Loading...
HomeMy WebLinkAboutGW1--05048_Well Construction - GW1_20240830 WELL CONSTRUCTION RECORD For Internal Use ONLY: This form can be used for single or multiple wells 1.Well Contractor Information: Dwight L. Huneycutt 14.WATER ZONES FROM TO DESCRIPTION Well Contractor Name 368 ft• 375 ft. 5 gpm 4070-A ft. ft. NC Well Contractor Certification Number 15.OUTER CASING(for multi-cased wells)OR LINER(if ap • ble) FROM TO DIAMETER THICKNESS MATERIAL Derry's Well Drilling, Inc. o ft• 45 ft• 6 1/8 i°• SDR-21 PVC Company Name 16.INNER CASING OR TUBING(geothermal closed-loop) 24-93 FROM TO DIAMETER THICKNESS MATERIAL 2.Well Construction Permit#: ft. ft. in. List all applicable well permits(i.e.County,State,Variance,Injection,etc.) - — ft. ft. in. 3.Well Use(check well use): 17.SCREEN Water Supply Well: FROM TO DIAMETER SLOT SIZE THICKNESS MATERIAL ❑Agricultural ❑Municipal/Public ft. ft. in. ❑Geothermal(Heating/Cooling Supply) OResidential Water Supply(single) ft. ft. in. ❑Industrial/Commercial ❑Residential Water Supply(shared) 15.GROUT FROM TO MATERIAL EMPLACEMENT METHOD&AMOUNT ❑Irrigation 0 ft. 3 ft• Bent.Chips Gravity Non-Water Supply Well: ❑Monitoring ❑Recovery 3 ft• 20 ft• Bentonite Pumped Injection Well: ft. ft. ❑Aquifer Recharge ❑Groundwater Remediation 19.SAND/GRAVEL PACK(if applicabJ FROM TO MATERIAL EMPLACEMENT METHOD ❑Aquifer Storage and Recovery ❑Salinity Barrier ft ft. ❑Aquifer Test ❑Stormwater Drainage ft. ft. ❑Experimental Technology ❑Subsidence Control 20.DRILLING LOG(attach additional sheets if necessary) ❑Geothermal(Closed Loop) ❑Tracer FROM TO DESCRIPTION(color,hardness,soillrock type,grain size,etc.) ❑Geothermal(Heating/Cooling Return) ❑Other(explain under#21 Remarks) 0 ft. 8 ft. Brown Dirt 4.Date Well(s)Completed: 4/17/24 Well ID# 8 ft• 385 ft• Slate ft. ft. 51.Well Location: ft. ft. Michael Sarullo ft. ft. Seams: 75',90', 113', 134', 178',212', Facility/Owner Name Facility ID#(if applicable) ft. ft. 255',269',299', 321',335', 368'=5g 4925 Dusty Ln., Marshville 28103 ft. ft. Physical Address,City,and Zip 21.REMARKS ,_._ _-_ -_ _._ . _ -. Union 01-117-003 ,. - ` ):- - County Parcel Identification No.(PIN) 5b.Latitude and Longitude in degrees/minutes/seconds or decimal degrees: 22.Certification: (if well field,one lat/long is sufficient) ; N W L. � is f.'.:.-'S/15/24 Signature of ertified Well Contractor Date 6.Is(are)the well(s): ❑Permanent or ❑Temporary By signing this form,I hereby certifil that the well(s)was(were)constructed in accordance with 1 5A NCAC 02C.0100 or 1 5A NCAC 02C.0200 Well Construction Standards and that a 7.Is this a repair to an existing well: ❑Yes or EINo copy of this record has been provided to the well owner. If this is a repair,fill out known well construction information and explain the nature of the repair under#21 remarks section or on the back of this form. 23.Site diagram or additional well details: You may use the back of this page to provide additional well site details or well 8.Number of wells constructed: 1 construction details. You may also attach additional pages if necessary. For multiple injection or non-water supply wells ONLY with the same construction,you can submit one form. SUBMITTAL INSTUCTIONS 9.Total well depth below land surface: 385 (ft.) 24a. For All Wells: Submit this form within 30 days of completion of well For multiple wells list all depths if different(example-3@200'and 2@100') construction to the following: Division of Water Resources,Information Processing Unit, 10.Static water level below top of casing: 30 (ft.) If water level is above casing,use"+" 1617 Mail Service Center,Raleigh,NC 27699-1617 11.Borehole diameter: 6 (in.) 24b. For Iniection Wells ONLY: In addition to sending the form to the address in Rota 24a above, also submit a copy of this form within 30 days of completion of well 12.Well construction method: ry construction to the following: (i.e.auger,rotary,cable,direct push,etc.) Division of Water Resources,Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center,Raleigh,NC 27699-1636 13a.Yield m 5 Method of test: Air 24c.For Water Supply&Injection Wells: (gpm) Also submit one copy of this form within 30 days of completion of 13b.Disinfection type: Granular Amount 1/2 lb. well construction to the county health department of the county where constructed. Form GW-I North Carolina Department of Environment and Natural Resources-Division of Water Resources Revised August 2013