Loading...
HomeMy WebLinkAboutSW6231002_O&M Agreement/Plan_20240906 Operation & Maintenance Agreement Project Name: Serenity - Phases 8 & 9 Project Location: Rollins Rd., Harnett Co., NC Cover Page Maintenance records shall be kept on the following SCM(s). This maintenance record shall be kept in a log in a known set location. Any deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures,safety of the public,and the pollutant removal efficiency of the SCM(s). The SCM(s)on this project include(check all that apply&corresponding O&M sheets will be added automatically): Infiltration Basin Quantity: Location(s): Infiltration Trench Quantity: Location(s): Bioretention Cell Quantity: Location(s): Wet Pond Quantity: 6 Location(s): 35.55163, -78.83281 Stormwater Wetland Quantity: Location(s): Permeable Pavement Quantity: Location(s): Sand Filter Quantity: Location(s): Rainwater Harvesting Quantity: Location(s): Green Roof Quantity: Location(s): Level Spreader-Filter Strip Quantity: Location(s): Proprietary System Quantity: 1. Location(s): Fi-lE24J Treatment Swale Quantity: Location(s): Dry Pond Quantity: Location(s): Disconnected Impervious Surface Present: No Location(s): User Defined SCM Present: No Location(s): Low Density Present: Yes Type: Dispersed flow only I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each SCM above, and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to the system or responsible party. Responsible Party: Yang Song Title&Organization: 6heeenftkl4e9timitcalainG Gf+..A.ra,,Ftc-Lo S *k,,mil 1 D La-C. Street address: 8601 Six Forks Road Suite 270 City, state, zip: Raleigh, NC 27615 Phone number(s): 919.815.6469 Email: ysong@greenfieldcommunities.com Signature: Date: 03/61ZOZ4 1, Kr;St1e 14. nStee rl , a Notary Public for the State of N J0(? 4 CA42OLtVA County of LOPK..0 , do hereby certify that `tau C Soucj personally appeared before me this (eh day of I'hAe_ca ajvT and acknowledge the due execution of the Operations and Maintenance Agreement . Witness my hand and official seal, cj<1L _, ( . ^KRISTLE H. OSTEEI NOTARY PUBLIC WAKE COUNTY, N.C. Seal My commission expires Mule. 1 1 t 90asT STORM-EZ 3/1/2024 Version 1.5 O&M Agreement Page 1 of 6 Wet Pond Maintenance Requirements Important operation and maintenance procedures: Immediately after the wet detention basin is established, the plants on the vegetated shelf and - perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet pond should be fertilized after the initial fertilization that is required to establish the plants on the vegetated shelf. _ Stable groundcover will be maintained in the drainage area to reduce the sediment load to the wet pond. If the pond must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain will be minimized as much as possible. - At least once annually, a dam safety expert will inspect the embankment. Any problems that are found will be repaired immediately. - The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. After the wet pond is established, it will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance shall be kept in a known set location and shall be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. SCM element: Potential problem: How to remediate the problem: The entire wet pond Trash/debris is present. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to remove the gully, plant ground pond erosive gullies have cover and water until it is established. Provide lime and a one- formed. time fertilizer application. The inlet pipe is clogged (if Unclog the pipe. Dispose of the sediment off-site. applicable). The inlet pipe is cracked or otherwise damaged (if Repair or replace the pipe. The inlet device applicable). Erosion is occurring in the Regrade the swale if necessary and provide erosion control swale (if applicable). devices such as reinforced turf matting or riprap to avoid future problems with erosion. Sediment has accumulated to a depth Search for the source of the sediment and remedy the problem greater than the original if possible. Remove the sediment and dispose of it