Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW6210201_Design Calculations_20240822
Bowman NORTH CAROLINA Ryan's Run Calloway Road Hoke County, North Carolina COORDINATE: 35°01'23"N 79°21'56"W Project No: 2201 64-01 -01 5 Stormwater Design Report Prepared By: Bowman NORTH CAROLINA 4006 Barrett Drive, Suite 104 Raleigh, NC 27609 0$I1lu2II., •`, C A �se, � wb :Qt, r .� M SEAL 051 7 N. .. ,../9, , ....0 -..s, PREPARED FOR: ' , D & L Engineering PLC Carlo Pardo, PE 150 S. Page Street NC License No. 051571 Southern Pines, NC 28387 0: (919) 553-6570 910-684-8646 cpardo@bowman.com J U N E 3, 2024 Ryan's Run -Storm water Design Report 1 I P a g e Bowman NORTH CAROLINA TABLE OF CONTENTS Stormwater Management Narrative PAGE • Project Description 3 • Watershed 3 • Floodplains 3 • Design Requirements 3 • Methodology 3 • Peak Runoff Analysis 4 Appendix A: Figures 6 • County Soil Survey • Topography Map • FEMA Flood Map No. 3710848600J • Hydrologic Unit Code (HUC) • Surface Water Classification Map • NOAA Point Precipitation Frequency Estimates • Pre-Development Drainage Basin Map • Post-Development Drainage Basin Map • Design Supplement Appendix B: Wet Pond #1 Calculations 7 • CN Values • Wet Pond Design • Hydrographs • Spillway Design • Rip-Rap Apron Calculations • Stormwater Management Details Appendix C: Infiltration Basin #1 Calculations 8 • CN Values • Wet Pond Design • Hydrographs • Spillway Design • Rip-Rap Apron Calculations • Stormwater Management Details Appendix D: State Stormwater Management Permit No. SW6210201 9 Ryan's Run-Stormwater Design Report 2 I P a g e Bowman NORTH CAROLINA STORMWATER MANAGEMENT NARRATIVE PROJECT DESCRIPTION This report contains the Stormwater design calculations for the proposed Ryan's Run development in Hoke County, North Carolina. The report consists of a review of available hydrologic data, methods analysis, development of existing and proposed hydraulic models, and presentation of the impacts of the proposed development in the project. Both SCM's have been designed to treat all of the impervious area within their drainage areas. However, due to site constraints (an existing pond and proposed septic systems on individual lots), the majority of BUA from lots 13 to 25 is not able to be conveyed to an SCM. The proposed site is on Calloway Road. The development of the site will result in an on-site impervious area of 11.39 acres (+ 496,534 SF). Soils located within the project site as defined by NRCS (National Resources Conservation Service) are described in Table 1. Table 1:Hydrologic Soil Groups Group Description AuA Autryville loamy sand, 0 to 2 percent slopes CaB Candor sand, 1 to 8 percent slopes BaB Blaney loamy sand, 2 to 8 percent slopes BaD Blaney loamy sand, 8 to 15 percent slopes JT Johnston loam WATERSHED There are no streams located on site. The site drains to Drowning Creek in the Lumber River Basin. FLOODPLAINS The project is shown to be located in Zone'X' per FEMA Panel 3710848600J (eff. 10/17/2006).This zone has minimal flood risk. DESIGN REQUIREMENTS Stormwater design was based on the standards presented in the North Carolina Department of Environmental Quality (NC DEQ) Stormwater Design Manual. The NC DEQ requires that post-development discharge rates for the site are not to exceed pre- development discharge rates for the one(1)-year,two(1)-year,and ten (10)-year twenty-four(24)- hour duration storm event. The one hundred (100)-year twenty-four hour duration storm event was also analyzed. Ryan's Run-Stormwater Design Report 3 I P a g e Bowman NORTH CAROLIN Stormwater control will be provided by one infiltration basin and one infiltrating wet pond as part of the development. METHODOLOGY Hydrology and storm water modeling calculations were performed using the latest version of Hydraflow modeling software. Simulations were set up based on information provided within the North Carolina Department of Environmental Quality (NC DEQ) Stormwater Design Manual. The Soil Conservation Service (NRCS TR-55) hydrologic method was utilized for the estimation of stormwater runoff peak rates and the generation of hydrographs for the routing of stormwater flows. Input and results can be found summarized in tables throughout this report and in the appendices. Permit No. SW6210201 Infiltration Basin #2 hasn't changed based on the previous permit No. SW6210201. Infiltration Basin #1 has been changed since. PEAK RUNOFF ANALYSIS • Pre-Development Conditions The site is currently vacant with primarily open and/or wooded space. For the purposes of SCM design, two (2) drainage areas were analyzed in this report with their own study point, composite runoff curve number and point of analysis. The characteristics for the pre-development condition are shown in the table below and additional calculations can be found in Appendix B. A drainage map identifying the basin can also be found in Appendix A. Table 2:Pre-Development Drainage Area Summaries Area Composite Time of Basin ID [acres] Curve Concentration Number (CN) (Tc) [min.] Pre-Developed DA #1 22.50 53.3 25.60 Pre-Developed DA #2 12.71 72.7 25.60 • Post-Development Conditions The post-development condition contains two (2) drainage areas to the infiltrating wet pond consisting of the proposed residential development area. The drainage area collects runoff with curb inlets, and drainage pipes that connect to the respective infiltration basin SCM. The characteristics for the post-development drainage areas are shown below and additional calculations can be found in Appendix B. A drainage map identifying the area can be found in Appendix B. Ryan's Run-Stormwater Design Report 4 I P a g e Bowman NORTH CAROLINA Table 3:Post Development Area Summaries Area Composite Time of Basin ID [acres] Curve Concentration Number (CN) (Tc) [min.] Post-Developed DA #1 22.50 59.8 10.0 Post-Developed DA #2 12.71 75.5 10.0 • Comparison of Peak Discharges The pre- and post- development peak discharges are shown below. Full calculations and hydrographs can be found on Appendix B. Table 4: Total Site Downstream Impact-Infiltrating Wet Pond#1 Pre-Dev. Post-Dev. w/o Detention Post-Dev. w/ Detention Peak Discharge Rate Peak Discharge Rate Peak Discharge Rate Storm Event (cfs) (cfs) (cfs) 1-yr 24-hr 0.905 6.743 0.109 2-yr 24-hr 3.572 15.46 0.883 10-yr 24-hr 19.20 48.12 9.414 100-yr 24-hr 57.40 112.61 73.37 Table 5: Total Site Downstream Impact-Infiltration Basin #2 Pre-Dev. Post-Dev. w/o Detention Post-Dev. w/ Detention Peak Discharge Rate Peak Discharge Rate Peak Discharge Rate Storm Event (cfs) (cfs) (cfs) 1-yr 24-hr 0.905 6.743 0.163 2-yr 24-hr 3.572 15.46 1.112 10-yr 24-hr 19.20 48.12 15.35 100-yr 24-hr 57.40 112.61 107.36 Ryan's Run-Storm water Design Report 5 I P a g e Bowman [Von7FlC CAUL !!VA APPENDIX A Figures County Soil Survey Topography Map FEMA Flood Map Hydrologic Unit Code (HUC) Surface Classification Map NOAA Point Precipitation Frequency Estimates Pre-Development Drainage Basin Map Post-Development Drainage Basin Map Design Supplement Ryan's Run -Storm water Design Report Wage Hydrologic Soil Group—Hoke County,North Carolina rn Pl N . ::11 ."•111 . : .. 64. 11 b.WI C.Z 'Ci 35°1'42'N 35°1'4Y'N 1_ Y; 4 7, \ , lir i -\Vit. 4 iii' \,......, ,,,,, ON \-, . ,,. I 1 '4' 4 yf y ;0•• rft.ul tri �(ya6 , .. 4, I 4 4. rr- t S_ ►a 1, .\ co ,..4 • ,[3a13 4 ,._ ...c....,... ..„,.. . . ? . liev,,......Ario . i, ..- . !!! 2 .a. O'' 8 . Nor__ 4 ,. • .,,‘,31—,it‘14-4 00O[ °DA axN vwi[16:i1 Ott(tdotg 6 ' a, s 35°1'14'N - 35°1'14"N 649303 649X0 ,4)I,Y) E<Dii F_431 O Gt 41a 649503 3 3 to iy Map Sole:1:4,0901f printed m A pahat(8.5'X 11")sheet. ,Meters 1N 0 50 100 200 300 k 0 150 300 600 Feet 900 • Map pro]edlon:V1kb Mext r Cigna marinates:WGS84 Edge tits:UTM Zone 17N WGS84 t 1,d) Natural Resources Web Soil Survey 4/12/2021 Conservation Service National Cooperative Soil Survey Page 1 of 4 1-.ct N.- O O N `O m CO tOh _ N a 4-O0 w a>p "0 y y Cl) 3a a a l0 a) a) a) r d a N W c0p C1 C > o ° o. V 2 ° U O o To Uy co .o v= wO C=y Ey j 0 E a) a y r d cu O_ a) CN N CUa o • U coo E. 9 E Z E co ' nm0 � ° y 0- co mE N yaw O N da co UCC a ayd 0 O , c cN C a) ° a) ix O O l a) to ° Q L0. coy ` ZE o oy'vf 33 y 0) o y N EE ai� 0 a)Lo c ,c,L1a) ixay7 (U N 0 a) 2 oU Q. Nc E w ma U L to �f -0-3 -c U).0 CV p y E y ° U � O d pC y O C N Z 7 U N ONQNCA G O3 � ° ma nEO ° > o o a) �(1)i 0 � w o ° � ° yLL a) _c— c > c ii E la y Z � c _ °t °N y a) o � ai Z � c o c v n a E.w _ j0a .0 7 y c.) 0 V y L a) Ey a OE '0 y ° O>. L CO OW an Ca v 0- '0 a) Na � — O a) N N ° NnU wl — p 3 L a d 7 Q ° y E ° «Li co C y L O .0,Cl0 E O 1a0Ocl. .o E Q ° C -) 1! _ L a N Np Z O Oo co (UE N co� y •c >.d -c E m rn m co 0 > c co0 � O rn v .mZ Q m O CcNy ° O a U p � 7 3 O � U .° w(U E o aa -c CyE' co a) 1-1:, E � nm wQ c ma00 ° mc N 0wv aa a0 - a- co a) � a w E � co ? Z c)ow? E 0 23 'Do o Hr 1 5 w E = c°) w a E cons () 2 a=o< m H o ton n n 0� I- O.E y CO 0 L zo a) 3 E' 3 >•'p 0 Za) Y to ' O — E a) O a) O 0.O a3 L O 1 2 > (U uJ V N N 0 a) 3 C 0 .c 2 To c O _ o CI) y u) O O to O Cco = -0 O � d 1 o v co IL) Z w rn o Ix Ct O l6 N fn E) tr 8 ca la O ❑ y0 C ,E m to O o U U ❑ Z T to O c p m J 9 a = 0 Z ■ ■ ■ o LLo 2cn W a, � C 4 1 # R II (D m L1J J a) a) O. a La a ° El C a m co L N p o N C O C _ •a) O O - °p� a0 Q 'aA i y I'm' d a o) a a m m U e o z o a a 0 m U e ❑ z m a 0 m m a) C C C a)• you ❑ ❑ ❑ ❑ e ❑ ❑ o t o . . . . el Li - y co a CO a al vw re (13 To o 7 y C N O zU 1 Hydrologic Soil Group—Hoke County,North Carolina Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI AuA Autryville loamy sand,0 A 27.1 69.4% to 2 percent slopes BaB Blaney loamy sand,2 to C 4.5 11.5% 8 percent slopes BaD Blaney loamy sand,8 to C 5.0 12.7% 15 percent slopes CaB Candor sand,1 to 8 A 0.2 0.4% percent slopes JT Johnston loam AID 0.9 2.3% W Water 1.4 3.6% Totals for Area of Interest 39.1 100.0% viQNatural Resources Web Soil Survey 4/12/2021 �i Conservation Service National Cooperative Soil Survey Page 3 of 4 •)\ \--3°) ' T° C-1 ) I - _. , \ . \ fo -------- / ' . - r — -- I.,Ap4.- \0Th' . _ C, :-;--''--+-): c_ ______--7-----"1/4„._' ____, \ 6R 4t>- ,. . --_ _ ! / tale* 1r N\t, fi - --- ---'\ \ \\IT 1 'ik' @ ) \ ( iir f•-' ,4_ • ---- ik. ,,,--,9 ‘1" ,, A ‘i - .. _, • av - - - o .....); 0 \_, 0 • .. oleo, f�1)--I 1V,,- r ,S „....-y - t :15 -7( Z\ 7 ' ) ±- c) -;, . , % .t. , I- IV. 1*: ' ,K----;;:_-- 0 ) \ ,r- 0 _... s _ 1, , ..r :. _ 1 ...-- \ A,,_ ti. f.,, to„.. Site „:23 ,\ _\,. J, iv, 11. 4 N. 0 e Points . - ' I V l'< .\-.. 11 tiV( -3- - i '. _j V77-3 /).. * , --jyz- - — -1- ' ,--j - itost-t• ---1 , 0 _---/--) `? — -_---- , too I : L.....,,y_____"\--=--- C4ti„ i ( ° t, (5-( C-J 0 ' _____i 2p � OG� / t. le, ' ,--ifk,,*---k---7:351 , _ram : rac,. �� J r' ,--:..17-- m mo a a Q �.cN o `_ ' c E a a z c f0«rm _ 73 m m 3 m LL z no c « E m c_10mm Q s x c `o ._ m Q O O x 3 3 m N J N C m m N m L O m 3 m C O w 6 Q 9 co 7 a' w H O C m N O_ H C V '" O c m E 2 N Yi O 8 O y C e V m = li F_ — Q C C C m N V O 0 0 w a N N;O'a 0 T. m ° LT- w m Q . O , V V O mm * O J m L p-V•8 y.0 m E O—V m 0 ai R W 1V T m C �R'� LL eS O m N U 0 C N m m •0 l0 U ,N• T LL y « •_ m O N; m O ci N N N O C o O y > O m m O L E O m `2 V T C Y L it m O Lint ox 0m v co r2 E m LL u3, w , m = t m Im . M .. p a 'v7m3cE E• mEvc >< 0 O U N i+-p O O Emil; a. 0 C U N >- m N C U Q m 0- N N rL m 6 0�, p to O m m WO W f 0 ?. J C y m C O o' m Li_ •C O C U Y O co t c 13 c W ymj �E W O y a C'O LL O�0 (p > E ? m 2j 0 Z al i LL O C cIF, U LL 'L"fn 'L"' m = - 0 m O 1- Q O r m i 0 2 a D-0 m m W- m O.N z ,- O p 0-m m m Z m N Q m L O m 8 3 m 3 O O C - NN m LL O a m m m - 'm a C O, N 3 N N N C r c E c m m Q Le L m N-1 Gm 7 m m > m m m m O > yo m N N m -O 0 E N t'•am+ Q > m C c' 0 O (0 O E-0 O N m m 7L m '� L m O m O l0 O Q T b0 O C m c0•Z'i E. m0 m LL W R' 0 0 m LL O Q J Q Q W Q O J O O OO J O O- 0 Z O w c n m 0 E m �-' O C I W 1 N I I I d C l0 rL+ U �Lfill HUh ¢ 1 N l a _c o c 3._ c ° 3 y r a m N- 3 N c J` L o I I I m a L x► 1 z 1 af0 Nv P. cc Dln LLD rn JN x� Eam10 m >mcLLo. momcma '0 LL 0w ox w �� ww w 0 a E S L. rmzj �7, gmv __I IX �� w� Ix-� Z aomT vmoLmN aYNcmZ- o m LL¢ C 2 Q wz 1-o a Em2E ° om0~ E E22°•aio or Q fQ.�� Q=p W C7= w a ,2Zm g mL N m m N E m E CD N d Q CC w 0 p a co 'm 3 m n ▪m m m J w mx FIJi 0 z v y M FI •. • 1.srsn } W < r • ID 4 J•,W _ • +-+ ‘c;) h CIo s 1 ,...1. . . •A' IIP CO e ,t' ql N.0 cis .e\ - ,r___It .... ei git- ►, , a) tN C - 0 _ ; - >1 ti 1 M mr'' cv J'y82 r' .;iy. O LD 0 L-CCI i N �, cc Q CU • O - ✓133d E VS8Z o o \I/P. LL :1, 1 f r • 0 &Ran? ) ilik,.. ..1,' ' . w•' 1 , 114 c) In C Z 133�8£:Zee - �.t in 0 M e N Z 1 r-i aa . ( .»� "A f\ « $ We 77, J $ ® / * k S In 2 Nm�e' a > CZ Is % % % v- Cfr e` J •a 2 \ \ 5 k § ! 7St ^t a }\ e ; a, Q } �� } / I I } q I � \I ± R u n ] § C § § f . § k E t O ) k ) § k \ \ \ § ( 21d ƒ ± O J *O 2 A ----\\....„,..._ 1. \ 141 / b b g i g i N o g 8 lq % o o s o 6 o q ast` vss cp o v,c, 'sbd �' o. .o -4` s Gd c a P° I- se N .0a T A 4 1/11/2021 Precipitation Frequency Data Server NOAA Atlas 14,Volume 2,Version 3 Location name:Raeford,North Carolina,USA* ° s _ \1 Latitude:35.0116°,Longitude:-79.3159° none I Elevation:390.38 ft** 'source:ESRI Maps'' source:USGS POINT PRECIPITATION FREQUENCY ESTIMATES G M Bonnin,D.Martin,B.Lin,T.Parzybok,M Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals(in inches)1 Average recurrence interval(years) Duration 1 i 2 5 10 25 50 100 200 500 [ 1000 5-min 0.437 0.515 0.601 0.665 0.742 ` 0.797 0.850 0.899 0.960 1.01 (0 398-0.482) (0.470.0.569) (0.547-0..663) (0.604.0.732) (0 671-0 815)1(0 720-0 874) (0.763-0.931) (0.803-0.986) (0 850-1.05) (0.886-1 11) 10{rtin 0.697 0.824 0.963 1.06 1.18 1.27 1.35 1.43 1.52 1.59 (0 636-0 769) (0 752-0 910) (0 877-1.06)- (0.967-1.17) (1.07-1.30) , (1 15-1.39) (1.21-1.48) (1.27-1.56) (1.34-1.67) (1 40-1.74) 15-min 0.872 1.04 1.22 1.35 1.50 1.61 1.71 1.80 1.91 1.99 (0.795-0.962) (0945-1.14) (111-134) (1.22-1.48) (136-165) (1 45-1.76) (1,53-1.87) (1,61-1 97) (1.69-2 10) (175-2.19) 30-min 1.20 1.43 1.73 1.95 2.22 2.42 2.62 2.80 3.04 3.22 (1 09-1.32) (1.31-1.58) (1 58-1 91) (1 77-2 15) (2 01-2 44) (2 19-2 66) (2.35-2 87) (2.50-3,07) (2 69-3.34) (2.84-3.54) 60-min 1.49 1.80 2.22 2.54 2.96 3.28 3.60 3.93 4.37 4.71 (1 36-1 64) (1 64-1.98) (2 02-2.45) (2.31-2 79) (2.67.3.25) (2 96-3 60) (3 23-3 95) (3 51-4 30) (3 86-4.79) (4 14-5.17) 2-hr 1.74 2.11 2.65 3.06 3.62 4.06 4.50 4.96 5.57 6.06 (1 58-1 94) (1.91-2 35) (2.40-2.95) (2 76-3 41) (3 25-4 02) (3.63-4 51) (4 00-5 00) (4.37-5.50) (4 87-6 18) (5.25-6.72) 3-hr 1.84 2.23 2.82 3.28 3.92 4.45 4.99 5.56 6.36 7.00 (1 67-2 06) (2 02-2 50) (2.55-3.14) (2 96-3.66) (3 51-4 36) (3 96-4 94) (4.41-5 53) (4 87-6 16) (5 51-7 05) (6 00-7.76) 6-hr 2.19 2.66 3.36 3.92 4.70 5.34 6.01 6.72 7.73 8.54 (1 99-2 44) (2 42-2 95) (3.05-3.72) (3.54-4.34) , (4.22-5.19) (4 76-5 89) (5.32-6 62) (5.89-7 39) (6.68-8 48) (7 30.9.38) 12-hr 2.59 3.14 3.98 4.67 5.64 6.45 7.30 8.22 9.53 10.6 (2.34-2.88) (2.84-3 49) (3.60-4.42) (4.20-5.18) (5.04-624) (5.71-7.11) (6.41-8.04) (7.14-9.04) (8.15-10.5) (8.96.11 7) 24-hr 3.05 3.69 4.67 5.45 6.52 7.37 8.25 9.17 10.4 11.4 (2.83-3.30) (3 42-4 00) (4 32-5.06) (5 02-5 89) (5 99-7 04) (6 76-7 96) (7.54-8 92) (8 36-9.90) (9 46-11.3) (10 3-12 4) 2-day3.54 4.28 5.37 6.24 7.43 8.38 9.36 10.4 11.8 12.9 (3.30-3.82) (3.98-4.61) (4 99-5.79) (5.78-6 71) (6.86-7.99) (7 71-9.01) (8.59-10 1) (9,48-11.2) (10.7-12.7) (11 7-13.9) 3-day 3.76 4.53 5.66 6.55 7.77 8.75 9.76 10.8 12.2 13.4 (3 51-4 03) (4.23.4.86) (5.27.6.06) (6 09-7 01) (7 20-8 32) (8 09-9.37) (8.99-10.5) (9 91-11 6) (11 2-13.1) (12 2-14 4) 4-day 3.98 4.79 5.94 6.86 8.12 9.13 10.2 11.2 12.7 13.9_13 73-4 25) (4 48-5.11) (5 55-6.34) (6.40-7.31) (7 55-8 66) (8 46-9 73) (9.39.10.8) (10 3-12 0) (11 6-13.6) (12 6-14 8) 4.61 5.51 6.76 7.75 t 9.11 10.2 11.3 12.5 14.0 15.3 7-day (4 31-4 93) (5.16-5.89) (6.32-7.23) (7 23-8 29) (8 48-9 74) (9 46-10 9) (10 5-12.1) (11 5.13 3) (12.9-15.0) (14.0-16.4) 10-day 5.29 6.30 7.61 8.64 10.0 11.1 12.2 13.3 14.8 16.0 (4 98-5.62) (5.93-6.70) (7.16.8.08) (8.11-9.17) (9 39-10 6) (10 4-11.8) (11.4-13.0) (12.4-14.2) (13.7-15.8) (14.8-17.1) 20-day 7.11 8.41 10.00 11.2 12.9 14.2 15.5 16.9 18.7 20.1 (6 72-7.53) (7.95-8 91) (9.43-10.6) (10 6-11 9) (12 1-13.7) (13.3-15 1) (14 5-16.5) (15.7-17 9) (17.3.19.9) (18 6-21 4) 30{tay 8.83 10.4 12.2 13.5 15.3 16.7 18.0 19.4 21.2 22.6 (8.35-9.34) (9 85-11 0) (11 5-12.9) (12.8-14,3) (14 4.16.2) (15.7-17 6) (16.9-19.1) (18.2-20.5) (19.8-22.5) (21.0-24 0) 45-day 11.2 13.1 15.1 16.6 18.5 20.0 21.4 22.8 24.7 26.1 (10.6-11.8) (12.4-13,8) (14.3-15 9) (15 7-17 5) (17.5.19.5) (18.8-21 1) (20.2-22 6) (21.5-24,1) (23 1-26 1) (24.4-27 7) r 60-day 13.4 15.7 17.8 19.5 21.6 23.2 24.7 26.2 28.2 29.7 (12.7-14.1) (14.9-16.5) (16 9-18.7) (18 5-20 5) (20 4-22 7) (21,9-24 4) (23,4-26.0) (24.7-27.7) (26 5-29 8) (27 8-31 4) t Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval The probability that precipitation frequency estimates(for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values ,Please refer to NOAA Atlas 14 document for more information Back to Top PF graphical https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.0116&Ion=-79.3159&data=depth&units=english&series=pds 1/4 Scott Cole,NCLSS 3,l2 Copples Road Ext Asheboro, NC 27205 (336) 460-4559 Double D Engineering, PLLC April 7,2021 Attn: Mr. Lee Humphrey 150 S. Page Street Southern Pines,NC 28387 Re: Seasonal High-Water Table Identification and Soil Infiltration Rates: Ryans Run; Hoke County NC Calloway Road Soil conditions and infiltration rates were evaluated and measured on the above-referenced property within the proposed storm water BMP devices. Work was conducted in