Loading...
HomeMy WebLinkAbout20240964 Ver 1_BROOKS SKETCH_20240828 deice (Atl ull Pond/Normal water@ @v q Dull Pond/ Norm jam/ . ShoreWne Nb ` 1�E'� )2twi NL`Nij-PVk L Disriar IAS)N 4 L.Wko dWA—rd.0_4- Please appr0xIYn8tety sketch the following Information on thin pier, item,such as 10 frx 100 f#)*o (provide�+, engaon$ ®ra�c�i • �. All proposed vegetation clearing Zo LOCition of rip rep or fill to be placed above the Full Pond/'Normal Water Level elevation R• Location of rip rap or fill to be placed below the Full Pond]Normal Water Level elevation 4e Location of any proposed structures such as buildings,retaining walls, docks,ebc• I Location of any excavation or dredging heinw r h. Full Pond/Normal Water Level elevation a. Location of construction access corridors FORM:SSOP 10•2013 Palo di