NOT REQUIRED FOR DUCTILE IRON PIPE. 7. COPPER WIRE INSULATION SHALL BE GREEN FOR SEWER AND BLUE FOR WATER. WIRE CONNECTIONS ARE TO BE MADE WATER TIGHT WITH TWISTER DB PLUS WATERPROOF WIRE CONNECTORS OR AN APPROVED EQUAL. 8. INSTALL 3" WIDE DETECTOR TAPE AT 18" DEPTH. TAPE SHALL HAVE MIDDLE FOIL LAYER. FORCE MAIN TRENCH TYPE 3 LAYING CONDITIONS N.T.S. a a• 24"x24"x6" THICK CAST —IN —PLACE CONCRETE PAD 2" SQUARE OPERATOR NUT MECHANICAL IIIIII JOINT PLUG VALVE IIII LOOP TRACER WIRE UP TO TOP OF VALVE BOX CAST IRON VALVE BOX SOLID BRICK PLACED ON COMPACTED SOIL UNDER VALVE BOX IIIIIII #12 COPPER IIII TRACER WIRE OVER NON FERROUS PIPE i, CONCRETE III BLOCK NOTE: SEPARATION FROM ADJACENT FITTINGS SHOWN ON PLANS AND PROFILES IS FOR CLARITY. ACTUAL SEPARATION MAY BE ADJUSTED TO FIT LAYING CONDITIONS. PLUG VALVE ASSEMBLY N.T.S. a 3 -10-1/4" J m Q BOTTOM SECTIONIr 7-5/16" s N OR 2" 7„ 9,, 7-3/8" 6-3/8" COMPLETE BOX DIMENSIONS IN INCHES LENGTH TOP BOTTOM 10 15 10 24 16 24 16 36 26 36 26 48 26 60 NOTES: TOP SECTION 1. VALVE BOX SHALL HAVE RAISED LETTERS "SEWER" CAST INTO COVER. 2. VALVE BOX ACCOMMODATES 4" THRU 12" VALVES. 3. VALVE BOX SHALL HAVE j" HOLE DRILLED IN TOP SECTION THRU WHICH A J" X 1j" GALVANIZED BOLT SHALL BE USED TO SECURE A 12GA. THHN TRACER WIRE FOR NON—FERROUS PIPE. A J" WASHER SHALL BE USED BETWEEN NUT AND INSIDE OF BOX. TIGHTEN HAND TIGHT. 4.SCREW TYPE VALVE BOXES ARE REQUIRED. 5 SSHOWN Y VARY DEPENDING UPON VALVE B 0 X THE MANUFACTURER. N.T.S. r •� o c� 4-0O u i E s z .� s U~U 4-1 0 4— N Q LL O U E O 2 U DATE: February, 2024 DESIGNED: - DRAWN: - CHECKED: - MISC DETAILS 23.03.dwg: Layout=S.4 Proposed Aeration Basin No.1 Typical Details at D.l N a� v a� r U (N d C O N f0 � O z 0 o � o O U 0 0 N O 0 W N 3 O J O 0 m U "0 - � �o O L N o c U c 0 0 � N O c c � O w U C N 0 0 O ui N II p O' 0 �o d U .o 0 �° N " O N O I'll U 0 O Ld O W J T 3 m� U) .o > W 00 V) J y N 3 N •o N ;' .60 4! N O 00 U o� N 0 fN w �3 U N N r0+ fA 01 r C U c o� o� N c - 6� 0 0 ! 0 N U) co 3 r O U a� o~ � 3 c � E 00 U d 0 3 CLu wa c J •N m 3 c O o x o D Q 0 aIm II P O� PO N I rn O f- r � iUJ of J X 3"-5" DEEP TRENCH 6"-8" DIA. 1"x1" STAKE ON STEEP SLOPE '" 4" NAIL COIR WATTLE A-r WOODEN WEDGE COIR WATTLE STAPLE (TYP.) 2"x4" WOODEN WEDGE NOTES: 1. INSTALLATION TO BE COMPLETED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. 2. WHEN SLOPES ARE STEEP, STRAW ROLL INSTALLATION REQUIRES THE PLACEMENT AND STAKING OF THE ROLL IN A TRENCH DUG, 3"-5" DEEP. 3. RUNOFF MUST NOT BE ALLOWED TO RUN UNDER OR AROUND ROLL. MATERIAL: COCONUT FIBER, SYNTHETIC, JUTE, STRAW AND EXCLESIOR PRODUCT SPECIFICATION: UNIT WEIGHT: 1 LB/FT ROLL WEIGHT: 17 LBS ROLL LENGTH: 15 FT FUNCTIONAL HEIGHT: 61N UPSTREAM FILTER APRON: 61N DOWNSTREAM FILTER APRON: 10" COIR WATTLE N.T.S. SILT FENCE DETAIL N.T.S. SILT FENCE INSTALLATION: 1. THE BASE OF BOTH END POSTS SHOULD BE AT LEAST ONE FOOT HIGHER THAN THE MIDDLE OF THE FENCE. CHECK WITH A LEVEL IF NECESSARY. 