HomeMy WebLinkAboutWQ0044433_Application (FTSE)_20230524 State of North Carolina
Department of Environmental Quality
Division of Water Resources
DWIM
FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Division of Water Resources FTA 06-21 &SUPPORTING DOCUMENTATION
Application Number: a > . 4`i J-5 tto be completed by DwRt RECEIVED/NMEO/DWR
All items must be completed or the application will be returned
I. APPLICANT INFORMATION: W)ORES- 4-�LF REGrJNALt
1. Applicant's name: RAMA HOMES,LLC(company,municipality,HOA,utility,etc.)
2. Applicant type: ❑❑ Individual No Corporation ❑❑ General Partnership ❑❑ Privately-Owned Public
Utility
❑❑Federal ❑❑ State/County ❑❑Municipal ❑❑Other
3. Signature authority's name:Rama Yada per 15A NCAC 02T .0106(b)
Title:Owner
4. Applicant's mailing address: 8021 Wicklow Hall Dr
City:Matthews State:NC Zip: 28104
5. Applicant's contact information:
Phone number (704)287-6252 Email Address:ramayada(a)gmail.com
II. PROJECT INFORMATION:
1. Project name: 10317 Rozzelles Ferry Townhomes
2. Application/Project status: ®Proposed(New Permit) ❑Existing Permit/Project
If a modification,provide the existing permit number:WQ00 and issued date:
For modifications, also attach a detailed narrative description as described in Item G of the checklist._
If new construction,but part of a master plan,provide the existing permit number: WQ00
3. County where project is located:Mecklenburg
4. Approximate Coordinates(Decimal Degrees):Latitude: 35.322124` Longitude: -80.953787`
5. Parcel ID(if applicable): 03118239(or Parcel ID to closest downstream sewer)
III. CONSULTANT INFORMATION:
1. Professional Engineer:Greg Emery License Number: 045773
Firm:Gateway Design Group,PLLC
Mailing address: 15126 Foxbridge Dr
City:Weddington State:NC Zip: 28104-
Phone number:(828)989-9207 Email Address: greg(a!gatewaydesigngroup.com
IV. WASTEWATER TREATMENT FACILITY(WWTF)INFORMATION:
1. Facility Name:McAlpine Creek,Irwin Creek, Sugar Creek WWTP Permit Number:NC0024970,NC0024945,NC0024937
Owner Name: City of Charlotte
V. RECEIVING DOWNSTREAM SEWER INFORMATION:
1. Permit Nunmber(s): WQ-unknown
2. Downstream(Receiving)Sewer Information: 8 inch ® Gravity ❑ Force Main
3. System Wide Collection System Permit Number(s)(if applicable):WQCS
FORM: FTA 06-21 Page 5 of 5
State of North Carolina
Department of Environmental Quality
DWIM Division of Water Resources
FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Division of Water Resources FTA 06-21 &SUPPORTING DOCUMENTATION
Owner Name(s): City of Charlotte
FORM:FTA 06-21 Page 6 of 5
V1. GENERAL REQUIREMENTS
I. If the Applicant is a Privately-Owned Public Utility,has a Certificate of Public Convenience and Necessity been attached?
El
❑❑Yes❑ ❑No ❑®N/A
2. If the Applicant is a Developer of lots to be sold,has a Developer's Operational Agreement(FORM: DEV)been attached?
NO Yes ❑❑No ❑N/A
3. If the Applicant is a Home/Property Owners'Association,has an HOA/POA Operational Agreement(FORM: HOA)and
supplementary documentation as required by 15A NCAC 02T.0115(c)been attached?
