Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8200818_Historical File_20210420
aO' 1 die+ems ;, ROY COOPER Governorto' DIONNE DELLI-GATTI Secretary *� "` ` BRIAN WRENN NORTH CAROLINA Director EnviretrmentalQua►ity April 20,2021 Live Oak NC,LLC Attn:.Dean Scarafoni,Manager 5 Allen Avenue Manchester,MA 01944 Subject: State Stormwater Management Permit No.SW8 200818 Crossroads at Carolina Shores High Density Subdivision Project Brunswick County Dear Mr. Scarafoni: The Wilmington Regional Office received a complete State Stormwater Management Permit Application for the subject project on August 31, 2020 with final additional information received on April 12,2021. Staff review of the plans and specifications has determined that the project,as proposed, complies with the Stormwater Regulations set forth in Title 15A NCAC 02H.1000 amended on January 1,2017(2017 Rules). We are hereby forwarding Permit No. SW8 200818 dated April 20,2021,for the construction of the built-upon areas(BUA)and stormwater control measures(SCMs)associated with the subject project. This permit shall be effective from the date of issuance until April 20,2029 and the project shall be subject to the conditions and limitations as specified therein and does not supers any other agency permit that may be required. Failure to comply with these requirements will result in futureue compliance problems.Please note that this permit is not transferable except after notice to and approval by the Division. This cover letter,attachments,and all documents on file with DEMLR shall be considered part of this permit and is herein incorporated by reference. If any parts,requirements,or limitations contained in this permit are nninceptable,you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings(OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty(30)days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee(if a filing fee is required)and/or the details of the filing process at 6714 Mail Service Center, Raleigh,NC 27699-6714,or via telephone at 919-431-3000,or visit their website at www.NCOAH.com.Unless such demands are made this permit shall be final and binding. If you have any questions concerning this permit,please contact Steve Pusey in the Wilmington Regional Office, at(910)796-7215 or steven.pusey@ncdenr.gov. Sincerely, al;1.131. , 4.1.-Q .gQ Brian Wrenn,Director Division of Energy,Mineral and Land Resources Enclosures: Attachment A—Designer's Certification Form Attachment B—Built-Upon Area Allocation Application Documents DES/sgp: \1\Stormwater\Permits&Proj.ects12020\200818 HD12021 04 permit 200818 cc: Gary S.Pape,PE—GSP Consulting,PLLC Brunswick County Engineering Department NCDOT District Engineer Wilmington Regional Office Stormwater File E .. North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington,North Carolina 28405 _93 , raoasa aesinum n..m.cora .,..mrwar 910.796.7215 State Stormwater Management Permit No. SWB 200818 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY SUBDIVISION DEVELOPMENT In compliance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations promulgated and adopted by the North Carolina Environmental Management Commission, including 15A NCAC 02H.1000 amended on January 1, 2017 (2017 Rules) (the "stormwater rules"), PERMISSION IS HEREBY GRANTED TO Live Oak NC, LLC Crossroads at Carolina Shores Intersection of US Hwy 17& Calabash Road, Brunswick County FOR THE construction, management, operation and maintenance of built-upon area (BUA) draining to one (1) wet detention pond ("stormwater control measures" or"SCMs") as outlined in the application, approved stormwater management plans, supplement, calculations, operation and maintenance agreement, recorded documents, specifications, and other supporting data (the "approved plans and specifications") as attached and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or"DEMLR"). The project shall be constructed, operated, and maintained in accordance with these approved plans and specifications. The approved plans and specifications are incorporated by reference and are enforceable part of this permit. This permit shall be effective from the date of issuance until April 20, 2029 and shall be subject to the following specified conditions and limitations. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any condition. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking, and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. 1. BUA REQUIREMENTS. The maximum amount of BUA allowed for the entire project is 115,700 square feet. The runoff from all BUA within the permitted drainage area of this project must be directed into the permitted SCM. The BUA requirements and allocations for this project are as follows: a. SCM BUA LIMITS. The SCM has been designed using the runoff treatment method to handle the runoff from 115,700 square feet of BUA within the delineated drainage area for the existing CVS Pharmacy, "Outparcel # 1", and onsite roads and driveways. This permit dues riot provide any allocation of BUA for future development within the delineated drainage area(s). This permit approves some onsite drainage area without BUA on Lot numbers 2, 3, 4, and 5 to bypass the system. Prior to development of these lots, separate offsite permits must be obtained for them, and a permit modification will be required for this "master" permit. Page 1 of 6 State Stormwater Management Permit No. SW8 200818 b. BUA FOR INDIVIDUAL LOTS. The CVS Pharmacy lot, "Outparcel #1", and Lot#s 2, 3, 4, and 5 are limited to a maximum amount of BUA as indicated in Attachment B of this permit and as indicated in the approved plans and specifications. The maximum BUA assigned to each lot via this permit and the recorded deed restrictions and protective covenants may not be increased or decreased by either the individual lot owner or the permittee unless and until the permittee notifies the Division and obtains written approval from the Division. 2. PERVIOUS AREA IMPROVEMENTS. At this time, none of the pervious area improvements listed in G.S. 143-214.7(b2) or the Stormwater Design Manual have been proposed for this project. Pervious area improvements will be allowed in this project if documentation is provided demonstrating those improvements meet the requirements of the stormwater rule. 3. OFFSITE LOT REQUIREMENTS. Each non-residential lot whose ownership is not retained by the permittee shall submit a separate off-site stormwater permit application to the Division and receive approval prior to construction. Prior to the discharge of stormwater runoff from any lot into the approved stormwater system, the permittee shall ensure that the owner of the non- residential lot has obtained the separate off-site stormwater management permit. 4. SCM REQUIREMENTS. The SCM requirements for this project are as follows: a. SCM DESIGN. The SCM is permitted based on the design criteria presented in the sealed, signed and dated supplement and as shown in the approved plans and specifications. This SCM must be provided and maintained at the design condition. b. PLANTING PLAN. The SCM landscape planting plan shown in the approved plans shall be followed in its entirety during construction. After the plants are established, the operation and maintenance agreement must be followed. c. FOUNTAINS. At this time, a decorative spray fountain has not been proposed within the wet pond. Decorative spray fountains will be allowed in the wet pond if documentation is provided demonstrating that the proposed fountain will not cause resuspension of sediment within the pond or cause erosion of the pond side slopes. d. IRRIGATION. If the wet pond is to be used for irrigation, it is recommended that some water be maintained in the permanent pool, the vegetated shelf is planted with appropriate species that can handle fluctuating conditions, and human health issues are addressed. e. PRETREATMENT. The following pretreatment device(s) has (have) been provided to prevent clogging: grassed swales, forebays for pretreatment. 5. STORMWATER OUTLETS. The peak flow from the 10-year storm event shall not cause erosion downslope of the discharge point. 6. VEGETATED SETBACKS. A 50-foot wide vegetative setback must be provided and maintained in grass or other vegetation adjacent to all surface waters as shown on the approved plans. The setback is measured horizontally from the normal pool elevation of impounded structures, from the top of bank of each side of streams or rivers, and from the mean high waterline of tidal waters, perpendicular to the shoreline. a. BUA IN THE VEGETATED SETBACK. BUA may not be added to the vegetated setback except as shown on the approved plans. b. RELEASE OF STORMWATER NOT TREATED IN AN SCM. Stormwater that is not treated in an SCM must be released at the edge of the vegetated setback and allowed to flow through the setback as dispersed flow. 7. RECORDED DOCUMENT REQUIREMENTS. The stormwater rules require the following documents to be recorded with the Office of the Register of Deeds prior to the sale of individual lots or groups of lots: Page 2 of 6 State Stormwater Management Permit No. SW8 200818 a. ACCESS AND/OR EASEMENTS. The entire stormwater conveyance system, including any SCMs, and maintenance accesses must be located in public rights-of-way, dedicated common areas that extend to the nearest public right-of-way, and/or permanent recorded easements that extend to the nearest public right-of-way for the purpose of inspection, operation, maintenance, and repair. b. OPERATION AND MAINTENANCE AGREEMENT. The operation and maintenance agreement must be recorded with the Office of the Register of Deeds. c. FINAL PLATS. The final recorded plats must reference the operation and maintenance agreement and must also show all public rights-of-way, dedicated common areas, and/or permanent drainage easements, in accordance with the approved plans. d. DEED RESTRICTIONS AND PROTECTIVE COVENANTS. Recorded deed restrictions and protective covenants must include, at a minimum, the following statements related to stormwater management: i. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 200818, as issued by the Division of Energy, Mineral and Land Resources (the "Division") under 15A NCAC 02H.1000, effective January 1, 2017. ii. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. iii. These covenants are to run with the land and be binding on all persons and parties claiming under them. iv. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the Division. v. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division. vi. The maximum built-upon area (BUA) per lot is as shown in Attachment B. This allotted amount includes any BUA constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement not shown on the approved plans. BUA has the same meaning as G.S. 143-214.7, as amended. vii. The maximum allowable BUA shall not be exceeded on any lot until the permit is modified to ensure compliance with the stormwater rules, permit, and the approved plans and specifications. viii. All runoff from the BUA on the lot must drain into the permitted system. This may be accomplished via grading, a stormwater collection system and/or a vegetated conveyance. ix. A 50-foot wide vegetative setback must be provided and maintained adjacent to all surface waters in accordance with 15A NCAC 02H.1003(4) and the approved plans. x. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143, Article 21. xi. Each non-residential lot within the subdivision whose ownership is not retained by the permittee, must apply for and receive a separate offsite stormwater management permit from the Division prior to construction. xii. If permeable pavement BUA credit is requested, the property owner must submit a request, with supporting documentation, to the permittee and receive approval prior to construction. e. DEEDS FOR INDIVIDUAL LOTS. The permittee shall record deed restrictions and protective covenants prior to the issuance of a certificate of occupancy to ensure the permit conditions and the approved plans and specifications are maintained in perpetuity. Page 3 of 6 State Stormwater Management Permit No. SW8 200818 8. CONSTRUCTION. During construction, erosion shall be kept to a minimum and any eroded areas of the on-site stormwater system will be repaired immediately. a. PROJECT CONSTRUCTION, OPERATION AND MAINTENANCE. During construction, all operation and maintenance for the project shall follow the Erosion Control Plan requirements until the Sediment-Erosion Control devices are converted to SCMs or no longer needed. Once the device is converted to a SCM, the permittee shall provide and perform the operation and maintenance as outlined in the applicable section below. b. SCM RESTORATION. If one or more of the SCMs are used as an Erosion Control device and/or removed or destroyed during construction, it must be restored to the approved state stormwater design condition prior to close-out of the erosion control plan and/or project completion and/or transfer of the state stormwater permit. Upon restoration, a new or updated certification will be required for the SCM(s) and a copy must be submitted to the appropriate DEQ regional office. 