HomeMy WebLinkAboutNCC242805_ESC Approval Submitted_20240912 Dennis Gilbert
From: SVC_DoNotReply-DEQPermits <DoNotReply-DEQPermits@deq.nc.gov>
Sent: Tuesday, September 10, 2024 9:49 AM
To: Onsite Homes, LLC
Cc: Dennis Gilbert;Andrew Conner
Subject: NC DEMLR - FROF Application Approval CRM:0177161
Attachments: Certificate of Approval - Tuesday, September 10, 2024 943 AM.docx; Application Report
- Tuesday, September 10, 2024 943 AM.pdf; Letter of Approval - Tuesday, September
10, 2024 943 AM.docx
dl",!.7:11-q- (4.44s,
, 1
IN
p,
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
Roy Cooper
Governor
Elizabeth S. Biser
Secretary
William Vinson Jr. (Acting)
Director 1
09-10-2024
LETTER OF APPROVAL
Onsite H mes LL
2931 Breezewoo Avenue, Suite 202
Fayetteville, NC 2 303
RE: Project Name: 965 Nighthawk Loop
Acres Approved: 0.9
Application ID: PA-006817
Permit Number: HOKE-2025-00178
Address:965 Nighthawk Loop
City:Quewhiffle Township
1 County: Hoke
River Basin: Lumber
1
I
Stream classification: C: Aquatic Life, Secondary Contact Recreation, Fresh water
Plan Type: New Plan
Dear Onsite Homes, LLC,
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and
hereby issue this Letter of Approval. The Certificate of Approval must be posted at the job site. This plan approval shall
expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by
]Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent
(eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General
I Permit. After the orm is reviewed and found to be complete, you will receive a link with payment instructions for the
$120 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party
shown on the FR form submitted for this project, you MUST obtain the COC prior to commencement f any land
disturbin activity The eNOl form may be accessed at deq.nc.gov/NCG01. Please direct questions abo t the eNOl form
to the St rmwater Pro ram staff in the Raleigh central office. If the owner/operator of this project chan es in the future,
the new r sponsible party must obtain a new COC. 1
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2.The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with
the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural
resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation
control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina
General Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to
insure compliance with the Act.
Acceptance and a proval of this plan is conditioned upon your compliance with Federal and State wate quality laws,
regulations, and r les. In addition, local city or county ordinances or rules may also apply to this land-di turbing
activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in t e Financial
Responsibility/Ownership Form, which you provided. You are requested to file an amended for if there is any change in
the information included on the form. In addition, it would be helpful if you notify this office o the proposed starting
date for this project. Please notify us if you plan to have a preconstruction conference.
(Your cooperation is appreciated.
Sincerely,
Chris Baker, Assistant Regional Engineer
cc:
Dennis Gilbert, P. E., Moorman, Kizer& Reitzel, Inc.
Andrew Conner Hoke County Inspection Office
Fayetteville Regional Office
2
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
117,) Fayetteville Regional Office 1225 Green Street,Suite 714 I Fayetteville NC,28301-5095
910-433-3300
Hirai!col )ondence tp and from this address may be subject to the North Carolina Public Records I..aw and inay he damlosErd to third parties by an authorized
state official
Ali
3