in a location design depth for sediment where it will not cause impacts to streams or the SCM. storage. The forebay Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. STORM-EZ 3/1/2024 Version 1.5 O&M Agreement Page 2 of 6 Wet Pond Maintenance Requirements (Continued) SCM element: Potential problem: How to remediate the problem: Sediment has accumulated to a depth Search for the source of the sediment and remedy the problem greater than the original if possible. Remove the sediment and dispose of it in a location design sediment storage where it will not cause impacts to streams or the SCM. depth. The main treatment area Algal growth covers over Consult a professional to remove and control the algal growth. 50% of the area. Cattails, phragmites or other invasive plants cover Remove the plants by wiping them with pesticide (do not spray). 50% of the basin surface. Best professional practices show that pruning is Prune according to best professional practices. needed to maintain optimal plant health. The vegetated shelf Determine the source of the problem: soils, hydrology, disease, Plants are dead, diseased etc. Remedy the problem and replace plants. Provide a one- or dying. time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. Shrubs have started to Remove shrubs immediately. grow on the embankment. Evidence of muskrat or Consult a professional to remove muskrats or beavers and beaver activity is present. repair any holes or erosion. The embankment A tree has started to grow Consult a dam safety specialist to remove the tree. on the embankment. An annual inspection by an appropriate professional shows that Make all needed repairs immediately. the embankment needs repair. Clogging has occurred. Clean out the outlet device and dispose of any sediment in a gg g location where it will not cause impacts to streams or the SCM. The outlet device The outlet device is Repair or replace the outlet device. damaged. Weeds or volunteer trees Remove the weeds or trees. are growing on the mat. Floating wetland island (if applicable) The anchor cable is damaged, disconnected or Restore the anchor cable to its design state. missing. STORM-EZ 3/1/2024 Version 1.5 O&M Agreement Page 3 of 6 Wet Pond Maintenance Requirements (Continued) SCM element: Potential problem: How to remediate the problem: Erosion or other signs of damage have occurred at Repair the damage and improve the flow dissipation structure. the outlet. The receiving water Discharges from the wet pond are causing erosion Contact the local NCDEQ Regional Office. or sedimentation in the receiving water. STORM-EZ 3/1/2024 Version 1.5 O&M Agreement Page 4 of 6 Wet Detention Pond Design Summary wet Pond Diagrani WET POND ID FOREBAY MAIN POND SCM 6 Permanent Pool El. 332.5 Permanent Pool El. 332.5 Temporary Pool El: 335 Temporary Pool El: 335 Pretreatment other No Clean Out Depth: 3.5 Clean Out Depth: 4.5 than forebay? Sediment Removal Er 329 Sediment Removal E 328 Has Veg. Filter? No Bottom Elevation: 328 Bottom Elevation: 327 WET POND ID FOREBAY MAIN POND SCM 7 Permanent Pool El. 328.5 Permanent Pool El. 328.5 Temporary Pool El: 331 Temporary Pool El: 331 Pretreatment other No Clean Out Depth: 3.5 Clean Out Depth: 3.5 than forebay? Sediment Removal Er 325 Sediment Removal E 325 Has Veg. Filter? Bottom Elevation: 324 Bottom Elevation: 324 WET POND ID FOREBAY MAIN POND SCM 8 Permanent Pool El. 352.5 Permanent Pool El. 352.5 Temporary Pool El: 354 Temporary Pool El: 354 Pretreatment other No Clean Out Depth: 3.5 Clean Out Depth: 3.5 than forebay? Sediment Removal El 349 Sediment Removal E 349 Has Veg. Filter? Bottom Elevation: 348 Bottom Elevation: 348 WET POND ID FOREBAY MAIN POND SCM 9 Permanent Pool El. 362.5 Permanent Pool El. 362.5 Temporary Pool El: 364.5 Temporary Pool El: 364.5 Pretreatment other No Clean Out Depth: 3.5 Clean Out Depth: 3.5 than forebay? Sediment Removal El 359 Sediment Removal E 359 Has Veg. Filter? Bottom Elevation: 358 Bottom Elevation: 358 WET POND ID FOREBAY MAIN POND SCM 10 Permanent Pool El. 370.5 Permanent Pool El. 370.5 