HomeMy WebLinkAboutNCC242631_ESC Approval Submitted_20240827 Dennis Gilbert
From: SVC_DoNotReply-DEQPermits <DoNotReply-DEQPermits@deq.nc.gov>
Sent: Friday, August 23, 2024 10:01 AM
To: Onsite Homes, LLC
Cc: Dennis Gilbert; Debra Ensminger
Subject: NC DEMLR - FROF Application Approval CRM:0177148
Attachments: Application Report - Friday, August 23, 2024 957 AM.pdf; Certificate of Approval -
Friday, August 23, 2024 957 AM.docx; Letter of Approval - Friday, August 23, 2024 957
AM.docx
ST
N.,.i pair.xn,1;AA,_
,,, 1...,
,g 441.4 J., ,s.
‘„,. . , ,i,,,-:ol e,
, s.e-s,'2 ''''' ,,:•:4
-'s,QUnM viC . a'
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
Roy Cooper
Governor
Elizabeth S. Biser
Secretary
William Vinson Jr. (Acting)
Director
08-23-2024
j i LETTER OF APPROVAL
Onsite Homes, LL
2931 Breezewoo Avenue, Suite 202
Fayetteville, NC 2 303
RE: Project ame: Seven Lakes Country Club, Windermere Section—Lot 2230
Acres Approved: 0.65
Application ID: PA-006621
Permit umber: MOORE-2025-0192
Addres : 144 Lancashire Lane
City: Mineral Springs Township
I
County: Moore
River Basin: Lumber
1
1
Stream Classification: HQW: High Quality Waters; WS-II: Water Supply II
Plan Type:New Plan
,Dear Onsite Homes, LLC,
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and
hereby issue this Letter of Approval. The Certificate of Approval must be posted at the job site. This plan approval shall
expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by
Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent
(eN01) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General
Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the
$120 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party
shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land
disturbing activity. The eNOl form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOl form
to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future,
the new responsible party must obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gi es the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with
the approved pla
North Carolina's S, dimentation Pollution Control Act is performance-oriented, requiring protection of existing natural
resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation
control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina
General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to
insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,
regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing
activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility/Ownership Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting
date for this project. Please notify us if you plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
Chris Baker, Assistant Regional Engineer
cc:
Dennis Gilbert, P. E., Moorman, Kizer& Reitzel, Inc.
Debra Ensminger, Moore County Inspections Office
;Fayetteville Regional Office
2
North Carolina Department of Environmental Quality Division of Energy. Mineral and Land Resources
Fayetteville Regional Office 225 Green Street,Suite 714 Fayetteville NC,28301-5095
910-433-3300
' I
' Einar!correspondence t-and from this address may be subject to the North Carolina Public Records Law and may be d w,losrd to third parties by an authonzed
state oft oral
1
3