LETTER OF APPROVAL
FOR SEDIMENTATION & EROSION CONTROL
December 5, 2022
D.R. Horton, Inc
7208 Falls of Neuse Rd, Ste. 201
Raleigh, NC 27615
Re: Project Name: Saddlebrook Subdivision, Phase 1
Permit Number. Muni#2021-02549
Location: Green Hills Rd
Submitted By: Kevin Varnell, Stocks Engineering
Disturbed Area: 8.95 acres
To Whom it may concern:
This office has reviewed the subject erosion and sedimentation control plan sealed by J. Michael
Stocks, PE on October 5, 2021. We find the plan to be acceptable and hereby issue this letter of
approval. This letter of approval shall be valid for a period not to exceed twenty-four months or
the time required for the proposed construction activities, whichever comes first.
Please be advised that Section 801, Sub-section E12 of the City of Rocky Mount's Land
Development Code(hereinafter referred to as LDC)requires that a copy of the approved erosion
control plan be on file at the job site. Also, you should consider this letter the notice required by
the LDC, Section 802, Sub-section Q 1 of our right of periodic inspection to ensure compliance
with the approved plan.
The City of Rocky Mount's Sedimentation Pollution Control Program is performance oriented,
requiring protection of the natural resources and adjoining properties. If following the
commencement of this project,it is determined that the erosion and sedimentation control plan is
inadequate to meet the requirements of the Soil Erosion and Sedimentation Control Ordinance of
the City of Rocky Mount(Section 801 of the LDC,also NCGS 113A-51 through 66,)this office will
require revisions to the plan and implementation of the revisions to ensure compliance with the
Ordinance. Performance Reservations for this plan are included as part of this approval. The
developer is responsible for the control of sediment on-site. If the approved erosion and
(252)972-1121 / 331 S Franklin St,PO Box 1180,Rocky Mount,NC 27802-1180 / www.rockymountnc gov
sedimentation control measures prove insufficient, the developer must take additional steps
necessary to stop sediment from leaving this site. Each sediment storage device must be inspected
after each storm event. Maintenance and/or clean out, is necessary anytime the device is at 50%
capacity.
Please note that attached to this Letter of Approval is an NPDES Stormwater Discharge Permit for
Construction Activities,which was revised by the Division of Water Quality on August 3,2011. Because
this project includes land-disturbing activities totaling one or more acres, this permit is required in
addition to a Sedimentation and Erosion Control Permit. Please read and become familiar with the
monitoring, maintenance, and record keeping requirements noted in the attached General Permit.
Effective October 1,2010,North Carolina General Statute requires that persons responsible for land-
disturbing activities of one acre or more inspect the subject site following each phase of construction
to ensure that the approved erosion and sedimentation control plan is being followed. I have enclosed
information sheets explaining this requirement and the required self-inspection form. The City of
Rocky Mount will also be conducting sedimentation and erosion control inspections.
Please be aware that this approval is based in part on the accuracy of the information in the Financial
Responsibility/Ownership Form,which you have provided. You are required to file an amended form if
there is any change in the information included on the form. Also,please note that this approval does not
relieve the permittee of the responsibility to obtain any other Federal, State,or Local approvals or permits.
The responsible party may need to contact the appropriate Federal, State, and Local agencies prior to
beginning work. This approval does not permit the construction of any impervious surface,nor does it
allow for the placement of fill in any area for which a floodplain development permit is required.
In addition,LDC Section 801-E l0 requires that you notify this office of the proposed starting date for this
project. Your cooperation is appreciated, and we look forward to working with you on this project.
Sincerely,
Gabriel ryson
Stormwater Engineer
City of Rocky Mount
Enclosures: NCDENR DWQ NPDES Permit—Please read carefully
Self-Inspection Form
cc: Kevin Varnell— Stocks Engineering
Bill Pridgen & Allen Goff- Construction Inspector, City of Rocky Mount