2. INSTALL POSTS 4 FEET APART IN CRITICAL AREAS AND 6 FEET APART ON STANDARD APPLICATIONS. 3. INSTALL POSTS 2 FEET DEEP ON THE DOWNSTREAM SIDE OF THE SILT FENCE, AND AS CLOSE AS POSSIBLE TO THE FABRIC, ENABLING POSTS TO SUPPORT THE FABRIC FROM UPSTREAM WATER PRESSURE. 4. INSTALL POSTS WITH THE NIPPLES FACING AWAY FROM THE SILT FABRIC. 5. ATTACH THE FABRIC TO EACH POST WITH THREE TIES, ALL SPACED WITHIN THE TOP 8 INCHES OF THE FABRIC. ATTACH EACH TIE DIAGONALLY 45 DEGREES THROUGH THE FABRIC, WITH EACH PUNCTURE AT LEAST 1 INCH VERTICALLY APART. ALSO, EACH TIE SHOULD BE POSITIONED TO HANG ON A POST NIPPLE WHEN TIGHTENED TO PREVENT SAGGING. 6. WRAP APPROXIMATELY 6 INCHES OF FABRIC AROUND THE END POSTS AND SECURE WITH 3 TIES. 7. NO MORE THAN 24 INCHES OF A 36 INCH FABRIC IS ALLOWED ABOVE GROUND LEVEL. 8. THE INSTALLATION SHOULD BE CHECKED AND CORRECTED FOR ANY DEVIATIONS BEFORE COMPACTION. 9. COMPACTION IS VITALLY IMPORTANT FOR EFFECTIVE RESULTS. COMPACT THE SOIL IMMEDIATELY NEXT TO THE SILT FENCE FABRIC WITH THE FRONT WHEEL OF THE TRACTOR, SKID STEER, OR ROLLER EXERTING AT LEAST 60 POUNDS PER SQUARE INCH. COMPACT THE UPSTREAM SIDE FIRST, AND THEN EACH SIDE TWICE FOR A TOTAL OF 4 TRIPS. SILT FENCE MAINTENANCE: 1. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. 2. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 3. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. 4. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. 5. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. 6. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. A t- REVISIONS SYM. DESCRIPTION DATE BY ``����„1111'��������''' `J �S" O w� Z. 2 v� En e Ln 2 MAX. vzzzzzz" MMMM, 0;' 0 SECTION A -A .,JNSTRUCTION SPECIFICATIONS: PLAN 1. UNIFORMLY GRADE A SHALLOW DEPRESSION APPROACHING THE INLET. 2. DRIVE 5' STEEL POST 2' INTO THE GROUND SURROUNDING THE INLET SPACE POSTS EVENLY AROUND THE PERIMETER ON THE INLET, MAX. 4' APART. 3. SURROUND THE POSTS WITH WIRE MESH HARDWARE CLOTH. SECURE THE WIRE MESH TO THE STEEL POSTS AT THE TOP, MIDDLE AND BOTTOM. PLACING A 2' FLAP OF THE WIRE MESH UNDER THE GRAVEL FOR ANCHORING IS RECOMMENDED. 4. USE A MINIMUM 16" DIAMETER WATTLE WITH A LENGTH TO SURROUND WIRE MESH HARDWARE CLOTH FITTING SNUG AGAINST THE GROUND. SECTION VIEW 5. USE 2" X 2" X 30" LONG WOODEN STAKES. 6. EXCAVATE A 1 " TO 2" TRENCH FOR WATTLE TO BE PLACED. 7. INSTALL A MINIMUM OF 2 UPSLOPE STAKES AT AN ANGLE TO WEDGE THE WATTLE TO THE GROUND AND UP AGAINST THE HARDWARE CLOTH. 8. PROVIDE STAPLES MADE OF 0.125" DIAMETER STEEL WIRE FORMED INTO A "U" SHAPE AND NOT LESS THAN 12" LENGTH. 9. INSTALL STAPLES APPROXIMATELY EVERY 12" ON BOTH SIDES OF WATTLE AND AT EACH END TO SECURE IT TO THE SOIL. 10. WATTLE INSTALLATION SHALL BE ON THE OUTSIDE OF THE HARDWARE CLOTH. 11. ONCE THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE ACCUMULATED SEDIMENT, AND ESTABLISH FINAL GRADING ELEVATIONS. 12. COMPACT THE AREA PROPERLY AND STABILIZE IT WITH GROUND COVER. TEMPORARY INLET PROTECTION (COIR WATTLE) SEEDING SCHEDULE GRASSING PLAN FOR STREETS AND UTILITY EASEMENTS: NOTE TEMPORARY SEED MIX SHALL BE USED FOR ALL AREAS EXPOSED GREATER THAN ONE WEEK AND SUBJECT TO FURTHER DISTURBANCE. PERMANENT SEED MIX SHALL BE CHECKED FOR ADEQUACY ON JULY 15. AN ADEQUATE COVER SHALL HAVE 50 SPRIGS OF BERMUDA OR SERICEA LESPEDEZA PER ONE SQUARE FOOT. PERMANENT SPRING SEED MIX SPECIES RATE (LB./ACRE) MARCH 1 - JULY 1 COMMON BERMUDA 25 SERICEA LESPEDEZA 30; TEMPORARY SUMMER SEED MIX (TO BE FOLLOWED BY PERMANENT FALL SEED MIX) SPECIES RATE (LB./ACRE) MARCH 1 - SEPT. 1 GERMAN MILLET 120 PERMANENT FALL SEED MIX SEPT. 1 - NOV. 1 TEMPORARY WINTER SEED SEPT. 1 - MARCH 1 SPECIES RATE (LB./ACRE) COMMON BERMUDA 30; SERICEA LESPEDEZA (UNSCARIFIED) 30,, KOBE LESPEDEZA 10-= MIX (TO BE FOLLOWED BY PERMANENT SPRING SEED MIX) SPECIES RATE (LB./ACRE) WINTER RYE (GRAIN) 200- _ KOBE LESPEDEZA 120' SOIL AMENDMENTS TO BE INCORPORATED INTO THE TOP 3 INCHES OF SOIL IN AREAS WITH SLOPES 2:1 OR FLATTER APPLY FERTILIZER (10-10-10) AT A RATE OF 1000 LB/ACRE APPLY LIME (GROUND AGRICULTURAL LIMESTONE) AT A RATE OF 4000 LB/ACRE APPLY SUPERPHOSPHATE (0-49-0) AT A RATE OF 200 LB/ACRE * REQUIRED FOR PERMANENT SEED MIX ONLY AAI II rW APPLY 4,000 LB/ACRE GRAIN STRAW OR EQUIVALENT COVER. ANCHOR MULCH WITH ROVING, NETTING OR BY TACKING WITH ASPHALT EMULSION AT A RATE OF 400 GAL./ACRE WATER MINIMUM OF 1" OF RAINFALL A WEEK (IF NOT SUPPLIED NATURALLY, CONTRACTOR SHALL SUPPLY THE REMAINING AMOUNT UNTIL GROUND COVER HAS BEEN ESTABLISHED). MAINTENANCE REFERTILIZE IN THE SECOND YEAR UNLESS THE GROWTH IS FULLY ADEQUATE. MOW WHEN THE AVERAGE PLANT HEIGHT EXCEEDS 6 INCHES. RESEED, FERTILIZE AND MULCH DAMAGED AREAS IMMEDIATELY. - =-rv1d1 Dal O rvm ,1-0 v 0 ..V00�0 N •,­ rL i(VUrQM.i �=Z�(�O (V V) (3) o (V Z . 0 O (31 .� (3) N V t = Q v •= a i LV V J rz a-J 4J 4-J O m � (V E s o .� s U cd u 0 4- N Q u- O Q � � P 0 4-1 z 4 0 U N E 0 U DATE: February, 2024 DESIGNED: UP DRAWN: LR CHECKED: LJP at Erosion Control Details.dwg: Layout=D.2 Erosion Control Details