HomeMy WebLinkAboutNCC232852_NOT Closeout Documents_20240909 ,.� Engineering Department
C� Greenville 1500 Beatty St.-PO Box 7207
"v' NORTH CAROLINA Greenville, NC 27835-7207
Office:252.329.4467
ENGINEERING
Engineering Department - Sedimentation/Erosion Control Program
September 05, 2024
Letter of Final Inspection
Re: Project Name: Abigail Trails Lot62B
Bedroom, 2.5 Baths
1636sf
Project Number: ESCP-2023-0095
County: Pitt
Disturbed Acreage: 0.1
Responsible Party: HOUSE BPR LLC
Dear Sir/Madam:
At your request, this office has completed its final site inspection of the referenced project. We found the
site stable and in compliance with the approved Sedimentation and Erosion Control Plan.
Upon issuance of this letter, the referenced Sedimentation and Erosion Control Plan has been closed for this
project and you will need to terminate your NCGO1 permit.
Please do not hesitate to call if you have any questions.
Respectfully,
Tyler Averett
EN LD Engineering Assistant II
Engineering Department
City of Greenville
TAverett@greenvillenc.gov
www.greenvillenc.gov
(252) 329-4828
Engineering- 1500 Beatty Street- PO Box 7207-Greenville, NC 27835-7207-Office: 252.329.4467-greenvillenc.gov