HomeMy WebLinkAbout20240964 Ver 1_BROOKS SKETCH_20240828 deice
(Atl ull Pond/Normal water@ @v q
Dull Pond/
Norm jam/ .
ShoreWne
Nb ` 1�E'� )2twi
NL`Nij-PVk L Disriar
IAS)N 4 L.Wko
dWA—rd.0_4-
Please appr0xIYn8tety sketch the following Information on thin pier,
item,such as 10 frx 100 f#)*o (provide�+, engaon$ ®ra�c�i
• �. All proposed vegetation clearing
Zo LOCition of rip rep or fill to be placed above the Full Pond/'Normal Water Level elevation
R• Location of rip rap or fill to be placed below the Full Pond]Normal Water Level elevation
4e Location of any proposed structures such as buildings,retaining walls, docks,ebc•
I Location of any excavation or dredging heinw r h. Full Pond/Normal Water Level elevation
a. Location of construction access corridors
FORM:SSOP 10•2013
Palo di