Loading...
HomeMy WebLinkAboutNCC242709_Site Plan or Location Map_20240909 CONSTRUCTION SCHEDULE q, I.Obtain all necessary PetmlM and plan aPPmvals.Erosion and Sediment Covvol(S@SCJ Permit and a CenlficateoC Coverage copy (COC)must be obtained before any land dlsturbivg arevitias occur_A copy of the e&SC permit,Me CAC end a herd copy q�qOO�� of the plan must bekept on site,preferably in epemtits box,surd accessible during inspection. / :I �-.0 2.Install gravel comtroctiov entrances fire4 Men silt fevua,remfm.silt f co � � ` 'LR4M0 11 _ outets and wattles. CONSTRUCTION` sR-j Ro„ S.Finishcicanng and grabbing any necessary areas on Mel.as they are stated. \ �— \ LIMITS \\ I d.Begin lot grading and excavation activities 5.Begin or continue with house construction activities. \/ 1 0 6.Finish all rough grading and house construction.All erase not disturb.for]days needs to have temporary or permanent \ \ \� REMAIN OF REMAINDER OF / / 0 9 gmundaover inatsllcd. j J p ].Install driveways,walks and patios. \ re LOTITO REAI,AIN LOT2 TO REMAIN I (e�Z B.Begin five grading of lot areas o UNDISTURB UNDISTURBED a� 9.Final grassing,mulching and stabilizing of IOC In most cases Mis will involve the installation of sod on the lot The silt \ \ / // I 4 SITE fence will main inDl etrntllMelotis dddor grassingiastabilized d takes hold. \ \ \ \ m 1 10.The contractor shall conduct selRimpxvons of the erosion avd sedimentation control measures and complete the following ,iicombined.thiwpenion form found on Me DEMLR webs. \ ) / es, ` jr:•SREY ROnD hops I/www.deq.nc.gov/aboutldivisi°ns/enetgy-mineral-and-land-resource✓stotmwat«/stormwater-pwgreMnpdesconstmction-program. \ \ 1 \ / 1( yy�� Twelve months of complete inspection forms shall be kept on site and available f«inspection at all times.It is recommend. Lof Plan RPF �1'R ¢� °copy be kept in a permits box.Ref:GS.113A-34.1 through G.S.113A-S1 Sections ISA.CAC 04A.0101 tM1mugh l SA ,_ \ I „Fr 2 r / 'm3� oiu �= 1 .CAC 04E.0504 General Permit NCO o1011oo rvpDEs for Construction Activities. \ \ c Lot Plan TR I I.Self-inspections for erosion and sedimentation control measures are to be performed at least once every seven calendar days \ kn r �E' and within 24 hours of very rain event of greater Man l inch.Any needed repairs shall be made immediately to maintain \ I \ C 3 rJ SR.t yERO,go , 'Ayp measures.designed.All ESC measures shall be maintained as specified in the construction details on this plan.A rain 12q \ — p I 4 3 yod, gauge shall be installed a[NeProlect site for monitoring. ` ` \ \ 1-I \ J / 240 I A �^ 12.IrssPecoon and final eccepumcolen«s.When the project is complete,the Permtttees Mall conmc[DEMLR to close out the \ \ \ ` J/ P wpO 4 P.CPlan.After DEMLR informs Me permitter of the project close out,via inspection report,the Permittee shall visit \CONSTRUCTION / v zaC �gl q�'.,� / "da9.ncgovMCG01"to submit an electronic Notice of termination(a-NOT).A$120 annual general Permit fee will be \ r \ \ LIMITS / 3N' F� �� `fi hags tilM1e>NO M1 been filled GROUND STABILIZATION •\ \ `� \ \\ -d Ald�aman Court \ / 6 BRYAxr AD q 5 \ \ ct 1 \ / i /l 1 /� kgr,1 oTm '� �`����' , SITE AREA STABILIZATION EXCEPTIONS \ \ \ ` \ _ _ _ _ \ ( `/ V \ f�I VICINITY MAP DESCRIPTION TIME FRAME ` \ 10'UTILITY EASEMENT 1 r/ Ire��� (N.T.S.) PERIMETER DIKES, 7 DAYS NONE \ \ \ \ \ I I \ \ / \ / SWALES, DITCHES ' 8c SLOPES I \ ` / HIGH QUALITY 7 DAYS NONE bA I I f l i / WATER ZONES /I / / (HOW) \ \ \ \ �I -� I / //�_ to.UTILITY EASEMENT \ / / / SLOPES STEEPER 7 DAYS IF SLOPES ARE \ 1 4 I // / A SELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY THAN 3:1 10'OR LESS IN \ 1 .CGS 113A-54.1•IS AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR LENGTH AND ARE r — AN LETED AS AN EXCEL SPREADSHEET. NOT STEEPER \ \ \ ` \ \ / 15 /� r /F \ \ 7 ' I AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED THAN 2:1, 14 \ I EROSION AND DAYS ARE \ \ ` \ / SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A ALLOWED \ \ \ ) \ › S I / \ \\ I NCAC 04E.0131 STATES THAT-..DOCUMENTATION SHALL BE ACCOMPLISHED BY INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE SLOPES 3:1 OR 14 DAYS 7 DAYS FOR - APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, FLATTER SLOPES GREATER \ \ \ • "' 1 \ / / 5• 'IQ / S \ I DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, THAN 50'IN • PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION ALL OTHER AREAS 14 DAYS NONEE(EXCEPT \ \ \ I I / - / 8 \ \\ I CONTROL PLAN." \ / \ WITH SLOPES FOR PERIMETERS \\ \ \ ) / f ?T'''' ` FLATTER THAN 4:1 AND HOW ZONES) \ \ \ ' \ ���� 7 / / / tea` \ DATE: PAGE --) Co' S so.,w Silt S k/Wtte (//)\ FL .l ce PLO .I - - bcaon I �.' II... use in sin seem a wan.. M J / /Mn�l Stokes Mn 0 stakes a� \\1 I / J / \ —I_'� 14 ; / /1� .....-"- SECTION SECTION pe.S m,l0�booted mum or 10 feet.yond the toe e:ww locatedflat areas .g dfb D should ureMywalq to silt _ \ / j * i1IJI silt,,.1 i,1 , Oak or other durable hardwood stakes with a 2 inch x 2 inch cross section 4/ W vertically plumb,through the er ort the silt socklwanth Stakes thou.. of 8 feet if maximum val of 0 t or a SF \ ff \ re--exmmree..mreco...—.swuemwr: S wweanle to hold a b place chitin runoff events. ,___„/ I I m F\ _ 23§— aDM aaL VIEW MAINTENANCE: ` 1 12 \\ yAry� —� / . „pn«ttlnM«gr.atarrabfaa.Ramanaaner silt aomawale aN.aet Weekly Mukn«Lampoat mJwsT sax wmAL ROW RATES accumulated sediment a.any daenseas 'Th / .yAO IZ / «DnlrenMaaa°ras reH�d Ork�on'trer ,,,° (gin.°co)( o)(;�.ml araamnnwrePlacaaddwgeaorallow for adequate Row. � _ ✓ 1R I �\ K ( ` 1 P silt Sock/"L:e"e'r,az) °E'113 t(imFmj eet rat 3. a eedMbeemt.@Mt a i / / I I ( Sheet rwal8e , col (om, re _ _ I ) ► ) I / "1�,;4),e ate •s all' atm;a 22-s a';n 5. diameter irhei"n°mm°°pledm.o. / 6— \ ' oN Meet d '1la pmr and w;taell.ed t. 4 I I �an SILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION `` I / 1 II I \ DATE: PAGE: ( \'1P COMMON ' l \ AREA ‘\..) \ g 7, I 1 \ J I—lr I. ll 4C 1/ ctI) I \\ J// if R ll Ha it HOUSE I I �. ¢ jjjjjjjjj / 1EUU �\ .�E E"" Notes: \ I \I 1.If needed,Tree Protection fencing should be installed along the buffer zone,wetland boundary and/or around protected trees,providing a radius of at least 1,25 feet for each LEGEND Inch Install Silt Fdiameter.nth \ % c 2.sche l Silt Fence m the low elevatiod sides a each IOC Install Silt Fence outlets shown re ) DIRECTIONFLOW schematic/diagram and fend adjusted.k necessary,for placement at low points.If lots are contiguous and have dMerent land owners or builders,each lot should have individual SIB \ ` / SILT FENCE OUTLET ® 3.Install SILT FENCE —k—k— requhetl Sill Fence within lO feel of property line to ensure there is no conflict with / / ENTRANCECONSTRUCTION septic system,It is the responsibility of the builder to ensure the inslallatiOn of sediment ` 1 1 / / CURB INLET = control measures does not impact the septic system and repair area(s). \ I 1 _/' 5.AL Waste one d other are Entransdedicate for m nagingauil nr lot. 1 Il\ / 5.Wastebins andotherareastl draped buildingformanainag unless shall shown t least 50 fret away from storm drain inlets or drainage dachas unless It can be shown that ` C//".... no other alternative exists.If this separation cannot be achieved,these areas must be Ir/) ntained behind Sik Fence. 6.Inlets downstream of disturbances should be protected:streets should be swept when sediment from the construction activity is present. ..\NC-Environmenlal.jpeg ],Details for Silt Fence,Sill Fence Outlets,Construction Entrances and other measures are / \ provided on additional sheets.Erosion and sediment control details are not drawn to scale. ------------- TYPICAL LOT LAYOUT WITH CURB AND GUTTER I /— —122..