❑❑Yes❑ ❑No ❑❑N/A
4. Origin of wastewater: (check all that apply):
®❑Residential(Individually Owned) ❑❑Retail(stores,centers,malls)
❑❑❑❑Car Wash
❑Residential(Leased) ❑❑Retail with food preparation/service ❑❑❑Hotel and/or Motels
❑ School/preschool/day care ❑❑Medical/dental/veterinary facilities ❑❑❑ Swimming Pool/Clubhouse
❑❑Food and drink facilities ❑❑Church ❑❑❑❑❑ Swimming Pool/Filter
Backwash
❑Businesses/offices/factories ❑❑❑Nursing Home ❑❑Other(Explain in Attachment)
5. Nature of wastewater: 100%Domestic %Commercial %Industrial(See 15A NCAC 02T.0103(20))
If Industrial,is there a Pretreatment Program in effect?❑❑❑Yes ❑❑
No
6. Hasa flow reduction been approved under 15A NCAC 02T.0114(f)? ❑❑Yes ❑®No
➢ If yes,provide a copy of flow reduction approval letter with this application
7. Summarize wastewater generated by project:
Establishment Type(see 02T.0114(f)) Daily Design Flow'" No.of Units Flow
Townhomes (3 bedroom) 190 gal/unit 19 3,610 GPD
GPD
gal/ GPD
gal/ GPD
gal/ GPD
Total 3,610 GPD
a See 15A NCAC 02T .01 14(b), (d), (e)(1) and(e)(2) for caveats to wastewater design flow rates (i.e.,minimum flow per
dwelling; proposed unknown non-residential development uses; public access facilities located near high public use
areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals
as defined in G.S.42A-4).
b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.0114] shall
be determined using available flow data,water using fixtures,occupancy or operation patterns,and other measured data.
8. Wastewater generated by project: 3,610 GPD(per 15A NCAC 02T.0114)
➢ Do not include future flows or previously permitted allocations
If permitted flow is zero,please indicate why:
❑❑ ❑Pump Station/Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this
line.
Please provide supplementary information indicating the approximate timeframe for permitting upstream sewers with flow.
OF ❑Flow has already been allocated in Permit Number: Issuance Date:
❑❑Rehabilitation or replacement of existing sewers with no new flow expected
OF Other(Explain):
FORM: FTA 06-21 Page 7 of 5
VII. GRAVITY SEWER DESIGN CRITERIA(If Applicable)-02T.0305&MDC (Gravity Sewers):
1. Summarize gravity sewer to be pennitted:
Size(inches) Length(feet) Material
6 283 PVC
➢ Section II&III of the MDC for Permitting of Gravity Sewers contains information related to design criteria
➢ Section III contains information related to minimum slopes for gravity sewer(s)
➢ Oversizing lines to meet minimum slope requirements is not allowed and a violation of the MDC
VIII. PUMP STATION DESIGN CRITERIA(If Applicable)—02T.0305&MDC(Pump Stations/Force Mains):
PROVIDE A SEPARATE COPY OF THIS PAGE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
1. Pump station number or name: N/A
2. Approximate Coordinates(Decimal Degrees): Latitude: Longitude: -
3. Total number of pumps at the pump station:
3. Design flow of the pump station: millions gallons per day(firm capacity)
➢ This should reflect the total GPM for the pump station with the largest pump out of service.
4. Operational point(s)per pump(s): gallons per minute(GPM)at feet total dynamic head(TDH)
5. Summarize the force main to be permitted(for this Pump Station):
Size(inches) Length(feet) Material
If any portion of the force main is less than 4-inches in diameter,please identify the method of solids reduction per
MDCPSFM Section 2.01 C.l.b. ❑❑Grinder Pump ❑❑ Mechanical Bar Screen ❑❑Other(please specify)
6. Power reliability in accordance with 15A NCAC 02T.0305(h)(1):
❑❑ Standby power source or ❑❑ Standby pump
➢ Must have automatic activation and telemetry- 15A NCAC 02T.0305(h)(1)(B)_
➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day
➢ Must be permanent to facility and may not be portable
Or if the pump station has an average daily flow less than 15,000 gallons per day 15A NCACO2T.0305(h)(1)(C):
❑❑ Portable power source with manual activation,quick-connection receptacle and telemetry-
or
❑❑ Portable pumping unit with plugged emergency pump connection and telemetry:
➢ Include documentation that the portable source is owned or contracted by the applicant and is compatible with the
station.
➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations'
storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be
provided as part of this permit application in the case of a multiple station power outage.
FORM: FTA 06-21 Page 8 of 5
IX. SETBACKS& SEPARATIONS—(02B.0200 & 15A NCAC 02T.0305(f)):
1. Does the project comply with all separations/alternatives found in 15A NCAC 02T .0305(f)&(g)? ®❑ Yes❑
❑No
15A NCAC 02T.0305 contains minimum separations that shall be provided for sewers stems:
Setback Parameter* Separation Required
Storm sewers and other utilities not listed below(vertical) 18 inches
zWater mains(vertical-water over sewer preferred,including in benched trenches) 18 inches
'Water mains(horizontal) 10 feet
Reclaimed water lines(vertical-reclaimed over sewer) 18 inches
Reclaimed water lines(horizontal-reclaimed over sewer) 2 feet
**Any private or public water supply source,including any wells,WS-I waters of Class I or
Class II impounded reservoirs used as a source of drinking water,and associated wetlands. 100 feet
**Waters classified WS(except WS-I or WS-V),B, SA,ORW,HQW,or SB from normal
high water(or tide elevation)and wetlands associated with these waters(see item IX.2) 50 feet
**Any other stream, lake,impoundment,or ground water lowering and surface drainage
ditches,as well as wetlands associated with these waters or classified as WL. 10 feet
Any building foundation(horizontal) 5 feet
Any basement(horizontal) 10 feet
Top slope of embankment or cuts of 2 feet or more vertical height 10 feet
Drainage systems and interceptor drains 5 feet
Any swimming pools 10 feet
Final earth grade(vertical) 36 inches
➢ If noncompliance with 02T.0305(f)or(g), see Section X.1 of this application
*15A NCAC 02T.0305(g)contains alternatives where separations in 02T.0305(f)cannot be achieved.Please check"yes"
above if these alternatives are used and provide narrative information to explain.
**Stream classifications can be identified using the Division's NC Surface Water Classifications webpage
2. Does this project comply with the minimum separation requirements for water mains? ❑❑ Yes❑ ❑No
®N/A
➢ If no,please refer to 15A NCAC 18C.0906(f)for documentation requirements and submit a separate document,
signed/sealed by an NC licensed PE,verifying the criteria outlined in that Rule.
3. Does the project comply with separation requirements for wetlands? ❑❑ Yes❑ ❑No
® N/A
➢ Please provide supplementary information identifying the areas of non-conformance.
➢ See the Division's draft separation requirements for situations where separation cannot be met.
➢ No variance is required if the alternative design criteria specified is utilized in design and construction.
4. Is the project located in a river basin subject to any State buffer rules? ❑❑Yes❑ Basin name: ®No
If yes,does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ❑❑Yes❑ ❑
No
➢ This includes Trout Buffered Streams per 15A NCAC 213.0202
5. Does the project require coverage/authorization under a 404 Nationwide/individual permits ❑❑ Yes❑
® No
or 401 Water Quality Certifications?
➢ Please provide the pen-nit number/pennitting status in the cover letter if coverage/authorization is required.
6. Does project comply with 15A NCAC 02T.0 I 05(c)(6)(additional permits/certifications)? ®❑Yes❑ ❑
No
Per 15A NCAC 02T.0105(c)(6),directly related environmental pen-nits or certification applications must be being prepared,
have been applied for,or have been obtained.Issuance of this permit is contingent on issuance of dependent pen-nits(erosion
and sedimentation control plans, stonmwater management plans,etc.).
FORM: FTA 06-21 Page 9 of 5
7. Does this project include any sewer collection lines that are deemed"high-priority?" ❑❑Yes❑
®No
Per 15A NCAC 02T.0402,"high-priority sewer"means any aerial sewer,sewer contacting surface waters,
siphon,or sewers positioned parallel to streambanks that are subject to erosion that undermines or deteriorates the sewer.
Siphons and sewers suspended through interference/conflict boxes require a variance approval.
➢ If yes, include an attachment with details for each line,including type(aerial line, size,material,and location).
High priority lines shall be inspected by the permittee or its representative at least once every six-months and
inspections documented per 15A NCAC 02T.0403(a)(5)or the permittee's individual System-Wide Collection permit.
X.
FORM: FTA 06-21 Page 10 of 5
CERTIFICATIONS:
1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Penmitting of Purnp Stations
and Force Mains(latest version),and the Gravity Sewer Minimum Design Criteria(latest version)as applicable?
®❑Yes ❑❑No
If no, for projects requiring a single variance, complete and submit the Variance/Alternative Design Request application
(VADC 10-14) and supporting documents for review to the Central Office. Approval of the request will be issued
concurrently with the approval of the permit, and projects requiring a variance approval may be subject to longer
review times. For projects requiring two or more variances or where the variance is determined by the Division to be
a significant portion of the project,the full technical review is required.
2. Professional Engineer's Certification:
1, Greg Emery ,attest that this application for 10317 Rozzelles Ferry Townhomes
(Professional Engineer's name from Application Item 1II.1.) (Project Name from Application Item 11.1)
has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans,
specifications,engineering calculations,and all other supporting documentation to the best of my knowledge. I further
attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations,
Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast-Track
Pennitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain
portions of this submittal package,inclusion of these materials under my signature and seal signifies that I have reviewed this
material and have judged it to be consistent with the proposed design.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. Misrepresentation of the
application information, including failure to disclose any design non-compliance with the applicable Rules and design
criteria,may subject the North Carolina-licensed Professional Engineer to referral to the licensing board.(21 NCAC 56.0701)
North Carolina Professional Engineer's seal,signature,and date: """"""""""""'�����lt' '1'uft
LS
457 3 2
esf c
4
3. Applicant's Certification per 15A NCAC 02T.0106(b):
I, Rama Yada ,attest that this application for 10317 Rozzelles Feny Townhormes
(Signature Authority Name from Application Item 1.3.) (Project Name from Application Item 11.1)
attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge.
I understand that if all required parts of this application are not completed and that if all required supporting documentation
and attachments are not included, this application package is subject to being returned as incomplete. I understand that any
discharge of wastewater from this non-discharge system to surface waters or the land will result in an immediate enforcement
action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the
Division of Water Resources should a condition of this permit be violated. 1 also understand that if all required parts of this
application package are not completed and that if all required supporting information and attachments are not included, this
application package will be returned to me as incomplete.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed$10,000 as well as civil penalties up to$25,000 per violation.
Signature: Date: g
FORM: FTA 06-21 Page I 1 of 5
STATE OF NORTH CAROLINA
COUNTY OF Mecklenburg Permit No.1 4�)NO,53
OPERATIONAL AGREEMENT
This AGREEMENT made pursuant to G.S. 143-215.1 (dl) and entered into this day of
, by and between the North Carolina Environmental Management
Commission, an agency of the State of North Carolina, hereinafter known as the COMMISSION; and
RAMA HOMES LLC , a corporation/general partnership registered/licensed to do
business in the State of North Carolina, hereinafter known as the DEVELOPER.
WITNESSETH:
1. The DEVELOPER is the owner of the certain lands lying in Mecklenburg
which it is erecting and will erect dwelling units and other improvements, said developmen'
as 10317 Rozzelles Ferry Townhomes (hereinafter th,
2. The DEVELOPER desires, to construct a wastewater collection system with pumps, wa,
works, and/or disposal facilities (hereinafter Disposal System) to provide sanitary sewa
the Development on said lands.
3. The DEVELOPER has applied to the COMMISSION for the issuance of a permit pursuant to G.S.
143-215.1 to construct, maintain, and operate the Disposal System.
4. The DEVELOPER has created or shall create unit ownership in said dwellings units, other improvements
and lands through filing of a Declaration of Unit Ownership (hereinafter Declaration),pursuant to Chapter
47C of the North Carolina General Statutes.
5. The DEVELOPER has caused to be formed or will cause to be formed at the time of filing of the Declaration,
the Unit Owners'Association (hereinafter Association), a
non-profit corporation organized and existing under and by the virtue of the laws of the State of North
Carolina, for the purpose, among others, of handling the property, affairs and business of the
Development; of operating, maintaining, re-constructing and repairing the common elements of the lands
and improvements subject to unit ownership, including the Disposal System; and of collecting dues and
assessments to provide funds for such operation, maintenance, re-construction and repair.
6. The COMMISSION desires to assure that the Disposal System of the Development is properly constructed,
maintained and operated in accordance with law and permit provisions in order to protect the quality of the
waters of the State and the public interest therein.
NOW, THEREFORE, in consideration of the promises and the benefits to be derived by each of the parties hereto,
the COMMISSION and DEVELOPER do hereby mutually agree as follows:
1. The DEVELOPER shall construct the Disposal System in accordance with the permit and plans and
specifications hereafter issued and approved by the COMMISSION, and shall thereafter properly operate
and maintain such systems and facilities in accordance with applicable permit provisions and law.
2. The DEVELOPER shall not transfer ownership and/or control of the Disposal System to the Association
until construction has been completed in accordance with the permit and approved plans, and the staff of
the Division of Water Resources has inspected and approved of the facilities. In order to change the name
of the permit holder, the DEVELOPER must request that the permit be reissued to the Association. The
request must include a copy of the Association Bylaws and Declaration.
3. The DEVELOPER shall not transfer, convey, assign or otherwise relinquish or release its responsibility for
the operation and maintenance of its Disposal System until a permit has been reissued to the DEVELOPER's
successor.
FOP M• nPV nI-W) Pnaa 1 nf*?
4. The DEVELOPER shall provide in the Declaration and Association Bylaws that the Disposal System and
appurtenances thereto are part of the common elements and shall thereafter be properly maintained and
operated in conformity with law and the provisions of the permit for construction, operation, repair, and
maintenance of the system and facilities. The Declaration and Bylaws shall identify the entire wastewater
treatment, collection and disposal system as a common element, which will receive the highest priority for
expenditures by the Association except for Federal, State, and local taxes and insurance.
5. The DEVELOPER shall provide in the Declaration and Association Bylaws that the Disposal System will
be maintained out of the common expenses. In order to assure that there shall be funds readily available to
repair, maintain or construct the Disposal System, beyond the routine operation and maintenance expenses,
the Declaration and Association Bylaws shall provide that a fund be created out of the common expenses.
Such fund shall be separate from the routine maintenance funds allocated for the facility and shall be part
of the yearly budget.
6. In the event the common expense allocation and separate fund are not adequate for the construction, repair,
and maintenance of the Disposal System, the Declaration and Association Bylaws shall provide for special
assessments to cover such necessary costs. There shall be no limit on the amount of such assessments, and
the Declaration and Bylaws shall provide that such special assessments can be made as necessary at any
time.
7. If a wastewater collection system and wastewater treatment and/or disposal facility provided by any city,
town, village, county, water and sewer authorities, or other unit of government shall hereinafter become
available to serve the Development, the DEVELOPER shall take such action as is necessary to cause the
existing and future wastewater of the Development to be accepted and discharged into said governmental
system, and shall convey or transfer as much of the Disposal System and such necessary easements as the
governmental unit may require as condition of accepting the Development's wastewater.
8. Recognizing that it would be contrary to the public interest and to the public health, safety and welfare for
the Association to enter into voluntary dissolution without having made adequate provision for the
continued proper maintenance,repair and operation of its Disposal System,the DEVELOPER shall provide
in the Association Bylaws that the Association shall not enter into voluntary dissolution without first having
transferred its said system and facilities to some person, corporation or other entity acceptable to and
approved by the COMMISSION by the issuance of a permit.
9. The agreements set forth in numbered paragraphs 1, 2, 3, 4, 5, 6, 7, and 8 above shall be conditions of any
permit issued by the COMMISSION to the DEVELOPER for the construction, maintenance, repair and
operation of the Disposal System.
10. A copy of this agreement shall be filed at the Register of Deeds in the County(ies) where the Declaration is
filed and in the offices of the Secretary of State of North Carolina with the Articles of Incorporation of the
Association.
IN WITNESS WHEREOF, this agreement was executed in duplicate originals by the duly authorized
representative of the parties hereto on the day and year written as indicated by each of the parties named below:
FOR THE ENVIRONMENTAL RAMA HOMES LLC
MANAGEMENT COMMISSION Name of DEVELOPER
By: 41
S. Daniel Smith, Director (Signature)
Division of Water Resources
Rama Yada - Member
Print Name and Title
(Date) (Date)
PO RM• rIFV nl_?n Paaa of
CHARLOTTE
W6TER
October 7, 2022
Mr. Greg Emery
Gateway Design Group
15126 Castlebridge Ln
Matthews NC, 28104
SUBJECT: WATER AND SEWER FLOW ACCEPTANCE
ROZZELLES FERRY TOWNHOMES
10317 ROZZELLES FERRY RD. CHARLOTTE, NC. 28214
CLTWATER TRACKING#20226778
After analysis of the sanitary sewer associated with the proposed design of project, 20226778,
ROZZELLES FERRY TOWNHOMES, it was determined that there is sufficient capacity to
accommodate the proposed sewer flow 3,610 gallons per day(19-units x 190-gpd/unit) at the
connection point(s) indicated on the submitted utility plan for transmission to the McAlpine Creek
Wastewater Treatment Plant; NPDES permit number NC0024970, for treatment. This acceptance of
flow is based upon the existing capacity of the designated publicly owned treatments works.
Please see attached NCDEQ-FTSE form.
Charlotte Water(CLTWater) agrees to furnish water to the subject project. The water quality to the
subject project is regulated by the State Drinking Water Act Amendments of 1986 and The Water
Supply Management Plan, PWS ID#0160010 on file with the Public Water Supply Section of
NCDEQ. However, CLTWater cannot guarantee a constant pressure or quality of flow.
The applicant should understand that due to the involvement of other agencies and continuing
growth of the water and sewer system, the ability to provide service for future projects cannot be
guaranteed nor reserved. Connection to the CLTWater and sewer system is accepted on a first
come, first served basis.
The applicant should understand that this letter is not authorization to construct or extend private
water or sewer systems, as the appropriate local or State permits are required prior to construction.
If the appropriate authorization to construct permits are not obtained and construction has not
started within two (2) years of issuance of this flow acceptance and payment for any service
connections have not been received within two (2) years of issuance of this flow acceptance letter,
this flow acceptance approval shall be rescinded and a new flow acceptance request must be made.
If you have any questions, please do not hesitate to contact me at(704) 432-5801.
Sincerely,
Pedro-Ga l.arre#a
Pedro Galarreta, BSCE, BBA / Engineering Assistant
CHARLOTTE WATER / charlottewater.org
Charlotte Water 5100 Brookshire Blvd,Charlotte, NC 28216 charlottewater.org
an� operated by the City of Charlotte
State of North Carolina
Department of Environmental Quality
Division of Water Resources
Flow Tracking for Sewer Extension Applications
(FTSE 10-18)
Entity Requesting Allocation: Gateway Design Group
Project Name for which flow is being requested: Rozzelles Ferry Townhomes
More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump
stations along the route of the proposed wastewater flow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: McAlpine Creek, Irwin Creek, Sugar Creek
b. WWTP Facility Permit#: NCo024970, NC0024945, NCO024937
All flows are in MGD
c. WWTP facility's permitted flow 99.00
d. Estimated obligated flow not yet tributary to the WWTP 14.877
e. WWTP facility's actual avg. flow 65.200
f. Total flow for this specific request 0.00361
g. Total actual and obligated flows to the facility 80.081
h. Percent of permitted flow used 80.9%
II. Complete this section for each pump station you are responsible for along the route of this proposed
wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A) (B) (C) (D)=(B+C) (E)=(A-D)
Design Obligated,
Pump Pump Average Approx. Not Yet Total Current
Station Station Firm Daily Flow** Current Tributary Flow Plus
(Name or Permit Capacity, * (Firm/pf), Avg. Daily Daily Flow, Obligated Available
Number) No. MGD MGD Flow,MGD MGD Flow Capacity***
Hwy 27 1 .712 0.685 0.493 0.041 0.534 0.151
Long Creek 8.500 3.400 4.478 0.870 5.348 -1 .948
Paw Creek 10.700 4.280 6.051 2.853 7.133 -2.853
* The Firm Capacity(design flow)of any pump station is defined as the maximum pumped flow
that can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor
(pf)not less than 2.5,per Section 2.02(A)(4)(c) of the Minimum Design Criteria.
***A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is<0.
Downstream Facility Name (Sewer): Rozzeles Ferry Rd
Downstream Permit Number: Unknown
Page 1 of 6
FTSE 10-18
III. Certification Statement:
I Keri Cantrell certify to the best of my knowledge that the addition of
the volume of wastewater to be permitted in this project has been evaluated along the route to the
receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any
capacity related sanitary sewer overflows or overburden any downstream pump station en route to the
receiving treatment plant under normal circumstances, given the implementation of the planned
improvements identified in the planning assessment where applicable. This analysis has been performed
in accordance with local established policies and procedures using the best available data. This
certification applies to those items listed above in Sections I and II plus all attached planning assessment
addendums for which I am the responsible party. Signature of this form certifies that the receiving
collection system or treatment works has adequate capacity to transport and treat the proposed new
wastewater.
Digitally signed by Keri B Cantrell
Date: 2022.10.07 13:09:42 -04'00' 10/7/2022
e Adobe Acrobat version: 2022.002.20212
Signing Official Signature Date
Chief Engineer
Title of Signing Official
Page 2 of 6
FTSE 10-18
PLANNING ASSESSMENT ADDENDUM (PAA)
Submit a planning assessment addendum for each pump station listed in Section II where Available Capacity is<
0. —
Pump Station(Name or Number):
Given that:
a. The proportion and amount of Obligated,Not Yet Tributary Daily Flow(C)accounts for
40 % and 2.853 MGD of the Available Capacity(E)in Pump Station
Long Creek and Paw Creek ; and that
b. The rate of activation of this obligated,not yet tributary capacity is currently approximately
2.853 MGD per year; and that
c. A funded Capital Project that will provide the required planned capacity,namely
Stowe Regional Water Resource Recovery Facility is in design or under construction with
planned completion in 2025 ; and/or Paw Creek FM Replacement-2022
d. The following applies: Paw Creek Pump Station Improvements-2022
Charlotte Water's Capital Improvement Plan has allocated funds for improvements to the Paw Creek Pump Station Improvements and a new Stowe
Regional Water Resource Recovery Facility("Stowe Regional").The design plan is for Stowe Regional to use the Long Creek Pump Station(LCPS)
to house the second stage pumps of its influent pump station. In the short term,LCPS will also continue to house pumps which export flow to Paw Creek PS
("Paw Creek export pumps"). Currently LCPS has 8 MGD of export capacity,which will be increased to 12 MGD(firm)by 1 at quarter of 2024.
Stowe Regional is under design and expected to come online in early 2026. Before Stowe Regional is brought online,a new headworks and Influent Pumping Station
building will be constructed adjacent to the LCPS,which will house the first stage influent pumps for Stowe and be the Paw Creek export pumps.
Currently,Long Creek and Paw Creek operate as a combined system with the Long Creek pump station able to transfer flows to flow equalization
tanks during peak flow events and then meter out flow to Paw Creek as conditions allow.
Paw Creek Pump Station was awarded a permit on 8/27/2020 to increase firm pumping capacity to 20 MGD.Construction on this project has begun,
and this project is anticipated to be substantially complete November 2022.
Therefore:
Given reasonably expected conditions and planning information, there is sufficient justification to allow
this flow to be permitted, without a significant likelihood of over-allocating capacity in the system
infrastructure.
I understand that this does not relieve the collection system owner from complying with G.S. 143-
215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal
system.
Digitally signed by Keri B Cantrell
-� Date: 2022.10.0713:11:14-04'00'
Adobe Acrobat version: 2022.002.20212 10/7/2022
Signing Official Signature Date
Page 3 of 6
FTSE 10-15
THE
M SGS U.S.DEPARTMENTU.SGE F SURVEY INTERIOR � MOUNTAIN ISLAND LAKE QUADRANGLE
a.W OS Topo NORTR GROUNn
>.SAUMUfE SERIES
to
11UNPERWILLE. ..
13
�f Alomy i
e°
1 r'
09 i [J � j//` ..:� ...-. \•\it - .. 1 W
t . i
dd ` � 1•!
1Nkdair
CHARLOTTE �w +,
-X-N
02
x e..
ax o) a ds m m oe m la
wur rew cwuvkn s�..rr
'I SCALE 124000 __ xuozuzsr z.
.. .. w.,...L .r,m., ... .: � •� . .., «n:.... ,,.. i.. ,,:...�...:. •.,..n, MOUNTAIN ISLAND LAKE,NC
x019
R
F
ti. t`
V/ =f
b17
f
✓}�er 1 p��
��� ;iM ' r ✓� �„y a� ..yam„� y� - •
4 the r
v O
r
y
s �=
A
��N V
!ad ' A
1 •�• d fi � �Yy,
M1
•
1 d
a � �
• y k - 1"+1
40
Po
�4
Fri
• File an Annual Report/Amend an Annual Report • Upload a PDF Filing • Order a Document Online -
Add Entity to My Email Notification List • View Filings • Print a Pre-Populated Annual Report form • Print
an Amended a Annual Report form
Limited Liability Company
Legal Name
RAMA HOMES LLC
Information
Sosld: 2296513
Status: Current-Active O
Date Formed: 10/29/2021
Citizenship: Domestic
Annual Report Due Date: April 15th
Currentgnnual Report Status:
Registered Agent: YADA, RAMA
Addresses
Mailing Principal Office Reg Office
8021 WICKLOW HALL DR 8021 WICKLOW HALL DR 8021 WICKLOW HALL DR
UNION, NC 28104-8067 UNION, NC 28104-8067 MATTHEWS, NC 28104-8067
Reg Mailing
8021 WICKLOW HALL DR
MATTHEWS, NC 28104-8067
Company Officials
All LLCs are managed by their managers pursuant to N.C.G.S. 57D-3-20.
Managing Member
Ramakrishna Yada
8021 WICKLOW HALL DR
Matthews NC 28104
5/22/23,3:53 PM North Carolina Secretary of State Search Results
• File an Annual Report/Amend an Annual Report - Upload a PDF Filing • Order a Document Online -
Add Entity to My Email Notification List - View Filings - Print a Pre-Populated Annual Report form - Print
an Amended a Annual Report form
Limited Liability Company
Legal Name
RAMA HOMES LLC
Information
Sosld: 2296513
Status: Current-Active O
Date Formed: 10/29/2021
Citizenship: Domestic
Annual Report Due Date: April 15th
Currentgnnual Report Status:
Registered Agent: YADA, RAMA
Addresses
Mailing Principal Office Reg Office
8021 WICKLOW HALL DR 8021 WICKLOW HALL DR 8021 WICKLOW HALL DR
UNION, NC 28104-8067 UNION, NC 28104-8067 MATTHEWS, NC 28104-8067
Reg Mailing
8021 WICKLOW HALL DR
MATTHEWS, NC 28104-8067
Company Officials
All LLCs are managed by their managers pursuant to N.C.G.S. 57D-3-20.
Managing Member
Ramakrishna Yada
8021 WICKLOW HALL DR
Matthews NC 28104
https://www.sosnc.gov/online_services/search/Business_Registration_Results 1/1