accordance with Parts A-2 and C- 1 of the North Carolina Department of Environmental Quality Stormwater Design Manual. Soil samples were evaluated with a hand auger. SEASONAL HIGH WATER TABLE IDENTIFICATION Seasonal High Water Table depth is determined by field evaluation for soil wetness conditions which are indicated by the presence of redoximorphic (redox) features with a chroma of 2 or less (in Munsell color notation) in mottles or the horizon matrix. Colors of chroma 2 or less due to relic minerals from parent material (underlying rock), anaerobic activity created by placement of fill material, or soil textural class transitions (perched water) are not considered as indicators for seasonal high water. Upon determination of SHWT depth, an additional 6" will be deducted from the observed depth to account for capillary fringe water movement above the SHWT. Stormwater infiltration trenches are designed to ensure the lowest point is at least two feet above the Seasonal High Water Table(SHWT). SATURATED HYDRAULIC CONDUCTIVITY (K,a,) Soils evaluated on this property are typical of those within the Blaney Loamy Sand series(BaB, BaD)and the Vaucluse Loamy Sand series (VaB). These soil series consist of deep, well drained soils with varying rates of permeability. Infiltration rates were measured to determine if soil conditions were suitable for the installation of stormwater infiltration trenches. Infiltration rates were measured using a Johnson Constant Head Permeameter. Measurements were recorded at varying intervals until equilibrium was reached. A summary of observations within the proposed Stormwater BMP Device is shown in the table below. BMP Device Site#1 SHWT Munsell Color Ksat Ksat K_a, (inches below Notation (0-30"; SL) (30-48";SCL) (48-96"; SCL/SC ground surface mixed mineralogy) with capillary fringe adjustment) 90"(7.5')(SHWT 2.5Y 8/1 18"/hour .8"/hour Not Measured elevation 292.5') 2.5Y 7/1 Scott Cole, NCLSS 312 Copples Road Ext Asheboro, NC 27205 (336) 460-4554 BMP Device Site#2 SHWT Munsell Color Ksal Ks.t Kcal (inches below Notation (0-48"; SL) (48-80";SCL) (80-100"; SCL/SC ground surface mixed mineralogy) with capillary friRge adjustment) 96"(8')(SHWT 2.5Y 8/1 18"/hour .8"/hour Not Measured elevation 300') 2.5Y 7/1 CONCLUSION Field evaluation of hydraulic conductivity provides estimations of soil infiltration rates; however, methods used to measure these rates can influence the results. Side walls of the bore hole are"smeared" by the soil auger as the hole is prepared and loose soil in the bottom of the hole is placed in suspension when water is applied; both factors negatively influence water infiltration rates. To help overcome these issues, after excavation of each infiltration trench, it is recommended the trench bottom and sidewalls be raked and dusted with pulverized limestone. These are practices that have been in place within the on-site wastewater industry to help loosen the soil and aid in restoration of soil structure. I am pleased to be of service in this matter and can be contacted at your convenience should you have any questions concerning information within this report. Thank you. SOK NKL///�'1; Scott Cole "a . O\! \\ North Carolina Licensed Soil Scientist `1) 1 7 2h`` y „ /--- cv 14 st BMP Site#1 'c2 \ SHWT: 90"(7.5')bgs En C\I \ SHWT Elevation: 292.5' \ Ksat 0-30"SL: 18"1 hour ,;7 - Ksat 30-48""SCL: .8"1 hour 1.9. Ksat 48-96"SCL mixed min: Not Measured 7 •1 ,. • • •el": •r EEE 1 nuT1-m i >••.�1 Y`wi,48s�its�/ t) 8.S 017yW6TG09{169 PixyLLkHT SIORk ORw,AST , T 1I fA iJ/S 2cEl-A'13 / \ VSEu_rlr mg maa..;r 47 jer:X 4.1.� ` s 11 v2tE rA'sro �E /iI" •,�. �-1 II`f •••• : ��� �p,1u ` / ,. O I ". 1.,•• :tWAF T sNAEat ' ES'JGA GRACE \ k0 6019d0001009 ' a 1276-592 , , /4 ,! ,// \ 20:E0 R20 iV 56!?4/ f4t4 FCRD ,,,....„ 4,f, 4,K;',,,I.--'et" ----''----.7-t.7:Vs..- / #to/ \ - - /e, .:.,,..,, ..., ,,,,,,*, ,, .!, \,,,‘e-, At e1 �In; / .,4.e,z, t r �. pnWANENscr r i DRWM�iE / / / C µti al T . � - � / �� 10244 .„,,,,,„,„. ,..„ .4,. A$E1TE117 rY ,� / /y Z �i : 'I OLBERT NUF0 ., .., 1::i," .//Ji I{ ,•10 „ !I�{II �� (Ki91fT107n50r f` f7 Ir hr � ril i,I _00 gNEo Rea /�/ J ,�1,,, / s� Ilr ,I� i i, t , F II,,Ire , o�.,��, !)''(I� Lors Ie 2.s Au uAHr�{Y A fr, 2 /r,„l ll.>f 1\� •I / I/�I� I, 70'1CCLAICD 8'JTER /'� 11 L1 rc• !I00! .OEIYfE>•3VPFA�IYAhXS 40 t 1 1 '" /V ! /I I Att 1wvENVTOUs swr,LCEs AN0 % / 0 se.\\ /*/- ezt 1 , \40...,, P \ \\',C�\I/ i. iii: ..,-A^..; g:Igi'AAllt14011 41' ' �� t. PEF1tWFNT 9RMV DAAPIM( \ '' •��1�:"v•d- ' BMP Site#2 e \ E�3E:li A Ptrow+tlll ter\ , .«���, '�t?''� SHWT: 96"(8')bgs �e.cu o r�u \ / f, ' \%�,►��� . , 4 SHWT Elevation: 300' � N", / %;\� r � Ksat 0-48"SL: 18"I hour \N. ,1 i ,`,/4,4�,r Ksat 48-80"SCL: ,8"1 hour MUM/CM LUAU DRAINAGE \ r�41,�`� Ksat 80-100"SCL mixed min. Not Measured int _ 40, ��_ f.AS.ViNT ANO PIPUMERT NJ �� ,Q�4,�� �. - 'Y \ , 6ETAR.O SWALE . , trcMOMoue2 7, \ /� / ♦0 /.� t�>\•,� w = scl SHWT )R20 °:•./.1 jff .1.0,':1:44..40AP 7."-- .148Sr. ‘SCI 8.18frO .41 ,..z- v, /410.4.-',.. " 44r. SiuN CASfYii.1--- V'r��••. 'TT � � � ,1I;0, C � ��\� / /Ir."4 , 1, %* %or 10'' al \14#1,7..-'---;,-..•=-';.A$10,,e'.*0 44.7,#44 :S1xAtg triAl.) \' / 41. ‘ii \ / / NORTH-, /. .. _ I/ CO Q, _V." 504160001011 74P, �� fir" A 5e1E60001237 900-238KUM TUNIC)!2011E0 R20 \\�/ (OJT SPACE Sb1tisoorn09 J�J •••� C7 csRt)c pQ+�[rP: , 6,3J7 S, Miro O 7' 1660CYnp1027 �/ YWEO On �� 16I-10DSS \ NOnA1WTT IlL \ $34400m1010 U,Ip:wEvAUS \ ,,Al . WNW R10 42'Ou0001H1 Cfffii GAM. \ `'ATER V 11 24740 RID .T38a1410011J1 C 201E0 Pi* 7111'14Da..A ORA0140i / \ {DNS, i1pT1 ANC 'CUE N /�' ... 1ouble _ _-- iH • il1 inch = 200 feet RY • RUN ii1 1 r1r`IiVlac�ki2'�r�I PI I t- O A 'D-Q. , / HOKE COl1 ' Y. NO.1H CAROLINA SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name Ryan's Run 2 Project Area(ac) 35.777 3 Coastal Wetland Area(ac) - 4 Surface Water Area(ac) 1.524 5 Is this project High or Low Density? High 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided(feet) 30 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? No 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 1 12 Bioretention Cell 0 13 Wet Pond 1 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting(RWH) 0 18 Green Roof 0 19 Level Spreader-Filter Strip(LS-FS) 0 20 Disconnected Impervious Surface(DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 I Name and Title: Carlo Pardo,PE 28 Organization: Triangle Site Design,PLLC 29 Street address: 4004 Barrett Drive,Suite 101 30 City,State,Zip: Raleigh,NC 27609 31 Phone number(s): 919-553-6570 32 Email: cpardo@trianglesitedesign.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer Signature of Designer Seal Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so,number of drainage areas/SCMs 2 3 Does this project have low density areas? No 4 If so,number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 2 4 Type of SCM - Wet Pond Infiltration Basin 5 Total drainage area(sq ft) 1533633 979923 553710 6 Onsite drainage area(sq ft) 1352690 955530 397160 7 Offsite drainage area(sq ft) 180943 24393 156550 8 Total BUA in project(sq ft) 496534 242378 sf 254156 sf New BUA on subdivided lots(subject to permitting) 9 (sq ft) 315591 217985 sf 97606 sf New BUA not on subdivided lots(subject to 10 permitting)(sf) 11 Offsite BUA(sq ft) 180943 24393 sf 156550 sf 12 Breakdown of new BUA not on subdivided lots: -Parking(sq ft) -Sidewalk(sq ft) 14490 12026 sf 2464 sf -Roof(sq ft) 220000 148000 sf 72000 sf -Roadway(sq ft) 81101 57959 sf 23142 sf -Future(sq ft) -Other,please specify in the comment box below(sq ft) New infiltrating permeable pavement on 13 subdivided lots(sq ft) New infiltrating permeable pavement not on 14 subdivided lots(sq ft) Existing BUA that will remain(not subject to 15 permitting)(sq ft) 16 Existing BUA that is already permitted(sq ft) 17 Existing BUA that will be removed(sq ft) 18 Percent BUA 32% 25% 46% 19 Design storm(inches) 1.0 in 1.0 in 20 Design volume of SCM(cu ft) 24326 cf 21369 cf 21 Calculation method for design volume Simple Method Simple Method ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): Offsite DA-100%Build-Out Potential for residentail homes along Calloway Road for DA#2. INFILTRATION SYSTEM 1 Drainage area number 1 I 2 Minimum required treatment volume(Cu ft) 21369 cf GENERAL MDC FROM 02H.1050 3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM(H:V or enter"Vertical'for trenches)? 3:1 6 Does the SCM have retaining walls,gabion walls or other engineered side slopes? No 7 Are the inlets,outlets,and receiving stream protected from erosion (10-year storm)? Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes 9 What is the method for dewatering the SCM for maintenance? Pump(preferred) 10 If applicable,will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC(8)? Yes 12 Does the drainage easement comply with General MDC(9)? Yes 13 If the SCM is on a single family lot,does(will?)the plat comply with General MDC(10)? N/A 14 Is there an O&M Agreement that complies with General MDC(11)? Yes 15 Is there an O&M Plan that complies with General MDC(12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM desi ned b an NC licensed rofessional? Yes INFILTRATION SYSTEM MDC FROM 02H.1051 18 Proposed slope of the subgrade surface(%) 0% 19 Are terraces or baffles provided? No 20 Type of pretreatment: Forebay Soils Data 21 Was the soil investigated in the footprint and at the elevation of the infiltration system? Yes 22 SHWT elevation(fmsl) 300.00 23 Depth to SHWT per soils report(in) 96.00 24 Ground elevation at boring in soils report(fmsl) 308.00 25 Is a detailed hydrogeologic study attached if the separation is between 1 and 2 feet? Yes 26 Soil infiltration rate(in/hr) 18.00 27 Factor of safety(FS) (2 is recommended): 2.00 Elevations 29 Bottom elevation(fmsl) 307 ft 30 Storage elevation(fmsl) 309.ft 31 Bypass elevation(fmsl) 310.9 ft For Basins Only 32 Bottom surface area(ft2) 11530 ft 33 Storage elevation surface area(ft2) 14290.ft For Trenches Only 34 Length(ft) 35 Width(ft) 36 Perforated pipe diameter,if applicable(inches) 37 Number of laterals 38 Total length of perforated piping 39 Stone type,if applicable 40 Stone porosity(%) 41 Is stone free of fines? 42 Is the stone wrapped in geotextile fabric? 43 Has at least one inspection port been provided? Volumes/Drawdown 44 Design volume of SCM(cu ft) 21369 cf 45 Time to draw down hours 72 hrs ADDITIONAL INFORMATION 46 Please use this space to provide any additional information about the infiltration system(s): Infiltration 1 1:20 PM 5/20/2024 WET POND 1 Drainage area number 3 I 2 Minimum required treatment volume(Cu ft) 22261 cf GENERAL MDC FROM 02H.1050 3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM(H:V)? 3:1 6 Does the SCM have retaining walls,gabion walls or other engineered No side slopes? 7 Are the inlets,outlets,and receiving stream protected from erosion Yes (10-year storm)? 8 Is there an overflow or bypass for inflow volume in excess of the Yes design volume? _ 9 What is the method for dewatering the SCM for maintenance? Pump(preferred) 10 If applicable,will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC(8)? Yes 12 Does the drainage easement comply with General MDC(9)? Yes If the SCM is on a single family lot,does(will?)the plat comply with 13 General MDC(10)? N/A 14 Is there an O&M Agreement that complies with General MDC(11)? Yes 15 Is there an O&M Plan that complies with General MDC(12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM designed by an NC licensed professional? Yes WET POND MDC FROM 02H.1053 18 Sizing method used SA/DA 19 Has a stage/storage table been provided in the calculations? Yes 20 Elevation of the excavated main pool depth(bottom of sediment 292,00 removal)(fmsl) 21 Elevation of the main pool bottom(top of sediment removal)(fmsl) 293.00 22 Elevation of the bottom of the vegetated shelf(fmsl) 296.50 23 Elevation of the permanent pool(fmsl) 297.00 _ 24 Elevation of the top of the vegetated shelf(fmsl) 297.50 25 Elevation of the temporary pool(fmsl) 298.30 _ 26 Surface area of the main permanent pool(square feet) 14570 27 Volume of the main permanent pool(cubic feet) 43188 cf 28 Average depth of the main pool(feet) 3.39 ft 29 Average depth equation used Equation 3 30 If using equation 3,main pool perimeter(feet) 665.0 ft 31 If using equation 3,width of submerged veg.shelf(feet) 3.0 ft 32 Volume of the forebay(cubic feet) 7480 cf 33 Is this 15-20%of the volume in the main pool? Yes _ 34 Clean-out depth for forebay(inches) 48 in 35 Design volume of SCM(cu ft) 24326 cf 36 Is the outlet an orifice or a weir? Orifice 37 If orifice,orifice diameter(inches) 2.00 in 38 If weir,weir height(inches) 39 If weir,weir length(inches) 40 Drawdown time for the temporary pool(days) 3.49 41 Are the inlet(s)and outlet located in a manner that avoids short- Yes circuiting? 42 Are berms or baffles provided to improve the flow path? Yes 43 Depth of forebay at entrance(inches) 48 in 44 Depth of forebay at exit(inches) 36 in 45 Does water flow out of the forebay in a non-erosive manner? Yes 46 Width of the vegetated shelf(feet) 6 ft 47 Slope of vegetated shelf(H:V) 6:1 48 Does the orifice drawdown from below the top surface of the Yes permanent pool? 49 Does the pond minimize impacts to the receiving channel from the 1- Yes yr,24-hr storm? 50 Are fountains proposed?(If Y,please provide documentation that No MDC(9)is met.) 51 Is a trash rack or other device provided to protect the outlet system? Yes 52 Are the dam and embankment planted in non-clumping turf grass? Yes 53 Species of turf that will be used on the dam and embankment Hybrid Bermuda 54 Has a planting plan been provided for the vegetated shelf? Yes ADDITIONAL INFORMATION 55 Please use this space to provide any additional information about the wet pond(s): Wet Pond 1 2:59 PM 5/21/2024 Bowman [Von7Fl .A ULNA APPENDIX B Infiltrating Wet Pond #1 Calculations CN Values Wet Pond Design Hydrographs Spillway Design Rip-Rap Apron Calculations Stormwater Management Details Ryan's Run -Storm water Design Report 7 ----D , or c-tx ,,a(3,_ A im N Qo5V aC_ v . \.\__ ____,-• --------*____-_-//::_---:--'---:---___ _,\ L,\- ----, ) , __J -NY,- V cf,7„, / :ff.'..........-- ,,__ -;. ' 7 lila ,_ / �.®� %�- 40/r, li � ,fir_ _4: i ,;,,•-__- ----Em_--e-,-* ,=-----;-------:------k.,-._:#..„); ii:1 4- D • _ ---_„_____----1 ,-,:,----- -:.___.-----:-_-_--,..rz--E,-_-_--110-1,- ----...4- 01:0 41-04 i ,...•,, -4f.'7•47•<:.. 1.1.„..."..1 ApriFlpf"-- IP .. .,4004,-..1.,001/411111 All ,jp ,N‘ , 4 P,7".:0-------::47.1trIeni et njaril; ', Alft.443%;r7.17441W-4 111,,.I. ef /%4/ re-9- • - ,=0•i- Aso:dr. .,,,,v f„elm x------ j le fi „fey, ,i,..-___,-.....- -7---2..Ezilrito 4orp... i illber { )tair -,1/4„, \pp ,--- IIIIIIIia NI �1 fr $ 4‘, \. pdh. .fes • ii 0 is L�'' .''t ( ' .A.•, <;* oo.wii. . . 16 O / d Triangle Site Design, PLLC Ryan's Run, Hoke County, NC Curve Number Calculation (CN) Pre-Developed Conditions#1 Drainage Area(acres).- 22.50 Existing Soil Groups: Soil Group Map Symbol Soil Description Acres Percent of DA A AuA Autryville Loamy Sand 20.11 89% A CaB Candor Sand 0.20 1% C BaD Blaney Loamy Sand 1.33 6% A/D JT Vaucluse Loamy Sand 0.86 4% Existing Land Uses: Land Use Description Existing Soil Group Acres Curve# Weighted CN Wooded-Good Stand A 19.98 50 44.4 Wooded-Good Stand C 1.33 73 4.3 Impervious- Dirt Road A 0.63 77 2.2 Off-Site Calloway Road A 0.56 98 2.4 Cumulative Curve#= 53.3 Triangle Site Design, PLLC Ryan's Run, Hoke County, NC Curve Number Calculation (CN) Post-Developed Conditions to Infiltration Basin #2 Drainage Area(acres): 22.50 Existing Soil Groups Soil Group Map Symbol Soil Description Acres Percent of DA A AuA Autryville Loamy Sand 20.11 89% A CaB Candor Sand 0.20 1% C BaD Blaney Loamy Sand 1.33 6% A/D JT Vaucluse Loamy Sand 0.86 4% Proposed Land Uses: Land Use Description Existinp Soil Group Acres Curve# Weicrhted CN Impervious Area-Residential Lots A 3.40 98 14.8 Impervious Area-Sidewalk/Road A 1.61 98 7.0 Open Space-Good A 15.60 45 31.2 Open Space-Good C 1.33 74 4.4 Off-Site Calloway Road A 0.56 98 2.4 Cumulative Curve#= 59.8 Proposed Wet Pond Project Information Project Name: Turnberry South Project#: 220164-01-007 Designed by: CP Date: 6/16/2023 Revised by: CB Date: 12/6/2023 Checked by: Date: Site Information Sub Area Location: Drainage To Proposed Wet Pond Drainage Area (DA) = 22.50 Acres 979,923 sf Impervious Area (IA) = 5.56 Acres 242,378 sf Percent Impervious (I) = 24.73 Required Surface Area Permanent Pool Depth: 3.39 ft SA/DA= 0.923 Min Req'd Surface Area = 9,044 sf(at Permanent Pool) Required WQv Storage Volume Design Storm = 1 inch Non-Coastal County Determine Rv Value = 0.05 + .009 (I) = 0.273 in/in Storage Volume Required = 22,261 cf(above Permanent Pool) Elevations Top of Pond Elevation = 301.50 ft Temporary Pool Elevation = 298.30 ft Permanent Pool Elevation = 297.00 ft Shelf Begining Elevation = 296.50 ft Forebay Weir= 296.00 ft Shelf Ending Elevation = 297.50 ft Bottom Elevation = 293.00 ft Permanent Pool Area Area @ Top of Permanent Pool = 17,770 sf Volume of Temporary Storage = 26,567 cf Is Permenant Pool Surface Area Sufficient(yes/no)? Yes ( 17770 > 9044 ) sf Volume of Storage for Design Storm = 26,567 Yes ( 26567 > 22261 ) cf Incremental Drawdown Time STORMWATER POND INCREMENTAL DRAWDOWN METHOD-Water Quality Volume Project Information Project Name: Turnberry South Project#: 220164-01-007 Designed by: CP Date: 6/16/2023 Checked by: CB Date: 12/12/2023 Water Quality Orifice Incremental Determination of Water Quality Volume Drawdown Time • Zone 3 Q3=0.0437 CD*D2(Z-D/24-Ei)" 2> V • Zone 