Loading...
HomeMy WebLinkAboutNCC242595_Site Plan or Location Map_20240826 NA / \ LOT28 // I \ \ CAROLINE&DAVID WEIDL / I Olio �V9 P = \ \ P.B.2007,PG.293-295 / I ., �No-� I \\ Lor2s \ I 0 \ CAROLINEP. &DAVID ID 29 WEIDL 0 /, II B.M.2007,PG.293-295 _ f A. I LEGEND: \ • •/ I B.M. Book of Maps 0 Ex.Property Corner Q \ o D.B. Deed Book • (P�\v I PG. Page New 3/4"Iron Pipe \ 0 50,JEG" 00:& .. S.F. Square Feet 0 Calculated point �— — — 1 0X, 0, 00 r I AC. Acres ® Water Meter • S1RRZF PG•2g31 /I I —x— Fence —SD— Storm drain pipe ❑T Telephone Pedestal p8 p0 I I © Cable Pedestal LOCATION MAP I • I 1" = 1000' / • SITE DATA I I I LOT 25 I CLIENT/OWNER HOMESTEAD BUILDING I •/•.I� p 47,759 Sq. Feet I COMPANY I I 1.096 Acres I SITE ADDRESS 126 HARVEST LANE PARCEL ID 85806 / I I I I I DEED REFERENCE D.B.2418, PG.331 I I I II 18.5' 14.83', SUBDIVISION THE HAMPTONS,PH. 11 SEPTIC I SCRN. �, PLAT REFERENCE P.B.2007,PG.293-295 I i y / (BY OTHERS) REPAIR I II 2' PORCH 23' 15.5, 01 ZONING RA-40 I 18.13' I LOT24 I J / SCN. I LOT26 w w w BUILDING SETBACKS IMPERVIOUS AREAS(S.F.) MARYA.&STEPHENR.HOOPER I 10' / PCH 25.3' STEPHANIEKAY&JAMESLEEBROWN \ r P.B.2007,PG.293-295 I• ,I �� P.B.2007,PG.293-295 I 4' I FRONT 40' HOUSE 4405 I I / r_ PROPOSED 1 a . ' I I DWELLING — CORNER 22.5' CONCRETE 2196 I 20' I PROPOSED I r—— REAR 25' TOTAL 6601 i i j-- DWELLING r___J _ I r J 16.67' SIDE 25' rn • /I PORCH rJ \� I I N I , 30� 1 4' N • I SURVEY NOTES: I CII I /� _r 1• 63 7-4COV. 1. ALL EASEMENTS, RIGHT-OF-WAY'S, BUFFERS, SETBACKS W I � / pi O I 15.83'" "'15.83' 8' i Nr PORCH N , AND ADJOINERS, ETC., REFERENCED FROM PLAT BOOK ~O • I o 16.5' 2007,PAGES 293-295 UNLESS OTHERWISE NOTED. I 2. SURVEYOR HAS MADE NO INVESTIGATION OR A I I o HOUSE DETAIL n INDEPENDENT SEARCH FOR EASEMENTS OF RECORD, I / I I 1" — 30' ENCUMBRANCES, RESTRICTIVE COVENANTS, OWNERSHIP 8 I I r" TITLE EVIDENCE OR ANY OTHER FACTS THAT AN I m . I o ACCURATE AND CURRENT TITLE SEARCH MAY DISCLOSE. m I — — I 12' -i • _ J \\\\\\\\ N\ttCARo7 7jii� INITIAL SEPTIC ; / ' � SSlC� % (BY OTHERS) Ze^°oFe oti °°"9 QQ SEAL c" —.. — ..— . .. — .. —.._..—.. — .. _..—.. _ SHEET INDEX: El o L-3841 %v '°4i0 J� oQ\ EX.EDGE OF PAVEMENT C-01 SITE PLAN F `°°, SUR Q HARVEST LANE C-02 EROSION CONTROL PLAN Jere ,y Tayoi- 55'PUBLIC RIGHT OF WAY D 03 D 05 EROSION CONTROL DETAILS 77////mniinnm\v DEVELOPMENT PLAN REVISIONS TAYLOR DATE:A 0 BY:CM /2024 SITE PLAN T THE PURPOSE OF THIS DEVELOPMENT PLAN IS FOR THE PERMITTING DRAWN BY:CM `c LAND CONSULTANTS, PLLC ASPECT OF THE PROPOSED DWELLING. THIS IS NOT A CERTIFIED THE HAMPTONS, PHASE 3 - LOT 25 License#P-0829 BOUNDARY MAP AND SHOULD NOT BE CONSIDERED AS SUCH OR o 25 50 SHEET C-01 1600 Olive Chapel Rd.,#140 USED FOR ANY SALE. BALDWIN TOWNSHIP, CHATHAM COUNTY, NC Apex,NC 27502 (919)801-1104 SCALE: 1" =50 Z:\Projects\Homestead\Hamptons-245041Lots\Lot-25\Dwg1Hamptons-25-SitePlan.dwg CHATHAM COUNTY SAMPLE RESIDENTIAL \ \ i I\ CONSTRUCTION SEQUENCE \ \ - I ,— 1. Submit a Land Disturbing Permit Application at least 30 days prior to any land \ \ ° disturbing activity occurring. \ / \ 1110 2. Organize pre-construction meeting with Chatham County Watershed 0 \ Protection Department to review site plan prior to land disturbing activities. / Land-Disturbing Permit and Approved Plans will be provided at this meeting. \ /•• I B.M.2007,PG.292-295 3. Install all temporary erosion control measures according to the information discussed during the pre-construction meeting. Minimal clearing may occur \ — — 1 in the immediate area of all measures to provide for installation. ° ��Poe __J • 4. Permitted land disturbing activities may begin once measures are installed. \ o 0 vEG OFFER I 5. Complete self-inspections weekly and within 24 hours or a 0.5" or greater J— — -1 ,1REPMBROM 31 / 7 rainfall