CONSTRUCTION SCHEDULE /I ( \ I I I I III I ll` ) \ Oil
I I I
(1.Obtam all neceamry peens and plan eppr I.F d Se4mem Control(FffiSC)pen and a Cartificace of Covmaga1il II
(CAC)muel be obtained before any land dlamdaln8 activitlea acrur.AeoPY o[theE&SC petmtt ttM1e COCand shard eoPY o[the , I � IIIIIII / / Ill
2.Install
moat be kept rnsite,preferably inapmnits box,and accessible doting inspection. \
tall gravel construction entrances first,then silt fences,reinforced silt fence
° SITE cord a and wattles.
I I I I II ` 1 N N / Jill!
II I3.Fiaiah clearing and grabbing any necessary areas on the lots az they are started. /4. \s<conatmction activiti<a. \ I I I I I \ \ \ I I / I andhouseconstruction.Allareasnotdisturbedfor7daysneedstohavetemporaryerrpermanent land patios."O�v B.Beginf egr8 ing of lot / 1 1 \ \ / \ / / // '
pa ER 9.Fiiral grass' ,mulching /J /
.1 place until the 10.The contractor shall conduct self-inspections ofthe erasion and sedimentation control measures and complete the following combleade.gf-inspoutionfom]fowdonthaoeh¢Rwebsite f / I //M1nps:IM1welvemonths of compleieinspenergyforms shand-laudton sitteeand avnwableforrmweteonatll time.Itis recommended am. / /Twelve months ofwmpinei.Ref:G.S.om A-54.borough sice a13A-S7lSecefnsiISANonaz 4A.010.throuhISA eda I / / / / I I \ \ /) / \ / �I
OQ copy be kept in a permits box.Ref:G.S.113A-54.1 though O.S.113A-5)Sections ISA NCAC 04A.0101 through ISA I I I/ J
00 4 ' , NCAC 04E.0504 Grnenl Permit NCG 010000 NPDES for Conatmetion Activities. \ \I.Self-inspections for era and sedimentation control measures veto be performed at least onre every seven calendar days and )I withind.hours ofAllESC every einhall be maetained alivci MYneededco rapersndetahall emadeimplan.A rY to ngauiesiameazuresas I I / 1 / \designed.All ESC measures shallbegriaterth azspecified in the con repairs sdetailsone iaplan.atrain gaugeain ea lures as /)
12.Inspection and final acceptance letters.Whenthe project is completeUe permittces shall eonWet°EMU to close out Oe E&SC1 IdnncgavDCG0 infousthenominee o Notice%ect close au,via inspection report,the permiuee shall visit I I I / / / \ \ / III1 IIf
FMLR \ / Ilf
ftermiration(e-NOT).A 3120 annual general permit 4e will be charged IV until the a-NOT has been filled out / /// / / I= GROUND STABILIZATION l l I
•%- - - SITE AREA STABILIZATION / > / c
\ C / I / / / II IIIVICINITY MAP I ExcEPrloNs ( 1 / I l /N.T.S. /`' DESCRIPTION TIME FRAME / \ / r„--- / I / LPERIMETER DIKES, 7 DAYS NONE / / / / \ / I I I I I / )///)
I I I
SWALES, DITCHES / I / / 1 /I
&SLOPES 7 / / J/ 1
C / l 1 I I l
HIGH QUALITY 7 DAYS NONE // /
A SELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY WATER ZONES _
NCGS 113A-54,11IS AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR ) P / /
COMPLETED AS AN EXCEL SPREADSHEET. I\\ 1
AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED SLOPES(HOW)
7 DAYS IF SLOPES ARE (\/ \ I �� / /
EROSION AND THAN 3:1 10'OR LESS IN \ ' Y' `� 'I �ycy `V0 ("--------___- _ - ,'L ///I /
SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE,RULE 15A LENGTH AND ARE \ I \ �t, I I \ I j I
arimi
NCAC 04B.0131 STATES THAT-...DOCUMENTATION SHALL BE ACCOMPLISHED BY NOT STEEPER 1--.-: -.•-• r+J / Q
INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE THAN 2:1, 14 1 I I \ / / �- /// I/ �./5 /
APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, I \/
DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, DAYS ARE \) I) \\ / I
PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION ALLOWED 1 J \ / �/ I ` / LIMITCTION� / //// I I I
/ \ / / I / LIMITS •CONTROL PLAN." SLOPES 3:1 OR 14 DAYS 7 DAYS FOR \ 6
FLATTER SLOPES GREATER \ \ I / / / I/ / 3 4// � 5 e1 pin / / / / I
THIS PROJECT IS IN A PUBLIC SUPPLY THAN 50.IN (/ ,r) I /
LENGTH
WATERSHED(WS-IV)AND ALL REQUIREMENTS ALL OTHER AREAS a DAYS NONE(EXCEPT CP \ \ / / 00
/ / / �CONBTRUCTION I / I I /
REGARDING SENSITIVE AREA WITH SLOPES THAN
FOR PERIMETERS I % �/ \ LIMITS 8 / '
AND HOW ZONES) l ----_ ^ I • 11'
WATERSHEDS SHOULD BE FOLLOWED I I I / j-, ___ --2 I I I /
I I I % Wolf ck Lae m �, 1 I h 1 I
DATE: PAGE: \
m
FLOW � �I S .Area/w - Slts ato be 1. Other materials proviain e0eiveleet tertian \ /, (3 0 r L� 1 -\ -- --� i I I I'
° I r _u tr / ) \ )\) 2\)\2 )
T\ 11III• mledfixI 1 / IIak,a Mn �takas to the desired length such 3. Silt amalabaadna note edpre a b� / II I 'Me toe of a 1 I20 , '�9 11111 1
6ELTION 6EL IDN lave :lked at Me edge o. I l 19 / / \� 16 / j 1 / ' 11' 1 1 I /\_
,° �, rv. ..gat areas 9 meleef the upslopederma / l l l l l / I ///�i/ ' o '° 11�1 'I I I
W ' I ll ' � I� �� - � �,'� �11 i I b - ill's i l
or Coror 8 feet if the MR n maximum interval of.reet pHmaximuminterval ( I I I I I I I I III , // /� I� /I \ o j 1 / l 'I I I l
UNTRENCTo Wood
f/2 height of log et g ntl 4 Min. 6 anem1e EI�vv 1 I /
HEDIrv6TA INSTALLATION ..,,.....mr.....r.�o..o,r.�s.,�....,..�,,. =�ata>mMa'� placeaba°d°gry�rca'wma - I I I I I I �1 r
/i` / ( 1 11 , / /accumulated �l /Mulch or / ' I I II \ ' / ' I / 14 /,// / 'I//l I I I / /
Sheet Plm� g Gllt6a<g/"�as,�mfax� ��OaPm��,mPm� t,� a excessive,
ma I ►� ,� �� / / / l / / /
werxAr rwatta Em //// // / /
ACCESS
" <a„ tl qe
at. aom�r, a �n aom rndamaed or / /I J /IJ
(a, w, urea izeft '(ai`t -a`°Pet th•measure.
t� / �I / \\ T /l wry-evrAta.y 12/ �/ l 1111/l I I
"VV lade, imnn, /m/m) imim> imnn, bro^re a ...'�. tnvf12T / /I l
SILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION ' I / / / I ` ••% ` //// // / I I /
DATE: � / / / I / //� /�..• //// /3/ \ m_/' N Va,*( �T3� ////i // 1 ///
PAGE: ^ \ / I 1 I \ / .. -../ / �/ / l/ I - I //l A
Pa ..B. �..C.� �VD•G -. .-.� �nG� �H•� Mq ,\ j -„� JT�� ^Izil ��^^ I / I l \ /// / / //I / 1 /Il/ 1
( -('
I z i / l l / l // i c
T a R 1 HOU it .HOUSE I �V ri nous j ( / /'...") \
/// / /
TilILII
sup'-}� Rpm °, =: ,.... -GnnwAY 1. .�-=:�,. :�--: I „a / -I� l l l 1 I
`auRe lNLEi O""" Notes: I \ j
/ I / / / \ \ ' l//l Il l / I I \\1 \\
1.If needed,Tree Protection fencing should be installed radius
the buffer zone,wetland I \ \ ' I __ -\ \ \ \ / // / / /
I \(i \
- boundary Felton around protected trees,providing a radius ll at least 1,25 feet for each \ ) I I I -- ��( /I \ I / // I/ / I \\\
LEGEND inch of trunk diameter. 11\
2.Install Silt Fence on the low elevation sides of each lot.Install Silt Fence outlets shown on
DIRECTIONFLOW @ schematic/diagram and field adjusted,if necessary,for placement at low points.If lots are Il I
contiguous and have dMerent land owners or builders,each lot should have individual SiRSILT FENCE
\ ( �_ _� / \
SILT FENCE OUTLET ® 3ENE .Install required SltFenc within 10 feet ofproperty line to ensure there inno Conflict with \ 1 I )...))