9. MODIFICATIONS. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. c. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material within the common areas to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. 10. DESIGNER'S CERTIFICATION. Upon completion of the project, the permittee shall determine if the project is in compliance with the approved plans and take the necessary following actions: a. If the permittee determines that the project is in compliance with the approved plans, then within 45 days of completion, the permittee shall submit to the Division one hard copy and one electronic copy of the following: i. The completed and signed Designer's Certification provided in Attachment A noting any deviations from the approved plans and specifications. Deviations may require approval from the Division; ii. A copy of the recorded operation and maintenance agreement; iii. Unless already provided, a copy of the recorded deed restrictions and protective covenants; and iv. A copy of the recorded plat delineating the public rights-of-way, dedicated common areas and/or permanent recorded easements, when applicable. b. If the permittee determines that the project is not in compliance with the approved plans, the permittee shall submit an application to modify the permit within 30 days of completion of the project or provide a plan of action, with a timeline, to bring the site into compliance. 11. OPERATION AND MAINTENANCE. The permittee shall provide and perform the operation and maintenance necessary, as listed in the signed operation and maintenance agreement, to assure that all components of the permitted on-site stormwater system are maintained at the approved design condition. The approved operation and maintenance agreement must be followed in its entirety and maintenance must occur at the scheduled intervals. Page 4 of 6 State Stormwater Management Permit No. SW8 200818 a. CORRECTIVE ACTIONS REQUIRED. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by the Division and the stormwater rules such as the construction of additional or replacement on- site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. b. MAINTENANCE RECORDS. Records of maintenance activities must be kept and made available upon request to authorized personnel of the Division. The records will indicate the date, activity, name of person performing the work and what actions were taken. 12. PERMIT RENEWAL. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(3). 13. CURRENT PERMITTEE NAME OR ADDRESS CHANGES. The permittee shall submit a completed Permit Information Update Application Form to the Division within 30 days to making any one or more of the following changes: a. A name change of the current permittee; b. A name change of the project; c. A mailing address change of the permittee. 14. TRANSFER. This permit is not transferable to any person or entity except after notice to and approval by the Director. Neither the sale of the project and/or property, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. a. TRANSFER REQUEST. The transfer request must include the appropriate application, documentation and the processing fee as outlined in 15A NCAC 02H.1045(2) and must be submitted upon occurrence of any one or more of the following events: i. The sale or conveyance of the project and/or property area in whole or in part, except in the case of an individual residential lot sale that is made subject to the recorded deed restrictions and protective covenants; ii. The assignment of declarant rights to another individual or entity; iii. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of NCGS 143-214.7(c2); iv. Dissolution of the partnership, corporate, or LLC entity, subject to NCGS 55-14-05 or NCGS 57D-6-07 and 08; v. Bankruptcy; vi. Foreclosure, subject to the requirements of Session Law 2013-121; b. TRANSFER INSPECTION. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on-site stormwater system complies with the permit conditions. Records of maintenance activities performed to date may be requested. Projects not in compliance with the permit will not be transferred until all permit and/or general statute conditions are met. 15. COMPLIANCE. The permittee is responsible for complying with the terms and conditions of this permit and the approved plans and specifications until the Division approves the transfer request. Page 5 of 6 State Stormwater Management Permit No. SW8 200818 a. REVIEWING AND MONITORING EACH LOT FOR COMPLIANCE. The permittee is responsible for verifying that the proposed BUA on each individual lot, within each drainage area and for the entire project does not exceed the maximum amount allowed by this permit. The permittee shall review all individual lot plans for new construction and all subsequent modifications and additions for compliance. The plans reviewed must include all proposed BUA, grading, and driveway pipe placement. The permittee shall not approve any lot plans where the maximum allowed BUA limit has been exceeded or where modifications are proposed to the grading and/or to the stormwater collection system and/or to the vegetated conveyance unless and until a permit modification has been approved by the Division. The permittee shall review and routinely monitor the project and each lot to ensure continued compliance with the conditions of the permit, the approved plans and specifications, and the recorded deed restrictions and protective covenants. The permittee shall notify any lot owner that is found to be in noncompliance with the conditions of this permit in writing and shall require timely resolution. b. ARCHITECTURAL REVIEW BOARD (ARB) OR COMMITTEE (ARC). The permittee may establish an ARB or ARC to conduct individual lot reviews. However, any approval given by the ARB or ARC on behalf of the permittee does not relieve the permittee of the responsibility to maintain compliance with the conditions of the permit and the approved plans and specifications. c. APPROVED PLANS AND SPECIFICATIONS. A copy of this permit, approved plans, application, supplement, operation and maintenance agreement, all applicable recorded documents, and specifications shall be maintained on file by the permittee at all times. d. DIVISION ACCESS. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. e. ENFORCEMENT. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. f. OBTAINING COMPLIANCE. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of modified plans and certification in writing to the Director that the changes have been made. g. OTHER PERMITS. The issuance of this permit does not preclude the permittee from obtaining and complying with any and all other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which are imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. Permit issued this the 20th day of April 2021. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION C1414atiA;4 4 Brian Wrenn, Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW8 200818 Page 6 of 6 State Stormwater Management Permit No. SW8 200818 Attachment A Certification Forms The following blank Designer Certification forms are included and specific for this project: • As-Built Permittee Certification • As-Built Designer's Certification General MDC • As-Built Designer's Certification for Wet Detention Pond Project A separate certification is required for each SCM. These blank certification forms may be copied and used, as needed, for each SCM and/or as a partial certification to address a section or phase of the project. Page 1 of 1 State Stormwater Management Permit No. SW8 200818 AS-BUILT PERMITTEE CERTIFICATION I hereby state that I am the current permittee for the project named above, and I certify by my signature below, that the project meets the below listed Final Submittal Requirements found in NCAC 02H.1042(4) and the terms, conditions and provisions listed in the permit documents, plans and specifications on file with or provided to the Division. Check here if this is a partial certification. Section/phase/SCM #? _ Check here if this is part of a Fast Track As-built Package Submittal. Printed Name Signature , a Notary Public in the State of County of , do hereby certify that personally appeared before me this day of , 20 and acknowledge the due execution of this as-built certification. (SEAL) Witness my hand and official seal My commission expires Peer mittee s Certification NCAC .1042(4) Ca ' ed/ N/A Provided A. DEED RESTRICTIONS/BUA RECORDS 1. The deed restrictions and protective covenants have been recorded Y or N and contain the necessary language to ensure that the project is maintained consistent with the stormwater regulations and with the permit conditions. 2. A copy of the recorded deed restrictions and protective covenants Y or N has been provided to the Division. 3. Records which track the BUA on each lot are being kept. (See Note Y or N 1) B. MAINTENANCE ACCESS 1. The SCMs are accessible for inspection, maintenance and repair. Y or N 2. The access is a minimum of 10 feet wide. Y or N 3. The access extends to the nearest public right-of-way. Y or N C. EASEMENTS 1. The SCMs and the components of the runoff collection /conveyance Y or N system are located in recorded drainage easements. 2. A copy of the recorded plat(s) is provided. Y or N ®. SII 3LE FAPPLY RESIDENTIAL LOTS -Plats for resident4ots that Y or N have an SCM include the foiinwii;a: 1. The specific location of the SCM on the lot. Y or N 2. A typical detail for the SCM. Y or N 3. A note that the SCM is required to meet stormwater regulations and that the lot owner is subject to enforcement action as set forth in Y or N NCGS 143 Article 21 if the SCM is removed, relocated or altered without prior approval. E. OPERATION AND MAINTENANCE AGREEMENT Y or N 1. The O&M Agreement is referenced on the final recorded plat. Y or N 2. The O&M Agreement is recorded with the Register of Deeds and Y or N appears in the chain of title. F. OPEK4 OJ AND MAINTENANCE PLAN — mdir ienarie records tire being kept in a known set location for each SCM and are available for Y or N Page 1 of 6 State Stormwater Management Permit No. SW8 200818 G. OIESIGNER'S CERTIFICATKIN F iRIA tas been provided to the Y or Cikfi ion. Note 1-Acceptable records include ARC approvals, as-built surveys, and county tax records. Provide an explanation for every requirement that was not met, and for every "N/A" below. Attach additional sheets as needed. Page 2 of 6 State Stormwater Management Permit No. SW8 200818 AS-BUILT DESIGNER'S CERTIFICATION GENERAL MDC I hereby state that I am a licensed professional and I certify by my signature and seal below, that I have observed the construction of the project named above to the best of my abilities with all due care and diligence, and that the project meets the below listed General MDC found in NCAC 02H.1050 in accordance with the permit documents, plans and specifications on file with or provided to the Division, except as noted on the "AS-BUILT" drawings, such that the intent of the storrnwater rules and statutes has been preserved. Check here if this is a partial certification. Section/phase/SCM #? _ Check here if this is a part of a Fast-Track As-Built Package Submittal per .1044(3). _ Check here if the designer did not observe the construction, but is certifying the project. Check here if pictures of the SCM are provided. Printed Name Signature NC Registration Number Date Consultant's Mailing Address: SEAL: City/State/ZIP Phone Number Consultant's Email address: iD Circle N if the as-built value differs from the Plan. If N is circled, provide an explanation on Page 2. ON/E = not evaluated (provide explanation on page 2) ©N/A= not applicable to this SCM or project. 7—C nnit nt's Certification NCAC .1003{03) &General "ADC ©As-bunt ©N/E I JN/A .1050 A. TREATMENT REQUIREMENTS 1. The SCM achieves runoff treatment. Y or N 2. The SCM achieves runoff volume match. Y or N 3. Runoff from offsite areas and/or existing BUA is Y or N bypassed. 4. Runoff from offsite areas and/or existing BUA is directed Y or N into the permitted SCM and is accounted for at the full build-out potential. 5. The project controls runoff through an offsite permitted Y or N SCM that meets the requirements of the MDC. 6. The net area of new BUA increase for an existing project Y or N has been accounted for at the appropriate design storm level. 7. The SCM(s) meets all the specific minimum design Y or N criteria. B. VEGETATED SETBACKS/BUA 1. The width of the vegetated setback has been measured Y or N from the normal pool of impounded waters, the MHW line of tidal waters, or the top of bank of each side of rivers or streams. 2. The vegetated setback is maintained in grass or other Y or N vegetation. 3. BUA that meets the requirements of NCGS 143-214.7 Y or N (b2)(2) is located in the setback. Page 3 of 6 State Stormwater Management Permit No. SW8 200818 4. BUA that does not meet the requirements of NCGS 143- Y or N 214.7 (b2)(2) is located within the setback and is limited to: a. Publicly funded linear projects (road, greenway sidewalk) b. Water-dependent structures c. Minimal footprint uses (utility poles, signs, security lighting and appurtenances) 5. Stormwater that is not treated in an SCM is released at Y or N the edge of the setback and allowed to flow through the setback as dispersed flow. i �IJA -bunt ci)N/ ON/A C. STNalIWATER OUTLETS—the outlet handles the peak Y or N low from the 10 year storm with no downslope erosion. D. VARIATIONS 1. A variation (alternative) from the stormwater rule Y or N provisions has been implemented. 2_ The variation provides equal or better stormwater control Y or N and a ual or better protection of surface waters. E. COMPLIANCE r TFH OTTER REGULATORY PROGRAMS Y or N has been met. F. WING-the volume of the,SCM takes the runoff from surfaces into account and is sufficient to lundle the required Y or N storm depth. _ G. CONTA INATEbtbO1LS—infiltratihg SCIM's are not Y or N located in or on areas with contaminated sow. H. SIDE ELOPES } 1. Vegetated side slopes are no steeper than 3H:1 V. Y or N 2. Side slopes include retaining walls, gabion walls, or Y or N other surfaces that are steeper than 3H:1 V. 3. Vegetated side slopes are steeper than 3H:1 V(provide Y or N supporting documents for soils and vegetation). I. EROSION PROTECTION 1. The inlets do not cause erosion in the SCM. Y or N 2. The outlet does not cause erosion downslope of the Y or N discharge point during the peak flow from the 10 year storm. J. EXCESS FL( S-An oveMov;; bypass has been provided. Y or N K. DE WATERING—A method to drawdown standing water has Y or N been provided to facilitate maintenance and ins ction. L CLEANC JT AFTER CONDUCTION —the SCM has been t Y or N cleaned out and converted to its approved design state.. M. MAINTENANCE ACCESS I 1. The SCM is accessible for maintenance and repair. Y or N 2. The access does not include lateral or incline slopes Y or N >3:1. N. t ESIGNER OUAUP NS (FAST-TRACK .4E — The designer is licensed under Chapters 89A, 89C, 69E. or Y or N 89F of the Genera! Statue. Provide an explanation for every MDC that was not met, and for every item marked "N/A" or"N/E", below. Attach additional pages as needed: Page 4 of 6 State Stormwater Management Permit No. SW8 200818 AS-BUILT DESIGNER'S CERTIFICATION FOR WET DETENTION POND PROJECT I hereby state that I am a licensed professional and I certify by my signature and seal below, that I have observed the construction of the project named above to the best of my abilities with all due care and diligence, and that the project meets all of the MDC found in NCAC 02H.1053, in accordance with the permit documents, plans and specifications on file with or provided to the Division, except as noted on the "AS-BUILT" drawings, such that the intent of the stormwater rules and the general statutes has been preserved. Check here if this is a partial certification. Section/phase/SCM #? _ Check here if this is part of a Fast-Track As-Built Package Submittal per .1044(3). _ Check here if the Designer did not observe the construction, but is certifying the project. Check here if pictures of the SCM are provided. Printed Name Signature NC Registration Number Date Consultant's Mailing Address: SEAL: City/State/ZIP Phone Number Consultant's Email address: O Circle N if the as-built value differs from the Plan/permit. If N is circled, provide an explanation on page 2 ©N/E = not evaluated (provide explanation on page 2) OO N/A= not applicable to this project or SCM. This Certification must be completed in conjunction with the General MDC certification under NCAC 02H.1050 C��ee iufta et (MDC .1053) ©As-buit ; v N:E GMVA A. Forebay/Depths/Fob"' 1. The available Sediment storage is consistent with the Y or N approved plan and is a minimum of 6 in. 2. Water flow over the forebay berm into the main pond Y or N occurs at a non-erosive velocity. 3. The provided Forebay Volume is 15%-20% of the main Y or N pool volume. 4. The Forebay entrance elevation is deeper than the exit Y or N elevation into the pond. 5. The Average Design Depth of the main pond below the permanent pool elevation is consistent with the permitted Y or N value? 6. Fountain documentation is provided. Y or N B. Side slopes/Banks I Vegetated Shelf 1. The width of the Vegetated Shelf is consistent with the Y or N approved plans and is a minimum of 6 feet. 2. The slope of the Vegetated Shelf is consistent with the Y or N approved plans and is no steeper than 6:1. w C. As-built Tain Fool I Area's i!ioiurnes/Elevations 1. The permanent pool surface area provided is consistent Y or N with the permitted value. 2. The Temporary Pool Volume provided is consistent with Y or N the permitted value. Page 5 of 6 State Stormwater Management Permit No. SW8 200818 3. The permanent pool elevation is consistent with the Y or N permitted value. 4. The temporary pool elevation is consistent with the Y or N permitted value. CDAs-but N1F D. +Outlet t i Dr wdow Y. inletsi Wawa i at��a�w�rn 1. The design volume draws down in 2-5 days. Y or N 2. The size of the Orifice is consistent with the permitted Y or N value. 3. A trash rack is provided on the outlet structure. Y or N 4. Hydrologic impacts to the receiving channel are minimized Y or N from the 1 yr 24 hr storm discharge? 5. The inlets and the outlet location are situated per the Y or N approved plan and avoid short-circuiting. E. Vegetation 1. The vegetated shelf has been planted with a minimum of 3 Y or N diverse species. 2. The vegetated shelf plant density is consistent with the approved plans and is no less than 50 plants per 200 sf or Y or N no less than 24 inches on center. Provide an explanation for every MDC that was not met, and for every item marked "N/A" or"N/E" below. Attach additional pages as needed: Page 6 of 6 State Stormwater Management Permit No. SW8 200818 Attachment B Built-upon Area (BUA)Allocations Crossroads at Carolina Shores Permit No. SW8 200818 Lot# Offsite Offsite Drains from Date Allocated Proposed Permit Project to Pond Master No Issued Name # BUA BUA Permit CVS This 4/20/2021 NA 1 55268 55268 Pharmacy permit This 1 4/20/2021 NA 1 28202 28202 permit 2 TBD 3 TBD 4 TBD 5 TBD TBD = To be determined Page 1 of 1 ____ Operation & Maintenance A.-reement Project Name: Crossroads at Carolina Shores Project Location: Intersection of US Hwy 17 &Calabash Road �. Cove r am P .._ -.�. Maintenance records shall be kept on the following BMP(s). This maintenance record shall be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected,repaired,or replaced Immediately. These deficiencies can affect the integrity of structures,safety of the public,and the pollutant removal efficiency of the BMP(s). The BMP(s)on this project include(check all that apply&corresponding O&M tables will be added automatically): Infiltration Basin Quantity: Location(s): I Infiltration Trench Quantity: Location(s): Bioretention Cell Quantity: Location(s): Wet Pond Quantity: 1 Location(s): Eastern Side of Site Stormwater Wetland Quantity: Location(s): Permeable Pavement Quantity: Location(s): Sand Filter Quantity: Location(s): Rainwater Harvesting Quantity: Location(s): Green Roof Quantity: Location(s): Level Spreader-Filter Strip Quantity: Location(s): Proprietary System Quantity: Location(s): Treatment Swale Quantity: Location(s): Dry Pond Quantity: - Location(s): Disconnected Impervious Surface Present: No_ Location(s): User Defined SCM Present: No Location(s): Low Density Present: No I nrafinnkl• I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each BMP above,and attached O&M tables. I agree to notify NCDENR of any problems with the system or prior to any changes to the system or responsible party. *Responsible Party: Dean Scarafoni Title&Organization: Manager-Live Oak NC,LLC Street address: 5 •Ilen Avenue Cit ate,zi, a chester,MA 01944 Phon ber( : 91 538-5855 0 Err:il: • -anscarafoni@comcast.net Signature: 1 / Virl Date: 5-—.ids'^ ® I, Garry S. ape ,a Notary Public for the State of North Carolina County of ew Hanover �_y�, ,do hearby rtify tha Dean Scarafoni personally appeared before me this '5";/ day of 3 47. and acknowledge the due execution of the •perations an. ,:intenance Agreement. Witness my hgRO cial seal, _1 i . eT�ee. ti, .Ltd "i• n 40. ..) Seal . • - ," My commission expires: April 13,2025 1,.,c,ep d, St ^, f AUG 3 I4 1 , BY Wet Detention Pond Maintenance i equ rements The wet detention basin system is defined as the wet detention basin,pretreatment including forebays and the vegetated filter if one is provided. Important maintenance procedures: Immediately after the wet detention basin is established,the plants on the vegetated shelf and perimeter of the basin -should be watered twice weekly if needed,until the plants become established(commonly six weeks). No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the -plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. If the basin must be drained for an emergency or to perform maintenance,the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year,a dam safety expert should inspect the embankment. After the wet detention pond is established,it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches(or 1.5 inches if In a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the BMP Areas of bare soil and/or Regrade the soil if necessary to remove the gully,and then plant a erosive gullies have formed. ground cover and water until it is established. Provide lime and a one- time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of approximately six inches. long. The Inlet device The pipe is clogged. Unclog the pipe. Dispose of the sediment off-site. _ _ , The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to smooth it over and provide erosion swale. control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and replace with clean stone. covered in sediment(if applicable). The forebay Sediment has accumulated to Search for the source of the sediment and remedy the problem if a depth greater than the possible. Remove the sediment and dispose of it in a location where it original design depth for will not cause impacts to streams or the BMP. sediment storage. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or jprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds,preferably by hand. If pesticide is used,wipe it on the plants rather than spraying. _ The vegetated shelf Best professional practices Prune according to best professional practices show that pruning is needed to maintain optimal plant health. Plants are dead,diseased or Determine the source of the problem: soils,hydrology,disease,etc. dying. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds,preferably by hand. If pesticide is used,wipe it on the plants rather than spraying. AL 31Z BY Wet Detention Pond Maintenance Requirements(Continued) The main treatment area Sediment has accumulated to Search for the source of the sediment and remedy the problem if a depth greater than the possible. Remove the sediment and dispose of it in a location where it original design sediment will not cause impacts to streams or the BMP. storage depth. Algal growth covers over 50% Consult a professional to remove and control the algal growth. of the area. Cattails,phragmites or other Remove the plants by wiping them with pesticide(do not spray). invasive plants cover 50%of the basin surface. The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and consult a professional to remove beaver activity is present. beavers. A tree has started to grow on Consult a dam safety specialist to remove the tree. the embankment. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair.(if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Department of Environment and Natural damage have occurred at the Resources Regional Office. outlet. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. Wet mention Pond Design Summary ___ WET POND ID FOREBAY MAIN POND 1 Permanent Pool El. 40.0 Permanent Pool El. 40.0 Temporary Pool El: 41.25 Temporary Pool El: 41.25 Pretreatment other No Clean Out Depth: 8.0 Clean Out Depth: 3.0 than forebay? Sediment Removal El: 32.0 Sediment Removal El: 37.0 Has Veg.Filter? I No Bottom Elevation. 31.0 Bottom Elevation: 36.0 I I fi,,:e. Am',"A.A.. 1 ,......... 7.`onle"Ii. O.yv ,. AUG 3 12C2 Br DEMLR USE ONLY Date ec ived Fee Paid Permit Number 8 31 a©90 �103 5Q5 �SU- . 00893 - Applicable Rule . ❑Coastal SW 1995 ❑Coastal SW-2008 ❑Ph II-Post Construction (select all that apply) ❑Non-Coastal SW-HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑Other WQ Mgmt Plan: State of North Carolina Department of Environment and Natural Resources Division of Energy,Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name(subdivision,facility,or establishment name-should be consistent with project name on plans, specifications,letters,operation and maintenance agreements,etc.): Crossroads at Carolina Shores 2. Location of Project(street address): Intersection of US Hwy 17&Calabash Road City:Carolina Shores County:Brunswick Zip: Oil If,7 3. Directions to project(from nearest major intersection): Site is located at the ntersection of US Hwy 17&Calabash Road 4. Latitude:33°54'30"N Longitude:78°35'09"W of the main entrance to the project. II. PERMIT INFORMATION: 1.a.Specify whether project is(check one): New ['Modification ❑Renewal w/ Modification tRenewals with modifications also requires SWU-102-Renewal Application Form b.If this application is being submitted as the result of a modification to an existing permit,list the existing permit number ,its issue date(if known) ,and the status of construction: ❑Not Started DPartially Completed* ❑Completed* *provide a designer's certification 2. Specify the type of project(check one): ❑Low Density ®High Density ['Drains to an Offsite Stormwater System ['Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application,list the stormwater project number, if assigned, and the previous name of the project,if different than currently proposed, . 4.a.Additional Project Requirements(check applicable blanks;information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑LAMA Major ®Sedimentation/Erosion Control:4.12 ac of Disturbed Area DNPDES Industrial Stormwater 0404/401 Permit:Proposed Impacts b.If any of these permit have already been acquired please provide the Project Name,Project/Permit Number, issue date and the type of each permit 5. Is the project located within 5 miles of a public airport? /1 No ['Yes If yes, see S.L.2012-200,Part VI:http://portal.ncdenr.org/web/lr/rules-and-regulations Sr!"1"rota ,ft,, ill Form SWU-101 Version Oct.31,2013 Page 1 of 6 BY III. CONTACT INFORMATION 1.a.Print Applicant/Signing Official's name and title(specifically the developer,property owner,lessee, designated government official,individual,etc.who owns the project): Applicant/Organization:Live Oak NC, LLC Signing Official&Title:Dean Scarafoni-Manager b.Contact information for person listed in item la above: Street Address:5 Allen Avenue City:Manchester State:MA Zip:01944 Mailing Address(if applicable): City: State: Zip: Phone: (910 ) 538-5855 Fax: ( ) Email:deanscarafoni@comcast.net c.Please check the appropriate box.The applicant listed above is: ®The property owner(Skip to Contact Information,item 3a) ❑Lessee*(Attach a copy of the lease agreement and complete Contact Information,item 2a and 2b below) ❑Purchaser*(Attach a copy of the pending sales agreement and complete Contact Information,item 2a and 2b below) ❑Developer*(Complete Contact Information,item 2a and 2b below.) 2.a.Print Property Owner's name and title below,if you are the lessee,purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official&Title: b.Contact information for person listed in item 2a above: Street Address: City: State: Zip: Mailing Address(if applicable): City: State: Zip: Phone: ( ) Fax: ( ) Email: 3.a. (Optional)Print the name and title of another contact such as the projects construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official&Title: b.Contact information for person listed in item 3a above: Mailing Address: City: State: Zip: Phone: ( ) Fax: ( ) Email: 4. Local jurisdiction for building permits:Brunswick .... P, , 4+ tom' Point of Contact: Phone#: Form SWU-101 Version Oct. 31,2013 Page 2 of 6 IV. PROJECT INFORMATION 1. In the space provided below,briefly summarize how the stormwater runoff will be treated. The storm water for this project will be treated by a wet detention basin 2.a.If claiming vested rights,identify the supporting documents provided and the date they were approved: ❑Approval of a Site Specific Development Plan or PUD Approval Date: ❑Valid Building Permit Issued Date: ❑Other: Date: b.If claiming vested rights,identify the regulation(s)the project has been designed in accordance with: ❑Coastal SW-1995 ❑Ph II-Post Construction 3. Stormwater runoff from this project drains to the Lumber River basin. 4. Total Property Area:17.15 acres 5. Total Coastal Wetlands Area:0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area(4)-Total Coastal Wetlands Area(5)-Total Surface Water Area(6)=Total Project Area+: 17.15 acres + Total project area shall be calculated to exclude the following: the normal pool of impounded structures,the area between the banks of streams and rivers, the area below the Normal High Water(NHW)line or Mean High Water W�(MH line,and coastal wetlands landward from the NHW(or MHW>J line. The resultant project area is used to calculate overall percent built upon area(KM). Non-coastal wetlands landward of the NHW(or MHW)line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area/Total Project Area)X 100 = 15.5 % 9. How many drainage areas does the project have?1 (For high density,count 1 for each proposed engineered stormwater BMP. For low density and other projects,use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project,attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area_ Drainage Area_ Drainage Area_ Receiving Stream Name Persimmon Swamp Stream Class * 15-23-2-1 Stream Index Number* C;Sw DECEIVE": Total Drainage Area(sf) 186,232 t 11 On-site Drainage Area (sf) 72,871 FFR 1 6 2E121 I) Off-site Drainage Area(sf) 113,361 Proposed Impervious Area (sf) 115,700 BY %Impervious Area** (total) 62.1 Impervious`Surface Area Drainage Area 1 ; Drainage Area_ Drainage Area_ Drainage Area_ On-site Buildings/Lots(sf) On-site Streets (sf) On-site Parking (sf) 32,230 On-site Sidewalks (sf) Other on-site (sf) Future(sf) Off-site (sf) 83,470 Existing BUA***(sf) Total (sf): 115,700 * Stream Class and Index Number can be determined at: http://portal.ncdenr.org/web/wq/ps/csu/classifications ** Impervious area is defined as the built upon area including,but not limited to, buildings,roads,parking areas, sidewalks,gravel areas,etc. Form SWU-101 Version Oct.31,2013 Page 3 of 6 ***Report only that amount of existing BUA that will remain after development.Do not report any existing BUA that is to be removed and which will be replaced by new BUA. 11. How was the off-site impervious area listed above determined?Provide documentation.Offsite BUA is 28,202 sf for Out-Parcel#1 and 55,268 sf for the Existing CVS Store. Projects in Union County: Contact DEMLR Central Office staff to check if the project is located within a Threatened& Endangered Species watershed that may be subject to more stringent stormwater requirements as per 15A NCAC 02B.0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M)forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://portal.ncdenr.org/web/wq/ws/su/bmp-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy,Mineral and Land Resources(DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms_docs. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map at http://portal.ncdenr.org/web/wq/ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item.All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms docs. nitials 1. Original and one copy of the Stormwater Management Permit Application Form. r Qs? 2. Original and one copy of the signed and notarized Deed Restrictions&Protective Covenants ✓ Form. (if required as per Part VII below) / 3. Original of the applicable Supplement Form(s) (sealed,signed and dated)and O&M F/ agreement(s)for each BMP. 4. Permit application processing fee of$505 payable to NCDENR. (For an Express review,refer to ✓ http://www.envhelp.org/pages/onestopexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative(one to two pages)describing the stormwater treatment/management for 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the tWA receiving stream drains to class SA waters within 1/2 mile of the site boundary,include the'/z mile radius on the map. / 7. Sealed,signed and dated calculations (one copy). ✓ 8. Two sets of plans folded to 8.5"x 14" (sealed,signed,&dated),including: a. Development/Project name. �� ��� b. Engineer and firm. 0 c. Location map with named streets and NCSR numbers. d. Legend. (•'E I e. North arrow. f. Scale. g. Revision number and dates. BY: h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures,the banks of streams and rivers,the MHW or NHW line of tidal waters,and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures,the banks of streams or rivers,and the MHW(or NHW)of tidal waters. i. Dimensioned property/project boundary with bearings&distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours,proposed contours,spot elevations,finished floor elevations. 1. Details of roads,drainage features,collection systems,and stormwater control measures. m.Wetlands delineated,or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage(including off-site),drainage easements,pipe sizes,runoff calculations. o. Drainage areas delineated(included in the main set of plans,not as a separate document). Form SWU-l.01 Version Oct.31,2013 Page 4 of 6 p. Vegetated buffers(where required). 9. Copy of any applicable soils report with the associated SHWT elevations(Please identify _ALE elevations in addition to depths)as well as a map of the boring locations with the existing elevations and boring logs.Include an 8.5"x11"copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs,the report should also include the soil type,expected infiltration rate,and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO:Schedule a site visit for DEMLR to verify the SHWT prior to submittal, (910) 796-7378.) " 10. A copy of the most current property deed.Deed book:2012 Page No: 73 +� 11. For corporations and limited liability corporations(LLC):Provide documentation from the NC Secretary of State or other official documentation,which supports the titles and positions held by the persons listed in Contact Information,item 1a,2a,and/or 3a per 15A NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State,otherwise the application will be returned. http://www.secretary.state.nc.us/Corporations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions,outparcels,and future development,the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary,a table listing each lot number,lot size,and the allowable built-upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://portal.ncdenr.org/web/lr/state- stormwater-forms docs.Download the latest versions for each submittal. In the instances where the applicant is different than the property owner,it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below,the permit holder(s)certify that the recorded property restrictions and protective covenants for this project,if required,shall include all the items required in the permit and listed on the forms available on the website,that the covenants will be binding on all parties and persons claiming under them,that they will run with the land,that the required covenants cannot be changed or deleted without concurrence from the NC DEMLR,and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm(such as a consulting engineer and/or firm)so that they may provide information on your behalf for this project(such as addressing requests for additional information). Consulting Engineer:Garry S.Pape,P.E. Consulting Firm:GSP Consulting,PLLC Mailing Address:6626 Gordon Road,Unit C City:Wilmington State:NC Zip:28411 Phone: (910 ) 442-7870 Fax: (910 ) 799-6659 Email:gRape@gsp-consulting.com IX. PROPERTY OWNER AUTHORIZATION (if Contact Information,item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) ,certify that I own the property identified in this permit application,and thus give permission to (print or type name of person listed in Contact Information, item 1a) with(print or type name of organization listed in Contact Information, item 1a) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal,which indicates the party responsible for the operation and maintenance of the stormwater system. R E:....—A:7.4 44 :'4,4.- AUG 3 1 2C Li BY Form SWU-101 Version Oct.31,2013 Page 5 of 6 As the legal property owner I acknowledge,understand,and agree by my signature below,that if my designated agent(entity listed in Contact Information,item 1)dissolves their company and/or cancels or defaults on their lease agreement,or pending sale,responsibility for compliance with the DEMLR Stormwater permit reverts back to me,the property owner.As the property owner,it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days;otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to$25,000 per day,pursuant to NCGS 143-215.6. Signature: Date: I, ,a Notary Public for the State of ,County of ,do hereby certify that personally appeared before me this_day of ,and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires X. APPLICANT'S CERTIFICATION I, (print or type name of person listed in Contact Information,item la)Dean Scarafoni , certify that the information included on this permit application form is,to the best of my knowledge,correct and that the project will be co 1.truc :: conformance with the approved plans,that the required deed restrictions and protectiv ovenan. ill b: irded,and that the proposed project complies with the requirements of the applicable r water r -s un• - 5A NCAC 2H.1000 and any other applicable state stormwater requirements. Signa 41..). Date: C',2.5.--2420 I, l< + a Notary Public for the State of 41+r V' Ifki,County of Is)E.A,1 /I .a ,do hereby certify that /L'6+...+ j8 + e..-.i personally appeared before me this ay of &k , 7"'X,and .cknowledg the due execution of the application for a stormwater permit. Witness my hand and official seal, Pi ` aa, . SEAL �,OTAFt pr .( °� .2�2, kp,,,,,,,t,,.,. �` My commission expires AUG 312 BY: 1j Form SWU-101 Version Oct.31,2013 Page 6 of 6 Di: SUPPLEMENT-EZ COVER PAGE n, ( FORMS LOADED I kPROJECT INFORMATION x �-# s 1 1 Project Name Crossroads at Caro lina Shores_ —- 2 Project Area(ac) : �. _..._ 5.72 �.__.. , 1 3 Coastal Wetland Area(ac) I. 0 4 Surface Water Area(ac) 0--__.�_._._ 5 Is this project High or Low Density? I __._ . - ._ Hr9h.__.-__.. - _,_I r 6 Does this project use an off-site SCM? Yes YrrL ,CSMPUANCE WITh OZH.1003(4) 7 Width of vegetated setbacks provided(feet) N/A _ �'• 8 Will the vegetated setback remain vegetated? _ N!A _M _ ...._ _5 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? ~N/A _._^ - __ 10 Is streambank stabilization proposed on this project? N/A /NUMBER AND TYPE OF SCMs: j 11 Infiltration System 112 Bioretention Cell ; a 13 Wet Pond �__ __._ ---____--�:.----•---•- __.___— 1 14 Stormwater Wetland I 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting(RWH) _ 18 Green Roof .___-- —_.. __ .___.._.._... ._.._....:..) 19 Level Spreader-Filter Strip(LS-FS) E _......__..._- ...._. —T._....__.._.._.....1 20 Disconnected Impervious Surface(DIS) _ —_ _ _ _ 21 Treatment Swale I 22 Dry Pond _ :__,_..,._-- .._. 23 StormFilter .._..-... -..._-,_..._.__....______,_..........._.-__ __ .._ 24 Silva Cell 25 Bayfilter 26 Filterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title. _ _.. ....-._. Garry„S_Pape PE _.._., 28 Organization: f r_ GSP_Consuitingw PLLC_ 29 Street address: -, 6626-C Gordon Road i 30 City,State,Zip: Wilmington:NC 28411 - 4 31 Phone number(s): 910,442 7870_ 1 32 Email: `� — _ -gpape@gsp-consulting com z-.. Certification Statement I certify,under penalty of law that this.Supplement E Z fo ni and aI supportng information ware prepared under my direction or supervision,that the information provided in the form is.to the best of my knowledge and belief,true,accurate:and complete:and that the engineering plans: specifications,operation and maintenance agreements and other supporting information are consistent with the rnformatron.provided here. Deslaner \'IIu! 0 'os 4 9 . 11 r • Signature of D= u. ' �! ' 1ir,. : 031313 :• By, 3 tic A -r..'. .1 0 C/731.702e-.;d• Date DRAINAGE AREAS 1 Is this a high density project? Yes ...___, I2 If so,number of drainage aeas/SCMs 3_ t 3 Does this pipject have low density areas? ' �No^ _ '/�_4 If so,number of low density drainage areas i 0 i i S Is all/part of this project subject to previous rule _` N , , versions.? !.._.._._.....:_-.._-._._..r.-..r FORMS LOADED DRAINAGE AREA INFORMATION 4 3 Entire Site , 1 2 3 -71Trp ;_.1C - -----------'—'1"— f - wa—_� :^ ' 9—WiIle t Pond ._ On S'rNeP ''ExsTng CVi O=uP1; er.#1- S Total drainage area(sq ft) 186232 72871 71151 42210 ; 6 Onsite drainage area(sq ft) 72871 F 72871 is 7 Offsite drainage area(sq ft) 1-. -_ ___ r 1133fi? 71151 422rQ a 8 Total BUA in project(sq ft)_ 115700 sf 32230 sf 55268sf • 28202 sf _r New BUA on subdivided lots(subject to permitting) i 9 s ft 32230 sf 32230 sf , 10 New BUA not on subdivided lots(subject to _ ^— Pi y,_ permitting)(sf) C 11 Offsite BUA(sq ft) 83470 sf 55268 sf 28202 sf� [ 12 Breakdown of new BUA not on subdivided lots: Total On Site Existing CVS Out Parcel#1 !! 1 Parking(sq ft) 1 92809 sf 32230 sf 38631 sf 21948 sf Sidewalk(sq ft) _ - 6724 sf W 4 2863 sf � 3862 sf Roof(sq ft) 1616ti_sf� _ P_.._ wF 13774 sf i 2392 sf i 111 -Roadway(sq ft) ; _. -Future(sq ft) _.._._..._w_)_..._.. ..__._... m ...� ...y -Other,please specify in the comment box below(sq ft) New infiltrating permeable pavement on 13 subdivided lots(sq ft) 14 New infiltrating permeable pavement not on subdivided lots(sq ft) 15 Existing BUA that will remain(not subject to permitting) sq ft) dy ted 17 Exi t ng BUA( U(A that will bea emov dt(sg ft)4 ft) ..._ { r... 55268 sf 1, 18 Percent BUA .• 82% 44% 78% 67% 19 Design storm(inches) ._ 1.5 in 1.5 in y_ i 5 in 15 in 20 Design volume of SCM(cu ft) 14180 cf 21 Calculation method for design volume : A DA ADDITIONAL INFORMATION F ��• Please use this space to provide any additional information about the 22 drains a aea(s The drainage areas are broken up for the Total going to the Wet Pond.the on" site drive aisles:the Existing CVS that was permitted with SW8070824 and •' YOut-Parcel#1. h BY: WET POND } ` '11 Drainage area number L _` _i_ [. 2 Minimum required treatmentRvolu�me(Cu ft i 14180 cf t�E �D4 Fitl UZ�t0.50_ _ .a..�x�.c.-y _. .. ._:r.-a-�-o.ars�.nr•-.y�zas> .rkry+v 3 Is the SCM sized to treat the SW from all surfaces at build-out? ! Yes i 4 Is the SCM located away from contaminated soils? I Yes i 5 What are the side slopes of the SCM(H:V)? 3:f ,; 6 Does the SCM have retaining walls,gabion walls or other engineered No 1 i side slopes? I 7 Are the inlets,outlets,and receiving stream protected from erosion "Yes E (10-year storm)? 4. . I; Is there an overflow or bypass for inflow volume in excess of the t. 8 design volume? Yes 9 What is the method for dewatering the SCM for maintenance? Pump(preferred) ,: 10 If applicable,will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC(8)? Yes 12 Does the drainage easement comply with General MDC(9)? Yes r 13 If the SCM is on a single family lot,does(will?)the plat comply with L N/A General MDC(10)? •) ...._ ._...:._.._ ,_.__ 7 14 Is there an O&M Agreement that complies with General MDC(11)? 1 Yes' s 15 Is there an O&M Plan that complies with General MDC(12)? _ Yes S 16lDoes the SCM follow the device specific MDC? Yes j 17 Was the SCM designed by an NC licensed professional? Yesue.. i 18 Sizing method used • SA/DA_ 19 Has a stage/storage table been provided in the calculations? _Yes Elevation of the excavated main pool depth(bottom of sediment 20 31.00 is removal)(fmsl) 21 Elevation of the main pool bottom(top of sediment removal)(fmsl) 32.00 22 Elevation of the bottom of the vegetated shelf(fmsl) ; 39.50 235Elevation of the permanent pool(fmsl) r 40.00 ^;a 24 Elevation of the top of the vegetated shelf(fmsl) _ 40.50 _ j 1 25 Elevation of the temporary pool(fmsl) i 41.25 26 Surface area of the main permanent pool(square feet) 7088 }27 Volume of the main permanent pool(cubic feet) r 23002 cf 28 Average depth of the main pool(feet) i 3.97 ft 29 Average depth equation used Equation.3 .11 30 If using equation 3,main pool perimeter(feet) 472.0 ft 31 If using equation 3,width of submerged veg.shelf(feet) 3,0 ft• !. 32 Volume of the forebay(cubic feet) 3445 cf V. 33 Is this 15-20%of the volume in the main pool? Yes 34 Clean-out depth for forebay(inches) 36 in — 35 Design volume of SCM(cu ft) 14394 cf .40 36 Is the outlet an orifice or a weir? Orifice 37 If orifice,orifice diameter(inches) 2 in 4 38 If weir,weir height(inches) 39 If weir,weir length(inches) 40 Drawdown time for the temporary pool(days) 2.46 6 Are the inlet(s)and outlet located in a manner that avoids short- ii 41 Yes circuiting? I 42 Are berms or baffles provided to improve the flow path? No �43 Depth of forebay at entrance(inches) 36 in '< f44 Depth of forebay at exit(inches) l _24 in 45 Does water flow out of the forebay in a non-erosive manner? _ Yes_ _ 46 Width of the vegetated shelf(feet) 6 ft 47 Slope of vegetated shelf(H:V) 6 1 ^� Does the orifice drawdown from below the top surface of the E 48 permanent pool? Yes , 49 Does the pond minimize impacts to the receiving channel from the 1- , Yes yr,24-hr storm? 1—50 Are fountains proposed?(If Y,please provide documentation that ! No •v I MDC(9)is met.) -4 51 Is a trash rack or other device provided to protect the outlet system? Yes 1 52 Are the dam and embankment planted in non-clumping turf grass? Yes I .. i 53 Species of turf that will be used on the dam and embankment Centipede ,,, ° - I 54I Hasa planting plan been provided for the vegetated shelf? Yes yAflOITIONAONFORMAYION 1 G orn 55 Please use this space to provide any additional information about the dQj4a �__..., wet pond(s): -. - •—--- 8r 1 1 L Wet Pond 1 7:05 AM 8/28/2020 OFF-SITE SCM THE DRAINAGE AREA - 1 (Drainage area number for this project Existing CVS 2 iMaster permit number i • 3 'Drainage area number from the masterpermit _ �� �_.. Existing ,gCV ._rN. ; Existing CVS M 'Lot or out parcel number1 .....,4 p 1 Existing CVS 5 j BUA allocated by Master Permit I 55268 sf INFORMATION ABOUT THE OFF-SITE SCM 6 'Type of off-site SCM Wet Pond 7 ;Available treatment capacity in the off-site SCM (cu ft) _ _ ~{ N/A 8 Have deed restrictions limiting the BUA on the site been recorded'? No 9 Has an Engineers Certification for the off-site SCM been submitted to DEQ? R-�~ No __ ~ 10 'Are there any Notices of Violation for the off-site system? ' No s 11 1Has the off-site SCM been maintained in accordance with its O&M Plan? ' No 12iWill the collection system be maintained in its design state and kept clean? ` Yes ADDITIONAL INFORMATION 13 [Please use this space to provide any additional information about the off site SCM(s): Existing BUA is being allocated to this Permit .��'. T_ ._ _____ ___ zr,...7,..,,,., _____ _. „...........,_ ..:_..,,. 14:., . • AUG 3 1 ;.: BY• OFF-SITE SCM M THE DRAINAGE AREA - 1 i Drainage area number for this project i Out-Parcel#1 2 'Master permit number ^ t 3 IDrainage area number from the master permit l Out-Parcel#1 4 ILot or outparcel number ' 'Out-Parcel#1 5 BUA allocated by Master Permit 2.8y20Li-,? #�49-sf. i1ORMATION ABOUT THE OFF-SITE SCM_ 6 'Type of off-site SCM i Wet Pond 7 [Available treatment capacity in the off-site SCM (cu ft) N/A • 8 Have deed restrictions limiting the BUA on the site been recorded? i No 9 Has an Engineer's Certification for the off-site SCM been submitted to DEQ? 1'-.._.,,..Nw..,..rNo,•..e_.._� 10 lAre there any Notices of Violation for the off-site system? , No _ 11 JHas the off-site SCM been maintained in accordance with its O&M Plan'? ; No J. 121Will the collection system be maintained in its design state and kept clean? 1 Yes ADDITIONAL.INFORMATION � .., _13 jPlease use this space to provide any additional information about the off-site SCM(s): The propodsed BUA for Out-Parcel#1 is being allocated with this Permit *��' r K" ~'# �'� "j illco,3 f High Density Developments with Outparcels Deed Restrictions & Protective Covenances In accordance with Title 15 NCAC 2H.1000 and S.L. 2006-246, the Stormwater Management Regulations, deed restrictions and protective covenants are required for High Density Developments with Outparcels where outparcel lots will be subdivided from the main tract and sold. Deed restrictions and protective covenants are necessary to ensure that the development maintains a "built-upon" area consistent with the design criteria used to size the stormwater control facility. I, Dean Scarafoni , acknowledge, affirm and agree by my signature below, that I will cause the following deed restrictions and covenants to be recorded prior to the sale of any outparcel or future development area: 1. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number..564 zoOS f$ , as issued by the Division of Energy, Mineral and Land Resources under the Stormwater Management Regulations. 2. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the stormwater management permit. 3. These covenants are to run with the land and be binding on all persons and parties claiming under them. 4. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Energy, Mineral and Land Resources. 5. Alteration of the drainage as shown on the approved plan may not take place without the concurrence of the Division of Energy, Mineral and Land Resources. 6. The maximum built-upon area for the outparcel(s) shown on the approved plans is as follows: Outparcel# BUA Outparcel# BUA Existing CVS 55.258 sf Out-Parcel#1 28.202 sf These allotted amounts include any built-upon area constructed within the property boundaries, and that portion of the right-of-way between the lot lines and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. 7. The runoff from all built-upon area within the outparcel or future development area must be directed into the permitted stormwater control system. 8. Built-upon area in excess of the permitted amount will require a permit modification. 9. The connection from the outparcel's collection system into the stormwater control shall be made such that short-circuiting of the system does not occur. 10. For those outparcels or future development areas whose ownership is not retained by the permittee, the new owner shall submit a separate offsite stormwater permit application to the Division of Energy, Mineral and Land Resources and receive a permit prior to construction. 11. The project and each outparcel will maintain a 30**foot wide vegetated buffer between all impervious areas and surface waters. **50 foot for project s I cated i� the 20 coastal counties. Signature: 4 M L - Date: of—g. - EC • Form DRPC-2 Rev.2 05Nov2009 Page 1 of 2 . AUG 3 1 Z� BY: Hiqh Density Developments with Outparcels ?peed Restrictions & Protective Covenances I, 6a fr S? le_ , a Notary Public in the State of Po v log list__ , County of !Uf" llaring,--- , do hereby certify that �J�arc.-i, personally appeared before me this the day of �og-�— , 20 , and acknowledge r the due execution o he foregoing instrument. Witness my hand and official seal, eolert Signs w- � My Co fission expires r• 3 � � t,OTAy. r ECA+ra:xa 1 AUG 31 2023 Br Form DRPC-2 Rev.2 05Nov2009 Page 2 of 2 GBP CDNSUL`RNG 6626 Gordon Road,Unit C LC II if OF MANS I'\ DUAL WILMINGTON, NORTH CAROLINA,28411 OAS 02/15/21 JOB NO. 2020-0005 (910)442-7870 ATTENTION FAX(910)799-6659 PHONE# RE: Crossroads at Carolina Shores TO: Steve Pusey SW8 200818 NC Division of Water Quality 127 Cardinal Drive Ext. • FEB 1 6 2021 Wilmington, NC 28405 _ r WE ARE SENDING YOU ❑Attached ❑ Under separate cover via the following items: ❑ Fee Check ® Permit Applications Z Plans ❑Calculations ❑Specifications ❑Copy of Letter ❑Change order ❑ Diskette ❑ COPIES DESCRIPTION 2 Revised Pages 3 &4 of Stormwater Management Permit Application Form 2 Revised Sheets C-3, C-4 &C-5 THESE ARE TRANSMITTED as checked below: ►/ For approval ❑Approved as submitted ❑Resubmit copies for approval ❑For your use ❑Approved as noted ❑Submit copies for distribution ❑As requested ❑ Returned for corrections ❑ Return corrected prints ❑For review and comment ❑ ❑FOR BIDS DUE ❑PRINTS RETURNED AFTER LOAN TO US REMARKS: COPY To: File SIGNED: - Garry S. Pape, P.E. If enclosures are not as noted,kindly not:yus at once. Pusey, Steven From: Pusey, Steven Sent: Wednesday,January 27, 2021 2:25 PM To: Garry Pape Subject RE: [External] RE: SW8 200818 Crossroads at Carolina Shores Additional Info Needed Garry, Hope you're doing well. I'm back on this project now. Please consider this as a request for additional information for project SW8 200818. Upon initial review, I noticed that page 3 of the original application for this permit needs some revision, along with some other things. The drainage area table lists the total in the left hand column consisting of a summation of onsite,existing CVS, and outparcel#1. Now that you are submitting 2 offsite applications,one for CVS and one for the outparcel#1, the table should be revised to show the total consisting of"Other" drainage area,the CVS outparcel, and outparcel#1. Under"other" drainage area,you should include your total of other drainage areas, which would have the area for outparcels 2-5 and any offsite area draining to the pond (reference area north of outparcel#2). If you are going to route the offsite area around the pond, that should be shown on grading and drainage plans (i.e.-a swale that drains runoff from that area around the pond). If you are going to include the runoff from the offsite area into the pond,that will change your calculations. If there is another plan for that offsite area, please provide it. Also, your lot lines need to be delineated clearly for the CVS lot and all other outparcels, including metes and bounds. This should be shown on the drainage area plan. I hope this makes sense to you. Let me know if you have any questions. Thanks, Steve .We•r,, 9 P4441, Steven G. Pusey Environmental Engineer II Division of Energy, Mineral and Land Resources State Stormwater Program North Carolina Department of Environmental Quality 127 Cardinal Drive,Wilmington, NC 28405 Office: (910) 796-7215 Direct: (910) 796-7331 Email: steven.pusey@ncdenr.gov Ernti:ccrtt:^UI):leri CL't,u:?i.Trair th' 1tici"es.i is=Lthj'.ct the Nor... Ccr ; c:Public:4earci Li cr,Jt:.?�;vb ais;:;a_tdreti; arr'.'tc�s. 1 From:Garry Pape<gpape@gsp-consulting.com> Sent:Wednesday, December 23,2020 8:16 AM To: Pusey,Steven <steven.pusey@ncdenr.gov> Subject: RE: [External] RE:SW8 200818 Crossroads at Carolina Shores-Additional Info Needed CAUTION:External ems,Do not cL .kits or open attachments unless you verify Send an suspicious email as an atrmdtmerf.to Report Sm. Attached are the Outparcel Offsite Applications. Will drop off hard copies.-Garry From: Pusey, Steven [mailto:steven.ouseyAncdenr.aov] Sent:Tuesday, December 08, 2020 10:24 AM To: Garry Pape Subject: RE: [External] RE: SW8 200818 Crossroads at Carolina Shores Additional Info Needed Hi Garry, One purpose of an offsite permit is to allow it to be easily transferred in the future. If the owner(master permit holder) plans to hold on to these properties and never sell either lot,then it would be okay from that perspective. However,the owner will have to be some kind of internal agreement (covenants) about who maintains the stormwater conveyance system(s). If there are 2 separate permits,then we will hold each one accountable for their lot (assuming the permit is in the name of the lessee,with the property owner as a backup). If it is one offsite permit for both lots,then we will hold the master permit holder accountable for both lots. Steve C 9. Pt44e7, Steven G. Pusey Environmental Engineer II Division of Energy, Mineral and Land Resources State Stormwater Program North Carolina Department of Environmental Quality 127 Cardinal Drive,Wilmington, NC 28405 Office: (910) 796-7215 Direct: (910) 796-7331 Email: steven.puseyCa ncdenr.gov Email correspond€r;cc to and J`,nm ti-€;address is cubje: to `.hr, North Carofh a Pub;lc Record;Law and may be "icztio: ,a tc third parties. From:Garry Pape<gpapec gsp-consulting.com> Sent:Tuesday, December 8, 2020 9:55 AM 2 To: Pusey,Steven<steven.ousev@ncdenr.gov> Subject: RE: [External] RE:SW8 200818 Crossroads at Carolina Shores-Additional Info Needed CAUTION:External am i-Do not crvil Irnks or open attaderr*rr'i unl,ss yo*verily Fend all scrs i cious moll as an atfachment to p port Spam. _ Can the 2"Offsite"areas for this project be covered under the same Offsite permit since both outparcels are being leased and will be owned by the Master Permit holder? From: Pusey, Steven [mailto:steven.puseyftncdenr.gov] Sent: Wednesday, November 25, 2020 3:25 PM To: Garry Pape Subject: RE: [External] RE: SW8 200818 Crossroads at Carolina Shores -Additional Info Needed Garry, For an offsite permit,you just use the application for a regular permit. See the instructions document for more details. Here is some of the text from that document below: la. NEW or MODIFICATION - If the project has never received a stormwater permit before,then it is a NEW project.A project is a MODIFICATION if a previously permitted project is being modified. Please note that in the case of a group of non-residential lots covered by a Master Plan Permit, where BUA is allocated to the individual lots and is treated in a permitted BMP,the subsequent development of the individual lots is covered by a separate NEW OFFSITE permit, and is not considered a modification to the Master Permit. 1b. If the project is a MODIFICATION, please list the existing permit number and it's issue date (if you know it) and the status of construction. Check Not Started if the project that was previously permitted was not built. Check Partially Completed if, during the course of construction, something about the project has changed that requires a modification. Check Completed if the project is complete and is being modified for some other reason. For both Partially Complete and Completed projects, a Designer's Certification must accompany the modified application.A partial Designer's Certification is need for Partially Complete projects, and would cover just the BMP itself and any constructed BUA to date.The Designer's Certification fora Complete project would encompass the BMP, the drainage area and the built-upon area. 2. Specify the type of Project—check the appropriate box to identify whether the project is Low Density, High Density,Offsite(i.e., one that drains to a previously permitted BMP for treatment), or Universal. The "Other" project type category would include projects with Water Dependent Structures, Public Roads and bridges and those projects to be considered for a Director's Certification. There are many more references to offsite in the instructions; see attached. Steve From:Garry Pape<gpapePgsp-consulting.corr.> Sent:Wednesday, November 25,2020 3:01 PM To: Pusey,Steven<steven.pusev@ncdenr.gov> Subject: [External] RE:SW8 200818 Crossroads at Carolina Shores-Additional Info Needed 3 I can put together the Offsite Permits. Can you send me an Offsite Permit, I can't find it on the website. Should be able to get it to you next week. -Garry From: Pusey, Steven [mailto:steven.ousevftncdenr.govl Sent: Monday, November 23, 2020 3:40 PM To: Garry Pape Subject: SW8 200818 Crossroads at Carolina Shores -Additional Info Needed Garry, Do you intend to submit applications for offsite permits for the CVS and Outparcel#1? Or just Outparcel#1? Or, is it just going to be one permit at this time for Live Oak NC, LLC, and break out the parcels as offsite permits later, once they are sold? It might be better to go ahead and permit CVS and Outparcel#1 to have their own offsite permits. That way, they can be easily transferred in the future. Please advise. Thanks, Steve 9re-,.cry P Steven G. Pusey Environmental Engineer II Division of Energy, Mineral and Land Resources State Stormwater Program North Carolina Department of Environmental Quality 127 Cardinal Drive, Wilmington, NC 28405 Office: (910) 796-7215 Direct: (910) 796-7331 Email: steven.puseyC« ncdenr.gov E CP ,dio con-_-., •nrr:mcee c,and from this address the P•.'a.-tii'A,.o;=ra P.:.hl c Rcca;do Lai.v and mu)/be ci%s..lo:ed is(:bird parties. 4 Z14)54 GSP CONSULTING 6626 Gordon Road,Unit C LAC OR OF TRANSI\1 MAIL WILMINGTON,NORTH CAROLINA,28411 DATE12/23/20 JOB Na • 010)442-7870 ATTENTION FAX(910)799-6659 PHONE# } DEC Z 3 2020 RE: Crossroads at Carolina fires To: Steve Pusey Stormwater permit (Conventional) NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 WE ARE SENDING YOU ❑Attached ❑Under separate cover via the following items: ❑Fee Check ®Permit Applications ❑ Plans 0 Cal 4 lations ❑Specifications ❑Copy of Letter ❑Change order ❑ Diskette ❑ COPIES DESCRIPTION 2 Stormwater Management Permit Application For . (one original, one copy) Outparcel#1. 2 Stormwater Management Permit Application For s (one original, one copy) CVS Outparcel THESE ARE TRANSMITTED as checked below: ®For approval ❑Approved as submitted 0 Resubmit copies for approval ❑For your use ❑Approve. -s noted ❑Submit copies for distribution ❑As requested ❑ Return d for corrections 0 Return corrected prints ❑For review and comment ❑ ❑ FOR BIDS DUE ❑PRINTS RETURNED AFTER LOAN TO US REMARKS: V 0 n awld“ Iv � COPY TO: File SIGNED: - Garry S. Pape, P.E. If enclosures are not as noted,kindly notify us at once. DEMLR USE ONLY Date Received Fee Paid Permit Number <1#07 2 C912112 Applicable Rules: ❑Coastal SW-1995 ❑Coastal SW-2008 ❑Ph i-Post Construction (select all that apply) ❑ Non-Coastal SW-HQW/ORW Waters 0 Universal Stormwater Management Plan ❑Other WQ Mgmt Plan: State of North Carolina Department of Environment and Natural Resources Division of Energy,Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name(subdivision,facility,or establishment name-should be consistent with project name on plans, specifications,letters,operation and maintenance agreements,etc.): Crossroads at Carolina Shores-CVS Outparcel 2. Location of Project(street address): Intersection of US Hwy 17&Calabash Road City:Carolina Shores County:Brunswick Zip: 3. Directions to project(from nearest major intersection): Site is located at the ntersection of US Hwy 17&Calabash Road 4. Latitude:33°54'30"N Longitude:78°35'09"W of the main entrance to the project. II. PERMIT INFORMATION: 1.a.Specify whether project is(check one): ZNew ❑Modification ❑Renewal w/ Modifications tRenewals with modifications also requires SVVL.I-102-Renewal Application Form b.If this application is being submitted as the result of a modification to an existing permit,list the existing permit number ,its issue date(if known) ,and the status of construction: ONot Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project(check one): ['Low Density ['High Density ®Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application,list the stormwater project number, if assigned, and the previous name of the project,if different than currently proposed, 4.a.Additional Project Requirements(check applicable blanks;information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): OCAMA Major ❑Sedimentation/Erosion Control: ac of Disturbed Area ❑NPDES Industrial Stormwater 0404/401 Permit:Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name,Project/Permit Number, issue date and the type of each permit: 5. Is the project located within 5 miles of a public airport? No ['Yes If yes,see S.L.2012-200,Part VI:http://portal.ncdenr.org/web/lr/rules-and-regulations Form SVVU-101 Version Oct.31,2013 Page 1 of 6 III. CONTACT INFORMATION 1.a.Print Applicant/ Signing Official's name and title(specifically the developer,property owner,lessee, designated government official,individual,etc.who owns the project): Applicant/Organization:Live Oak NC,LLC Signing Official&Title:Dean Scarafoni-Manager b.Contact information for person listed in item la above: Street Address:5 Allen Avenue City:Manchester State:MA Zip:01944 Mailing Address(if applicable): City: State: Zip: Phone: (910 ) 538-5855 Fax: I ) Email:deanscarafoni@comcast.net c.Please check the appropriate box.The applicant listed above is: ®The property owner(Skip to Contact Information,item 3a) ❑Lessee*(Attach a copy of the lease agreement and complete Contact Information,item 2a and 2b below) ❑Purchaser*(Attach a copy of the pending sales agreement and complete Contact Information,item 2a and 2b below) ❑Developer*(Complete Contact Information,item 2a and 2b below.) 