Loading...
HomeMy WebLinkAboutNCC232305_Annual Fee NOD Letter (2024 Fee)_20240916 ROY COOPER Govemor ELIZABEIH S.BISER f . Secretary WILLIAM E.TOBY VINSON,JR NORTH CAROLINA lnw"Director EnWonmental Quality 9/16/2024 Caviness&Cates Building and Development Co. Attn:Christopher Cates 639 Executive Place, Suite 400 Fayetteville, NC 28305-5488 Subject: Notice of Deficiency-Failure to Pay Annual Fee Invoice No. NCC232305-2024 Dear Permittee: You are receiving a Notice of Deficiency because the annual fee of$120 for coverage under NPDES General Stormwater Permit NCG010000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4).The annual fee was billed on 8/1/2024 and was due on 9/1/2024.The annual fee applies to the following construction site: Anderson Creek Crossing, Phase 8,Section 4-Lots 155&156 Timber Skip Drive,Anderson Creek Township, NC Harnett County Certificate of Coverage No. NCC232305 NC Reference No. NCG01-2023-2305 If the project was closed out prior to the invoice due date, please request a Notice of Termination. Follow the instructions on the NPDES Construction Program website(deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice due date, please pay the permit fee using the Stormwater ePayment website(deq.nc.gov/SW-ePayments). Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil penalty assessment of up to$25,000 per day for failing to maintain permit coverage. If you have any questions or concerns, please contact Kieu Tran at kieu.tran@deq.nc.gov. Sincerely, William E.Vinson,Jr., PE,CPESC,CPM Interim Director Division of Energy, Mineral,and Land Resources D_E Q� Nrnlh Cara7ina Deparlmenl of Cnvroament:J Qwlily Drvisirr ul Cnrryy.Mineral urwl Lancf Frsorrccs Sl2 Nur R,Salisbury Slrrel I Iol2 Mail Se s,ceCmter Rork iyh.Nurlh Caroline Tiboo I612