Loading...
HomeMy WebLinkAboutWQ0005150_Monitoring - 08-2024_20240912Monitoring Report Submittal ................................................... Permit Number#* WQ0005150 Name of Facility:* North End Elementary Month: * August Year: * 2024 Report Information Type* Upload Document* NDMR, NDAR-1, NDAR-2, NDMLR NE NDAR-1 Aug. 24.pdf 227.32KB PDF Only Please upload one PDF containing all applicable monitoring reports (i.e., NDMR, NDAR-1, NDAR-2, NDMLR, GW-59). Confirmation Email Address: * phillipspa@person.k12.nc.us Name of Submitter: * Paul Phillips Signature: �a«/J�r�Ylrhl Date of submittal: 9/12/2024 This will be filled in automatically Initial Review Reviewer: Wanda.Gerald Is the project number correct?* W00005150 Is the monitoring report accepted?* Yes NO Regional Office* Raleigh Reviewer: _anonymous Review Date: 9/17/2024 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page-2—of Z Permit No.: 0111 1 Facility Name: North End ElementaryPerson. • 1 • irrigation • this facility? Area (acres): Area (acres): Area (acres): at Cover C p: Cover Crop: Cover Crop. BYES ONO Field Irrigated? ommoM= • 111 :1 1 1 0.10 -- - 1 m�__ ®___ __ -- -_-- ---- m�__--- Monthly• . • • • 1 / 1 /� 1 1% 1 11���/////% 1 11 �i/� 1 1 W/0111 .. • • j�j�j��j�jj�/��//!/j�j��"�Y�jjjjj�� �////�j�� ��j�jj.4;!/j�/jjj�%//����- ���j%% ���jj� ��/��/.- �jjjj�j/. t-UKM: NUAK-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page Z of Did the application rates exceed the limits in Attachment B of your permit? Were adequate measures taken to prevent effluent ponding in or runoff from the sites? Was a suitable vegetative cover maintained on all sites as specified in your p rmit? Were all setbacks listed in your permit maintained for every application to each permitted site? Were all freeboards maintained in accordance with the specified freeboard heights in your permit? ❑✓ Compliant ❑ Non -Compliant [Z Compliant ❑ Non -Compliant Q Compliant ❑ Non -Compliant 0 Compliant ❑ Non -Compliant ❑� Compliant ❑ Non -Compliant If the facility is non -compliant, please explain in -the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-ccmpliance and describe the corrective action(s) taken. Attach additional Isheets if n Operator in Responsible Charge (ORC) Certification I Permittee Certification ORC: Paul J. Phillips Permittee: Dr. Rodney Peterson Certification No.: 986029 Signing Off lcial: Dr. Rodney Peterson Grade: SI Phone Number: 336- 599- 0223 Signing Official's Title: Superientendent Has the ORC changed since the previous NDAR-1? Zves (3 No Phone Number: 336-599-0223 Permit Exp.: 7/31/26 ignature Date rgna ure Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under nalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a s tem designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Mail Original and Two Copies to: Division of Water Quality Information Processing ;Unit 1617 Mail Service Center Raleigh, North Carolina 2709-1617