HomeMy WebLinkAboutSW3240305_Application Form_20240912 IV. PROJECT INFORMATION
1. In the space provided below,briefly summarize how the stormwater runoff will be treated.
Site acts as low density.BUA will sheet flow to the north and east property boundaries with majority
flowing north.Undisturbed areas will remain as tall grasses and act as diffuse flow.There is no curb and
gutter or piping.North boundary will have approx.46'wide setback.
2.a.If claiming vested rights, identify the supporting documents provided and the date they were approved:
❑Approval of a Site Specific Development Plan or PUD Approval Date:
❑Valid Building Permit Issued Date:
❑Other: Date:
b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with:
❑ Coastal SW-1995 ®Ph II-Post Construction
3. Stormwater runoff from this project drains to the Yadkin Peedee River basin.
4. Total Property Area: 9.64 acres 5. Total Coastal Wetlands Area:0 acres
6. Total Surface Water Area:0 acres
7. Total Property Area (4)-Total Coastal Wetlands Area (5) -Total Surface Water Area (6) =Total Project
Area+:9.64 acres
+ Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area
between the banks of streams and rivers, the area below the Normal High Water(NHM line or Mean High Water
(MH10 line, and coastal wetlands landward from the NHW(or MHM line. The resultant project area is used to
calculate overall percent built upon area (B UA). Non-coastal wetlands landward of the NHW(or MHVv) line may
be included in the total project area.
8. Project percent of impervious area: (Total Impervious Area/ Total Project Area)X 100 = 1.3
9. How many drainage areas does the project have?1 (For high density, count 1 for each proposed engineered
stormwater BMP. For low density and other projects,use 1 for the whole property area)
10. Complete the following information for each drainage area identified in Project Information item 9. If there
are more than four drainage areas in the project,attach an additional sheet with the information for each area
provided in the same format as below.
Basin Information Drainage Area 1 Drainage Area_ Drainage Area_ Drainage Area_
Receiving Stream Name Coddle Creek
Stream Class * C
Stream Index Number 13-17-6-(5.5)
Total Drainage Area(sf) 450,104
On-site Drainage Area(sf) 450,104
Off-site Drainage Area (sf) 0
Proposed Impervious Area**(sf) 5543
Impervious Area**(total) 1.3%
Impervious-Surface Area Drainage Area 1 Drainage Area_ Drainage Area_ Drainage Area_
On-site Buildings/Lots (sf) 0
On-site Streets (sf) 0
On-site Parking (sf) 0
On-site Sidewalks (sf) 0
Other on-site (sf) 5543
Future (sf) 0
Off-site (sf) 0
Existing BUA***(sf) 0
Total (sf): 1 5543
* Stream Class and Index Number can be determined at: http.Z&ortal.ncdenr.or /w�cl(ps/csu/classifications
Im ervious area is defined as the built upon area including, but not limited to, buildings,roads,parking areas,
sidewalks,gravel areas,etc.
Form SWU-101 Version Oct. 31,2013 Page 3 of 6