2 Q2=0.372 CD*D*(Z-Ei)^(3/2) Zone1 Q1=0 Orifice Diameter(D)= 2 in Cd= 0.6 Ei= 297 Orifice Inv. Zone 1 Range= 0.00 to 297 Zone 2 Range= 297 to 297.1 Zone 3 Range= 297.1 to 298.2 Incremental Drawdown Method Contour Incremental Drawdown Countour Area Volume Stage,Z Zone Q Time sq ft cu ft ft cfs min 297.00 17,770 0 0.00 2.00 0.000 -- 297.50 20,180 9,488 0.50 3.00 0.068 2,336 298.00 21,570 10,438 1.00 3.00 0.100 1,732 298.30 22,700 6,641 2.00 3.00 0.116 957 Total -- -- -- -- 5,025 Drawdown Time=Incremental Volume/Q/60sec/min Summary Total Volume= 26,567 cf Total Time= 5,025 min Total Time= 3.49 days 5/21/2024 Prop Wet Pond#1-new design(Ryan's Run#1).xls 1 of 1 Project: Pond #4 Date: 5/21/2024 Main-Pond Contours-Volumes Elevation Main-Pond Incremental Vol. Accumulated Vol. Description 297 14,570 6,795 43,188 A2 (Perm_Pool) 296.5 12,610 6,143 36,393 Al (Bottom_Shelf) 296 11,960 11,330 30,250 295 10,700 10,075 18,920 294 9,450 8,845 8,845 293 8,240 0 0 A3 (Bottom_Pond) Forebay Contours-Volumes Elevation FB1 FB2 FB3 Total-Areas Incremental Vol. Accumulated Vol. 297 2,780 2,780 1,330 7,215 296.5 2,540 2,540 1,210 5,885 296 2,300 2,300 2,075 4,675 295 1,850 1,850 870 2,600 294.5 1,630 1,630 765 1,730 294 1,430 1,430 965 965 293 500 500 0 0 Forebay Volume 16.7% *Between 15% &20% Average Depth (Option 1) 2.89 *At least 3' average depth Average Depth Calculation (Option 2) Vpp 43,188 permeter of shelf 665 width of shelf 3 Al (Bottom_Shelf): 12,610 Average Depth = 3.39 Proposed Wet Pond Project Information Project Name: Turnberry South Project#: 220164-01-007 Designed by: CP Date: 6/16/2023 Revised by: CB Date: 12/12/2023 Checked by: Date: Site Information Sub Area Location: Drainage to Proposed Pond Drainage Area (DA)= 22.50 Acres Impervious Area (IA)= 5.56 Acres Percent Impervious(I)= 24.73 % (Drainage Area) Orifice Sizing Orifice Size= 2.00 in (Diameter) Drawdown Time = 3.49 days (Incremental Draw Down Method) less than 5 days(yes/no)? yes greater than 2 day(yes/no)? yes Anti-Flotation Device 4'x 4' Outlet Structure Area: 16.0 sf Volume: 136.0 cf (Water Displaced-Top of Pond to Bottom of Pond) Weight: 8486 lbs Factor of Safety 1.20 WT Req'd of Anti-Flotation Device: 10,184 lbs Volume of Concrete Req'd: 67.9 cf (Unit WT of Concrete= 150 pcf) Volume Provided: 69.5 cf (4'x4' riser x 2'=32 sf, 5'x5'footing x 1.5'=37.5cf) 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,05/21 /2024 Hyd. No. 1 SCM Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 0.905 cfs Storm frequency = 1 yrs Time to peak = 746 min Time interval = 2 min Hyd. volume = 13,455 cuft Drainage area = 22.500 ac Curve number = 53.3 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 25.60 min Total precip. = 3.05 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Pre-Developed Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 1.00 - 1.00 0.90 / 0.90 0.80 0.80 0.70 0.70 0.60 a 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 0.10 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,05/21 /2024 Hyd. No. 2 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 6.743 cfs Storm frequency = 1 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 29,058 cuft Drainage area = 22.500 ac Curve number = 59.8 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 3.05 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 7.00 7.00 6.00 6.00 5.00 5.00 • 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,05/21 /2024 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 0.109 cfs Storm frequency = 1 yrs Time to peak = 1450 min Time interval = 2 min Hyd. volume = 24,070 cuft Inflow hyd. No. = 2 - BMP Post-Developed Max. Elevation = 298.23 ft Reservoir name = BMP Pond Max. Storage = 24,948 cuft Storage Indication method used. Post Through Pond Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 7.00 7.00 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 — 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 3 Hyd No. 2 111111111 Total storage used = 24,948 cuft Pond Report 4 Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,05/21 /2024 Pond No. 1 - BMP Pond Pond Data Contours-User-defined contour areas.Average end area method used for volume calculation. Begining Elevation=297.00 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 297.00 17,770 0 0 0.50 297.50 20,180 9,488 9,488 1.00 298.00 21,570 10,438 19,925 1.30 298.30 22,700 6,641 26,566 2.00 299.00 24,600 16,555 43,121 3.00 300.00 27,350 25,975 69,096 4.00 301.00 30,170 28,760 97,856 4.50 301.50 31,590 15,440 113,296 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 18.00 2.00 0.00 0.00 Crest Len(ft) = 6.00 10.00 20.00 0.00 Span(in) = 18.00 2.00 0.00 0.00 Crest El.(ft) = 298.30 299.20 299.80 0.00 No.Barrels = 1 1 0 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El.(ft) = 297.00 297.00 0.00 0.00 Weir Type = Rect Broad Ciplti --- Length(ft) = 50.00 0.50 0.00 0.00 Multi-Stage = Yes Yes No No Slope(%) = 14.00 1.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Contour) Multi-Stage = n/a Yes No No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage(ft) Stage/ Discharge Elev(ft) 5.00 302.00 4.00 301.00 3.00 300.00 2.00 299.00 1.00 298.00 0.00 297.00 0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0 180.0 Total Q Discharge(cfs) 5 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,05/21 /2024 Hyd. No. 5 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Drainage area = 22.500 ac Curve number = 59.8 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 1.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 5 -- 1 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 - 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 - , 0.00 0 20 40 60 80 100 120 Hyd No. 5 Time (min) 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,05/21 /2024 Hyd. No. 6 1.0-in Storm Thru Pond Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 5 - BMP Post-Developed Max. Elevation = 297.00 ft Reservoir name = BMP Pond Max. Storage = 0 cuft Storage Indication method used. 1.0-in Storm Thru Pond Q (cfs) Hyd. No. 6 -- 1 Year Q (cfs) 0.10 - 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 - 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 6 Hyd No. 5 I I Total storage used = 0 cuft Pond Report 7 Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,05/21 /2024 Pond No. 1 - BMP Pond Pond Data Contours-User-defined contour areas.Average end area method used for volume calculation. Begining Elevation=297.00 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 297.00 17,770 0 0 0.50 297.50 20,180 9,488 9,488 1.00 298.00 21,570 10,438 19,925 1.30 298.30 22,700 6,641 26,566 2.00 299.00 24,600 16,555 43,121 3.00 300.00 27,350 25,975 69,096 4.00 301.00 30,170 28,760 97,856 4.50 301.50 31,590 15,440 113,296 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 18.00 2.00 0.00 0.00 Crest Len(ft) = 6.00 10.00 20.00 0.00 Span(in) = 18.00 2.00 0.00 0.00 Crest El.(ft) = 298.30 299.20 299.80 0.00 No.Barrels = 1 1 0 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El.(ft) = 297.00 297.00 0.00 0.00 Weir Type = Rect Broad Ciplti --- Length(ft) = 50.00 0.50 0.00 0.00 Multi-Stage = Yes Yes No No Slope(%) = 14.00 1.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Contour) Multi-Stage = n/a Yes No No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage(ft) Stage/ Discharge Elev(ft) 5.00 302.00 4.00 301.00 3.00 300.00 2.00 299.00 1.00 298.00 0.00 297.00 0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0 180.0 Total Q Discharge(cfs) 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,05/21 /2024 Hyd. No. 1 SCM Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 3.572 cfs Storm frequency = 2 yrs Time to peak = 734 min Time interval = 2 min Hyd. volume = 28,208 cuft Drainage area = 22.500 ac Curve number = 53.3 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 25.60 min Total precip. = 3.69 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Pre-Developed Q (cfs) Hyd. No. 1 -- 2 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 - 2.00 1.00 1.00 0.00 — ' - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 1 9 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,05/21 /2024 Hyd. No. 2 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 15.46 cfs Storm frequency = 2 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 51,083 cuft Drainage area = 22.500 ac Curve number = 59.8 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 3.69 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 2 -- 2 Year Q (cfs) 18.00 - 18.00 15.00 15.00 12.00 - 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 - �- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,05/21 /2024 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 0.883 cfs Storm frequency = 2 yrs Time to peak = 940 min Time interval = 2 min Hyd. volume = 45,144 cuft Inflow hyd. No. = 2 - BMP Post-Developed Max. Elevation = 298.41 ft Reservoir name = BMP Pond Max. Storage = 29,217 cuft Storage Indication method used. Post Through Pond Q (cfs) Hyd. No. 3 -- 2 Year Q (cfs) 18.00 - 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 — - 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 3 Hyd No. 2 111111111 Total storage used = 29,217 cuft 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,05/21 /2024 Hyd. No. 5 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 0.000 cfs Storm frequency = 2 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Drainage area = 22.500 ac Curve number = 59.8 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 0.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 5 -- 2 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 - 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 - , 0.00 0 20 40 60 80 100 120 Hyd No. 5 Time (min) 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,05/21 /2024 Hyd. No. 6 1.0-in Storm Thru Pond Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 2 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 5 - BMP Post-Developed Max. Elevation = 297.00 ft Reservoir name = BMP Pond Max. Storage = 0 cuft Storage Indication method used. 1.0-in Storm Thru Pond Q (cfs) Hyd. No. 6 -- 2 Year Q (cfs) 0.10 - 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 - 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 6 Hyd No. 5 I I Total storage used = 0 cuft 13 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,05/21 /2024 Hyd. No. 1 SCM Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 19.20 cfs Storm frequency = 10 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 88,227 cuft Drainage area = 22.500 ac Curve number = 53.3 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 25.60 min Total precip. = 5.45 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Pre-Developed Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 21.00 21.00 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 14 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,05/21 /2024 Hyd. No. 2 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 48.12 cfs Storm frequency = 10 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 131,112 cuft Drainage area = 22.500 ac Curve number = 59.8 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 5.45 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 50.00 I 50.00 40.00 40.00 30.00 30.00 20.00 • 20.00 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 15 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,05/21 /2024 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 9.414 cfs Storm frequency = 10 yrs Time to peak = 740 min Time interval = 2 min Hyd. volume = 125,082 cuft Inflow hyd. No. = 2 - BMP Post-Developed Max. Elevation = 299.14 ft Reservoir name = BMP Pond Max. Storage = 46,755 cuft Storage Indication method used. Post Through Pond Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 � 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 2400 2640 2880 Time (min) Hyd No. 3 Hyd No. 2 1111111 I Total storage used =46,755 cuft 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,05/21 /2024 Hyd. No. 5 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 0.000 cfs Storm frequency = 10 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Drainage area = 22.500 ac Curve number = 59.8 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 0.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 5 -- 10 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 - 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 - , 0.00 0 20 40 60 80 100 120 Hyd No. 5 Time (min) 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,05/21 /2024 Hyd. No. 6 1.0-in Storm Thru Pond Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 10 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 5 - BMP Post-Developed Max. Elevation = 297.00 ft Reservoir name = BMP Pond Max. Storage = 0 cuft Storage Indication method used. 1.0-in Storm Thru Pond Q (cfs) Hyd. No. 6 -- 10 Year Q (cfs) 0.10 - 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 - 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 6 Hyd No. 5 I I Total storage used = 0 cuft 18 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,05/21 /2024 Hyd. No. 1 SCM Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 57.40 cfs Storm frequency = 100 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 222,446 cuft Drainage area = 22.500 ac Curve number = 53.3 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 25.60 min Total precip. = 8.25 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Pre-Developed Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 J ..---- _ 0.00 - . 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 19 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,05/21 /2024 Hyd. No. 2 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 112.61 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 294,724 cuft Drainage area = 22.500 ac Curve number = 59.8 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 8.25 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 2 -- 100 Year Q (cfs) 120.00 120.00 • 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 ) _ _ __ _ _ ____ _ , . 0.00 .' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 20 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,05/21 /2024 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 73.37 cfs Storm frequency = 100 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 288,628 cuft Inflow hyd. No. = 2 - BMP Post-Developed Max. Elevation = 300.72 ft Reservoir name = BMP Pond Max. Storage = 89,783 cuft Storage Indication method used. Post Through Pond Q (cfs) Hyd. No. 3-- 100 Year Q (cfs) 120.00 . 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 3 Hyd No. 2 111111111 Total storage used = 89,783 cuft 21 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,05/21 /2024 Hyd. No. 5 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 0.000 cfs Storm frequency = 100 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Drainage area = 22.500 ac Curve number = 59.8 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 0.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 5-- 100 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 - 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 — — 0.00 0 20 40 60 80 100 120 Hyd No. 5 Time (min) 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,05/21 /2024 Hyd. No. 6 1.0-in Storm Thru Pond Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 100 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 5 - BMP Post-Developed Max. Elevation = 297.00 ft Reservoir name = BMP Pond Max. Storage = 0 cuft Storage Indication method used. 1.0-in Storm Thru Pond Q (cfs) Hyd. No. 6-- 100 Year Q (cfs) 0.10 - 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 - 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 6 Hyd No. 5 I I Total storage used = 0 cuft 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Tuesday,05/21 /2024 Hyd. No. 3 12.97-12.00=0.97 - 1.5 hour Post Through Pond Hydrograph type = Reservoir Peak discharge = 73.37 cfs Storm frequency = 100 yrs Time to peak = 12.13 hrs Time interval = 2 min Hyd. volume = 288,628 cuft Inflow hyd. No. = 2 - BMP Post-DevelorRdservoir name = BMP Pond Max. Elevation = 300.72 ft Max. Storage = 89,783 cuft Storage Indication method used. Hydrograph Discharge Table (Printed values>=1.00%ofQp.) Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 11.87 52.35 298.48 1.705 0.100 1.596 1.696 11.90 68.20 298.77 6.399 0.071 6.328 6.399 11.93 86.26 299.11 9.263 0.044 9.218 9.262 11.97 102.55 299.50 11.10 0.022 8.697 2.381 11.10 12.00 112.52 299.93 12.53 0.013 8.164 4.342 3.414 15.93 12.03 112.61 << 300.30 13.56 0.010 8.099 5.408 23.52 37.03 12.07 103.24 300.55 14.23 0.008 8.154 6.005 43.52 57.69 12.10 88.16 300.69 14.56 0.008 8.217 6.303 55.49 70.02 12.13 71.66 300.72 << 14.65 0.008 8.235 6.378 58.75 73.37 12.17 56.33 300.69 14.57 0.008 8.218 6.307 55.66 70.19 12.20 42.87 300.62 14.39 0.008 8.186 6.151 49.05 63.40 12.23 32.08 300.52 14.15 0.008 8.140 5.939 41.09 55.18 12.27 24.84 300.43 13.91 0.009 8.115 5.720 33.32 47.16 12.30 21.06 300.34 13.68 0.009 8.104 5.513 26.70 40.33 12.33 19.47 300.27 13.48 0.010 8.102 5.334 21.54 34.99 12.37 18.62 300.21 13.32 0.010 8.109 5.187 17.65 30.95 12.40 17.76 300.16 13.19 0.011 8.111 5.057 14.78 27.95 12.43 16.89 300.13 13.08 0.011 8.112 4.944 12.46 25.52 12.47 16.00 300.09 12.99 0.011 8.114 4.846 10.54 23.51 12.50 15.11 300.06 12.90 0.012 8.119 4.753 9.050 21.93 Continues on next page... 2 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 12.53 14.22 300.03 12.82 0.012 8.124 4.668 7.688 20.49 12.57 13.38 300.01 12.75 0.012 8.128 4.590 6.434 19.16 12.60 12.61 299.98 12.68 0.013 8.138 4.510 5.368 18.03 12.63 11.95 299.96 12.60 0.013 8.150 4.430 4.435 17.03 12.67 11.42 299.94 12.54 0.013 8.162 4.356 3.568 16.10 12.70 10.98 299.92 12.48 0.013 8.173 4.287 2.772 15.25 12.73 10.63 299.90 12.42 0.014 8.182 4.224 2.077 14.50 12.77 10.35 299.88 12.37 0.014 8.193 4.159 1.707 14.07 12.80 10.11 299.86 12.32 0.014 8.204 4.095 1.353 13.67 12.83 9.898 299.85 12.27 0.014 8.214 4.035 1.015 13.28 12.87 9.694 299.83 12.22 0.015 8.224 3.978 0.694 12.91 12.90 9.490 299.82 12.18 0.015 8.233 3.924 0.388 12.56 12.93 9.284 299.80 12.13 0.015 8.242 3.872 0.095 12.22 12.97 9.076 299.79 12.09 0.015 8.254 3.816 0.000 12.08 13.00 8.868 299.78 12.04 0.016 8.268 3.756 0.000 12.04 13.03 8.660 299.76 12.00 0.016 8.283 3.692 0.000 11.99 13.07 8.459 299.75 11.95 0.016 8.298 3.626 0.000 11.94 13.10 8.269 299.73 11.89 0.016 8.314 3.557 0.000 11.89 13.13 8.094 299.71 11.84 0.017 8.331 3.485 0.000 11.83 13.17 7.936 299.69 11.78 0.017 8.350 3.408 11.78 13.20 7.792 299.68 11.72 0.018 8.376 3.322 11.72 13.23 7.659 299.66 11.66 0.018 8.402 3.233 11.65 13.27 7.535 299.64 11.60 0.018 8.429 3.143 11.59 13.30 7.417 299.62 11.54 0.019 8.456 3.052 11.53 13.33 7.303 299.60 11.47 0.019 8.484 2.960 11.46 13.37 7.190 299.58 11.40 0.020 8.523 2.852 11.39 13.40 7.076 299.56 11.33 0.020 8.563 2.742 11.33 13.43 6.962 299.54 11.26 0.021 8.605 2.630 11.26 Continues on next page... 3 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 13.47 6.848 299.52 11.19 0.022 8.646 2.517 11.19 13.50 6.733 299.50 11.12 0.022 8.688 2.403 11.11 13.53 6.618 299.48 11.04 0.023 8.745 2.268 11.04 13.57 6.505 299.46 10.96 0.024 8.804 2.127 10.96 13.60 6.396 299.44 10.88 0.025 8.864 1.986 10.87 13.63 6.292 299.42 10.80 0.026 8.924 1.844 10.79 13.67 6.194 299.40 10.71 0.027 8.984 1.701 10.71 13.70 6.100 299.38 10.62 0.028 9.071 1.518 10.62 13.73 6.011 299.36 10.52 0.029 9.157 1.335 10.52 13.77 5.924 299.34 10.43 0.030 9.244 1.152 10.43 13.80 5.839 299.32 10.34 0.032 9.330 0.970 10.33 13.83 5.755 299.30 10.24 0.033 9.412 0.790 10.23 13.87 5.672 299.28 10.13 0.034 9.470 0.621 10.12 13.90 5.588 299.26 10.02 0.036 9.528 0.453 10.02 13.93 5.504 299.23 9.909 0.037 9.585 0.285 9.908 13.97 5.420 299.21 9.801 0.039 9.643 0.119 9.800 14.00 5.335 299.19 9.694 0.040 9.654 9.694 14.03 5.252 299.17 9.591 0.041 9.549 9.590 14.07 5.172 299.15 9.488 0.042 9.446 9.488 14.10 5.099 299.13 9.386 0.043 9.342 9.385 14.13 5.035 299.11 9.284 0.044 9.240 9.284 14.17 4.980 299.10 9.180 0.045 9.134 9.179 14.20 4.934 299.08 9.064 0.046 9.018 9.063 14.23 4.894 299.06 8.950 0.047 8.903 8.950 14.27 4.860 299.04 8.839 0.048 8.790 8.838 14.30 4.829 299.02 8.729 0.049 8.680 8.729 14.33 4.800 299.00 8.622 0.050 8.572 8.621 14.37 4.772 298.98 8.490 0.051 8.438 8.490 Continues on next page... 4 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 14.40 4.744 298.96 8.357 0.052 8.305 8.357 14.43 4.716 298.95 8.228 0.054 8.174 8.228 14.47 4.687 298.93 8.102 0.055 8.047 8.102 14.50 4.659 298.91 7.957 0.056 7.900 7.956 14.53 4.631 298.90 7.816 0.058 7.758 7.816 14.57 4.602 298.88 7.681 0.059 7.621 7.680 14.60 4.574 298.86 7.550 0.060 7.489 7.549 14.63 4.545 298.85 7.403 0.062 7.340 7.402 14.67 4.517 298.84 7.253 0.063 7.189 7.252 14.70 4.488 298.82 7.109 0.064 7.044 7.109 14.73 4.459 298.81 6.972 0.066 6.906 6.972 14.77 4.430 298.80 6.841 0.067 6.773 6.840 14.80 4.401 298.78 6.675 0.069 6.606 6.675 14.83 4.372 298.77 6.476 0.070 6.405 6.475 14.87 4.343 298.76 6.292 0.072 6.220 6.291 14.90 4.314 298.75 6.120 0.073 6.047 6.120 14.93 4.285 298.74 5.962 0.074 5.888 5.962 14.97 4.256 298.74 5.815 0.075 5.740 5.815 15.00 4.226 298.73 5.678 0.076 5.602 5.678 15.03 4.197 298.72 5.550 0.077 5.473 5.550 15.07 4.168 298.72 5.432 0.078 5.351 5.429 15.10 4.138 298.71 5.321 0.079 5.236 5.314 15.13 4.109 298.70 5.218 0.079 5.128 5.208 15.17 4.079 298.70 5.121 0.080 5.028 5.108 15.20 4.049 298.69 5.031 0.080 4.934 5.014 15.23 4.020 298.69 4.946 0.081 4.846 4.927 15.27 3.990 298.68 4.867 0.081 4.763 4.844 15.30 3.960 298.68 4.791 0.082 4.685 4.766 Continues on next page... 5 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 15.33 3.930 298.68 4.720 0.082 4.610 4.693 15.37 3.900 298.67 4.653 0.083 4.541 4.623 15.40 3.870 298.67 4.588 0.083 4.474 4.557 15.43 3.840 298.66 4.528 0.083 4.411 4.494 15.47 3.810 298.66 4.470 0.084 4.351 4.434 15.50 3.780 298.66 4.414 0.084 4.293 4.377 15.53 3.750 298.66 4.361 0.085 4.238 4.322 15.57 3.720 298.65 4.311 0.085 4.185 4.270 15.60 3.689 298.65 4.262 0.085 4.134 4.219 15.63 3.659 298.65 4.218 0.085 4.090 4.175 15.67 3.629 298.64 4.175 0.086 4.046 4.132 15.70 3.598 298.64 4.133 0.086 4.004 4.090 15.73 3.568 298.64 4.093 0.086 3.962 4.048 15.77 3.537 298.64 4.053 0.086 3.922 4.008 15.80 3.507 298.63 4.013 0.087 3.882 3.968 15.83 3.476 298.63 3.975 0.087 3.843 3.930 15.87 3.446 298.63 3.937 0.087 3.805 3.891 15.90 3.415 298.63 3.900 0.087 3.767 3.854 15.93 3.384 298.63 3.863 0.087 3.729 3.817 15.97 3.353 298.62 3.827 0.088 3.693 3.780 16.00 3.322 298.62 3.791 0.088 3.656 3.744 16.03 3.292 298.62 3.756 0.088 3.621 3.709 16.07 3.263 298.62 3.721 0.088 3.586 3.674 16.10 3.236 298.62 3.687 0.088 3.551 3.639 16.13 3.213 298.61 3.653 0.089 3.517 3.605 16.17 3.193 298.61 3.621 0.089 3.484 3.573 16.20 3.176 298.61 3.590 0.089 3.452 3.541 16.23 3.161 298.61 3.560 0.089 3.422 3.511 Continues on next page... 6 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 16.27 3.149 298.61 3.531 0.089 3.393 3.482 16.30 3.137 298.60 3.504 0.089 3.365 3.454 16.33 3.127 298.60 3.477 0.089 3.338 3.428 16.37 3.116 298.60 3.453 0.090 3.313 3.403 16.40 3.106 298.60 3.429 0.090 3.290 3.379 16.43 3.095 298.60 3.407 0.090 3.267 3.357 16.47 3.085 298.60 3.385 0.090 3.245 3.335 16.50 3.075 298.60 3.365 0.090 3.224 3.314 16.53 3.064 298.59 3.345 0.090 3.204 3.294 16.57 3.054 298.59 3.326 0.090 3.185 3.275 16.60 3.043 298.59 3.308 0.090 3.166 3.257 16.63 3.033 298.59 3.290 0.091 3.149 3.239 16.67 3.022 298.59 3.273 0.091 3.131 3.222 16.70 3.012 298.59 3.256 0.091 3.114 3.205 16.73 3.001 298.59 3.241 0.091 3.098 3.189 16.77 2.991 298.59 3.225 0.091 3.082 3.173 16.80 2.980 298.59 3.210 0.091 3.067 3.158 16.83 2.970 298.59 3.195 0.091 3.052 3.143 16.87 2.959 298.58 3.181 0.091 3.037 3.128 16.90 2.948 298.58 3.166 0.091 3.023 3.114 16.93 2.938 298.58 3.153 0.091 3.009 3.100 16.97 2.927 298.58 3.139 0.091 2.995 3.087 17.00 2.916 298.58 3.126 0.091 2.982 3.073 17.03 2.906 298.58 3.113 0.091 2.968 3.060 17.07 2.895 298.58 3.101 0.092 2.956 3.048 17.10 2.884 298.58 3.088 0.092 2.944 3.036 17.13 2.874 298.58 3.077 0.092 2.933 3.025 17.17 2.863 298.58 3.065 0.092 2.922 3.014 Continues on next page... 7 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 17.20 2.852 298.58 3.053 0.092 2.911 3.002 17.23 2.842 298.58 3.041 0.092 2.899 2.991 17.27 2.831 298.58 3.030 0.092 2.888 2.980 17.30 2.820 298.57 3.019 0.092 2.877 2.969 17.33 2.809 298.57 3.007 0.092 2.866 2.958 17.37 2.799 298.57 2.995 0.092 2.854 2.947 17.40 2.788 298.57 2.984 0.092 2.844 2.936 17.43 2.777 298.57 2.972 0.092 2.832 2.925 17.47 2.766 298.57 2.961 0.092 2.821 2.914 17.50 2.755 298.57 2.949 0.092 2.810 2.903 17.53 2.745 298.57 2.938 0.092 2.799 2.892 17.57 2.734 298.57 2.926 0.093 2.788 2.881 17.60 2.723 298.57 2.915 0.093 2.777 2.870 17.63 2.712 298.57 2.904 0.093 2.766 2.859 17.67 2.701 298.57 2.892 0.093 2.755 2.848 17.70 2.690 298.57 2.881 0.093 2.744 2.837 17.73 2.679 298.56 2.869 0.093 2.733 2.826 17.77 2.668 298.56 2.858 0.093 2.722 2.815 17.80 2.657 298.56 2.846 0.093 2.711 2.804 17.83 2.646 298.56 2.835 0.093 2.700 2.793 17.87 2.635 298.56 2.824 0.093 2.689 2.782 17.90 2.624 298.56 2.812 0.093 2.678 2.771 17.93 2.614 298.56 2.801 0.093 2.667 2.760 17.97 2.603 298.56 2.789 0.093 2.656 2.749 18.00 2.592 298.56 2.778 0.093 2.645 2.738 18.03 2.581 298.56 2.766 0.093 2.634 2.727 18.07 2.570 298.56 2.755 0.094 2.623 2.716 18.10 2.558 298.56 2.744 0.094 2.612 2.705 Continues on next page... 8 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 18.13 2.547 298.56 2.732 0.094 2.601 2.694 18.17 2.536 298.55 2.721 0.094 2.590 2.683 18.20 2.525 298.55 2.709 0.094 2.578 2.672 18.23 2.514 298.55 2.698 0.094 2.567 2.661 18.27 2.503 298.55 2.686 0.094 2.556 2.650 18.30 2.492 298.55 2.675 0.094 2.545 2.639 18.33 2.481 298.55 2.663 0.094 2.534 2.628 18.37 2.470 298.55 2.652 0.094 2.523 2.617 18.40 2.459 298.55 2.640 0.094 2.512 2.606 18.43 2.448 298.55 2.629 0.094 2.501 2.595 18.47 2.436 298.55 2.617 0.094 2.490 2.584 18.50 2.425 298.55 2.606 0.094 2.479 2.573 18.53 2.414 298.55 2.594 0.094 2.467 2.562 18.57 2.403 298.55 2.583 0.095 2.457 2.551 18.60 2.392 298.55 2.571 0.095 2.445 2.540 18.63 2.380 298.54 2.560 0.095 2.434 2.529 18.67 2.369 298.54 2.548 0.095 2.423 2.518 18.70 2.358 298.54 2.537 0.095 2.412 2.507 18.73 2.347 298.54 2.525 0.095 2.400 2.495 18.77 2.336 298.54 2.514 0.095 2.390 2.484 18.80 2.324 298.54 2.502 0.095 2.378 2.473 18.83 2.313 298.54 2.490 0.095 2.367 2.462 18.87 2.302 298.54 2.479 0.095 2.356 2.451 18.90 2.291 298.54 2.467 0.095 2.344 2.440 18.93 2.279 298.54 2.456 0.095 2.334 2.429 18.97 2.268 298.54 2.444 0.095 2.322 2.417 19.00 2.257 298.54 2.432 0.095 2.311 2.406 19.03 2.245 298.54 2.420 0.095 2.300 2.395 Continues on next page... 9 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 19.07 2.234 298.53 2.409 0.096 2.288 2.384 19.10 2.223 298.53 2.397 0.096 2.277 2.373 19.13 2.211 298.53 2.385 0.096 2.266 2.361 19.17 2.200 298.53 2.374 0.096 2.254 2.350 19.20 2.189 298.53 2.362 0.096 2.243 2.339 19.23 2.177 298.53 2.350 0.096 2.232 2.328 19.27 2.166 298.53 2.338 0.096 2.220 2.316 19.30 2.155 298.53 2.327 0.096 2.209 2.305 19.33 2.143 298.53 2.315 0.096 2.198 2.294 19.37 2.132 298.53 2.303 0.096 2.186 2.283 19.40 2.120 298.53 2.292 0.096 2.175 2.271 19.43 2.109 298.53 2.280 0.096 2.164 2.260 19.47 2.097 298.53 2.268 0.096 2.152 2.249 19.50 2.086 298.52 2.256 0.096 2.141 2.237 19.53 2.075 298.52 2.244 0.096 2.129 2.226 19.57 2.063 298.52 2.232 0.097 2.118 2.215 19.60 2.052 298.52 2.221 0.097 2.107 2.203 19.63 2.040 298.52 2.209 0.097 2.095 2.192 19.67 2.029 298.52 2.197 0.097 2.084 2.181 19.70 2.017 298.52 2.185 0.097 2.072 2.169 19.73 2.006 298.52 2.173 0.097 2.061 2.158 19.77 1.994 298.52 2.162 0.097 2.050 2.147 19.80 1.983 298.52 2.149 0.097 2.038 2.135 19.83 1.971 298.52 2.138 0.097 2.027 2.124 19.87 1.960 298.52 2.126 0.097 2.015 2.112 19.90 1.948 298.52 2.114 0.097 2.004 2.101 19.93 1.937 298.51 2.102 0.097 1.992 2.090 19.97 1.925 298.51 2.090 0.097 1.981 2.078 Continues on next page... 10 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 20.00 1.914 298.51 2.078 0.097 1.969 2.067 20.03 1.902 298.51 2.067 0.098 1.958 2.055 20.07 1.892 298.51 2.054 0.098 1.946 2.044 20.10 1.882 298.51 2.043 0.098 1.935 2.033 20.13 1.874 298.51 2.031 0.098 1.924 2.021 20.17 1.867 298.51 2.022 0.098 1.914 2.012 20.20 1.862 298.51 2.013 0.098 1.905 2.003 20.23 1.858 298.51 2.004 0.098 1.896 1.994 20.27 1.855 298.51 1.995 0.098 1.888 1.986 20.30 1.853 298.51 1.988 0.098 1.880 1.978 20.33 1.850 298.51 1.980 0.098 1.872 1.970 20.37 1.848 298.51 1.972 0.098 1.865 1.963 20.40 1.846 298.50 1.965 0.098 1.857 1.956 20.43 1.844 298.50 1.959 0.098 1.851 1.949 20.47 1.842 298.50 1.952 0.098 1.844 1.942 20.50 1.840 298.50 1.946 0.098 1.838 1.936 20.53 1.838 298.50 1.940 0.098 1.832 1.930 20.57 1.836 298.50 1.934 0.098 1.826 1.925 20.60 1.834 298.50 1.929 0.098 1.821 1.919 20.63 1.832 298.50 1.923 0.098 1.815 1.914 20.67 1.830 298.50 1.918 0.098 1.810 1.909 20.70 1.828 298.50 1.913 0.098 1.805 1.904 20.73 1.826 298.50 1.909 0.098 1.801 1.899 20.77 1.824 298.50 1.904 0.099 1.796 1.895 20.80 1.822 298.50 1.900 0.099 1.792 1.890 20.83 1.820 298.50 1.896 0.099 1.787 1.886 20.87 1.817 298.50 1.891 0.099 1.783 1.882 20.90 1.815 298.50 1.887 0.099 1.779 1.878 Continues on next page... 11 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 20.93 1.813 298.50 1.883 0.099 1.775 1.874 20.97 1.811 298.50 1.880 0.099 1.771 1.870 21.00 1.809 298.50 1.876 0.099 1.768 1.866 21.03 1.807 298.50 1.872 0.099 1.764 1.863 21.07 1.805 298.50 1.869 0.099 1.761 1.859 21.10 1.803 298.50 1.866 0.099 1.757 1.856 21.13 1.801 298.50 1.862 0.099 1.754 1.853 21.17 1.799 298.50 1.859 0.099 1.751 1.849 21.20 1.797 298.50 1.856 0.099 1.747 1.846 21.23 1.795 298.50 1.853 0.099 1.744 1.843 21.27 1.792 298.50 1.850 0.099 1.741 1.840 21.30 1.790 298.50 1.847 0.099 1.738 1.837 21.33 1.788 298.50 1.844 0.099 1.736 1.834 21.37 1.786 298.49 1.841 0.099 1.732 1.831 21.40 1.784 298.49 1.838 0.099 1.730 1.829 21.43 1.782 298.49 1.835 0.099 1.727 1.826 21.47 1.780 298.49 1.832 0.099 1.724 1.823 21.50 1.778 298.49 1.830 0.099 1.721 1.820 21.53 1.776 298.49 1.827 0.099 1.719 1.818 21.57 1.774 298.49 1.824 0.099 1.716 1.815 21.60 1.772 298.49 1.822 0.099 1.713 1.812 21.63 1.769 298.49 1.819 0.099 1.711 1.810 21.67 1.767 298.49 1.817 0.099 1.708 1.807 21.70 1.765 298.49 1.814 0.099 1.706 1.805 21.73 1.763 298.49 1.812 0.099 1.703 1.802 21.77 1.761 298.49 1.809 0.099 1.701 1.800 21.80 1.759 298.49 1.807 0.099 1.698 1.797 21.83 1.757 298.49 1.804 0.099 1.696 1.795 Continues on next page... 12 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 21.87 1.755 298.49 1.802 0.099 1.693 1.793 21.90 1.753 298.49 1.800 0.099 1.691 1.790 21.93 1.750 298.49 1.797 0.099 1.689 1.788 21.97 1.748 298.49 1.795 0.099 1.686 1.785 22.00 1.746 298.49 1.793 0.099 1.684 1.783 22.03 1.744 298.49 1.790 0.099 1.682 1.781 22.07 1.742 298.49 1.788 0.099 1.679 1.778 22.10 1.740 298.49 1.786 0.099 1.677 1.776 22.13 1.738 298.49 1.783 0.099 1.675 1.774 22.17 1.736 298.49 1.781 0.099 1.672 1.772 22.20 1.733 298.49 1.779 0.099 1.670 1.769 22.23 1.731 298.49 1.777 0.099 1.668 1.767 22.27 1.729 298.49 1.774 0.099 1.666 1.765 22.30 1.727 298.49 1.772 0.099 1.663 1.763 22.33 1.725 298.49 1.770 0.099 1.661 1.760 22.37 1.723 298.49 1.767 0.099 1.659 1.758 22.40 1.721 298.49 1.765 0.099 1.656 1.756 22.43 1.718 298.49 1.763 0.099 1.654 1.754 22.47 1.716 298.49 1.761 0.099 1.652 1.751 22.50 1.714 298.49 1.759 0.099 1.650 1.749 22.53 1.712 298.49 1.756 0.099 1.648 1.747 22.57 1.710 298.49 1.754 0.099 1.645 1.745 22.60 1.708 298.49 1.752 0.099 1.643 1.743 22.63 1.706 298.49 1.750 0.100 1.641 1.740 22.67 1.703 298.49 1.748 0.100 1.639 1.738 22.70 1.701 298.49 1.745 0.100 1.637 1.736 22.73 1.699 298.49 1.743 0.100 1.634 1.734 22.77 1.697 298.49 1.741 0.100 1.632 1.732 Continues on next page... 13 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 22.80 1.695 298.49 1.739 0.100 1.630 1.729 22.83 1.693 298.49 1.737 0.100 1.628 1.727 22.87 1.691 298.49 1.734 0.100 1.625 1.725 22.90 1.688 298.49 1.732 0.100 1.623 1.723 22.93 1.686 298.49 1.730 0.100 1.621 1.721 22.97 1.684 298.49 1.728 0.100 1.619 1.719 23.00 1.682 298.49 1.726 0.100 1.617 1.716 23.03 1.680 298.49 1.723 0.100 1.614 1.714 23.07 1.678 298.49 1.721 0.100 1.613 1.712 23.10 1.675 298.49 1.719 0.100 1.610 1.710 23.13 1.673 298.48 1.717 0.100 1.608 1.708 23.17 1.671 298.48 1.715 0.100 1.606 1.706 23.20 1.669 298.48 1.713 0.100 1.604 1.703 23.23 1.667 298.48 1.710 0.100 1.601 1.701 23.27 1.665 298.48 1.708 0.100 1.599 1.699 23.30 1.662 298.48 1.706 0.100 1.597 1.697 23.33 1.660 298.48 1.704 0.100 1.595 1.695 23.37 1.658 298.48 1.702 0.100 1.593 1.692 23.40 1.656 298.48 1.699 0.100 1.590 1.690 23.43 1.654 298.48 1.698 0.100 1.588 1.688 23.47 1.652 298.48 1.695 0.100 1.586 1.686 23.50 1.649 298.48 1.693 0.100 1.584 1.684 23.53 1.647 298.48 1.691 0.100 1.582 1.682 23.57 1.645 298.48 1.689 0.100 1.580 1.679 23.60 1.643 298.48 1.687 0.100 1.577 1.677 23.63 1.641 298.48 1.684 0.100 1.575 1.675 23.67 1.638 298.48 1.682 0.100 1.573 1.673 23.70 1.636 298.48 1.680 0.100 1.571 1.671 Continues on next page... 14 Post Through Pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 23.73 1.634 298.48 1.678 0.100 1.569 1.669 23.77 1.632 298.48 1.676 0.100 1.566 1.666 23.80 1.630 298.48 1.674 0.100 1.564 1.664 23.83 1.627 298.48 1.671 0.100 1.562 1.662 23.87 1.625 298.48 1.669 0.100 1.560 1.660 23.90 1.623 298.48 1.667 0.100 1.557 1.658 23.93 1.621 298.48 1.665 0.100 1.556 1.655 23.97 1.619 298.48 1.663 0.100 1.553 1.653 24.00 1.617 298.48 1.660 0.100 1.551 1.651 24.03 1.541 298.48 1.656 0.100 1.546 1.647 24.07 1.393 298.48 1.645 0.100 1.536 1.636 24.10 1.172 298.48 1.623 0.100 1.514 1.614 24.13 0.879 298.47 1.587 0.101 1.478 1.578 24.17 0.628 298.47 1.537 0.101 1.427 1.528 24.20 0.418 298.47 1.475 0.101 1.365 1.466 24.23 0.251 298.46 1.406 0.102 1.295 1.397 24.27 0.125 298.45 1.332 0.102 1.221 1.323 24.30 0.042 298.45 1.256 0.103 1.145 1.247 24.33 0.000 298.44 1.181 0.103 1.069 1.172 24.37 0.000 298.44 1.120 0.104 1.008 1.111 24.40 0.000 298.43 1.068 0.104 0.955 1.059 24.43 0.000 298.43 1.018 0.104 0.904 1.008 24.47 0.000 298.42 0.970 0.105 0.856 0.960 24.50 0.000 298.42 0.924 0.105 0.810 0.915 24.53 0.000 298.41 0.881 0.105 0.766 0.871 24.57 0.000 298.41 0.840 0.106 0.724 0.830 24.60 0.000 298.40 0.801 0.106 0.685 0.791 24.63 0.000 298.40 0.763 0.106 0.646 0.753 ...End 5/21/24,3:22 PM ECMDS 7.0 NORTH North American Green AMERICAN 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 GREEN Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 SPILLWAY ANALYSIS >>>Ryan's Spillway Name Ryan's Spillway Discharge 73.37 Peak Flow Period 1.5 Channel Slope 0.33 Channel Bottom Width 20 Low Flow Liner Retardence Class C 6-12 in Vegetation Type Mix(Sod and Bunch) Vegetation Density Very Good 80-95% Soil Type Sandy Loam(GM) Shoremax - Class C - Mix (Sod & Bunch) - Very Good 80-95% Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern Shoremax w/ Straight 73.37 cfs 13.86 ft/s 0.26 ft 0.025 8.5 lbs/ft2 5.39 lbs/ft2 1.58 STABLE F P300 Unvegetated Underlying Straight 73.37 cfs 13.86 ft/s 0.26 ft 0.025 5.68 lbs/ft2 5.26 lbs/ft2 1.08 STABLE F Substrate Shoremax w/ Straight 73.37 cfs 14.03 ft/s 0.26 ft 0.024 14 lbs/ft2 5.31 lbs/ft2 2.64 STABLE F P300 Reinforced Vegetation Underlying Straight 73.37 cfs 14.03 ft/s 0.26 ft 0.024 8.5 lbs/ft2 5.18 Ibs/ft2 1.64 STABLE F Substrate https://ecmds.com/project/160817/spillway-analysis/265672/show 1/1 EROSION CONTROL CALCS(RIP-RAP CALCULATIONS) Project Information Project Name: Ryan's Run Project#: 220164-01-015 Designed by: PW Date: 5/23/2024 Revised by: Date: Checked by: Date: Rip-Rap Apron#1 Pipe Diameter d= 18 Pipe Slope s= 14 Manning's number n= 0.013 Flow Q= 9.411 cfs Velocity V= 13.41 ft/s Dissipator Dimensions* Zone= 2 Stone Filling Class= B Entry Width(2 X Do)= 4.5 ft Length(4 X Do)= 9.0 ft Width(La+Do)= 10.5 ft Min.Thickness= 22 inches Min.Stone Diameter= 6 inches r 9.0 1 *All units are in feet **Dissipator pad designed for full flow of pipe 4.5 *All units are in feet **Dissipator pad designed for full flow of pipe RIP-RAP.xls 5/28/2024 Page 1 of 1 Hydraflow Storm Sewers Extension for Autodesk® Civil 3D® Plan • Outfall Project File: pond#1 ryan's run.stm Number of lines: 1 Date: 5/20/2024 Storm Sewers v2022.00 Hydraulic Grade Line Computations Pagel Line Size Q Downstream Len Upstream Check JL Minor coeff loss Invert HGL Depth Area Vel Vel EGL Sf Invert HGL Depth Area Vel Vel EGL Sf Ave Enrgy elev elev head elev elev elev head elev Sf loss (in) (cfs) (ft) (ft) (ft) (sgft) (ft/s) (ft) (ft) (%) (ft) (ft) (ft) (ft) (sgft) (ft/s) (ft) (ft) (%) (%) (ft) (K) (ft) 1 18 9.41 294.00 294.63 0.63 0.70 13.41 0.61 295.24 0.000 50.000 297.00 298.18 1.18** 1.50 6.29 0.61 298.80 0.000 0.000 n/a 1.00 n/a Project File: pond#1 ryan's run.stm Number of lines: 1 Run Date: 5/20/2024 Notes: ;"Critical depth. ; c=cir e=ellip b=box Storm Sewers v2022.00 (--- , , \ \ ___________-. ,-.