�- \\ ) ////� / /CONSTRUCTION __ /� _ENTMN septic system.It eis the rnot impactt a the builderm ensure the repair installation MsetllmenlIIIII \ 1 / \ \ // / // / I ��cube INLET control one C es does not impa.lExites do be inst and perlot,ea(s). /I /1a.W least one nd other are Entrance/Exit is m nainstalled per lot. I I / / / 9 55.Waste bins and other areas tl drained for managing building material waste shall be at /lees[50 feet away from storm diode inlets or dainage dkches unless It can be shown that
no otherd ernatve exists.If this separation cannot be achieved,these areas must be / / I / I \ ///// / / / / / // /
contained behind Sik Fence.
6.Inlets downstream of disturbances should be protected streets should be swept when
,....._,
---\
sediment from the Construction activity is present. ( (
..\NC-Environrn en la Hoeg 7.Details for Silt Fence,Sill Fence Outlets,Construction Entrances and other measures are I /�� / \ \ �� / / I II / •\ I ///// / / / / I / // ,
provided on additional sheets.Erosion LOT
YOUT WITH Utr details arenot drawn to scale. I I \ \ / / Z �_ / / I I I 1/ //4/ ' / i / / /
------------- TYPICAL LOT LAYOUT WITH CURB AND GUTTER PAGE C
DATE: PAGE: ■P 1 of 2
/ TOTAL DISTURBED ACREAGE: 0.69 ACRES
•A. LOT EROSION CONTROL PLAN
MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION LOT 6
Q0
' �3 General-All measures will be inspected and corrections made after runoff producing rainfalls or at least once perweek minimum.The builder will insure that the construction activities on anyarticular lot do not adverse) affect anyof the installed erosion control measures.If lot construction dictates,measures will be• p p g p yROCK HILL MANOR
Q J`i0 / �'° relocated on the lot to insure that the potential for sedimentation runoff is eliminated as much as possible.Silt fences and gravel construction entrances will be maintained as suggested in the erosion control manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover.
:444414.-.S ,.`^era„� FOR
/ iltrWWWW:* ^.•g STt-, ''e Gravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic topdressing with 2-inch stone,After each rainfall,inspect any structure used to trap sediment and clean it out as necessary. Immediately remove NI
,�� • S --±±,� objectionable materials spilled,washed,or tracked onto public roadways. DREAM FINDERS
�gigj¢_iab 57: < '�-`J S:R 5:��K.Sn,-... Silt Fence-Sediment fences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed of properly to insure
y' 57,. that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during cleanout operations. HOMES L L C
�! e ran - ;tip$ t �'!� • Sodding The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to close,since this could inhibit adequate growth
/ ` -`,� R6 a- n P Y 9 9 ry GY q
-tjJO toe S p�,f.*`O d stabilization of the root bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. EASTOVER TOWNSHIP C U M BERLAN D COUNTY
Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are germinating properly.Any bare areas should be SCALE: 1"=100' AUGUST 2024
Construction: Maintenance: repaired,and reseeded as soon as possible.If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass.
1.Clear the entrance and exit area of all vegetation,roots,and other objectionable 1.Per NCG-01 impact at least once a week and after each l inch or GRAPHIC SCALE
material and Properly grade it. greater rainfall;make any required repairs immediately. Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed
2.Place the gavel to the specific grade and dimensions shown on the plans,and 2.Maintain the gravel pad in a Condition to prevent mud or sediment o 0
smooth h. from leaving the construction site.This may require periodic sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water. 11
3.Provide drainage to carry water to a sediment trap or other suitable outlet. topdressing with 2 inch stone.
4.Use geotextile fabrics in order to improve stability of the foundation in locations 3.Immediately remove all objectionable materials spilled washed or Reinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout.Remove and replace stone as necessary as it becomes clogged with sediment.Remove all
LL�-
subject to seepage or high water table, tracked onto public roadways. fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. ( IN FEET )
1 inch = 100 ft.
CONSTRUCTION ENTRANCE/EXIT MOORMAN,KIZER&REITZEL,INC.115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305
PHONE(910)484-5191 FAX(910)484-0388 LICENSE#F-0106
LAST SAVED:e/e/2024 10:31 AM LAST PLOTTED:9/9/2024 10:41 AM PLOTTED BY.Dennis Gilbert FILENAME:G\CURRENT JOBS\H&H CONSTRUCTORS\24-1367-05 ROCKHILLM0NOR-EC\PLANS\ROCKHILLEC-L0T6.DWG