` DATE: PAGE: / PAGE 1 of ,MMAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION TOTAL DISTURBED ACREAGE: 0,61 ACRES oaa �y�yy{ LOT EROSION CONTROL PLAN 0_ General-All measures will be inspected and corrections made after runoff producing rainfalls or at least once a week minimum.The builder will insure that the construction activities on an articular lot do not adverse) affect an of the installed erosion control measures.If lot construction dictates measures will be p p g p r any y y LOTS 1 & 2 a0�' 1,'Y•''ii'46-�''i1 aO Mw.a relocated on the lot to insure that the potential for sedimentation runoff is eliminated as much as possible.Silt fences and gravel construction entrances will be maintained as suggested in the erosion control manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. '~~~~~~~ �t nT FAIRGROUND �oyy+y+y+y+y+y+y+•y+y+y'>.�. �°waa Gravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic topdressing with 2-inch stone.After each rainfall,inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all /g...00 00'i-24''-ft'i•''i-''i�''i'i•''i-''i-''i, objectionable materials spilled,washed,or tracked onto public roadways. �' _ ~Y�� �������ti Silt Fence-Sediment fences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.An sediment deposits that build u against the fence should be removed and disposed of T T / _ Mn p y. y p p g p properly to insure FARMS A�,(�/■C y" 1�Y•''i�''ii''i•'77'"i�4�•''�-. that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not unclerm tie the fence during cleanout operations. 1�L.lIJ ii ii i i•'ii 1, i� FOR v+�� :`�T=i1b1b-j° 'w,a" Sodding-The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to close,since this could inhibit adequate growth / ep'0 and stabilization of the rootbed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. BENJAMIN STOUT REAL ESTATE SERVICES, INC. '. -'= -•• Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are germinating properly.Any bare areas should be AVERASBORO TOWNSHIP HARNETT COUNTY Construction: Maintenance: repaired,and reseeded as soon as possible.If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass. 1.Clear the entrance and exit area of all vegetation,roots.and other objectionable 1.Per NCG-01 Inspect at least once a week and after each 1 Inch or SCALE:1"=60' J U N E 2024 material and properly grade k. greater rainfall:make any required repairs immediately. Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed GRAPHIC SC ALE 2.Place the gravel to the specific grade and dimensions shown on the plans,and 2.Maintain the gravel pad in a condition to prevent mud or sediment sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water. 60 0 30 60 120 240 smooth It. from leaving the construction site.This may require periodic 3.Provide drainage to carry water to a sediment trap or other suitable outlet. topdressing with 2 inch stone, 11 4.Use geotextile fabrics in order to improve stability of the foundation in locations 3.Immediately remove all objectionable materials spilled,washed or Reinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout Remove and replace stone as necessary as it becomes clogged with sediment.Remove all subject to seepage or high water table. tracked onto public roadways. fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. ( IN FEET ) inch = so ft. CONSTRUCTION ENTRANCE/EXIT MOORMAN,KIZER&REITZEL,INC.115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305 PHONE(910)484-5191 FAX(910)484-0388 LICENSE HF-0106 LAST SAVED:6/18/2024 7:47 AM LAST PLOTTED:5/18/2024 8:50 AM PLOTTED B.Dennis Gilbert FILENAME:DOCUMENT JOBS\BENJAMIN STOUT REAL ESTATE SERVICES NOW-2510-2B FAIRGROUND FARMS-EC\PLANS\FAIRGROUND FARMS EC-LOTS 1 A 2.0WG