-- / / \ \ \ \ \ \ \__ '/I \ \��-------/ �� //- \' OPEN SPACE AND \ \`\ \ -- ?90 I I I \ STORMWATER ,"\`\ _ c� // \\ / MANAGEMENT EASEMENT \ \\\ I I I \— ^\ SOD AREAS ABOVE 41,593 SF I I —\ \ VEGETATIVE SHELF \\\ LITORAL SHELF \\` I I I I -- ---- \\ ELEVATION`297.5 � \ \ AREA=3,77O SF ♦\ I \ \ / REFER TO DETAIL • RIP RAP DISSIPATER PAD I I I / FOR PLANTINGS ♦ N. --\-- — \ \ \ \��, 15'OURET PIPE / cs=B WIDTH=10.5' I I 9' \ REFER TO DETAILSLENGTH=9.0' I / \ - _ ON THIS SHEETTHICKNESS=22" / / / / ----_ � -'--- CLASS B RIP-RAP `\ -.IA • RIP RAP LAS / /__ -- �� _- ATFOREBAYWEIR ,h ''{r --- / / / i� \\Illa = % / --- —� ----� � FI ♦ -SEJPAGE / / / CONCRETE ``! GI ,8F 6 COLLAR _// / / / _\- - - \ ` OUTLET CONTROL / / / II \` FOREBAY AREA i� kF. - �i-i_ �`� SRUCTURE REFER / / / / . � '�_� �` ` TO DETAILS ON / / \_ I JPs. THIS SHEET / INLET PIPE WITH ��\ \ %J- =---c ._� r1�� // / II RIP-RAP APRON \ ' `-- !' / - � � / MAIN POND AREA N '46'1Wir-_:-.. ........... -....,00. , -,T:'''+.ibifi:'' S 'I''..-,- .111111111-- "'.6.•••,....1 ....."74.......:,.............._._:i____.--,„,,-'*".-%:1114"11* • ,_' --- OPEN SPACE AND I J/� t \ \ \ _ STORMWATER _ {1\I -- ' \ \ \ ,\` -` \\ \;'J MANAGEMENT N�!!! -_`� • �,TA\\ \ \ \ \ EASEMENT — ,..._ � \\ \ � _ l0 I I l i i CGRASS SPILLWAY \ \\. \\ \ \\ \\\ ` i- \ i / i i \\ \ TOP OF �.. \ /--; \ -�/ --i'`- - \ \ EMBANKMENT ,\ - -_ \\ • \ \) / /,/-f� I \ __----- - i _ ,- ,� ELEV=301 S ��``\ _ ` -� \ \ \ /// \\ ` -' / // /�i ire/___� --`\\\ rr \ \^-, -... \ \ \,, \�� `N \, I /I / I __ i � \^ r i \\ ,__ \ \\\\ \-\`\\ \ \ /� J/ I GRASS \ - /� // / i - __\\- �� r r r \ \'\ `� \\ \ \ / / SPILLWAY ,/ / �� --- v r--. ..'1,7 v vv vv vv N \ \ ELEV=299.8 YN\, \ \ n a c r / / \ \ \\ \ %� \\ \ \ \ \ OPEN SPACE AND 2_0_,31 7/ y�G i /�O� I-04 \�lir\ \ i \\\\\\ \\ \\ ,/\ \ \\ \\ \ \\\\\ STORMWATER i r \ \ \ \ \ \ \ MANAGEMENT EASEMENT ` \� /i / ; ice/ i l\ \2-o, .2 \\ �.�? \�\• \ \,�}; \\ ♦♦\ V \___i i \ „\---, .„ PUWVIEW GRAPHIC SCALE o r11 m h IN FEET) 1 inch= 30 ft. Id D.TOPrl Pr ALL MEM rat of xAxi MAL Pax MAIM TEMBI KIK Q nr am IS.MK VIM MIER art sK PK TO BE BEDDED tW a mwxwi xsvAtm ms KM id swM ELM.5 an0pAND RER duu R anaaxGl ��!'\\r'iQ<'i'\\�\\. \, f iaysa a atwu xxf xrrr \�o1�1Go\\�oOa'Y M\\:9��\%\ ` u tit 0011ME 1 enaadi&DAnwC TOPSOL FOR la ,o, xmxian Mm4XUrw xcwxxr t anuAIM AIIME TIE 1. MAS OKBAY SEDIRENT Mr TOP Ser r,s _ POND ELrvAna.a3,x MS am w mx,Frexs.TEaxxoxs. ; 1.47.0 //i%/ ��` ros I r .aox�A �P Stilt'O L \\j\n\\�f'"t G1 ( xole K.wu a usm \l 10\^ \f �`..f \\• __.1�1Y�\\.. �' axis aP010¢r w'�"n on��sAxi wxxuxrs°L a� • I. t„ xRIKR,x 1A.TO BE s xta a t r. o\\\�'\l'Fpo\l, ROM (MP xa)mn _ MOAT ENTRANCE SMALL a /MO¢.hwWE aemru BR B`AFAY'ytY wMs MOLE cA roi.WORM)TO Axnwx PM roBARRI M \ote\\pA l,\'` LIFER rAr FORM.as s-.m V wais 10%,i[DI m0i00 0141ix a E BASE m eA¢xx 1\D \\\1.`\p\�`'\CCG las Y o/ BOTTOM smx¢ t �swmaxcx CONSTRUCTOR MS m a KKK MOM LOWER x„x q xzM- �w rur SEEL y Mgµs AT iY ac iro \•1 ���'`. \ party MAN rumArxx PLAY N-tC ROPE a x.px RnRM EKE a CONC.rp STEEL xnspvLNC.MD BORON Of FACT DRECTION PRONE 3 RN.MARA. MN POOL I PROFILE OF WET POND DETENTION SYSTEM STAGE/STORAGE TABLE STAGE(FT) ELEVATION(FT) CONTOUR AREA INCREMENTAL TOTAL STORAGE (SF) STORAGE(CF) (CF) 0.0 297.0 17,770 0 0 0.5 297.5 20,180 9,488 9,488 1 298.0 21,570 10,438 19,925 1.3 298.3 22,700 6,641 26,566(WQV) 2.0 299.0 24,600 18,812 43,137 3.0 300.0 27,350 25,975 69,112 4.0 301.0 30,170 28,760 97,872 4.5 301.5 31,590 15,440 113,312 / RIVER BASIN: Lumber RECEIVING STREAM: Mountain Creek STREAM INDEX: 14-2-16-(2) STREAM CLASS: C HUC: 03040203 PROJECT COORDINATES: 35'01'23"N 79'21'56"W POND DESIGN SUMMARY DRAINAGE AREA TO POND: 22.50 ACRES SITE IMPERVIOUS AREA TO POND: 3.674 ACRES OFF-SITE DESIGN IMPFRVIOUS AREA TO POND: 1.331 ACRES TOTAL DESIGN IMPERVIOUS AREA TO POND: 5.004 ACRES PRE-DEVELOPED POST-DEVELOPED POST DEVELOPED TO POND TO POND THROUGH POND DRAINAGE AREA: 22.50 AC 22.50 AC CURVE NUMBER: 53.3 59.8 TIME OF CONCENTRATION: 25.6 MIN 10 MIN 1.0" STORM EVENT: 0.000 CFS 0.000 CFS 1-YEAR STORM EVENT: 0.905 CFS 6.743 CFS 0.109 CFS 2-YEAR STORM EVENT: 3.572 CFS 15.46 CFS 0.883 CFS 10-YEAR STORM EVENT: 19.20 CFS 48.12 CFS 9.414 CFS Q0-YEAR STORM EVENT: 57.40 CFS 112.61 CFS 73.37 CFS j SPILLWAY FLOW LONG H B W SS CHANNEL LINING TOP OF EMBANKMENT SPILLWAY ELEVATION Q(100) SLOPE(%) ELEVATION GRASS STRAW WITH NET NAG 73.37 CFS 33.3% 1.0' 10.0' 16.0' 3:1 301.5 299.80 SPILLWAY SHOREMAX W/ P300 W EXTEND UNING TO EXTEND UNING TO TOP OF SPILLWAY TOP OF SPILLWAY TOP OF EMBANKMENT=301.5 H /CHANNEL UNING // c.' SPILLWAY ELEVATION=299.80 MATTING SHALL BE AS NOTED OR APPROVED EQUAL I• B GRASS SPILLWAY DETAIL GRASS SOD ON SPILLWAY AND SIDE SLOPES NOTES: 1. SEE DESIGN PLANS FOR SPECIFIED DIMENSIONS OF RISER. 2. TRASH RACK DIMENSION CRITERIA SPECIFIED IS APPROXIMATE AND VARIES BY MANUFACTURER. 3. INSTALLATION OF TRASH RACK SHALL BE ACCORDING TO MANUFACTURER'S RECOMMENDATIONS. 4. ALL COMPONENTS OF TRASH RACK SHALL BE OF STAINLESS STEEL OR OTHER NON-CORROSIVE MATERIAL. 5. ALL MOUNTING HARDWARE SHALL BE OF STAINLESS STEEL OR OTHER NON-CORROSIVE MATERIAL. -i4!'% TRASH RACK i i G i i�i���>!♦ NON CORROSIVE MATERIAL / 5.5" ♦�♦��Z ���M 0 5.5"SPACING / v *..II._ 1 \ TRASH RACK 1i, I. .�.:.�. // / \ \ NS s;;7 0 0 0 0 0 0 il ❑❑❑❑❑ 5.5" ❑ ❑❑ IHhIHHI❑❑❑ m❑❑❑❑❑❑ 5.5" ❑❑❑❑❑❑ I_ ❑❑❑❑I�TT❑I�TT❑ NOTE: TRASH RACK SHALL BE INSPECTED RISER ❑❑❑L LJ❑ PERIODICALLY AND ANY DEBRIS ON ❑❑❑M❑ THE TRASH RACK IS TO BE REMOVED ELM AND PROPERLY DISPOSED OF. NN RISER RISER TRASH RACK DETAIL LTER MEDIA(SEE NOTE 2) SILT FENCE AS NEEDED ___ PUMP FLU [ eeee•w.w...... NOTES: ATER LEVEL 1. PRIOR TO INSTALLATION, MANUFACTURER SPECIFICATIONS OF FILTER MEDIA SHALL BE REVIEWED TO ENSURE THAT DISCHARGE FROM FILTER MEDIA SHALL MEET OR EXCEED THE PROVISIONS OF THE CLEAN WATER ACT. 2. ENSURE THAT PUMP PRESSURE DOES NOT EXCEED FILTER MEDIA PRESSURE RATING. 3. FILTER MEDIA MAY BE,BUT NOT LIMITED TO,SAND MEDIA FILTRATION DEVICES,RATED ALTER FABRIC / BAGS OR POLYMER BASED DEWATERING PRACTICES. 11 4. PUMP STRAINER SHALL NOT BE IN CONTACT WITH BOTTOM OF POND. _ _� ,4 BMP POND DEWATERING / LOW POINT 12' 5.0' 2.5' /4 REBAR 0 12'OC • IN FRONT&REAR FACE OF COLLAR.REBAR TO HAVE 3' C.COMER FROM EDGE OR FACE OF COLLAR y^ . ' • • NOTES: aQ . • 1. ALL CONCRETE TO BE 3000 PSI NON-FLY ASH. 2. APPLY}'1HICK NRAP OF ASPHALTIC ' CEMENT AROUND DISCHARGE PIPE 6' 18'HDPE BEYOND PLANNED SEEPAGE COLLAR ON BO1H SIDES • 3. APPLY ADDIDCNAL ASPHALTIC CEMENT AT 'u / • PIPE/SEEPAGE COLLAR INTERFACE ON UPSTREAM FACES ®, • 4. TO BE FIELD INSPECTED BY GEOIECHNICAL ENGINEER.ASPHALTIC CEMENT TO MEET OR EXCEED FEDERAL SPECIFICATION SS-153 in A • a - TYPE 1:AS1M-D-2822-75 TYPE 1. • a / ✓ CONCRETE SEEPAGE COLLAR SCALE N.T.S RISER STRUCTURE 4'PVC SCREW CAP FOR CLEANING ACCESS TOP OF STRUCTURE NOT SHONN FOR CLARITY 4D qr a (REMOVABLE TRASH RACK) 12'MIN. EXTEND 4' PVC qy THROUGH RI` 1114 ,..r- 4'x4. STRUCTURETp PVC TEE •MI PERM.POND EIEV..195.0 f INSTALL 4"PVC SCREW CAP AT END OF TEE AND 20 pr H DRILL 2.0"DIA.HOLE INTO PVC CAP AT ELEV=297.0 12'MIN. OUTLET CONTROL STRUCTURE-INCREMENTAL WEIR 2.0'DIk PENNG SCALE N.T.S. PVC DRAIN OUTLET SCALE:N.T.S. B SHALLOW LAND ZONE HERBACEOUS PLANTS SHALLOW WATER ZONE I HERBACEOUS PLANTS p p If POND (NORMAL POOL) 1 I_ 6 TYPICAL LITTORAL SHELF VEGETATION SCALE N.T.S. SCIENTIFIC NAME COMMON NAME PLANTING ZONE QUANTITY NURSERY ONTAINER SPACING PLANTING SEASON TYPE Asdepias Incarnate Swamp Mikweed Gull sedge Ceres tenere Quill Sedge Chelone glabra White Turtlehead Eupsturiadelphus dubius Dward Joe Pye Weed Eupatoriaddphus fistulosus Joe Pye Weed Eupatariadelphus maculatus Spotted Trumpetweed Hbiscus coccneus Scarlet rasemallow SHALLOW LAND 472 Hbiscus loevis Halberdleaf rosemallow Kastdetzyka vrginica Seashore Mallow Lobelia cardinalis Cardinal Flower Lobelia elongate Longleaf Lobelia Lobelia siphlitica Great due Lobelia Rhynchoepora colarata Stmush whitetop Saccharum baldwinli Narrow plumegrass Acarus americanus Sweetflag PEAT POT 6'0.C. SPRING/SUMMER Alisma subcordatum Water Plantain Hydrolea quadrivalvis Waterpod Iris vrginica Waterpod Blue flag iris Juncos effusus var.pylaei or sdutus Softrush Ludwigia spp. Prinrase wilow Pdtandre Nrginica Arrow arum Pontederia cordate Pick rdweed SHALLOW WATER 472 Sagittaria latifolia Duck Potato Sagittaria lancifdia Bulltoungue Saururus cemuus Lizards tal Sdaenoplectus tabemaemontoni Soft stem bulrush Schoenopleatus americanus Three—square bulrush Schoenoplectus pungens var. pungens Scirpus cwerinus Woolgress Zizaniopsis mllacea Giant cutgrass (-- ..., ,. , ---, __ ......_ ......„ _ I \\ , \ ��___ I I I � \ / I I I /' / / / / / / .....:_ii._;:,:: 11,..-71:::::::- ''‘: / Lir--11:111-1 I ice:.: <. \ ` \\\\1:2=1::::::.\----.4.--1.;0:::::::::::::::11-111:' \\ \ 11---1:11-7-7::::--::\‘ \ Ill *^ \ \ � // .1� 1/�� --- —\ \\\ \fir--� \\ �_\ � \\\ \ <~ ,! I /' 1 I / / — \ ice\ \ N. N. \�,, \ / \\ \ / PLAN VIEW GRAPHIC SCALE 50 0 25 50 100 200 ( IN FEETJ 1 inch = 30 fk // PROP 07, cr, in a c N 2 GRADE 060 of 4 g @. M M N N EX m rn in D r7 GRADE °i o co 31y0, r7 M N N 310 \ \ \ \ \ \ UTORIAL SHELF(6:1 SLOPE) \ BCTRMA ELEV.297.5 _OUP CONTROL ..... \ / TOP ELEV.296.5 STRUCTURE 305 SEE SHEET C6.0 305 EXIS11NG GRADE FOR DETAILS \\ TOP OF EMBANIOAENT=301.5 1 SLOPE 100-1R ELEV.-JOO.72 \ ` 300 _ 1 sAPE 300 10-YR E1EV.-299.14 \ 2-YR E EV.=29&41 1-YR ELEV.-29&23 \ I: PERMANENT POOL EIEV.-2BT00ilik.' , \. �� CONCRETE �5INLET PPE _ SEEPAGE COLLAR �C J �� J 2:1 SLOPE \ 50'-18'HDPE 0 14.0% re a ..._..._. IaI BOOM OF FOREBAY(TOP OF SEMENT SAGE290BOTTOM OF SEDIMENT STORAGE=292.0 TOP OF 9ERM=29.0BOTTOM CF POND(TOP OF SMENT SAGE)290 \290 UREBAY HEIR=26.0 BOTTOM OF SEDIMENT STORAGE=292.0 ..5 290 -0+10+00 1+00 2+00 3+00 4+00 4+50 POND 1 ALLIGNMENT PROFILE VIEW HORIZONTAL SCALE: 1"=30' VERTICAL SCALE: 1"=3' Bowman NORTH CAROLINA APPENDIX C Infiltration Basin #1 Calculations CN Values Wet Pond Design Hydrographs Spillway Design Rip-Rap Apron Calculations Stormwater Management Details Ryan's Run -Storm water Design Report Wage SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name Ryan's Run 2 Project Area(ac) 35.777 3 Coastal Wetland Area(ac) - 4 Surface Water Area(ac) 1.524 5 Is this project High or Low Density? High 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided(feet) 30 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? No 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 1 12 Bioretention Cell 0 13 Wet Pond 1 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting(RWH) 0 18 Green Roof 0 19 Level Spreader-Filter Strip(LS-FS) 0 20 Disconnected Impervious Surface(DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 I Name and Title: Carlo Pardo,PE 28 Organization: Triangle Site Design,PLLC 29 Street address: 4004 Barrett Drive,Suite 101 30 City,State,Zip: Raleigh,NC 27609 31 Phone number(s): 919-553-6570 32 Email: cpardo@trianglesitedesign.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer Signature of Designer Seal Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so,number of drainage areas/SCMs 2 3 Does this project have low density areas? No 4 If so,number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 2 4 Type of SCM - Wet Pond Infiltration Basin 5 Total drainage area(sq ft) 1533633 979923 553710 6 Onsite drainage area(sq ft) 1352690 955530 397160 7 Offsite drainage area(sq ft) 180943 24393 156550 8 Total BUA in project(sq ft) 496534 242378 sf 254156 sf New BUA on subdivided lots(subject to permitting) 9 (sq ft) 315591 217985 sf 97606 sf New BUA not on subdivided lots(subject to 10 permitting)(sf) 11 Offsite BUA(sq ft) 180943 24393 sf 156550 sf 12 Breakdown of new BUA not on subdivided lots: -Parking(sq ft) -Sidewalk(sq ft) 14490 12026 sf 2464 sf -Roof(sq ft) 220000 148000 sf 72000 sf -Roadway(sq ft) 81101 57959 sf 23142 sf -Future(sq ft) -Other,please specify in the comment box below(sq ft) New infiltrating permeable pavement on 13 subdivided lots(sq ft) New infiltrating permeable pavement not on 14 subdivided lots(sq ft) Existing BUA that will remain(not subject to 15 permitting)(sq ft) 16 Existing BUA that is already permitted(sq ft) 17 Existing BUA that will be removed(sq ft) 18 Percent BUA 32% 25% 46% 19 Design storm(inches) 1.0 in 1.0 in 20 Design volume of SCM(cu ft) 22261 cf 21369 cf 21 Calculation method for design volume Simple Method Simple Method ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): Offsite DA-100%Build-Out Potential for residentail homes along Calloway Road for DA#2. INFILTRATION SYSTEM 1 Drainage area number 1 I 2 Minimum required treatment volume(Cu ft) 21369 cf GENERAL MDC FROM 02H.1050 3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM(H:V or enter"Vertical'for trenches)? 3:1 6 Does the SCM have retaining walls,gabion walls or other engineered side slopes? No 7 Are the inlets,outlets,and receiving stream protected from erosion (10-year storm)? Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes 9 What is the method for dewatering the SCM for maintenance? Pump(preferred) 10 If applicable,will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC(8)? Yes 12 Does the drainage easement comply with General MDC(9)? Yes 13 If the SCM is on a single family lot,does(will?)the plat comply with General MDC(10)? N/A 14 Is there an O&M Agreement that complies with General MDC(11)? Yes 15 Is there an O&M Plan that complies with General MDC(12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM desi ned b an NC licensed rofessional? Yes INFILTRATION SYSTEM MDC FROM 02H.1051 18 Proposed slope of the subgrade surface(%) 0% 19 Are terraces or baffles provided? No 20 Type of pretreatment: Forebay Soils Data 21 Was the soil investigated in the footprint and at the elevation of the infiltration system? Yes 22 SHWT elevation(fmsl) 300.00 23 Depth to SHWT per soils report(in) 96.00 24 Ground elevation at boring in soils report(fmsl) 308.00 25 Is a detailed hydrogeologic study attached if the separation is between 1 and 2 feet? Yes 26 Soil infiltration rate(in/hr) 18.00 27 Factor of safety(FS) (2 is recommended): 2.00 Elevations 29 Bottom elevation(fmsl) 307 ft 30 Storage elevation(fmsl) 309.ft 31 Bypass elevation(fmsl) 310.9 ft For Basins Only 32 Bottom surface area(ft2) 11530 ft 33 Storage elevation surface area(ft2) 14290.ft For Trenches Only 34 Length(ft) 35 Width(ft) 36 Perforated pipe diameter,if applicable(inches) 37 Number of laterals 38 Total length of perforated piping 39 Stone type,if applicable 40 Stone porosity(%) 41 Is stone free of fines? 42 Is the stone wrapped in geotextile fabric? 43 Has at least one inspection port been provided? Volumes/Drawdown 44 Design volume of SCM(cu ft) 21369 cf 45 Time to draw down hours 72 hrs ADDITIONAL INFORMATION 46 Please use this space to provide any additional information about the infiltration system(s): Infiltration 1 1:20 PM 5/20/2024 WET POND 1 Drainage area number 3 I 2 Minimum required treatment volume(Cu ft) 17760 cf GENERAL MDC FROM 02H.1050 _ 3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM(H:V)? 3:1 6 Does the SCM have retaining walls,gabion walls or other engineered No side slopes? 7 Are the inlets,outlets,and receiving stream protected from erosion Yes (10-year storm)? 8 Is there an overflow or bypass for inflow volume in excess of the Yes design volume? 