Temporary Pool El: 372.25 Temporary Pool El: 372.25 Pretreatment other No Clean Out Depth: 3.5 Clean Out Depth: 3.5 than forebay? Sediment Removal El 367 Sediment Removal El 367 Has Veg. Filter? Bottom Elevation: 366 Bottom Elevation: 366 WET POND ID FOREBAY MAIN POND SCM 11 Permanent Pool El. 375.5 Permanent Pool El. 375.5 Temporary Pool El: 377.5 Temporary Pool El: 377.5 Pretreatment other No Clean Out Depth: 4.5 Clean Out Depth: 7 than forebay? Sediment Removal E 371 Sediment Removal El 368.5 Has Veg. Filter? Bottom Elevation: 370 Bottom Elevation: 369.5 ATTACH ADDITIONAL SHEETS IF NECESSARY STORM-EZ 9/5/2024 Version 1.5 O&M Agreement Page 5 of 6 Low Density Maintenance Requirements Important maintenance procedures: The drainage area to the vegetated conveyance or vegetated receiving area will be carefully managed to reduce the sediment load to the vegetated conveyance or vegetated receiving area. After the initial fertilization to establish the grass in the vegetated conveyance or the vegetated receiving area, fertilizer will not be applied to the vegetated receiving areas. The vegetated conveyance or vegetated receiving area will be inspected quarterly. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. SCM element: Potential problem: How to remediate the problem: Vegetation Vegetation is too short or Maintain grassed vegetation such that the swale or vegetated too long. area does not erode during the peak flow from the 10-year storm Trash/debris is present. Remove the trash/debris. Vegetated receiving Areas of bare soil and/or Regrade the soil if necessary to remove the gully, and then re-sod areas erosive gullies have (or plant with other appropriate species) and water until formed. established. Provide lime and a one-time fertilizer application. Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device (if applicable) The outlet device is Repair or replace the outlet device. damaged Erosion or other signs of damage have occurred at Repair the damage and improve the flow dissipation structure. the outlet. The receiving water Discharges from the site are causing erosion or Contact the local NCDEQ Regional Office. sedimentation in the receiving water. STORM-EZ 3/1/2024 Version 1.5 O&M Agreement Page 6 of 6 Filterra Vault Owner's Manual (Precast Vault Configurations) ■ Bioretention Systems CONTECH ENGINEERED SOLUTIONS This Owner's Manual applies to all precast Filterra Configurations, including Filterra Bioscape Vault and Filterra HC. filterra® Bioretention Systems Table of Contents Introduction 4 Activation Overview 4 Filterra Plant Selection Overview 6 Warranty Overview 6 Routine Maintenance Guidelines 6 Maintenance Visit Procedure 9 Plant Care 11 Appendix 1 -Activation Package 12 Appendix 2 - Filterra Tree Grate Opening Expansion Procedure 19 CONTECH ENGINEERED SOLUTIONS www.ContechES.com/filterra 1800-338-1122 3 Minimum Requirements The minimum requirements for Filterra Activation are as follows: 1. The purchaser must have procured vegetation meeting the requirements outlined in the Filterra Activation Package. 2. The site la ndscaping must be fully stabilized, i.e. full landscaping installed and some grass cover (not just straw and seed) is required to reduce sediment transport. Construction debris and materials should be removed from surrounding area. N17. Ori".*7 3. Final paving must be completed. Final paving ensures that paving materials will not enter and contaminate the Filterra system during the paving process, and that the plant will receive runoff from the drainage area, assisting with plant survival for the Filterra system. r---- 4. Filterra throat opening should be at least 4" in order to ensure adequate capacity for inflow and debris. 