event. _ — I S �R�FO� pG•2g S�t�o 6. Maintain all erosion and sediment control measures in good workingorder. — — 0 Silt fence, inlet protection and other similar measures must be cleaed out I I j P. Ft�O� / I when they are half full.Clogged silt fence outlets must be refreshed/replaced. I B fence cannot have holes or tears. I /�SFt� ,- Silt I 7. Ground cover shall be provided as follows: I J— •' S� i ---- i LOT 25 1� a. Stabilize basins with ground cover immediately after installation. (If t r„ applicable) I • 47,759 Sq. Feet T b. Stabilize diversion ditches intended to be in service for (14) days or I 1.096 Acres o I more with temporary seeding and erosion control matting.(If applicable) .• •TT -- ,- I c. For all areas of moderate and/or steep slopes, stabilize area with seed I V _- „ and matting if the slope has not been disturbed for a period of(7)days. I ,- zz d. Provide ground cover sufficient to restrain erosion on any portion of the 400' 0 0 site upon which further land-disturbing activity is not being undertaken T within(14)calendar days of temporarily or permanently suspending land I I o ���SEPTIC REPAIR ,- ` -- - \ disturbing activity. •r (BY OTHE_RSr- 6__ I e. Establish permanent ground cover sufficient to restrain erosion I / I / i I immediately following completion of construction or development and/or prior to final inspection. f 10 I . __ -J - i I 41 9. Re-install adequate erosion and sediment control measures and/or increase maintenance frequency where approved measures fail to prevent accelerated I I /�. - ---- - v . Iterosion,off-site sedimentation,or repetitive non-compliance issues. I r 10.Measures must be installed at the back of curb to restrict all vehicle access to I 20' . - �� I _- r„ the construction entrance.All measures must be installed according to the j / o approved plan unless approved in the field by Chatham County Watershed I I r ' r r Protection Department staff(approved Field Revision). I i 11.Modifications to the approved and permitted plans shall be approved, by I o , . %� - I ' cn Chatham County Watershed Protection Department staff only, prior to • I �o I /ADO- removal or installation. Contact Chatham County Watershed Protection co , i �� ' , f o Department staff to request an inspection and obtain a sign-off on the plans or an approved Field Revision. I y y / / i 12.Once grading and construction activities are complete,temporary measures I T • LOT GRADES WILL CONFORM TO are removed, and the site is stabilized call Chatham County Watershed I o Protection Division staff to schedule the final inspection. o / i EXISTING TOPOGRAPHY. I I 13. Once the final inspection is complete the permit will be closed and no / z . ./ additional ground disturbing activities can occur. I I T IMMEDIATELY FOLLOWING CULVERT • TOTAL DISTURBED AREA = ±37,828 S.F. m . �i / o INSTALLATION,ENTRANCE TO BE l• m STABILIZED WITH TEMPORARY SEED AND EROSION CONTROL MATTING • ALL UTILITIES TO BE ENCOMPASSED BY (/ T ALL BURIED POWER,PHONE, L.O.D. INITIAL SEPTIC ' I p TELECOM AND OTHER UTILITIES \ (BY OTHERS) I tl SHALL BE LOCATED WITHIN \ I 0 CONCRETE WASHOUT LIMITS OF DISTURBANCE EROSION CONTROL LEGEND ' ®v \ PROP.15"RCP - i_ \ (±20 L.F.) EXISTING CONTOURS LDLDLDLP LD J __ LD LIMITS OF DISTURBANCE EX.EDGE OF PAVEMENT HARVEST LANE SF/LID SILT FENCE OUM ET OF DISTURBANCE TEMPORARY RESIDENTIAL 55'PUBLIC RIGHT OF WAY CONSTRUCTION ENTRANCE — DRAINAGE DIRECTION (12'x 50') WATTLE DEVELOPMENT PLAN REVISIONS DATE: 1 re TAYLOR DRAWN6BY:CM 4 EROSION CONTROL isurLAND CONSULTANTS, PLLC THE HAMPTONS, PHASE 3 - LOT 25 — PLAN License#P-0829 BALDWIN TOWNSHIP, CHATHAM COUNTY, NC 0 25 50 SHEET C-02 1600 Olive Chapel Rd.,#140 Apex,NC 27502 (919)801-1104 SCALE: 1" =50 Z:1Projects\Homestead1Hamptons-245041LotslLot-251Dwg1Hamptons-25-SitePlan.dwg