2.a.Print Property Owner's name and title below,if you are the lessee,purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official&Title: b.Contact information for person listed in item 2a above: Street Address: City: State: Zip: Mailing Address(if applicable): City: State: Zip: Phone: ( ) Fax: ( Email: 3.a. (Optional)Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official&Title: b.Contact information for person listed in item 3a above: Mailing Address: City: State:__ Zip: Phone: ( ) Fax: ( ) Email: 4. Local jurisdiction for building permits:Brunswick Point of Contact Phone#: ( ) Form SWU-101 Version Oct.31,2013 Page 2 of 6 IV. PROJECT INFORMATION 1. In the space provided below,briefly summarize how the stormwater runoff will be treated. The storm water for this project will be treated by an offsite wet detention basin 2.a.if claiming vested rights,identify the supporting documents provided and the date they were approved: ❑Approval of a Site Specific Development Plan or PUD Approval Date: ❑Valid Building Permit Issued Date: Other: Date: b.If claiming vested rights,identify the regulation(s)the project has been designed in accordance with: ❑Coastal SW-1995 ❑Ph II-Post Construction 3. Stormwater runoff from this project drains to the Lumber River basin. 4. Total Property Area:1.63 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area:0 acres 7. Total Property Area(4)-Total Coastal Wetlands Area(5)-Total Surface Water Area(6) =Total Project Area+:1.63 acres + Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water(NHW)line or Mean High Water (MHW)line,and coastal wetlands landward from the NHW(or MI- line. The resultant project area is used to calculate overall percent built upon area(BUM). Non-coastal wetlands landward of the NHW(or MHW)line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area/ Total Project Area)X 100 =77.7 % 9. How many drainage areas does the project have?1 (For high density,count 1 for each proposed engineered stormwuter BMP. For low density and other projects,use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project,attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area_.Drainage Area_ Drainage Area_ Receiving Stream Name Persimmon Swamp Stream Class * 15-23-2-1 Stream Index Number* C;Sw Total Drainage Area(sf) 71,151 On-site Drainage Area(sf) 71,151 Off-site Drainage Area(sf) Proposed Impervious Area**(sf) 55,268 % Impervious Area**(total) 77.7 Impervious**Surface Area Drainage Area 1 Drainage Area a_ Drainage Area Drainage Area On-site Buildings/Lots(sf) 13,774 On-site Streets (sf) On-site Parking (sf) 38,631 On-site Sidewalks (sf) 2,863 Other on-site (sf) Future(sf) Off-site (sf) Existing BUA***(sf) Total (sf): 55,268 * Stream Class and Index Number can be determined at: http://portal.ncdenr.org/web/wq/ps/csu/classifications ** Impervious area is defined as the built upon area including, but not limited to, buildings,roads,parking areas, sidewalks,gravel areas,etc. Form SWU-101 Version Oct.31,2013 Page 3 of 6 ***Report only that amount of existing BLIA that will remain after development.Do not report any existing BUA that is to be removed and which will be replaced by new B UA. 11. How was the off-site impervious area listed above determined?Provide documentation. Projects in Union County: Contact DEMLR Central Office staff to check if the project is located within a Threatened& Endangered Species watershed that may be subject to more stringent stormwater requirements as per 15A NCAC 02B.0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance(O&M)forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://portal.ncdenr.org/web/wq/ws/su/bmp-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy,Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms docs. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map at http://portal.ncdenr.org/web/wq/ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item.All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms docs. Iruals 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions&Protective Covenants Form. (if required as per Part VII below) �t 3. Original of the applicable Supplement Form(s) (sealed,signed and dated)and O&M agreement(s)for each BMP. 4. Permit application processing fee of$505 payable to NCDENR. (For an Express review,refer to http://www.envhelp.org/pages/onestopexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative(one to two pages) describing the stormwater treatment/management for 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the - 3 receiving stream drains to class SA waters within 1/2 mile of the site boundary,include the 1/2 mile radius on the map. 7. Sealed,signed and dated calculations(one copy). 8. Two sets of plans folded to 8.5"x 14" (sealed,signed,&dated),including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures,the banks of streams and rivers,the MHW or NHW line of tidal waters,and any coastal wetlands landward of the MHW or NHW lines. Delineate the vegetated buffer landward from the normal pool elevation of impounded structures,the banks of streams or rivers,and the MHW(or NHW)of tidal waters. i. Dimensioned property/project boundary with bearings&distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours,proposed contours,spot elevations,finished floor elevations. I. Details of roads,drainage features,collection systems,and stormwater control measures. m.Wetlands delineated,or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage(including off-site),drainage easements,pipe sizes,runoff calculations. o. Drainage areas delineated(included in the main set of plans,not as a separate document). Form SWU-101 Version Oct.31,2013 Page 4 of 6 p. Vegetated buffers(where required). 9. Copy of any applicable soils report with the associated SHWT elevations(Please identify elevations in addition to depths)as well as a map of the boring locations with the existing elevations and boring logs.Include an 8.5"x11"copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs,the report should also include the soil type,expected infiltration rate,and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO:Schedule a site visit for DEMLR to verify the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book:2012 Page No: 73 _ 11. For corporations and limited liability corporations(LLC):Provide documentation from the NC !'► Secretary of State or other official documentation,which supports the titles and positions held — by the persons listed in Contact Information,item 1a,2a,and/or 3a per 15A NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State,otherwise the application will be returned. http://www.secretary.state.nc.us/Corporations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions,outparcels,and future development,the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary,a table listing each lot number,lot size,and the allowable built-upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://portal.ncdenr.org/web/lr/state- stormwater-forms docs.Download the latest versions for each submittal. In the instances where the applicant is different than the property owner,it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s)below,the permit holder(s)certify that the recorded property restrictions and protective covenants for this project,if required,shall include all the items required in the permit and listed on the forms available on the website,that the covenants will be binding on all parties and persons claiming under them,that they will run with the land,that the required covenants cannot be changed or deleted without concurrence from the NC DEMLR,and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm(such as a consulting engineer and/or firm)so that they may provide information on your behalf for this project(such as addressing requests for additional information). Consulting Engineer:Garry S.Pape,P.E. Consulting Firm:GSP Consulting,PLLC Mailing Address:6626 Gordon Road,Unit C City:Wilmington State:NC Zip:28411 Phone: (910 ) 442-7870 Fax: (910 ) 799-6659 Email:gpape@gsp-consulting.com IX. PROPERTY OWNER AUTHORIZATION(if Contact Information, item 2 has been filled out,complete this section) I,(print or type name of person listed in Contact Information, item 2a) ,certify that I own the property identified in this permit application,and thus give permission to (print or type name of person listed in Contact Information,item la) with(print or type name of organization listed in Contact Information, item la) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal,which indicates the party responsible for the operation and maintenance of the stormwater system. Form SWU-101 Version Oct.31,2013 Page 5 of 6 As the legal property owner I acknowledge,understand,and agree by my signature below,that if my designated agent(entity listed in Contact Information,item 1)dissolves their company and/or cancels or defaults on their lease agreement,or pending sale,responsibility for compliance with the DEMLR Stormwater permit reverts back to me,the property owner.As the property owner,it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days;otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to$25,000 per day,pursuant to NCGS 143-215.6. Signature: Date: I, ,a Notary Public for the State of ,County of ,do hereby certify that personally appeared before me this_day of ,and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official.seal, SEAL My commission expires X. APPLICANTS CERTIFICATION I,(print or type name of person listed in Contact Information,item 1a)Dean Scarafoni certify that the information mcl,sidecrbn this permit application form is,to the best of my knowledge,cntieut and that the project will be constructed conformance with the approved plans,that the required deed restrictions and protective cove ants will orded,and that the proposed project complies with the requirements of the applicable stormwater rules er 5A NCAC 2H.1000 and any other applicable state stoiniwater requirements. Signature: ` r F C• � Date: i7,^ IS-7-c3'a-O I, Gat�('y E ,allotary Public for the State of 0,1�/l�{b 1`h�,�County of euj `I l � �,s�.,do hereby certify that ,) "'`— cc:ATa" i+4 personally appeared before me this 1' day of , 2O ,and a I wledge the du execution of the application for a stormwater permit. Witness my hand and official seal,epe Y8il F SEAL t iOTA,1y I k My commission expires Alit 1 Form SWU-101 Version Oct.31,2013 Page 6 of 6 4 DEMLR USE ONLY Date Received Fee Paid Permit Number Applicable Rules: ❑ Coastal SW-1995 ❑Coastal SW-2008 0 Ph II-Post Construction (select all that apply) ❑Non-Coastal SW-HQW/ORW Waters El Universal Stormwater Management Plan ❑Other WQ Mgmt Plan: State of North Carolina Department of Environment and Natural Resources Division of Energy,Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name(subdivision,facility,or establishment name-should be consistent with project name on plans, specifications,letters,operation and maintenance agreements,etc.): Crossroads at Carolina Shores-Outparcel#1 2. Location of Project(street address): Intersection of US Hwy 17&Calabash Road City:Carolina Shores County:Brunswick Zip: 3. Directions to project(from nearest major intersection): Site is located at the ntersection of US Hwy 17&Calabash Road 4. Latitude:33°54'30"N Longitude:78°35'09"W of the main entrance to the project. II. PERMIT INFORMATION: 1.a.Specify whether project is (check one): ElNew ❑Modification ❑Renewal w/ Modificationt tRenewals with modifications also requires SWU-102-Renewal Application Form b.If this application is being submitted as the result of a modification to an existing permit,list the existing permit number ,its issue date(if known) ,and the status of construction: ['Not Started OPartially Completed* ❑Completed* *provide a designer's certification 2. Specify the type of project(check one): ELow Density ['High Density ®Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application,list the stormwater project number, if assigned, and the previous name of the project,if different than currently proposed, 4.a.Additional Project Requirements(check applicable blanks;information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ❑Sedimentation/Erosion Control: ac of Disturbed Area ❑NPDES Industrial Stormwater 0404/401 Permit:Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name,Project/Permit Number, issue date and the type of each permit: 5. Is the project located within 5 miles of a public airport? No ['Yes If yes,see S.L. 2012-200,Part VI:http://portal.ncdenr.org/web/lr/rules-and-regulations Form SWU-101 Version Oct. 31,2013 Page 1 of 6 III. CONTACT INFORMATION 1.a.Print Applicant/ Signing Official's name and title(specifically the developer,property owner,lessee, designated government official,individual,etc.who owns the project): Applicant/Organization:Live Oak NC,LLC Signing Official&Title:Dean Scarafoni-Manager b.Contact information for person listed in item la above: Street Address:5 Allen Avenue City:Manchester State:MA Zip:01944 Mailing Address(if applicable): City: State: Zip: Phone: (910 ) 538-5855 Fax: ( ) Email:deanscarafoni@comcast.net c.Please check the appropriate box.The applicant listed above is: ®The property owner(Skip to Contact Information,item 3a) ❑Lessee*(Attach a copy of the lease agreement and complete Contact Information,item 2a and 2b below) ❑Purchaser*(Attach a copy of the pending sales agreement and complete Contact Information,item 2a and 2b below) ❑Developer*(Complete Contact Information,item 2a and 2b below.) 