4" MIN CLEAR THROAT OPENING • • CAST-IN-PLACE GUTTER AND THROAT THROAT PROTECTION DEVICE OPENING (BY CONTRACTOR PER r DO NOT REMOVE- LEAVE IN PLACE LOCAL STANDARDS) UNTIL SITE IS STABILIZED AND FILTERRA IS ACTIVATED The Filterra Activation Package is available on the Contech website (www.ContechES.com/filterra) and ensures that the proper conditions are met for Contech to perform the Activation service. Vegetation meeting Contech's requirements must be provided at time of Activation. If the site does not meet the conditions required for Activation, or acceptable vegetation is not provided by the purchaser at time of Activation, a charge of $1,500 will be invoiced to the purchaser. www.ContechES.com/filterra 'I 800-338-1122 5 Why Maintain? All stormwater treatment systems require maintenance for effective operation. This necessity is often incorporated in your property's permitting process as a legally binding BMP maintenance agreement. Other reasons to maintain are: • Avoiding legal challenges from your jurisdiction's maintenance enforcement program. • Prolonging the expected lifespan of your Filterra media. • Avoiding more costly media replacement. • Helping reduce pollutant loads leaving your property. Simple maintenance of the Filterra is required to continue effective pollutant removal from stormwater runoff before discharge into downstream waters. This procedure will also extend the longevity of the living biofilter system. The unit will recycle and accumulate pollutants within the biomass, but is also subjected to other materials entering the inlet. This may include trash, silt and leaves etc. which will be contained above the mulch layer. Too much silt may inhibit the Filterra's flow rate, which is the reason for site stabilization before activation. Regular replacement of the mulch stops accumulation of such sediment. When to Maintain? Maintenance visits are scheduled seasonally; the spring visit aims to clean up after winter loads including salts and sands while the fall visit helps the system by removing excessive leaf litter. It has been found that in regions which receive between 30-50 inches of annual rainfall, (2) two visits are generally required; in regions with less rainfall often only (1) one visit per annum is sufficient. Varying land uses can affect maintenance frequency. Contributing drainage areas which are subject to new development wherein the recommended erosion and sediment control measures have not been implemented may require additional maintenance visits. Some sites may be subjected to extreme sediment or trash loads, requiring more frequent maintenance visits. This is the reason for detailed notes of maintenance actions per unit, helping the Supplier and Owner predict future maintenance frequencies, reflecting individual site conditions. Owners must promptly notify the maintenance provider of any damage to the plant(s), which constitute(s) an integral part of the bioretention technology. L • • • __• ••, - , www.ContechES.com/filterra 1800-338-1122 7 Maintenance Visit Procedure Keep sufficient documentation of maintenance actions to predict location specific maintenance frequencies and needs. An example Maintenance Report is included in this manual. 1. Inspection of Filterra and surrounding area • Record individual unit before maintenance with photograph (numbered). Record on Maintenance Report (see example in this document) the following: Record on Maintenance Report the following: Standing Water yes I no Damage to Box Structure yes ( no Damage to Grate yes I no Is Bypass Clear yes I no If yes answered to any of these observations, record with close-up photograph (numbered). • 2. Removal of tree grate and erosion control stones • Remove cast iron grates for access into Filterra box. \ • • Dig out silt (if any) and mulch and remove trash & foreign items. • • 3. Removal of debris, trash and mulch P �* Record on Maintenance Report the following: Silt/Clay yes I no Cups/Bags yes I no Leaves yes I no Buckets Removed • After removal of mulch and debris, measure distance from the top of the �r�--,y,. -.,�.t• Filterra engineered media soil to the top of the top slab. Compare the t measured distance to the distance shown on the approved Contract Drawings ' ' for the system. Add Filterra media (not top soil or other) to bring media up as • - • Or ti needed to distance indicated on drawings. ' , • 'It Record on Maintenance Report the