Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCC242673_Site Plan or Location Map_20240829
Project No. 100% CONSTRUCTION DOCUMENTS 56398 Date: CORDON ROAD FIRE STATION 03/29/2024 Drawn by: A CHALOUPECKY Checked by: W ALTMAN Revisions: Addendum 02 5/10/2024 NEW HANOVER COUNTY GORDON ROAD, WILMINGTON , NORTH CAROLINA 28411 ©sTENR-C°°PER_NENELL ARCHITECTS,P.A. •+*• TI�MMO VISION NSS GROUP THIS 00.1•VIa=AT THE UTILITY / MUNICIPALITY CONTACTS: auw.y�. I6.f4... A. NEW HANOVER COUNTY: D. CAPE FEAR PUBLIC UTILITY AUTHORITY SITE DATA TABLE -"' PLANNING AND LAND USE CONTACT:JEFF THEBERGE,PE 1�� ��1il� �� �� -WO PID: R04300-008-346-000 CONTACT:ZACHARY DICKERSON ENGINEERING MANAGER ' ••,,,■ ,,NOMI �1,,',,,,,,,, ,'1 TOTAL SITE AREA: 2.77 AC PHONE:(910)798-7450 235 GOVERNMENT CENTER DR. •I sta..",, ,•,.,,,,,,,,,,;,' DISTURBED AREA 5.85 AC m o c EMAIL:ZDICKERSON@NHCGOV.COM WILMINGTON,NC 28403 f •.....,��,.. = �', , ;�, ZONING: R-15 RESIDENTIAL DISTRICT > PHONE:910-332-6673 @ ,,,, ■,►. ,, �e 1 WATERSHED: SMITH CREEK 8 o$i-- Nz B. BURIED CABLE LOCATION EMAIL:JEFF.THEBERGE@CFPUA.ORG Alp a , RIVER BASIN CAPE FEAR NC 811 10'z70'SIGHT VISIBILITY ' y� '' ONSITE:1.28 AC w N ' G ` PROPOSED IMPERVIOUS o TRIANGLE 10Q . DRIVEWAY TO SITE:0.50 AC a C. DUKE ENERGY SITE TRIAN 2p MAXIMUM BUILDING HEIGHT: 40' (866)582-6345 , il PROPOSED BUILDING HEIGHT 39'11" FRONT:25' Co A p , SIDE(STREET):15' I� MINIMUM BUILDING SETBACK SIDE(INTERIOR):10' c9 1` REAR:20' (Da 8 CONSULTANT CONTACTS•• 4* 1 * I . p PROVIDED BUILDING SETBACK FRONT:25' SIDE:20' REAR:20' , z MINIMUM LANDSCAPE 10' I BUFFERS �\^^� OWNER . TOTAL BUILDING FOOTPRINT • D 14,461 SOFT v�.// KEVIN CAISON SITE ENGINEER/LANDSCAPE ARCHITECT AREA • FACILITIES PROJECT MANAGER TIMMONS GROUP .... ,,' •0 . , ,; PARKING REQUIREMENTS NEW HANOVER COUNTY-FACILITIES CONTACT:WILL ALTMAN,PE MANAGEMENT 5410 TRINITY ROAD,SUITE 102 2.5 SPACES/1,000 SF 910-798-4338 RALEIGH,NC 27607 � . '-`I TOTAL REQUIRED PARKING KCAISON NHCGOV.COM PHONE:919-866 4938 (2.5 SPACES`14,461 SF)/1,000 SF=35 SPACES TOTAL PARKING SPACES WILLIAM.ALTMAN@TIMMONS.COM 37 PARKING SPACES L VICINITY MAP PROVIDED i O REQUIRED ADA PARKING 2 SPACES � ARCHITECT 1" = 500' GREGORY SCOTT ADA SPACES PROVIDED 2 SPACES 0 CD PROJECT MANAGER A+ 1E W STEWART-COOPER-NEWELL ARCHITECTS,P.A. CO 2 719 EAST SECOND AVENUE CB C GAS 28054 U 704-865-6311lifil N GENERAL NOTES: / \\ 1. ALL CONSTRUCTION SHALL CONFORM TO THE NEW HANOVER COUNTY DESIGN (I-hereby certify that this plan has been prepared in accordance with the latest New Hanover ` .»•+•+..a„+ AND CONSTRUCTION STANDARDS. 2. THE MONUMENT CONTROL POINTS FOR THIS PROJECT ARE: RBC #200 County Ordinances and Stormwater Design Manual. (+Of +.QSH CgRo+ry C3.9 PS DETAILS ESS/O K'\COORDINATES N=191,740.43'E=2,346,211.57'ELEV.42.14'(NAVD'88 DATUM), Sheet List Table RBC#201 COORDINATES N=192,059.79'E=2,346,134.24 ELEV.=43.75'(NAVD'88 C3.10 PS DETAILS Signature: SQL �D DATUM). Sheet Number Sheet Title 3. IF THERE IS A GEODETIC MONUMENT LOCATED ON THIS SITE, IT MUST BE CO.0 COVERSHEET C4.0 GRADING PLAN Printed Name and Title: William Altman,PE;Senior Project Manager ,04PROTECTED OR IF RELOCATION IS NEEDED IT WILL BE THE RESPONSIBILITY OF C4.1 STRM PROFILES Date: 7/11/24 N P - THE DEVELOPER TO RELOCATE IT WITH SURVEY ACCURACY. CO.1 KEY PLAN G/NEE 0l+ C4.2 SCM DETAILS W,>p, pe,... 