Loading...
HomeMy WebLinkAbout20240955 Ver 1_Approval Letter_20240819 (2) Docusign Envelope ID: B979E6DB-28F8-44C8-8B76-95A7CF2B39A6 F STATE 4 ROY COOPER Governor ELIZABETH S.BISERIa'�* a2 Secretary *F&QUMy0`s' RICHARD E.ROGERS,,JR. NORTH CAROLINA Director Environmental Quality SENT VIA ELECTRONIC MAIL ONLY: NO HARD COPY WILL BE MAILED. August 19, 2024 DWR#20240955 Burke County Richard Butrym and Nancy Mayek 9723 Crey Kestrel Dr Verona,WI 53593 Email: nmayek@tds.net Subject: APPROVAL of CATAWBA RIPARIAN BUFFER AUTHORIZATION CERTIFICATE Mayek-Lakeside Reserve Lot 100 Shoreline Stabilization Dear Mr. Butrym and Mrs. Mayek: You have our approval for the impacts listed below for the purpose described in your application received by the Division of Water Resources (Division) on July 22, 2024. These impacts are covered by this CATAWBA BUFFER AUTHORIZATION CERTIFICATE, which includes the conditions listed below. This Buffer Authorization does not relieve the permittee of the responsibility to obtain all other required Federal, State, or Local approvals before proceeding with the project, including those required by, but not limited to, Sediment and Erosion Control, Non-Discharge, Water Supply Watershed, and/or Stormwater regulations. The following impacts are hereby approved, provided that all of the Conditions listed below, and all of the conditions of the Catawba Buffer Rules are met. No other impacts are approved, including incidental impacts. [15A NCAC 02B .0611(b)(2)] Type of Impact Amount Approved (units) Amount Approved (units) Permanent Temporary Buffers—Zone 1 B1-Shoreline 380(square feet) 0 (square feet) Stabilization B2-Temporary Access 0 (square feet) 2100 (square feet) Corridor Buffers—Zone 2 B3—Temporary Access 0 (square feet) 200 (square feet) Corridor This approval is for the purpose and design described in your application.The plans and specifications for this project are incorporated by reference as part of this Authorization Certificate. If you change North Carolina Department of Environmental Quality I(Division of Water Resources Asheville Regional Office 1 2090 U.S.Highway 70 1 Swannanoa,North Carolina 28778 o nm m e mem o \ r 828.296.4500 Docusign Envelope ID: B979E6DB-28F8-44C8-8B76-95A7CF2B39A6 Mayek-Lakeside Reserve Lot 100 Shoreline Stabilization DWR#20240955 Buffer Authorization Certificate Page 2 of 3 your project,you must notify the Division and you may be required to submit a new application package. If the property is sold,the new owner must be given a copy of this Authorization Certificate and is responsible for complying with all conditions. [15A NCAC 02B .0611(b)(2)] If you are unable to comply with any of the conditions below,you must notify the Asheville Regional Office within 24 hours (or the next business day if a weekend or holiday)from the time the permittee becomes aware of the circumstances. The permittee shall report to the Asheville Regional Office any noncompliance with the conditions of this Authorization Certificate and/or any violation of state regulated riparian buffer rules [15A NCAC 02B .0614]. Information shall be provided orally within 24 hours (or the next business day if a weekend or holiday)from the time the applicant became aware of the circumstances. Additional Conditions: 1. No trees shall be removed from Zone 1 of the Catawba Buffer unless they are directly within the construction access corridor. If trees are removed,forested vegetation shall be re- established within the construction access or other temporary impact area occurring in the protected buffer zone within the next growing season following construction of the project. [15A NCAC 02B .0614(7) and (8)] 2.The Permittee shall replant the vegetation within temporarily disturbed areas associated with this project in an "in kind" manner immediately following construction. Restoration of trees/shrubs/forest must be completed by the first subsequent planting season (November 1 through March 30). Note, if the tree plantings do not survive,they will need to be replaced such that the density is sufficient to provide 260 trees per acre at maturity. [15A NCAC 02H .0507(c), 15A NCAC 02H .0506(b)(3), and 15A NCAC 02B .0614(10)(dd), (ee)] 3. Immediately post-construction, bare soils must be stabilized as quickly as possible by providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting without plastic mesh.This ground cover is a temporary measure used to address erosion until buffer restoration can be accomplished. [15A NCAC 02B .0611(b)(4), 15A NCAC 02B .0203, 15A NCAC 02B .0614(7) and (8)] This approval and its conditions are final and binding unless contested. [G.S. 143-215.5] Upon the presentation of proper credentials,the Division may inspect the property. This Authorization Certificate can be contested as provided in Chapter 150B of the North Carolina General Statutes by filing a Petition for a Contested Case Hearing(Petition) with the North Carolina Office of Administrative Hearings (OAH)within sixty(60)calendar days. Requirements for filing a Petition are set forth in Chapter 150B of the North Carolina General Statutes and Title 26 of the North Carolina Administrative Code.Additional information regarding requirements for filing a Petition and Petition forms may be accessed at http://www.ncoah.com/or by calling the OAH Clerk's Office at (919) 431-3000. A party filing a Petition must serve a copy of the Petition on: �Alr_ North Carolina Department of Environmental Quality I(Division of Water Resources 0RR-11 C Asheville Regional Office 1 2090 U.S.Highway 70 1 Swannanoa,North Carolina 28778 oeynmem of emememeem ooai� /"� 828.296.4500 Docusign Envelope ID: B979E6DB-28F8-44C8-8B76-95A7CF2B39A6 Mayek-Lakeside Reserve Lot 100 Shoreline Stabilization DWR#20240955 Buffer Authorization Certificate Page 3 of 3 William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 If the party filing the Petition is not the permittee,then the party must also serve the recipient of the Authorization Certificate in accordance with N.C.G.S 15013-23(a). This Authorization Certificate neither grants nor affirms any property right, license, or privilege in any lands or waters, or any right of use in any waters. This Authorization Certificate does not authorize any person to interfere with the riparian rights, littoral rights, or water use rights of any other person, nor does it create any prescriptive right or any right of priority regarding any usage of water. This Authorization Certificate shall not be interposed as a defense in any action respecting the determination of riparian or littoral rights or other rights to water use. No consumptive user is deemed by virtue of this Authorization Certificate to possess any prescriptive or other right of priority with respect to any other consumptive user regardless of the quantity of the withdrawal or the date on which the withdrawal was initiated or expanded. This Authorization shall expire when the corresponding 401 Water Quality Certification Approval DWR#20240955 expires. This letter completes the Division's review under the Catawba Riparian Buffer Rules as described in 15A NCAC 02B .0614. Please contact Natalie Nish at 828-296-4659 or.natalie.nish@deg.nc.gov if you have any questions or concerns. Sincerely, E DocuSigned by: r1. "002fi SC147F587AE9400... Andrew W. Moore, P.G. Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ-ARO cc: Charlie Washburn, Marine Construction LLC (via email) Peter Minter, Burke County (via email) Brandee Boggs, USACE Asheville Regulatory Field Office (via email) Andrea Leslie, North Carolina Wildlife Resources Commission (via email) DWR 401 & Buffer Permitting Branch Electronic file DAF Q� North Carolina Department of Environmental Quality l division of Water Resources 4,e�- v Asheville Regional Office 1 2090 U.S.Highway 70 1 Swannanoa,North Carolina 28778 Dip-1 m E—;o--1 Quail\ r 828.296.4500