following: Distance to Top of Top Slab (inches) ' Inches of Media Added www.ContechES.com/filterra 1800-338-1122 9 Plant Care for Filterra® Systems After Activation, the Contractor is responsible for proper care **Five gallons per square yard approximates 1 inch of water. of the vegetation until the site is handed over to the Owner. Therefore for a 6'x 6 foot Filterra'approximately 20-60 After that, it is the Site Owner's responsibility to care for the gallons of applied water is needed. To ensure even distribution vegetation. Contech recommends the following care for the of water it needs to be evenly sprinkled over the entire surface plants: of the filter bed, with special attention to make sure the root ball is completely wetted. NOTE: if needed, measure the 1. To prevent transplant shock (especially if planting takes time it takes to fill a five gallon bucket to estimate the applied place in the hot season), it may be necessary to prune water flow rate. Then calculate the time needed to irrigate some of the foliage to compensate for reduced root the Filterra", For example is the flow rate of the sprinkler is 5 uptake capacity. This is accomplished by pruning away gallons/minute then it would take 12 minutes to irrigate a 6'x6' some of the smaller secondary branches or a main filter scaffold branch if there are too many. Too much foliage relative to the root ball can dehydrate and damage the Plant Replacement: plant. In some cases, plants will require replacement. Please follow 2. Plant staking may be required. the procedures below to ensure a properly functioning Filterra'" 3. With all trees/shrubs, remove dead, diseased, crossed/ rubbing, sharply crotched branches or branches growing system. excessively long or in wrong direction compared to 1. Remove the existing plant, and leave as much of the majority of branches. Filterra'' media in place as possible. 4. Contech recommends irrigation of the Filterra`' 2. Select a replacement per the Filterra®Activation Package. Vegetation. The following guidance will help to ensure 3. Prior to removing the plant from the container, ensure the the vegetation is properly irrigated. soil moisture is sufficient to maintain the integrity of the Irrigation Recommendations: root ball. If needed, pre-wet the container plant. 4. Cut away any roots which are growing out of the • Each Filterra`' system must receive adequate irrigation to container drain holes. ensure survival of the living system during periods of drier 5. Plant(s) should be carefully removed from the pot by weather. gently pounding on the sides of the container with the fist • Irrigation sources include rainfall runoff from downspouts to loosen root ball. Then carefully slide out. Do not lift and/or gutter flow, applied water through the tree grate plant(s) by trunk as this can break roots and cause soil to or in some cases from an irrigation system with emitters fall off. Extract the root ball in a horizontal position and installed during construction. support it to prevent it from breaking apart. Alternatively, • At Activation: Apply about one (cool climates) to two the pot can be cut away to minimize root ball disturbance. (warm climates) gallons of water per inch of trunk 6. Excavate a hole with a diameter 4" greater than the root diameter over the root ball. ball, gently place the plant(s). • During Establishment: In common with all plants, each 7. Plant the tree/shrub/grass with the top of the root ball 1" Filterra`' plant will require more frequent watering during above surrounding media to allow for settling. the establishment period. One inch of applied water 8. All plants should have the main stem centered in the tree per week for the first three months is recommended for grate (where applicable) upon completion of installation. cooler climates (2 to 3 inches for warmer climates). If the 9. Reinstall or add mulch to a depth of 3" per Contech's system is receiving rainfall runoff from the drainage area, mulch specifications for Filterra® systems. then irrigation may not be needed. Inspection of the