4. ALL NEW UTILITY LINES(POWER,CABLE,ETC.)MUST BE UNDERGROUND C1.0 EXISTING CONDITIONS •.rr.e C4.3 SW COMPLIANCE PLAN g 045892 C1.1 EXISTING CONDITIONS Registration Number: C2.0 EC PHASE 1 C5.0 NOTES AND DETAILS Z Z C2.1 EC PHASE 1 C5.1 NOTES AND DETAILS _O 111 Designer's Plan Certification I(We)hereby certify that I(we)am(are)the current owner of the property and that upon C5.2 NOTES AND DETAILS I- C2.2 EC PHASE 2 receipt of the Stormwater Permit,any clearing,grading,construction,or development,will be NOTES AND DETAILS Q ¢ r L C2.3 EC PHASE 2 C5.3I- performed in accordance with the plan and that the applicable ordinances and rules of New 0_ C2.4 EC PHASE 3 C5.4 NOTES AND DETAILS W W Hanover County,the State of North Carolina and the Federal Government and its agencies O which are hereby made part of this plan.As the owner,I(we)accept full responsibility for the C2.5 EC PHASE 3 C5.5 NOTES AND DETAILS LIJ w LIJ construction and operation and maintenance of the proposed facilities.I(We)will not attempt C3.0 SITE PLAN C5.6 NOTES AND DETAILS i-y ,Ce Z/� to transfer this responsibility without the written authorization of New Hanover County. C5.7 NOTES AND DETAILS "H +"•• LL v J n C3.1 UTILITY PLAN ,+".,,y4 C,�R'•e, Q �/ Signature: K¢cve�C � C3.2 UTILITY PLAN C5.8 NOTES AND DETAILS {OQ'�FESS/OO��, Q Et Name and Title: Kevin Caison,Facilities PM(NHC owner's rep) C3.3 UTILITY PLAN C5.9 NOTES AND DETAILS s? t+ 7 Z. O O W SEAL GENERAL NOTE > Date: 7/11/2024 C5.10 NOTES AND DETAILS 5,92 w C3.4 UTILITY PROFILES O4 O L1.0 PLANTING PLAN s Z C3.5 UTILITY PROFILES Ly C` t Q- ALL NOTES APPLY TO ALL DRAWINGS AND ALL TRADES.IT IS THE RESPONSIBILITY OF ALL CONTRACTORS AND O 0 U C3.6 UTILITY PROFILES L1.1 TREE INVENTORY ty yd r'f,.,NEE ecs+ TRADES TO COORDINATE THE INSTALLATION OF THEIR WORK WITH THE INSTALLATION OF WORK BY ALL OTHER Q Z •„ ��•d CONTRACTORS AND TRADES.THE REQUIREMENTS OF THE DRAWINGS,GENERAL REQUIREMENTS AND ALL ITEMS N Property Owner Plan Certffication C3.7 UTILITY PROFILES -- LIGHTING PLAN ,P•rm^,.0. OF THE CONTRACT DOCUMENTS ARE EQUALLY BINDING ON ALL CONTRACTORS AND TRADES.EACH LL I '' CONTRACTOR IS REQUIRED TO MAINTAIN FULL SETS OF THE CONTRACT DOCUMENTS FOR HIS EMPLOYEES USE C3.8 PS SITE PLAN - ON THE PROJECT TO ASSURE THAT ALL WORK IS PROPERLY COORDINATED AND INSTALLED WITH THE WORK OF O w OTHER CONTRACTORS AND TRADES. 0 WHENEVER THERE ARE DISCREPANCIES BETWEEN DRAWINGS,OR BETWEEN THE DRAWINGS AND SPECIFICATIONS,OR CONFLICTS WITHIN THE SPECIFICATIONS AND/OR DRAWINGS,AND SUCH DISCREPANCY IS Sheet No. NOT CALLED TO THE ARCHITECTS ATTENTION IN TIME TO PERMIT CLARIFICATION BY ADDENDUM,THE CONTRACTOR SHALL BASE HIS BID UPON PROVIDING THE BETTER QUALITY OR GREATER OF WORK OR MATERIALCALLED FOR,SHALL 0•0 SHALL SO FURNISH AND BINISTAT A LL SUCH BETTER RITTEN TEMENT WITH I TER QUALITY ORGREATER QUANTIS PROPOSAL TY UNLESS OTHERWISE ORDERED NG SUCH DISCREPANCIES,AND l IN WRITING.