9 What is the method for dewatering the SCM for maintenance? Pump(preferred) 10 If applicable,will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC(8)? Yes 12 Does the drainage easement comply with General MDC(9)? Yes If the SCM is on a single family lot,does(will?)the plat comply with 13 General MDC(10)? N/A 14 Is there an O&M Agreement that complies with General MDC(11)? Yes 15 Is there an O&M Plan that complies with General MDC(12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM designed by an NC licensed professional? Yes WET POND MDC FROM 02H.1053 18 Sizing method used SA/DA 19 Has a stage/storage table been provided in the calculations? Yes 20 Elevation of the excavated main pool depth(bottom of sediment 292,00 removal)(fmsl) 21 Elevation of the main pool bottom(top of sediment removal)(fmsl) 293.00 22 Elevation of the bottom of the vegetated shelf(fmsl) 296.50 23 Elevation of the permanent pool(fmsl) 297.00 24 Elevation of the top of the vegetated shelf(fmsl) 297.50 25 Elevation of the temporary pool(fmsl) 298.20 26 Surface area of the main permanent pool(square feet) 14570 27 Volume of the main permanent pool(cubic feet) 43188 cf 28 Average depth of the main pool(feet) 3.39 ft 29 Average depth equation used Equation 3 30 If using equation 3,main pool perimeter(feet) 665.0 ft 31 If using equation 3,width of submerged veg.shelf(feet) 3.0 ft 32 Volume of the forebay(cubic feet) 7480 cf _ 33 Is this 15-20%of the volume in the main pool? Yes 34 Clean-out depth for forebay(inches) 48 in 35 Design volume of SCM(cu ft) 24326 cf 36 Is the outlet an orifice or a weir? Orifice 37 If orifice,orifice diameter(inches) _ 2.00 in 38 If weir,weir height(inches) 39 If weir,weir length(inches) 40 Drawdown time for the temporary pool(days) 3.28 41 Are the inlet(s)and outlet located in a manner that avoids short- Yes circuiting? 42 Are berms or baffles provided to improve the flow path? Yes 43 Depth of forebay at entrance(inches) 60 in 44 Depth of forebay at exit(inches) 54 in 45 Does water flow out of the forebay in a non-erosive manner? Yes 46 Width of the vegetated shelf(feet) 6 ft 47 Slope of vegetated shelf(H:V) 6:1 48 Does the orifice drawdown from below the top surface of the Yes permanent pool? _ 49 Does the pond minimize impacts to the receiving channel from the 1- Yes yr,24-hr storm? 50 Are fountains proposed?(If Y,please provide documentation that No MDC(9)is met.) 51 Is a trash rack or other device provided to protect the outlet system? Yes 52 Are the dam and embankment planted in non-clumping turf grass? Yes 53 Species of turf that will be used on the dam and embankment Hybrid Bermuda 54 Has a planting plan been provided for the vegetated shelf? Yes ADDITIONAL INFORMATION 55 Please use this space to provide any additional information about the wet pond(s): Wet Pond 1 12:52 PM 5/20/2024 1 f•a., nct_cje )As-c-tc , g- ••••-•...., 1 a 1•7 1 a (,,_ r.----') --N.,',----- ., 1,-,,, i „..„7,,),„ .. ,....... ,,,,,,,-,--:..•:,.. 'I, \ '4__ ''''.. -.1..'''SgZ.....--_,...,.-: -=. . -..,''*..2";"7,-.... ..-• ,19/ Iiii.. - •71-..-N,......, .....<-".......... ":•N‘ --!0: ::. -7..—_____—=!—_—" ----_ --------___ ,_______.- .:>14---- ii 111111 ' f •,44i,..r......,? • •, _ ..._ c A(' (1" - ---..1-- ..:... *:-r'..••"-.---7---=--'---.---1:-'''-' ''-'%•'-''"-'1':'t :''';•........ .,...*....':.%....., ,..._....,:r...di i '. ,m.r '\..)''tv\. ___......:-,..„...„...,,...!„." ....--."---"•-,...... .-.--... ....:... ......,:,...W , --1,.., . _2. Tr . U.' ' ' •-• 4e•0'..'.....- ,,, -,: .........:fr.../ .."...I.................7.7. .'._ '-.''.'' If.,.....r,..... . . ., ,. ,:--i; . . . , .'' ,,... 7 411Ir 7' i• • , -- - ' ' -- j, 21 /1/ . , E. :4 ( ,_.,i r i, \‘!, ,, ,., , .H . • i‘ ..,,,,,,...••"=-=-__4111:47471.""), ' , ,' -,1;- ..--...,__ : fi t It . It (<.(17(ce-. :7; ', - , _: - r.. ., :r L 1 '.il:\ I ' ' ,.1 ': • , ') _ ' T,.._ s ' ' 7 1 I 2 4('' IN \ S 1. 1 \ ;. • . - , di 1:t j 1 I 1 )q I W 3 . 1 ... s , _ 11.,, 4, , ,.•,.,. ).( . , A ..„,, , ( , . ., ., . . ... . _ , f _: ,, \ , • T•,- ,... , .... . . , ,,,, ) ,..,, , .5?-,----_->.' - • 0 e.-:- \ 0 .., , ; , : i ..11.••,./A. ,, i \• . .. \ / • h // - 7- - • , , At '. §.' gc.1 i:' '. L'q' •- ,-"' • •--, , g 1 g' • 4 ' .'• ,'" 62 . . , . 17 ...,-_,.. , • 0 0 / \ . , 0 . ,.. . .. .. -. C ir • .. •-•-....--.\ ' 1 7. :. .. Li ..,",'• _. :1 . :I Triangle Site Design, PLLC Ryan's Run, Hoke County, NC Curve Number Calculation (CN) Pre-Developed Conditions#2 Drainage Area(acres): 12.71 Existing Soil Groups: Soil Group Map Symbol Soil Description Acres Percent of DA A AuA Autryville Loamy Sand 6.27 49% A CaB Candor Sand 0.00 0% C BaB/BaD Blaney Loamy Sand 6.44 51% Existing Land Uses: Land Use Description Existing Soil Group Acres Curve# Weighted CN Wooded-Good Stand A 5.23 50 20.6 Wooded-Good Stand C 0.16 73 0.9 Wooded- Fair Stand C 3.73 80 23.5 Off-Site 100% Build Out+Calloway C 3.59 98 27.7 Cumulative Curve#= 72.7 Triangle Site Design, PLLC Ryan's Run, Hoke County, NC Curve Number Calculation (CN) Post-Developed Conditions to Infiltration Basin #2 Drainage Area(acres): 12.71 Existing Soil Groups: Soil Group Map Symbol Soil Description Acres Percent of DA A AuA Autryville Loamy Sand 6.27 49% A CaB Candor Sand 0.00 0% C BaB/BaD Blaney Loamy Sand 6.44 51% Proposed Land Uses: Land Use Description Existing Soil Group Acres Curve# Weighted CN Impervious Area-Residential Lots A 0.73 98 5.6 Impervious Area-Sidewalk/Road A 0.35 98 2.7 Open Space-Good A 4.15 45 14.7 Impervious Area-Residential Lots C 0.92 98 7.1 Impervious Area-Sidewalk/Road C 0.23 98 1.8 Open Space-Good C 2.74 74 16.0 Off-Site 100% Build Out+Calloway C 3.59 98 27.7 Cumulative Curve#= 75.5 Infiltration Basin Design Site Information Sub Area Location: Drainage To Infiltration Basin#2 Drainage Area(DA)= 12.71 Acres 553710 sf Impervious Area(IA)= 5.82 Acres 254156 sf Percent Impervious(I)= 45.9 % Required Water Quality Volume Design Storm= 1 inch Determine Rv Value= 0.05+.009(I)= 0.46 in/in Water Quality Volume= 0 491 ac-ft Water Quality Volume= 21,369 cf Water Quality Volume= 0 463 inches of runoff NOAA 1-year,24-hour event= 3.05 inches Minimum Surface Area SA= (12*FS*DV)/(K*T) Factor of Safety(FS)= 2 Design Volume(DV)= 21368 8 cf Hydraulic Conductivity of Soil= 18.00 in/hr Max Dewatering Time= 72 hours SA= 395.7 sf `\ \,\,\ • \\\\ \ \ \ \ \,\ \\�\ \ \\ \\-.1 1 // 0 \\ \ 0 • • ���' \ \ \ Vq \ \\ \ \ \\ \ \ \ •\ \\ 1 \ \ \ \� \\ \ \\ \ \ \ \ \ 1 \ \ \ \ \ \ \ <\\\\\\ \ \\ \ \' \ \ \ 1 �y\\ \ \ ;\ \ \\\ \ \ \ \ \\ \ \\ \• I ,\ �\ 11. ,,, \cl%\-/\ •\I it _\1`t\•'I,\ \;0•V, \ •�,� �� %.',o 5�, 1 1 1 Y-- ' , � 1' 1 t �' \ I \ �, \ 1 1 t 1 1 \ 1 1 V, \ • X I \ `<: 1• 1 1 , 1 • t\ \ ,„„„„„,,,,,I.'STOLOTtl t 1 Y 1• ���� \ \ 1 • I 1 t 1 1 ` \ \ umnrt \ 1 \ /,♦ \ \ 1 r 11 1, •• 1 \I t 1 \ 1 1 t 1 1,�� \. o\ `, `, \\ II • t / / 1 . „0,io.-114",,,,,, ,00 1 10\ )1 11 If, ' / fi/// i7;4.?,/ 1 ‘ \ \ .‘ .\ \ \ ., ., .e..) is -I, 7 • i i "-s' ( /1 '1 i Q e` \ \ \ �i ( r r I t \ \ \\\\ \ � a�/i \ v / o i / \\\ . \i‘c\ \ \\ 4ilitk1/4\VL\ \'. ...'''. "ill'... 4,\ , \ ,......... •__..._........ - -..... ...,...........-- ...... „... ......__:„..._ . ........,:-.......,........N..„. .‘ ,....,,N,„‘\\ �\ -- — — • \ \ \ � - � ~- -- 'ts \\ \ I \; — li _ `I �� ��\ \\ \\ \ \ \ \ \ \ \ GRAPHIC SCALE 10 q 10 PLAN VIEW 'I( =30 FEET (STAGE/STORAGE TABLE INFILTRATION BASIN STAGE ELEVATION CONTOUR INCREMENTAL TOTAL (FT) (FT) AREA (SF) STORAGE (CF) STORAGE (CF) 0.0 307.0 11530 0 0 1.0 308.0 12880 12205 12205 2.0 309.0 14290 13585 25790 3.0 310.0 15760 15025 40815 4.0 311.0 17280 16520 57335 5.0 312.0 18860 18070 75405 �TORMWATER MANAGEMENT DESIGN INFILTRATION BASIN RIVER BASIN: LUMBER RECEIVING STREAM: MOUNTAIN CREEK STREAM INDEX: 14-2-16-(2) STREAM CLASS: C HUC: 03040203 POND DESIGN SUMMARY DRAINAGE AREA TO POND: 12.71 ACRES SITE IMPERVIOUS AREA TO POND: 2.23 ACRES OFF-SITE DESIGN IMPERVIOUS AREA TO POND: 3.59 ACRES TOTAL DESIGN IMPERVIOUS AREA TO POND: 5.82 ACRES PRE-DEVELOPED POST-DEVELOPED POST DEVELOPED THROUGH POND DRAINAGE AREA: 12.71 AC 12.71 AC CURVE NUMBER: 72.7 75.5 INFILTRATION RATE: 18.0 IN/HR 1.0" STORM EVENT: 0.168 CFS 0.000 CFS 1-YEAR STORM EVENT: 8.516 CFS 18.24 CFS 0.000 CFS 2-YEAR STORM EVENT: 13.23 CFS 26.67 CFS 0.000 CFS 10-YEAR STORM EVENT: 27.96 CFS 52.57 CFS 0.000 CFS 100-YEAR STORM EVENT: 54.03 CFS 96.89 CFS 71.72 CFS —I Ic ♦ • r t .Y ';r � ,� .`4..IA r I; yip4. + ;,'• , I-roil kT t •Y t 4.1:y UNarluNNm ,, tt, I i HF 1 " 1 ,k's 1:'' Y �f$ t` '11 - l .s1k:4.. lj r / ..--:.> 0,, a 1:a Hr2 g w 1 mkt dR 1 t ,11 ,, go_ V- g d ce �a ga$ W Z • 35 i 1M o g4 ~ T' 1 g 8 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2009 by Autodesk,Inc.v6.066 Wednesday,Apr 14,2021 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 71.72 cfs Storm frequency = 100 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 63,024 cuft Inflow hyd. No. = 2 - SCM Post-Developed Reservoir name = BMP Pond Max. Elevation = 311.70 ft Max. Storage = 69,623 cuft Storage Indication method used. Exfiltration extracted from Outflow. Hydrograph Discharge Table (Printed values>=1 00%of Op) Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs fr.) 96.89 « 311.20 17.39 7.334 17.39 12. 94.93 311.55 54.76 7.563 54.76 12.07 85.60 311.68 « ---- 71.72 7.648 71.72 « 12.10 72.10 311.68 ----- 71.40 7.646 71.40 12.13 57.81 311.61 62.69 7.604 62.69 12.17 44.78 311.52 51.42 ----. 7.545 51.42 12.20 33.57 311.43 40.28 7.483 40.28 12.23 24.76 311.34 ----• 30.46 7.424 30.46 12.27 18.97 311.26 22.59 ---- 7.371 22.59 12.30 15.99 311.20 16.79 7.329 16.79 12.33 14.73 311.15 ---- ----- 13.20 7.299 13.19 12.37 14.04 311.12 10.69 ---- 7.277 10.69 12.40 13.36 311.10 9.007 7.263 9.008 12.43 12.68 311.08 7.927 7.251 7.927 12.47 11.99 311.06 6.981 7.240 6.981 12.50 11.30 311.05 6.124 7.231 6.124 12.53 10.61 311.03 5.326 7.222 5.326 12.57 9.966 311.02 4.576 ---- 7.214 4.575 12.60 9.379 311.01 3.873 7.206 3.872 12.63 8.877 311.00 3.247 ----- 7.199 3.247 12.67 8.466 310.99 2.869 7.192 2.869 12.70 8.133 310.98 2.494 7.185 2.494 12.73 7.863 310.97 2.136 7.178 2.136 12.77 7.643 310.95 1.804 7.171 1.804 12.80 7.457 310.95 1.500 7.166 1.500 12.83 7.293 310.94 1.225 7.160 1.225 12 ;7 7.135 310.93 0.976 ---- 7.155 0.976 41Ma. 6.977 310.92 0.747 7.151 0.747 ...End 1)the ),290 h r - 1 .0co hT = C3 1 hr-s -- 1.0 hrs 4/14/2021 ECMDS 7.0 NORTH North American Green 5401 St. Wendel-Cynthiana Rd. AMERICAN Poseyville, Indiana 47633 GREEN. Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 SPILLWAY ANALYSIS >>>Grass Spillway#2 Name Grass Spillway#2 Discharge 71.72 Peak Flow Period 1 Channel Slope 0.5 Channel Bottom Width 40 Low Flow Liner Retardence Class C 6-12 in Vegetation Type Mix(Sod and Bunch) Vegetation Density Very Good 80-95% Soil Type Sandy Loam(GM) Shoremax - Class C - Mix (Sod & Bunch) - Very Good 80-95% Phase Reach Discharge Velocity Normal Mannings N Permissible Calculated Safety Remarks Staple Depth Shear Stress Shear Stress Factor Pattern Shoremax w/ Straight 71.72 cfs 11.85 ft/s 0.15 ft 0.025 8.5 lbs/ft2 4.73 Ibs/ft2 1.8 STABLE F P300 Unvegetated Underlying Straight 71.72 cfs 11.85 ft/s 0.15 ft 0.025 5.68 lbs/ft2 4.69 lbs/ft2 1.21 STABLE F Substrate Shoremax w/ Straight 71.72 cfs 11.79 ft/s 0.15 ft 0.025 14 lbs/ft2 4.73 lbs/ft2 2.96 STABLE F P300 Reinforced Vegetation Underlying Straight 71.72 cfs 11.79 ft/s 0.15 ft 0.025 8.5 lbs/ft2 4.7 lbs/ft2 1.81 STABLE F Substrate https://ecmds.com/project/142852/spillway-analysis/202379/show# 1/1 Z 0 I-- Q Cr; >- O J CVO N I Fr) Z Z Z Lai W H w Z > Y Z Z CO J Q O p M W N LaJ W ^ Li- Q >- LaJ ' p 3 Q La-O W J 3 0CL 0 N Cl) W ~ Z CI- CZ) O OJ C.D IQ z Z � 0 a Nw I No w 3 = V � m Z 3 Cr) y (2) Cr) ff oQ 3 J N ^ C7 Z M d I- N W o 0 Z w c> > iG 0O z 'CIE W = -J J J W z CI- co3 U CO N Q milit c C7 x o } z = at z a CO W JN Z 0 a' 'J- OJ J 'xiz O N u..1 OO CD Er Ss. 3 o v m0 O _ CV m CY ^ J Cl- Q N O O Z p fEE W _O m Z � 3 f/'� Z a N Pond Report 5 Hydraflow Hydrographs Extension for AutoCADO Civil 3D®2009 by Autodesk,Inc.v6.066 Wednesday,Apr 14,2021 Pond No. 1 - BMP Pond Pond Data Contours-User-defined contour areas.Average end area method used for volume calculation. Begining Elevation=307.00 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0 00 307.00 11,530 0 0 1.00 308.00 12,880 12,205 12,205 2.00 309.00 14,290 13,585 25,790 3.00 310.00 15,760 15,025 40,815 4.00 311.00 17,280 16,520 57,335 5.00 312.00 18,860 18,070 75,405 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) Inactive Inactive Inactive Inactive Crest Len(ft) = 40.00 0.00 0.00 0.00 Span(in) = 0.00 0 00 0.00 0.00 Crest El.(ft) = 310.90 0.00 0.00 0.00 No.Barrels = 0 0 1 0 Weir Coeff. = 2.60 3.33 3.33 3.33 Invert El.(ft) = 0.00 0 00 0.00 0.00 Weir Type = Broad •-- - --- Length(ft) = 0.00 0 00 0.00 0.00 Multi-Stage = No No No No Slope(%) = 0.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 18.000(by Contour) Multi-Stage = n/a No Yes No TIN Elev.(ft) = 0.00 Note:CulverUOrifice outflows are analyzed under inlet(ic)and outlet(oc)control Weir risers checked for orifice conditions(ic)and submergence(s) Stage(ft) Stage/ Discharge Elev(ft) 5.00 . I - - 312.00 j" ................L.......... 4.00 - - 311.00 3.00 - - - 310.00 2.00 309.00 1.00 1 •- 308.00 0.00 - - - 307 00 0.0 10.0 20 0 30 0 40.0 50.0 60.0 70 0 80.0 90 0 100 0 110.0 120 0 130 0 Discharge(cfs) Total Q 1 Hydrograph Summary Report yc r flow Hydrographs Extension for AutoCAD®Civil 3D®2009 by Autodesk, Inc.v6.066 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval peak volume hyd(s) elevation strge used description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 8.516 2 734 40,781 SCM Pre-Developed 2 SCS Runoff 18.24 2 722 48,580 SCM Post-Developed 3 Reservoir 0.000 2 792 0 2 308.17 14,470 Post Through SCM 5 SCS Runoff 0.168 2 360 1,630 1.0 Post-Developed to SCM 6 Reservoir 0 000 2 232 0 5 307.03 362 1 OinPost Through SCM Infiltration2.gpw Return Period: 1 Year Wednesday,Apr 14, 2021 2 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2009 by Autodesk,Inc.v6.066 Wednesday,Apr 14,2021 Hyd. No. 1 SCM Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 8.516 cfs Storm frequency = 1 yrs Time to peak = 734 min Time interval = 2 min Hyd. volume = 40,781 cuft Drainage area = 12.710 ac Curve number = 72.7 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 33.00 min Total precip. = 3.05 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Pre-Developed Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 10.00 ---— 10.00 8.00 8.00 6.00 6.00 4.00 - - ° 4.00 2.00 2.00 0.00 -.- �- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2009 by Autodesk,Inc.v6.066 Wednesday,Apr 14,2021 Hyd. No. 2 SCM Post-Developed Hydrograph type = SCS Runoff Peak discharge = 18.24 cfs Storm frequency = 1 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 48,580 cuft Drainage area = 12.710 ac Curve number = 75.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 10.00 min Total precip. = 3.05 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Post-Developed Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 21.00 — 21.00 18.00 18.00 15.00 15.00 12.00 - - 12.00 9.00 - - 9.00 6.00 - - 6.00 3.00 - 3.00 0.00 -- - - .._ '_ �!'� 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 2 Hydrograph Report 4 Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2009 by Autodesk,Inc.v6.066 Wednesday,Apr 14,2021 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = 792 min Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 2 - SCM Post-Developed Max. Elevation = 308.17 ft Reservoir name = BMP Pond Max. Storage = 14,470 cuft Storage Indication method used. Exfiltration extracted from Outflow. Post Through SCM Q (cfs) Hyd. No. 3-- 1 Year Q (cfs) 21.00 - - 21.00 18.00 - - - 18.00 15.00 - — 15.00 12.00 iLinum — - 12.00 9.00 9.00 6.00 - - 6.00 3.00 - - 3.00 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 3 Hyd No. 2 Total storage used = 14,470 cult Hydrograph Report 6 Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2009 by Autodesk,Inc.v6.066 Wednesday,Apr 14,2021 Hyd. No. 5 1.0 Post-Developed to SCM Hydrograph type = SCS Runoff Peak discharge = 0.168 cfs Storm frequency = 1 yrs Time to peak = 360 min Time interval = 2 min Hyd. volume = 1,630 cuft Drainage area = 12.710 ac Curve number = 75.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 10.00 min Total precip. = 1.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 1.0 Post-Developed to SCM Q (cfs) Hyd. No. 5-- 1 Year Q (cfs) 0.50 — - - 0.50 0.45 0.45 0.40 - - 0.40 0.35 - 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 r "nk 0.15 0.10 0.10 0.05 0.05 I \ 0.00 - — - 0.00 0 60 120 180 240 300 360 420 Hyd No. 5 Time (min) 7 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D®2009 by Autodesk, Inc.v6.066 Wednesday,Apr 14,2021 Hyd. No. 6 1.0inPost Through SCM Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = 232 min Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 5 - 1.0 Post-Developed to SCM Max. Elevation = 307.03 ft Reservoir name = BMP Pond Max. Storage = 362 cuft Storage Indication method used. Exfiltration extracted from Outflow. 1.0inPost Through SCM Q (cfs) Hyd. No. 6 -- 1 Year Q (cfs) 0.50 - 0.50 0.45 - -- . 0.45 0.40 I 0.40 0.35 0.35 0.30 0.30 0.25 -- - 0.25 0.20 0.20 : :: i ' 0.10 0.05 0.05 0.00 = ii 0.00 0 60 120 180 240 300 360 420 480 540 Time (min) Hyd No. 6 Hyd No. 5 Total storage used = 362 cuft 9 Hydrograph Summary Rep—I-fydraflow Hydrographs Extension for AutoCAD®Civil 3D®2009 by Autodesk,Inc.v6.066 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval peak volume hyd(s) elevation strge used description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 13.23 2 734 60,276 ----- SCM Pre-Developed 2 SCS Runoff 26.67 2 722 69,996 SCM Post-Developed 3 Reservoir 0.000 2 822 0 2 308.84 23,647 Post Through SCM 5 SCS Runoff 0.000 2 n/a 0 ----- 1.0 Post-Developed to SCM 6 Reservoir 0.000 2 n/a 0 5 307.00 0.000 1.0inPost Through SCM Infiltration2.gpw Return Period: 2 Year Wednesday,Apr 14, 2021 10 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2009 by Autodesk,Inc.v6.066 Wednesday,Apr 14,2021 Hyd. No. 1 SCM Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 13.23 cfs Storm frequency = 2 yrs Time to peak = 734 min Time interval = 2 min Hyd. volume = 60,276 cuft Drainage area = 12.710 ac Curve number = 72.7 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 33.00 min Total precip. = 3.69 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Pre-Developed Q (cfs) Hyd. No. 1 -- 2 Year Q (cfs) 14.00 -- 14.00 12.00 12.00 10.00 10.00 8.00 — 8.00 6.00 -- - _ - - - 6.00 4.00 4.00 2.00 I 2.00 0.00 y J r - I 7` 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 11 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2009 by Autodesk,Inc.v6.066 Wednesday,Apr 14,2021 Hyd. No. 2 SCM Post-Developed Hydrograph type = SCS Runoff Peak discharge = 26.67 cfs Storm frequency = 2 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 69,996 cuft Drainage area = 12.710 ac Curve number = 75.