Loading...
HomeMy WebLinkAboutNCC216300_NOT Closeout Documents_20240910 FINAL INSPECTION REPORT-Erosion Control Town of Huntersville- Land Development 105 Gilead Rd, Ste 300, Huntersville NC 28078 (704)-875-7007 Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)should be requested by the permittee via a Notice of Termination. Please note that this correspondence must be uploaded as part of completing the Notice of Termination Process. NCGO1 COC# NCC216300 Project Name Ivory Barn Financially Responsible Owner(FRO) Grassroots Land, LLC/gayle_allen@bellsouth.net FRO Address 15550 Stumptown Rd. Huntersville, NC 28078 Project Location 14418 NC Hwy&3, Huntersville, NC River Basin/Watershed Upper Mountain Island Lake w EC Final Inspection Date 7/1/2024 Start Time 11:30 AM End Time 12:00 PM Inspector Name Anne Loftin Others Present Gayle Allen Weather Conditions Sunny Soil Conditions Workable Onsite Contact Made Yes Name Gayle Allen-Owner Title/Company Report Sent Yes See dispatch list at bottom of report Erosion/Sediment measures removed? Yes Site Permanently Stabilized? Yes Comment BMP's Installed Per Approved Plan? Yes As-Built BMP Project# As-Built SD& BMP(ASB-455156) FINAL INSPECTION COMMENTS Project is completed,stable and the erosion measures removed. Dry ponds on site should be monitored and maintained per the PCO-19 (Declaration and Covenants). Site approved for the two-year maintenance bond and reminded of the Owner annual inspection requirements as outlined in the PCO-19. DISPATCH LIST gayle_allen@bellsouth.net; Jay Henson <jay@hensonfoley.com>; Andrewkidd@drycorestoration.com; Skip <skip@canipeconstruction.com>; Gayle Allen <gayle@theivorybarn.net>; Kim Behrenbrinker <kbehrenbrinker@huntersville.org>; Nathan Farber<nfarber@huntersville.org>; Veronika Galitsky <vgalitsky@huntersville.org>; Cecil Talbot<ctalbot@huntersville.org>; Au'Darius Blackwood <ablackwood@huntersville.org>;Tess Fallova <TFallova@waengineering.com> 1 of 1 Report Date: 9/9/2024