HomeMy WebLinkAbout20060367 Ver 3_Application_20080108~n~,
e~~o
~ ~:n
.~~,~.
STATE OF NORTH CAROLINA
~ ~ ~/~~
~,J. ~ j, ~ -~~
~~ f~ ~,
os ~~~ :sr~~ ~' ~Y
DEPART7VIENT OF TRANSPORTATION ~~v"TSB
MICHAEL F. EASLEY
GOVERNOR
January 3, 2008
U. S. Army Corps of Engineers
Regulatory Field Office
6508 Falls of the Neuse Road
Suite 120
Raleigh, NC 27615
ATTN: Mr. Eric Alsmeyer
NCDOT Coordinator
LYNDO TIPPETT
SECRETARY
0(0034"1 V•3
SUBJECT: Request For Section 404 and Section 401 Permit Re-issuance for
TIP projects B-3916, R-2904, U-3344A and U-4010
Debit $240 from WBS 333501 B-3916
Debit $570 from WBS 34512 R-2904
Debit $240 from WBS 34934 U-3344A
REFERENCE: 1) B-3916 Permit Application dated March 20, 2007
2) B-3916 USACE 404 GP 31 Action ID Number 200220001 dated
March 26, 2007
3) R-2904 Permit Application dated June 25, 2004
4) R-2904 Permit Modification Application dated December 30, 2005
5) R-2904 USACE 404 NW 23/33 Action ID Numbers 200220393 &
200421561 dated September 10, 2004 and April 12, 2006
6) U-3344A Permit Application dated March 3, 2006
7) U-4010 Permit Application dated June 8, 2006
8) U-4010 USACE 404 NW 23 and 33 Action ID Number 200620283
Dear Sir:
The North Carolina Department of Transportation (NCDOT) has been issued Nationwide 23/33
and 14 and GP 31 permits from the U.S. Army Corps of Engineers (USACE) for projects B-
3916, R-2904, U-3344A and U-4010. Project construction in jurisdictional areas will not be
completed by the permit expiration date, therefore, we are requesting permit re-issuance.
The Section 404 permit for U-3344A was issued by default, as the U.S Army Corps of Engineers
review time period exceeded 45 days (per Nationwide Permit General Conditions number
13,a.,3). NCDOT will comply with all conditions, descriptions, and mitigation allowance in the
attached permit application dated 3/3/06, PCN form, Permit Drawings, 404 General Conditions
and EEP mitigation acceptance letter.
MAILING ADDRESS: TELEPHONE: 919-715-1334 or LOCATION:
NC DEPARTMENT OF TRANSPORTATION 919-715-1335 PARKER LQJCOLN BUB.DING
PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS 272$ CAPITAL BLVD. SUITE 240
NATURAL 1=~IVIRONMENT UNIT FAX: 919-715-5501 RALEIGH NC 27604
1598 MAIL SERVICE CENTER
RALEIGH NC 27699-1598 WEBS/TE: WWW.NCDOT.ORG
Table 1. Project Information
~ '
• .
,~
TIP Permit Action ID # Permit DOT Div County Stream Name SR # Permit
F~c iration Construction
Com letion
B-3916 200220001 GP 31 5 Wake Middle Creek US 401 8/31/08 12/31/08
R-2904 200220393 &
200421561 NW 23/33 5 Durham UTs to Burden's
Creek NC 54 3/17/07 12/31/09
U-3344A Permit by default NW 14 5 Wake UTs to Crabtree
Creek SR 3015 3/17/07 12/31/08
U-4010 200620283 NW 23/33 5 Durham Ellerbe Creek NC 98 3/17/07 12/31/08
Table 2. Project Im acts
~T~
;~,
r Pe Wetland
~• ~ ~,h~pa s
~'~ ~ Ott ~ Perm Stream
,~ Impacts
ft Temp Wetland
Impacts Temp Stream
Impacts Perm Open
Water Temp Open
Water Mechanized
Clearing in
Wetlands
B-3916 < .01 50 0.13 733
R-2904 232 40
U-3344A 0.07 109
U-4010 0 24 10
Application is hereby made for re-issue of the USAGE 404 permits and DWQ 401 certifications.
All permit drawings and plan sheets submitted with the original applications are current and do
account for the entire scope of the projects. All environmental commitments and special
conditions referenced in the Permit Applications will continue to be followed throughout project
construction.
The NCDOT will also continue to adhere to all general conditions set forth in the 401 General
Water Quality Certifications (WQC) 3701, 3688 and 3704. All general conditions of the Water
Quality Certifications will be met. Written concurrence is only required for B-3916, R-2904, and
U-3344A, therefore we are providing five copies of this application to the North Cazolina
Department of Environmental and Natural Resources, Division of Water Quality for their review.
Thank you for your time and assistance with these projects. If you have any questions or need
any additional information, please contact Erica McLamb for B-3916 at 919-715-1521 and Sara
Easterly for R-2904 at 919-715-5499 and Deanna Riffey for U-3344A and U-4010 at 919-715-
1409.
Sincere ,
~, .
Gregory J. Thorpe, Ph.D.
Environmental Management Director, PDEA
cc: Mr. Brian Wrenn, NCDWQ (5 copies)
Mr. Travis Wilson, NCWRC
Mr. Gary Jordan, USFWS
Dr. David Chang, P.E., Hydraulics
Mr. Greg Perfetti, P.E., Structure Design
Mr. Victor Barbour, P.E., Project Services Unit
Mr. Mark Staley, Roadside Environmental
Mr. J. Wally Bowman, PE., Division Engineer
Mr. Chris Murray, DEO
Mr. Jay Bennett, P.E., Roadway Design
Mr. Majed Alghandour, P. E., Programming and TIP
Ms. Michele James, PDEA
Ms. Stacy Oberhausen, PDEA
Mr. Gene Tarascio, PDEA
Mr. Scott McLendon, USAGE, Wilmington
Mr. Art McMillan, P.E., Highway Design
2