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 10.00 min Total precip. = 3.69 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Post-Developed Q (cfs) Hyd. No. 2--2 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 - 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) • Hyd No. 2 12 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2009 by Autodesk,Inc.v6.066 Wednesday,Apr 14,2021 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 2 yrs Time to peak = 822 min Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 2 - SCM Post-Developed Max. Elevation = 308.84 ft Reservoir name = BMP Pond Max. Storage = 23,647 cuft Storage Indication method used. Exfiltration extracted from Outflow. Post Through SCM Q (cfs) Hyd. No. 3 -- 2 Year Q (cfs) 28.00 - - - 28.00 24.00 I 24.00 20.00 - 1 20.00 16.00 -- 16.00 12.00 - - 12.00 8.00 - 8.00 4.00 4.00 • 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 3 Hyd No. 2 ITTITTTII Total storage used = 23,647 cuft 15 Hydrograph Summary Repot q,r8flow Hydrographs Extension for AutoCAD®Civil 3D®2009 by Autodesk,Inc.v6.066 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval peak volume hyd(s) elevation strge used description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 27.96 2 734 122,007 SCM Pre-Developed 2 SCS Runoff 52.57 2 720 136,300 --- ------ SCM Post-Developed 3 Reservoir 0.000 2 748 0 2 310.87 55,185 Post Through SCM 5 SCS Runoff 0.000 2 n/a 0 --.-- 1.0 Post-Developed to SCM 6 Reservoir 0.000 2 n/a 0 5 307.00 0 000 1.0inPost Through SCM Infiltration2.gpw Return Period: 10 Year Wednesday,Apr 14, 2021 16 Hydrograph Report Hydratlow Hydrographs Extension for AutoCAD®Civil 3D®2009 by Autodesk,Inc.v6.066 Wednesday,Apr 14,2021 Hyd. No. 1 SCM Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 27.96 cfs Storm frequency = 10 yrs Time to peak = 734 min Time interval = 2 min Hyd. volume = 122,007 cuft Drainage area = 12.710 ac Curve number = 72.7 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 33.00 min Total precip. = 5.45 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Pre-Developed Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 28.00 I/ 28.00 24.00 - - 24.00 20.00 — 20.00 16.00 - - 16.00 12.00 12.00 8.00 8.00 4.00 - 4.00 0.00 �/ — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 17 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2009 by Autodesk,Inc.v6.066 Wednesday,Apr 14,2021 Hyd. No. 2 SCM Post-Developed Hydrograph type = SCS Runoff Peak discharge = 52.57 cfs Storm frequency = 10 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 136,300 cuft Drainage area = 12.710 ac Curve number = 75.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 10.00 min Total precip. = 5.45 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Post-Developed Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 60.00 - -- 60.00 50.00 50.00 40.00 -- - 40.00 30.00 - — - - 30.00 20.00 -- 20.00 10.00 - 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 2 18 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2009 by Autodesk,Inc.v6.066 Wednesday,Apr 14,2021 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 10 yrs Time to peak = 748 min Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 2 - SCM Post-Developed Max. Elevation = 310.87 ft Reservoir name = BMP Pond Max. Storage = 55.185 cuft Storage Indication method used. Exfiltration extracted from Outflow. Post Through SCM Q (cfs) Hyd. No. 3-- 10 Year Q (cfs) 60.00 60.00 50.00 - - ! 50.00 40.00 - - 40.00 • 30.00 30.00 20.00 ! -- ---- , 20.00 10.00 - — -- 10.00 \ \_ 0.00 - 0.00 0 120 240 360 480 600 720 840 Time (min) Hyd No. 3 Hyd No. 2 111 1 1 1 1 1 Total storage used = 55,185 cuft 21 Hydrograph Summary Rep �r� �-fyclraflow Hydrographs Extension for AutoCAD®Civil 3D®2009 by Autodesk,Inc.v6.066 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval peak volume hyd(s) elevation strge used description (origin) (cfs) (min) (min) (cuft) (ft) (cuff) 1 SCS Runoff 54.03 2 732 233,420 ---- SCM Pre-Developed 2 SCS Runoff 96.89 2 720 253,446 ---- ----- SCM Post-Developed 3 Reservoir 71.72 2 724 63,024 2 311.70 69,623 Post Through SCM 5 SCS Runoff 0.000 2 n/a 0 1.0 Post-Developed to SCM 6 Reservoir 0.000 2 n/a 0 5 307.00 0 000 1.0inPost Through SCM Infiltration2.gpw Return Period: 100 Year Wednesday,Apr 14, 2021 22 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2009 by Autodesk,Inc.v6.066 Wednesday,Apr 14,2021 Hyd. No. 1 SCM Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 54.03 cfs Storm frequency = 100 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 233,420 cuft Drainage area - 12.710 ac Curve number = 72.7 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 33.00 min Total precip. = 8.25 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Pre-Developed Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 60.00 -- 60.00 50.00 50.00 40.00 40.00 30.00 - -. 30.00 1 - 20.00 20.00 10.00 10.00 0.00 _ 10.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 1 23 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2009 by Autodesk,Inc.v6.066 Wednesday,Apr 14,2021 Hyd. No. 2 SCM Post-Developed Hydrograph type = SCS Runoff Peak discharge = 96.89 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 253,446 cuft Drainage area = 12.710 ac Curve number = 75.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 10.00 min Total precip. = 8.25 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 SCM Post-Developed Q (cfs) Hyd. No. 2-- 100 Year Q (cfs) 100.00 i 100.00 90.00 90.00 80.00 80.00 70.00 - - 70.00 60.00 - - 60.00 50.00 50.00 40.00 - 40.00 30.00 30.00 20.00 20.00 10.00 10.00 f 0.00 — — - "� _ ,� - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 2 24 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2009 byAutodesk,Inc.v6.066 Wednesday,Apr 14,2021 Hyd. No. 3 Post Through SCM Hydrograph type = Reservoir Peak discharge = 71.72 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 63,024 cuft Inflow hyd. No. = 2 - SCM Post-Developed Max. Elevation = 311.70 ft Reservoir name = BMP Pond Max. Storage = 69,623 cuft Storage Indication method used. Exfiltration extracted from Outflow. Post Through SCM Q (cfs) Hyd. No. 3 -- 100 Year Q (cfs) 100.00 — 100.00 90.00 - 90.00 80.00 80.00 70.00 i1 70.00 60.00 I 60.00 50.00 - 50.00 40.00 - 40.00 30.00 I: 30.00 20.00 - 20.00 10.00 - 10.00 0.00 � iii�IV�iGi'i"�"� 0.00 0 120 240 360 480 600 720 840 Time (min) - Hyd No. 3 — Hyd No. 2 Total storage used = 69,623 cuft a !{ ! k\ § § }k | 2 t, i !E |}-F �!¥!! u §$ f! )!g'- `® o ■!>e, ! £0 1 /# k & ; ■ $& 62 2 )) {® ■ � m � \ - !|� 2 ;If \2 {» ! r ■ § )| V. k 7{« ��■ � k|! ! . | . c 13 oil or � | ' Bowman NORTH CAROLINA APPENDIX D State Stormwater Management Permit Ryan's Run -Storm water Design Report 9 I P a g e _=;,STATE Fti, i 5 6 Deli RAY COOPER — Governor V O JOHN NICHOLSON ',,' — ��za� a? Interim Secretary *fAfQ noE�* BRIAN WRENN NORTH CAROLINA Director Environmental Quality June 16, 2021 Ryan's Run Properties,LLC Attn: David T.Upchurch,Managing Member 244 National Drive Pinehurst, NC 28374 Subject: State Stormwater Management Permit No. SW6210201 Ryan's Run High Density Subdivision Project Hoke County Dear Mr. Upchurch: The Wilmington Regional Office received a complete, State Stormwater Management Permit Application for the subject project on April 16, 2021. Staff review of the plans and specifications has determined that the project, as proposed, complies with the Stormwater Regulations set forth in Title 15A NCAC 02H.1000 Permit No. SW6210201 dated June 16, 2021, for the construction of the built-upon areas (BUA) and stormwater control measures (SCMs) associated with the subject project. This permit shall be effective from the date of issuance until June 16, 2029 and the project shall be subject to the conditions and limitations as specified therein and does not supersede any other agency permit that may be required. Failure to comply with these requirements will result in future compliance problems. Please note that this permit is not transferable except after notice to and approval by the Division. This cover letter, attachments, and all documents on file with DEMLR shall be considered part of this permit and is herein incorporated by reference. If any parts, requirements, or limitations contained in this permit are unacceptable,you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions concerning this permit, please contact Corey Anen in the Central DEQ Office, at (919) 707-3649 or Corey.Anen@ncdenr.gov. Sincerely, .T:Brian Wrenn, Director Division of Energy, Mineral and Land Resources cc: Carlo Pardo,PE-Triangle Site Design,PLLC Fayetteville Regional Office Stormwater File D E 4 North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources 512 North Salisbury Street 1 1612 Mail Service Center I Raleigh,North Carolina 27699-1612 NORTH CAROLINA Dep tmeromemaoar� 919.707.9200 State Stormwater Management Permit No. SW6210201 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY SUBDIVISION DEVELOPMENT In compliance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations promulgated and adopted by the North Carolina Environmental Management Commission, including 15A NCAC 02H.1000 amended on January 1, 2017 (2017 Rules) (the "stormwater rules"), PERMISSION IS HEREBY GRANTED TO Ryan's Run Properties, LLC Ryan's Run Calloway Road, Raeford, Hoke County FOR THE construction, management, operation and maintenance of built-upon area (BUA) as well as two (2) infiltration systems ("stormwater control measures" or"SCMs") as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or"DEMLR"). The project shall be constructed, operated and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are enforceable part of this permit. This permit shall be effective from the date of issuance until June 16, 2029 and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. 1. BUA REQUIREMENTS. The maximum amount of BUA allowed for the entire project is 496,534 square feet. The runoff from all BUA within the permitted drainage areas of this project must continue to be directed into the permitted SCMs. The following specific requirements pertain to the BUA on this project: a. SCM BUA LIMITS. The SCMs labeled SCM-1 and SCM-2 have been designed using the runoff treatment method to handle the runoff from 242,378 square feet and 254,156 of BUA, respectively, within the delineated drainage areas. This permit does not provide any allocation of BUA for future development within the delineated drainage area(s). b. BUA FOR INDIVIDUAL LOTS. Each of the 55 lots are limited to a maximum of 4,000 square feet of BUA, as indicated in the approved plans and specifications. The maximum BUA assigned to each lot via this permit and the recorded deed restrictions and protective covenants may not be increased or decreased by either the individual lot owner or the permittee unless and until the permittee notifies the Division and obtains written approval from the Division. Page 1 of 6 State Stormwater Management Permit No. SW6210201 2. SCM REQUIREMENTS. The following requirements pertain to the SCMs on this project: a. SCM DESIGN. The SCMs are permitted based on the design criteria presented in the sealed, signed and dated supplement and as shown in the approved plans and specifications. These SCMs must be provided and maintained at the design condition. b. PRETREATMENT. The following pretreatment device(s) has (have) been provided to prevent clogging: forebays for pretreatment. 3. STORMWATER OUTLETS. The peak flow from the 10-year storm event shall not cause erosion downslope of the discharge point. 4. VEGETATED SETBACKS. A 30-foot wide vegetative setback must be provided and maintained in grass or other vegetation adjacent to all surface waters as shown on the approved plans. The setback is measured horizontally from the normal pool elevation of impounded structures, from the top of bank of each side of streams or rivers, and from the mean high waterline of tidal waters, perpendicular to the shoreline. a. BUA IN THE VEGETATED SETBACK. BUA may not be added to the vegetated setback except as shown on the approved plans or in the following instances where the BUA has been minimized and channelizing runoff from the BUA is avoided: i. Water dependent structures; and ii. Minimal footprint uses such as poles, signs, utility appurtenances, and security lights that cannot practically be located elsewhere. b. RELEASE OF STORMWATER NOT TREATED IN AN SCM. Stormwater that is not treated in an SCM must be released at the edge of the vegetated setback and allowed to flow through the setback as dispersed flow. 5. RECORDED DOCUMENT REQUIREMENTS. The stormwater rules require the following documents to be recorded with the Office of the Register of Deeds prior to the sale of individual lots or groups of lots: a. ACCESS AND/OR EASEMENTS. The entire stormwater conveyance system, including any SCMs, and maintenance accesses must be located in public rights-of-way, dedicated common areas that extend to the nearest public right-of-way, and/or permanent recorded easements that extend to the nearest public right-of-way for the purpose of inspection, operation, maintenance, and repair. b. OPERATION AND MAINTENANCE AGREEMENT. The operation and maintenance agreement must be recorded with the Office of the Register of Deeds. c. FINAL PLATS. The final recorded plats_must reference the operation and maintenance agreement and must also show all public rights-of-way, dedicated common areas, and/or permanent drainage easements, in accordance with the approved plans. d. DEED RESTRICTIONS AND PROTECTIVE COVENANTS. Recorded deed restrictions and protective covenants must include, at a minimum, the following statements related to stormwater management: i. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW6210201, as issued by the Division of Energy, Mineral and Land Resources (the "Division") under 15A NCAC 02H.1000, effective January 1, 2017. ii. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. iii. These covenants are to run with the land and be binding on all persons and parties claiming under them. iv. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the Division. v. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division. Page 2 of 6 State Stormwater Management Permit No. SW6210201 vi. The maximum built-upon area (BUA) per lot is 4,000 square feet. This allotted amount includes any BUA constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement not shown on the approved plans. BUA has the same meaning as G.S. 143-214.7, as amended. vii. For those lots within the CAMA Area of Environmental Concern, where DCM calculates a different maximum lot BUA, the governing maximum lot BUA shall be the more restrictive of the two amounts. viii. The maximum allowable BUA shall not be exceeded on any lot until the permit is modified to ensure compliance with the stormwater rules, permit, and the approved plans and specifications. ix. All runoff from the BUA on the lot must drain into the permitted system. This may be accomplished via grading, a stormwater collection system and/or a vegetated conveyance. x. A 50-foot wide vegetative setback must be provided and maintained adjacent to all surface waters in accordance with 15A NCAC 02H.1003(4) and the approved plans. xi. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143, Article 21. e. DEEDS FOR INDIVIDUAL LOTS. The permittee shall record deed restrictions and protective covenants prior to the issuance of a certificate of occupancy to ensure the permit conditions and the approved plans and specifications are maintained in perpetuity. 6. CONSTRUCTION. During construction, erosion shall be kept to a minimum and any eroded areas of the on-site stormwater system will be repaired immediately. a. SCM OPERATIONAL PRIOR TO DEVELOPMENT. During construction, all operation and maintenance for the project shall follow the Erosion Control Plan requirements until the Sediment-Erosion Control devices are converted to SCMs. Once the device is converted to a SCM, the permittee shall provide and perform the operation and maintenance as outlined in the applicable section below. b. SCM RESTORATION. If one or more of the SCMs are used as an Erosion Control device and/or removed or destroyed during construction, it must be restored to the approved state stormwater design condition prior to close-out of the erosion control plan and/or project completion and/or transfer of the state stormwater permit. Upon restoration, a new or updated certification will be required for the SCM(s) and a copy must be submitted to the appropriate DEQ regional office. Page 3 of 6 State Stormwater Management Permit No. SW6210201 7. MODIFICATIONS. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. c. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. Adding the option to use permeable pavement or#57 stone within the lots as a permeable surface. The request may require a proposed amendment to the deed restrictions and protective covenants for the subdivision to be submitted and recorded. g. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material within the common areas to be considered a permeable surface that were not included in the approved plans and specifications. h. Other modifications as determined by the Director. 8. DESIGNER'S CERTIFICATION. Upon completion of the project, the permittee shall determine if the project is in compliance with the approved plans and take the necessary following actions: a. If the permittee determines that the project is in compliance with the approved plans, then within 45 days of completion, the permittee shall submit to the Division one hard copy and one electronic copy of the following: i. The completed and signed Designer's Certification provided in Attachment A noting any deviations from the approved plans and specifications. Deviations may require approval from the Division; ii. A copy of the recorded operation and maintenance agreement; iii. Unless already provided, a copy of the recorded deed restrictions and protective covenants; and iv. A copy of the recorded plat delineating the public rights-of-way, dedicated common areas and/or permanent recorded easements, when applicable. b. If the permittee determines that the project is not in compliance with the approved plans, the permittee shall submit an application to modify the permit within 30 days of completion of the project or provide a plan of action, with a timeline, to bring the site into compliance. 9. OPERATION AND MAINTENANCE. The permittee shall provide and perform the operation and maintenance necessary, as listed in the signed operation and maintenance agreement, to assure that all components of the permitted on-site stormwater system are maintained at the approved design condition. The approved operation and maintenance agreement must be followed in its entirety and maintenance must occur at the scheduled intervals. a. CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by the Division and the stormwater rules such as the construction of additional or replacement on- site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. b. MAINTENANCE RECORDS. Records of maintenance activities must be kept and made available upon request to authorized personnel of the Division. The records will indicate the date, activity, name of person performing the work and what actions were taken. Page 4 of 6 State Stormwater Management Permit No. SW6210201 10. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(3). 11. CURRENT PERMITTEE NAME OR ADDRESS CHANGES. The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one or more of the following changes: a. A name change of the current permittee; b. A name change of the project; c. A mailing address change of the permittee. 12. TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. a. TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(2) and must be submitted upon occurrence of any one or more of the following events: i. The sale or conveyance of the project and/or property area in whole or in part, except in the case of an individual residential lot sale that is made subject to the recorded deed restrictions and protective covenants; ii. The assignment of declarant rights to another individual or entity; iii. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of NCGS 143-214.7(c2); iv. Dissolution of the partnership, corporate, or LLC entity, subject to NCGS 55-14-05 or NCGS 57D-6-07 and 08; v. Bankruptcy; vi. Foreclosure, subject to the requirements of Session Law 2013-121; b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on-site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. 13. COMPLIANCE. The permittee is responsible for complying with the terms and conditions of this permit and the approved plans and specifications until the Division approves the transfer request. a. REVIEWING AND MONITORING EACH LOT FOR COMPLIANCE. The permittee is responsible for verifying that the proposed BUA on each individual lot and for the entire project does not exceed the maximum amount allowed by this permit. The permittee shall review all individual lot plans for new construction and all subsequent modifications and additions for compliance. The plans reviewed must include all proposed BUA, grading, and driveway pipe placement. The permittee shall not approve any lot plans where the maximum allowed BUA limit has been exceeded or where modifications are proposed to the grading and/or to the stormwater collection system and/or to the vegetated conveyance unless and until a permit modification has been approved by the Division. The permittee shall review and routinely monitor the project and each lot to ensure continued compliance with the conditions of the permit, the approved plans and specifications, and the recorded deed restrictions and protective covenants. The permittee shall notify any lot owner that is found to be in noncompliance with the conditions of this permit in writing and shall require timely resolution. b. ARCHITECTURAL REVIEW BOARD (ARB) OR COMMITTEE (ARC). The permittee may establish an ARB or ARC to conduct individual lot reviews. However, any approval given by the ARB or ARC on behalf of the permittee does not relieve the permittee of the responsibility to maintain compliance with the conditions of the permit and the approved plans and specifications. Page 5 of 6 State Stormwater Management Permit No. SW6210201 c. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. d. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. e. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. f. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. g. OTHER PERMITS. The issuance of this permit does not preclude the permittee from obtaining and complying with any and all other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which are imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. Permit issued this the 16t" day of June, 2021. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Brian Wrenn, Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW6210201 Page 6 of 6 State Stormwater Management Permit No. SW6210201 Attachment A Certification Forms The following blank Designer Certification forms are included and specific for this project: • As-Built Permittee Certification • As-Built Designer's Certification General MDC • As-Built Designer's Certification for Infiltration Project A separate certification is required for each SCM. These blank certification forms may be copied and used, as needed, for each SCM and/or as a partial certification to address a section or phase of the project. Page 1 of 1 State Stormwater Management Permit No. SW6210201 AS-BUILT PERMITTEE CERTIFICATION I hereby state that I am the current permittee for the project named above, and I certify by my signature below, that the project meets the below listed Final Submittal Requirements found in NCAC 02H.1042(4) and the terms, conditions and provisions listed in the permit documents,plans and specifications on file with or provided to the Division. _ Check here if this is a partial certification. Section/phase/SCM#? Check here if this is part of a Fast Track As-built Package Submittal. Printed Name Signature I, ,a Notary Public in the State of County of ,do hereby certify that personally appeared before me this day of ,20 and acknowledge the due execution of this as-built certification. (SEAL) Witness my hand and official seal My commission expires Permittee's Certification NCAC .1042(4) Completed/ N/A Provided A. DEED RESTRICTIONS/BUA RECORDS 1. The deed restrictions and protective covenants have been recorded and Y or N contain the necessary language to ensure that the project is maintained consistent with the stormwater regulations and with the permit conditions. 2. A copy of the recorded deed restrictions and protective covenants has been Y or N provided to the Division. 3. Records which track the BUA on each lot are being kept. (See Note 1) Y or N B. MAINTENANCE ACCESS 1. The SCMs are accessible for inspection,maintenance and repair. Y or N 2. The access is a minimum of 10 feet wide. Y or N 3. The access extends to the nearest public right-of-way. Y or N C. EASEMENTS 1. The SCMs and the components of the runoff collection/conveyance system Y or N are located in recorded drainage easements. 2. A copy of the recorded plat(s)is provided. Y or N D. SINGLE FAMILY RESIDENTIAL LOTS -Plats for residential lots that Y or N have an SCM include the following: 1. The specific location of the SCM on the lot. Y or N 2. A typical detail for the SCM. Y or N 3. A note that the SCM is required to meet stormwater regulations and that the lot owner is subject to enforcement action as set forth in NCGS 143 Article Y or N 21 if the SCM is removed, relocated or altered without prior approval. E. OPERATION AND MAINTENANCE AGREEMENT Y or N 1. The O&M Agreement is referenced on the final recorded plat. Y or N 2. The O&M Agreement is recorded with the Register of Deeds and appears in Y or N the chain of title. F. OPERATION AND MAINTENANCE PLAN—maintenance records are Y or N being kept in a known set location for each SCM and are available for review. G. DESIGNER'S CERTIFICATION FORM—has been provided to the Y or N Division. Note 1-Acceptable records include ARC approvals,as-built surveys,and county tax records. Page 1 of 6 State Stormwater Management Permit No. SW6210201 Provide an explanation for every requirement that was not met, and for every"N/A"below.Attach additional sheets as needed. Page 2 of 6 State Stormwater Management Permit No. SW6210201 AS-BUILT DESIGNER'S CERTIFICATION GENERAL MDC I hereby state that I am a licensed professional and I certify by my signature and seal below,that I have observed the construction of the project named above to the best of my abilities with all due care and diligence, and that the project meets the below listed General MDC found in NCAC 02H.1050 in accordance with the permit documents,plans and specifications on file with or provided to the Division, except as noted on the"AS- BUILT"drawings, such that the intent of the stormwater rules and statutes has been preserved. _ Check here if this is a partial certification. Section/phase/SCM#? _ Check here if this is a part of a Fast-Track As-Built Package Submittal per.1044(3). _ Check here if the designer did not observe the construction,but is certifying the project. Check here if pictures of the SCM are provided. Printed Name Signature NC Registration Number Date Consultant's Mailing Address: SEAL: City/State/ZIP Phone Number Consultant's Email address: O Circle N if the as-built value differs from the Plan. If N is circled,provide an explanation on Page 2. OO N/E=not evaluated(provide explanation on page 2) OO N/A=not applicable to this SCM or project. Consultant's Certification NCAC .1003((3) &General MDC .1050 )As-built OO N/E OO N/A A. TREATMENT REQUIREMENTS 1. The SCM achieves runoff treatment. Y or N 2. The SCM achieves runoff volume match. Y or N 3. Runoff from offsite areas and/or existing BUA is bypassed. Y or N 4. Runoff from offsite areas and/or existing BUA is directed into Y or N the permitted SCM and is accounted for at the full build-out potential. 5. The project controls runoff through an offsite permitted SCM Y or N that meets the requirements of the MDC. 6. The net area of new BUA increase for an existing project has Y or N been accounted for at the appropriate design storm level. 7. The SCM(s)meets all the specific minimum design criteria. Y or N B. VEGETATED SETBACKS/BUA 1. The width of the vegetated setback has been measured from Y or N the normal pool of impounded waters,the MHW line of tidal waters, or the top of bank of each side of rivers or streams. 2. The vegetated setback is maintained in grass or other Y or N vegetation. 3. BUA that meets the requirements of NCGS 143-214.7 (b2)(2) Y or N is located in the setback. 4. BUA that does not meet the requirements of NCGS 143-214.7 Y or N (b2)(2) is located within the setback and is limited to: a. Publicly funded linear projects (road, greenway sidewalk) b. Water-dependent structures c. Minimal footprint uses(utility poles, signs, security lighting and appurtenances) 5. Stormwater that is not treated in an SCM is released at the Y or N edge of the setback and allowed to flow through the setback as dispersed flow. Page 3of6 State Stormwater Management Permit No. SW6210201 OAs-built OO N/E OO N/A C. STORMWATER OUTLETS—the outlet handles the peak flow Y or N from the 10 year storm with no downslope erosion. D. VARIATIONS 1. A variation(alternative) from the stormwater rule provisions Y or N has been implemented. 2. The variation provides equal or better stormwater control and Y or N equal or better protection of surface waters. E. COMPLIANCE WITH OTHER REGULATORY Y or N PROGRAMS has been met. F. SIZING-the volume of the SCM takes the runoff from all surfaces into account and is sufficient to handle the required storm Y or N depth. G. CONTAMINATED SOILS—infiltrating SCM's are not located Y or N in or on areas with contaminated soils. H. SIDE SLOPES 1. Vegetated side slopes are no steeper than 3H:1 V. Y or N 2. Side slopes include retaining walls, gabion walls, or other Y or N surfaces that are steeper than 3H:1 V. 3. Vegetated side slopes are steeper than 3H:1V(provide Y or N supporting documents for soils and vegetation). I. EROSION PROTECTION 1. The inlets do not cause erosion in the SCM. Y or N 2. The outlet does not cause erosion downslope of the discharge Y or N point during the peak flow from the 10 year storm. J. EXCESS FLOWS—An overflow/bypass has been provided. Y or N K. DEWATERING—A method to drawdown standing water has Y or N been provided to facilitate maintenance and inspection. L. CLEANOUT AFTER CONSTRUCTION—the SCM has been Y or N cleaned out and converted to its approved design state. M. MAINTENANCE ACCESS 1. The SCM is accessible for maintenance and repair. Y or N 2. The access does not include lateral or incline slopes>3:1. Y or N N. DESIGNER QUALIFICATIONS (FAST-TRACK PERMIT)— The designer is licensed under Chapters 89A, 89C, 89E, or 89F of Y or N the General Statutes. _ Provide an explanation for every MDC that was not met, and for every item marked"N/A"or"N/E",below. Attach additional pages as needed: Page 4 of 6 State Stormwater Management Permit No. SW6210201 AS-BUILT DESIGNER'S CERTIFICATION FOR INFILTRATION PROJECT I hereby state that I am a licensed professional and I certify by my signature and seal below,that I have observed the construction of the project named above to the best of my abilities with all due care and diligence, and that the project meets all of the MDC found in NCAC 02H.1051 in accordance with the permit documents,plans and specifications on file with or provided to the Division,except as noted on the"AS-BUILT"drawings, such that the intent of the stormwater rules and the general statutes has been preserved. _ Check here if this is a partial certification. Section/phase/SCM#? _ Check here if this is a part of a Fast-Track As-Built Package Submittal per.1044(4). _ Check here if the Designer did not observe the construction,but is certifying the project. Check here if pictures of the SCM are provided. Printed Name Signature NC Registration Number Date Consultant's Mailing Address: SEAL: City/State/ZIP Phone Number Consultant's Email address: O Circle N if the as-built value differs from the Plan. If N is circled,provide an explanation on Page 2. OO N/E=not evaluated(provide explanation on page 2) OO N/A=not applicable to this project or SCM This Certification must be completed in conjunction with the General MDC certification under NCAC 02H.1050 Consultant's Certification(MDC .1051) @As-built OO N/E OO N/A A. Inlets/Pretreatment/Design Depths/Elevations 1. Inlets are located per the approved plans. Y or N 2. Pretreatment measures are provided? (Rooftop runoff does not Y or N require pre-treatment.) 3. BASIN only—the area and depth of the basin is consistent with the approved plans 4. TRENCH only-the provided width, length and height of the trench are consistent with the approved plan. 5. TRENCH only-the provided length and size of the perforated pipe is consistent with the approved plan. 6. The bottom elevation of the basin/trench is consistent with the approved plans. 7. The bypass elevation is consistent with the approved plan. 8. The overflow elevation is consistent with the approved plan. B. Soils/SHWT/Subgrade 1. The hydraulic properties of the insitu soils are in accordance Y or N with the soils report. 2. The lowest point of the infiltration system is a minimum of 2 Y or N feet above the SHWT. 3. If separation to the SHWT is less than 1 foot,the water table Y or N draws down to its pre-storm level within 72 hours. 4. The slope of the soil subgrade is<=2%. Y or N C. Drawdown Time 1. The system dewaters within 72 hours? Y or N 2. The Insitu soils were removed and replaced with suitable Y or N infiltration media to achieve the 72 hour drawdown. Page 5 of 6 State Stormwater Management Permit No. SW6210201 OAs-built OO N/E ©N/A D. Observation Port—for underground systems, a minimum of one Y or N inspection port has been provided. Provide an explanation for every MDC that was not met, and for every item marked"N/A"or"N/E", below. Attach additional pages as needed: Page 6 of 6