soil moisture content can be evaluated by gently brushing aside the mulch layer and feeling the soil. Be sure to replace the mulch when the assessment is complete. Irrigate as needed**. • Established Plants: Established plants have fully developed root systems and can access the entire water column in the media. Therefore irrigation is less frequent but requires more applied water when performed. For a mature system assume 3.5 inches of available water within the media matrix. Irrigation demand can be estimated as 1" of irrigation demand per week. Therefore if dry periods exceed 3 weeks, irrigation may be required. www.ContechES.com/filterra 1800-338-1122 11 Appendix 1 - Filterra® Vault Activation Package FILTERRA° VAULT ACTIVATION PACKAGE C ; NTECH ENGINEERED SOLUTIONS The Filterra system will be (or has been)delivered to you with protection in place to resist intrusion of construction related sediment which can contaminate the biofiltration media and result in inadequate system performance.These protection devices are intended as a best practice and cannot fully prevent contamination. It is the purchaser's responsibility to provide adequate measures to prevent construction related runoff from entering the Filterra system. Included with your purchase is Activation of the Filterra system by the manufacturer as well as a 1-year warranty from delivery of the system and a Final Site Assessment(assessment of unit condition, mulch replacement, debris removal, and pruning of vegetation) scheduled between 6 months and 1 year after Activation, upon request. Activation of the Filterra system is a procedure completed by the manufacturer to place the system into working condition. This involves the following items: • Removal of construction runoff protection devices • Planting of the system's vegetation(provided by the purchaser) • Placement of pretreatment mulch layer using mulch acceptable for use in Filterra systems. Activation MUST be provided by the manufacturer to ensure proper site conditions are met for Activation, proper installation of the vegetation, and use of pretreatment mulch acceptable for use in Filterra systems.The purchaser should request Activation from Contech after the site is stabilized, but prior to turning over the site to the owner. Please allow 1-2 weeks to schedule Activation. The purchaser must ensure that the site is acceptable for Filterra Activation.A checklist(included as page 3 of this document must be completed and submitted to the Contech Activation Coordinator.The minimum 4 requirements for Filterra Activation are as follows: 1.The purchaser must have sourced vegetation meeting the requirements outlined in "Plant Selection for Filterra Systems" starting on page 4 of this document. r UNPREPARED SITE FEE NOTE: A charge of 51500.00 will be invoiced for each activation visit requested by customer f i lte rrU. where Contech determines that the site does not meet the conditions required for Activation AND/OR acceptable plants are not provided by the contractor. ONLY Contech authorized representatives can perform Activation of Filterra systems; unauthorized activations will void the system warranty and waive manufacturer supplied activation and final inspection. Filterra Activation Package I Page 1 www.ContechES.com/filterra I 800-338-1122 13 Filterra° Vault Activation Checklist C=.. NTECH ENGINEERED SOLUTIONS Project Name: Company: Site Contact Name: Site Contact Phone/Email: Site Owner/End User Name: Site Owner/End User Phone/Email: Preferred Activation Date: (provide 2 weeks minimum from date this form is submitted) Landscaping Construction Throat Opening Vegetation Site Top Opening Final Pavement materials/ Measures 4"Min. Complete/ Sourced by Designation Type Complete Piles/Debris Height Grass Emerging Removed (where applicable) Contractor ❑Tree Grate 0 Verified 0 Verified 0 Verified 0 Verified 0 Species on FT ❑ Full Grote Plant List (No tree opening) 0 Container Grown ❑Bioscape Vault (15 gal. max) (Open Planter) 0 4' Tall Min. (Tree grate units only) Qty provided 0 Tree Grote ❑ Verified 0 Verified 0 Verified 0 Verified ❑ Species on FT ❑Full Grate Plant List (No tree opening) 0 Container Grown ❑ Bioscape Vault (15 gal.max) (Open Planter) 0 4' Tall Min. (Tree grate units only) Qty provided ❑Tree Grate 0 Verified 0 Verified 0 Verified 0 Verified 0 Species on FT ❑Full Grate Plant List (No tree opening) 0 Container Grown ❑Bioscape Vault (15 gal. max) (Open Planter) 0 4' Tall Min. (Tree grate units only) Qty provided 0 Tree Grate 0 Verified 0 Verified 0 Verified 0 Verified 0 Species on FT ❑ Full Grate Plant List (No tree opening) 0 Container Grown ❑ Bioscape Vault (15 gal. max) (Open Planter) 0 4' Tall Min. (Tree grate units only) Qty provided Attach additional sheets os necessary. NOTE: A charge of$1500.00 will be invoiced for each activation visit requested by customer where Contech determines that the site does not meet the conditions required for activation AND/OR acceptable plants are not provided by the contractor. ONLY Contech authorized representatives can perform activation of Filterra systems;unauthorized activations will void the system warranty and waive manufacturer supplied activation and final inspection. Signature Date UNPREPARED SITE FEE NOTE: A charge of$1500.00 will be invoiced for each activation visit requested by customer f i lte rrd where Contech determines that the site does not meet the conditions required for Activation AND/OR acceptable plants are not provided by the contractor. ONLY Contech authorized representatives can perform Activation of Filterra systems; unauthorized adivotions will void the system warranty and waive manufacturer supplied activation and final inspection. Filterra Activation Package Page 3 www.ContechES.com/filterra j 800-338-1122 15 Filterra® Top Opening Examples Filterras Vault with Tree Grate vir text rt rr i ___If. -7.-.- , „, h 1 ,///ice`\� 1 OUTLET 4 077 illia • .pi -_* __ I N i 4 IAda FACE 1 OF CUM -..F het CURB MTh J._ GRATE tcASTaI , ' Figure I a.Filterra with Tree Grate Drawing Fgur,I b.Filterra with Tree Grate Photo(not yet planted) Filterras Vault with Full Grate .._. roar r-r A"; _ _ aFnllouT _.. r �'t-.) _ __ - N :.. ..... ......... , :i r I l I N _-.. 1_--_ __J S • - FRONT E OP CUM -41e4r LIM riUTN ., ME PULL OUT! (CASTYN Figure 2a.Filterra with Full Grate Drawing Figure 2b.Filterra with Full Grate Photo Filterra' Bioscape Vault s a. >A.: z - ENERGY PLANT PROM r - , DSSiPAT1aN- BY COMM-CM - . ','. l-•/ z 1 . 4'A 1r ROCK (TYP) ". ^'P` j � '`11q. NWT OPVING \ ( ce ` - \ ` t `4T 7'.� +y- 1 fist?. tv;. k !, . . _ .,-.,,,-vit./it . FLUYMIT- X"6!!OR]B PtO b '(•;, , _ OUTLET COUPLING-'CAS CAST MCP YN1Ll. Figure 3a.Filterra Bioscape Vault Drawing Figure 3b.Filterra Bioscape Vault Photo • UNPREPARED SITE FEE NOTE: A charge of$1500.00 will be invoiced for each activation visit requested by customer where Contech determines that the site does not meet the conditions required for Activation AND/OR acceptable plants e f i l t e rra: are not provided by the contractor. ONLY Contech authorized representatives can perform Activation of Filterra systems; unauthorized activations will void the system warranty and waive manufacturer supplied activation and final inspection. Filterra Activation Package I Page 5 www.ContechES.com/filterra 1800-338-1122 17 16x88 1Sx9 k Media a Bay **kk A. 24 B. 8 II%4* C.4 D. 2 18x8 Media Bay ** A. 28 B. 8 1V's C.4 D. 2 20x8 Media Bay * * * * * * * * *** A. 32 B. 10 %II II %°11 C.5 D. 3 22x8 Media Bay (***. * *** A. 36 B. 10 4141.41, 0 fit 0 C.5 D. 3 UNPREPARED SITE FEE NOTE: A chorge of 51500.00 will be invoiced for each activation visit requested by customer �filterra• where Contech determines that the site does not meet the conditions required for Activation AND/OR acceptable plants are not provided by the contractor. ONLY Contech authorized representatives can perform Activation of Filterra systems; unauthorized activations will void the system warranty and waive manufacturer supplied activation and final inspection. Filterra Activation Package ; Page 7 www.ContechES.com/filterra 800-338-1122 19 Notes Notes