County: Rockingham Project: Wentworth Solar Electric Power Plant River basin: Roanoke
Person financially responsible:Strata Solar Development,LLC-Markus Wilhelm, Project#: ROCKI-2022-023
Manager
Address: 800 Taylor Street,Suite 200,Durham,NC 27701
1. Project Location: 9296 NC-87,Wentworth
Pictures: No
2. Weather and soil conditions: 70's,sunny,workable Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Title:
Inspection report: Sent Report Date given/sent: September 06,2024
9. Corrective action needed:
10. Comments: The site was inspected on September 5,2024 to facilitate a site closure.Permanent ground
cover sufficient to restrain erosion has been established.No additional self-monitoring or
self-inspections are required.Project is in compliance and released under the SPCA.
Termination of coverage under the NPDES General Stormwater Permit for Construction
Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).
The NOT is available at:https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note
that this correspondence must be uploaded as part of completing the NOT process.
If you have any questions,please contact the Winston Salem Regional Office or
nate.gainer@deq.nc.gov or 336-776-9660.
Reported by: Nate Gainer Others present:
Date of inspection: September 05,2024 Time arriving on site: 4:00 PM Time leaving site: 4:15 PM
CC: