Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0044129_Application (FTSE)_20230606
DocuSign Envelope ID:4FDF47DB-B75A-46B8-B32B-1 91 D9EF8F1 DO FAST TRACK SEWER ENGINEERING CERTIFICATION RECEIVED/NCDEQ/DWR PERMITTEE: Dynamo Holdings, LLC JUN ( «;` PERMIT#: WQ0044129 PROJECT: Forest Park-Phase 2 MOORESVILLE QROS ISSUE DATE: March 1,2023 REGIONAL OFFICE This project shall not be considered complete nor allowed to operate in acebrdance with Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. It should be submitted in a manner that documents the Division's receipt. Send the required documentation the Regional Supervisor,Water Quality Regional Operations Section at the adbress at the bottom. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERW-rEE'S CERTIFICATION 1,the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate &maintain the wastewater collection system permitted herein po thereof. e Igor Shiper 6/5/23 Printed Name,Title Signature Date ENGINEER'S CERTIFICATION I, Josh Butler as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe ([K periodically, []weekly, full time) the construction of the project name and location as referenced above for the above Permittee hereby state that,to the best of my abilities, due care and diligence was used in the observation of the following construction: approximately 1,223 linear feet of 8-inch gravity sewer,;such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division)Gravity Sewer Minimum Design Criteria adopted February 12,1996,as applicable;the Division's Minimum Design Criteria for the Fast-Track Permitting of Pump Stations and Force Mains adopted June 1, 2000,as applicable;and other supporting materials. !t•LClll/"� ocu ined b North Carolina Professional Engineer's Seal w/signature&date: C " s y: ®Final Partial(include description) ��.�;6 �oFEssipti �� BD394C8C716448E_ ' SEAL 04841 Certification Comments/Qualifiers(attach if necessary): I N EEp -' �// 3 North Carolina Department of Environmental Quality I Dieision of Water Resources e��QEQ Mooresville Regional Office 1601 East Center Avenue,Suite 301 i Mooresville,NC 28115 704.663.1699 DocuSign Envelope ID:4FDF47DB-B75A-46B8-B32B-191D9EF8F1DO CERTIFICATION CHECKLIST To be completed by the certifying engineer prior to operation of the permitted sewers, per 15A NCAC 02T.0116. Certifying Engineer: Josh Butler RECEIVED/NCOEO/DWR Certification Review Date: 6/5/23 _ r L Project Name: Forest Park - Phase 2 wQoo 44129 Project County: Josh Butler WOROS $4100RES,I LE REGIONAL OFFICE 1) Has permittee information changed since the permit was issued (or last modified): change of mailing address, change of ownership,transfer from developer to HOA/POA, etc. ❑ Yes © No • If yes, please provide either a change of ownership form or new contact information. Note that transfer of permits from the developer to the HOA/POA must occur with the first certification. 2) Have the as-built drawings have been signed,sealed,and dated by an N.C. PE? FXI Yes ❑ No 3) Final Engineering certification? 0 Yes ❑ No • If Partial Engineering certification, provide detailed narrative including what is being certified in the current phase,what was previously certified (if applicable),and what is left to be certified. 4) Adequate information related to sewer lines: ® Yes ❑ No ❑ N/A • Three feet minimum cover has been provided for all sewers unless ferrous pipe was installed. • Minimum diameters for gravity sewers are 8-inches for public lines and 6-inches for private lines. • Manholes have been installed:At the end of each line, at all changes in grade,size, or alignment, at all intersections, and at distances not greater than 425 feet; minimum diameter shall be 4 feet(48-inches). 5) Adequate information related to pump stations: ❑ Yes ❑ No 0 N/A • Ensure power reliability option was selected per 15A NCAC 02T.0305(h). 6) Was project construction completed in accordance with all of the following: ® Yes ❑ No ❑ N/A • 15A NCAC 02T, Minimum Design Criteria (MDC)for the permitting of Gravity Sewers (latest version),and MDC for the Permitting of Pump Stations and Force Mains(latest version)? If not, a variance approval is required in accordance with 15A NCAC 02T.0105(b), prior to certification and operation. • Contact the Central Office to discuss the variance to determine a course of action. • Applicant must submit two copies of the variance request form, plans,specifications, calculations, and any other pertinent information to the Central Office (one hard copy, one digital copy). • The central office will review the variance request, and if approvable, specific language regarding the variance will be incorporated into the permit, either via a special condition or a supplementary letter.A copy of the reissued permit with variance language or the variance letter must be maintained with the original documents. 7) Does the project contains high priority lines(15A NCAC 02T.0402(2))? ❑ Yes ❑X No • If yes,ensure that the permit already contains the necessary condition related to high priority lines 15A NCAC 02T.0403 (a)(5). If the permit does not include this language,the Fast Track reviewer will reissue the permit with the appropriate language. 8) Are Permit modifications are required for any changes resulting in non-compliance with this permit(including pipe length difference of 10%or greater,change in flow,pump station design capacity design change of 5%or greater,and change in the number/type of connections)? ❑ Yes X❑ No • If yes, a permit modification request must be submitted to the appropriate Regional Office, and a modified permit with revised certification must be issued prior to certification and operation. NC DWR—Water Quality Regional Operations Section 610 East Center Avenue,Suite 301, Mooresville, NC 28115 Mooresville Regional Office Phone: (704)663-1699 FAX: (704)-633-6040