2.a.Print Property Owner's name and title below,if you are the lessee,purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official&Title: b.Contact information for person listed in item 2a above: Street Address: City: State: Zip: Mailing Address(if applicable): City: State: Zip: Phone: ( ) Fax: ( ) Email: 3.a. (Optional)Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official&Title: b.Contact information for person listed in item 3a above: Mailing Address: City: State: Zip: Phone: ( ) Fax: ( ) Email: 4. Local jurisdiction for building permits:Brunswick Point of Contact: Phone#: ( ) Form SWU-101 Version Oct.31,2013 Page 2 of 6 IV. PROJECT INFORMATION 1. In the space provided below,briefly summarize how the stormwater runoff will be treated. The storm water for this project will be treated by an offsite wet detention basin 2.a.If claiming vested rights,identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑Valid Building Permit Issued Date: ❑Other: Date: b.If claiming vested rights,identify the regulation(s)the project has been designed in accordance with: ❑Coastal SW-1995 ❑Ph II-Post Construction 3. Stormwater runoff from this project drains to the Lumber River basin. 4. Total Property Area:1.00 acres 5. Total Coastal Wetlands Area:0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area(4)-Total Coastal Wetlands Area(5)-Total Surface Water Area(6)=Total Project Areal-:1.00 acres + Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water(NHW)line or Mean High Water (MHW)line,and coastal wetlands landward from the NHW(or MHVV)line. The resultant project area is used to calculate overall percent built upon area(BUA). Non-coastal wetlands landward of the NHW(or MI-WV)line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area/ Total Project Area)X 100 =64.7 % 9. How many drainage areas does the project have?1 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects,use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project,attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area_ Drainage Area_ Drainage Area Receiving Stream Name Persimmon Swamp Stream Class * 15-23-2-1 Stream Index Number* C;Sw Total Drainage Area(sf) 42,210 On-site Drainage Area(sf) 42,210 Off-site Drainage Area(sf) Proposed Impervious Area**(sf) 28,202 % Impervious Area**(total) 67.4 Impervious**Surface Area . Drainage Area 1 Drainage Area_.. Drainage Area— Drainage Area On-site Buildings/Lots(sf) 2,392 On-site Streets (sf) On-site Parking (sf) 21,948 On-site Sidewalks (sf) 3,862 Other on-site (sf) Future(sf) I Off-site (sf) ' Existing BUA***(sf) Total (sf): I 28,202 I I * Stream Class and Index Number can be determined at: http://portal.ncdenr.org/web/wq/ps/csu/classifications ** Impervious area is defined as the built upon area including, but not limited to,buildings,roads,parking areas, sidewalks,gravel areas,etc. Form SWU-101 Version Oct.31,2013 Page 3 of 6 ***Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. 11. How was the off-site impervious area listed above determined?Provide documentation. Projects in Union Count: Contact DEMLR Central Office staff to check if the project is located within a Threatened& Endangered Species watershed that may be subject to more stringent stormwater requirements as per 15A NCAC 02B.0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance(O&M)forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://portal.ncdenr.org/web/wq/ws/su/bmp-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy,Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms docs. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map at http://portal.ncdenr.org/web/wq/ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item.All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms docs. 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions&Protective Covenants I� A Form. (if required as per Part VII below) 3. Original of the applicable Supplement Forms) (sealed,signed and dated)and O&M f l agreement(s)for each BMP. 4. Permit application processing fee of$505 payable to NCDENR. (For an Express review,refer to http://www.envhelp.org/pages/onestopexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative(one to two pages)describing the stormwater treatment/management for - 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the $J Pr receiving stream drains to class SA waters within 1/2 mile of the site boundary,include the l mile radius on the map. 7. Sealed,signed and dated calculations(one copy). &dated),including: t-4) 8. Two sets of plans folded to 8.5"x 14" (sealed,signed, a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures,the banks of streams and rivers,the MHW or NHW line of tidal waters,and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures,the banks of streams or rivers,and the MHW(or NHW)of tidal waters. i. Dimensioned property/project boundary with bearings&distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours,proposed contours,spot elevations,finished floor elevations. I. Details of roads,drainage features,collection systems,and stormwater control measures. m.Wetlands delineated,or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage(including off-site),drainage easements,pipe sizes,runoff calculations. o. Drainage areas delineated(included in the main set of plans,not as a separate document). Form SWU-101 Version Oct.31,2013 Page 4 of 6 p. Vegetated buffers(where required). 9. Copy of any applicable soils report with the associated SHWT elevations(Please identify J1 elevations in addition to depths)as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"x11"copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs,the report should also include the soil type,expected infiltration rate,and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO:Schedule a site visit for DEMLR to verify the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed.Deed book:2012 Page No:73 11. For corporations and limited liability corporations(LLC):Provide documentation from the NC 1 r. Secretary of State or other official documentation,which supports the titles and positions held by the persons listed in Contact Information,item 1a,2a,and/or 3a per 15A NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State,otherwise the application will be returned. http://www.secretary.state.nc.us/Corporations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions,outparcels,and future development,the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary,a table listing each lot number,lot size,and the allowable built-upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://portal.ncdenr.org/web/lr/state- stormwater-forms does.Download the latest versions for each submittal. In the instances where the applicant is different than the property owner,it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s)below,the permit holder(s)certify that the recorded property restrictions and protective covenants for this project,if required,shall include all the items required in the permit and listed on the forms available on the website,that the covenants will be binding on all parties and persons claiming under them,that they will run with the land,that the required covenants cannot be changed or deleted without concurrence from the NC DEMLR,and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm(such as a consulting engineer and/or firm)so that they may provide information on your behalf for this project(such as addressing requests for additional information). Consulting Engineer:Garry S.Pape,P.E. Consulting Firm:GSP Consulting,PLLC Mailing Address:6626 Gordon Road,Unit C City:Wilmington State:NC Zip:28411 Phone: (910 ) 442-7870 Fax: (910 ) 799-6659 Email:gpape@gsp-consulting.com IX. PROPERTY OWNER AUTHORIZATION (if Contact Information,item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) ,certify that I own the property identified in this permit application,and thus give permission to (print or type name of person listed in Contact Information,item la) with(print or type name of organization listed in Contact Information, item la) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal,which indicates the party responsible for the operation and maintenance of the stormwater system. Form SWU-101 Version Oct.31,2013 Page 5 of 6 As the legal property owner I acknowledge,understand,and agree by my signature below,that if my designated agent(entity listed in Contact Information,item 1)dissolves their company and/or cancels or defaults on their lease agreement,or pending sale,responsibility for compliance with the DEMLR Stormwater permit reverts back to me,the property owner.As the property owner,it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days;otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to$25,000 per day,pursuant to NCGS 143-215.6. Signature: Date: I, ,a Notary Public for the State of ,County of do hereby certify that personally appeared before me this_day of ,and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires X. APPLICANT'S CERTIFICATION I,(print or type name of person listed in Contact Information,item la)Dean Scarafoni certify that the information' d this permit application form is,to the best of my knowledge,correct and that the project will be cons cted conformance with the approved plans,that the required deed restrictions and protective coy is i rded,and that the proposed project complies with the requirements of the applicable stormwa rules der 5A NCAC 2H.1000 and any other applicable state stoiuiwater requirements. Signature: VV' c Date: 1,• 5-`+,,0 ;.(y I, GC r I qy ,a Notary Public for the State of 111 k Utz I(Kt—,County of t I 1--,dodo hereby certify that I. .g. 5 e c. �k+sni personallyappeared 11 PP before me this day of ivA) , 2° , . . . .. .wledge the . -e execution of the application for a stormwater permit Witness my hand and official seal, I ies . 4,,,, Y$pi.. 01 ,. SEAL HQTAAY kik ovetA * . i ri ...,_ My commission expires Ac)('t sC Form SWLJ--101 Version Oct 31,2013 Page 6 of 6 Pusey, Steven From: Pusey, Steven Sent: Monday, November 23, 2020 3:40 PM To: Pape, Garry(gpape@gsp-consulting.com) Subject: SW8 200818 Crossroads at Carolina Shores Additional Info Needed Garry, Do you intend to submit applications for offsite permits for the CVS and Outparcel #1? Or just Outparcel #1? Or, is it just going to be one permit at this time for Live Oak NC, LLC, and break out the parcels as offsite permits later, once they are sold? It might be better to go ahead and permit CVS and Outparcel #1 to have their own offsite permits. That way, they can be easily transferred in the future. Please advise. Thanks, Steve 5res•Voi, Pam. Steven G. Pusey Environmental Engineer II Division of Energy, Mineral and Land Resources State Stormwater Program North Carolina Department of Environmental Quality 127 Cardinal Drive, Wilmington, NC 28405 Office: (910) 796-7215 Direct: (910) 796-7331 Email: steven.pusey@ncdenr.gov ._^.r:%!spc EL';.7.' .. thS vdr( 'S_`I5 subject to the. 17n f(c P ,:.�r'�C 1_ f._'. : v be d sc(oscd to th rci porI'i . • Bard, Tina From: Burd,Tina J Sent: Tuesday, September 8, 2020 9:11 AM To: deanscarafoni@comcast.net; Garry Pape Subject: SW8 200818 -Crossroads at Carolina Shores The Wilmington Regional Office of the Division of Energy, Mineral and Land Resources(Stormwater Section)accepted the Stormwater Permit Application and$505.00 fee for the subject project on August 31,2020. The project has been assigned to Steven Pusey and you will be notified if additional information is needed. Please be advised that the construction of built-upon area may not commence until the Stormwater Permit is issued. Best Regards, Tina Burd Administrative Associate II Wilmington Regional Office Division of Environmental Assistance&Customer Service Phone 910-796-7215 NCDEQ Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington, NC 28405 0 TA; fig awt . .,f. +.�address is subject ect to the its �;.i'.�ii' c1.1. •� • ... , .nd may be disclosed to thitd parties. 1 Application Completeness Review Checklist(Non-Transfers)-Short Version p Project Name: C ie[:5.)•r,U{1 ( jZO 4_l A A )5 t❑et Date Delivered to W+RO. C.)'3 l A . I.J:� Ai f- U Project County/Location: c BINiS Received/Accented Date: 3 -ZQ20 Rule(s): oM2017 Coastal• 112008 Coastal 01995 Coastal BIMS Acknowledged Date'": Phase I{ DUniversai D:L988 Coastal Permit Action: New Slew Permit#2': S 3 g OW I j( Major Mod/Minor Mod/ Renewal Existing Permit#: Permit Type: / 1.D Overall!HD&LD Combo Expriation Date3: Genera; Permit/Offsite/Exempt/ Rescission Doffsite to SW8: Development Type: Commercial';;'Residential/Other IlLot is in Master Permit? Subdivided?: 'Subdivision or Single_or OPE Cert on File? Permittee Type& Documents Needed: 0..Property Owner((s) 0 Purchase' Lessee DROA ElDeveiooer ElViabier'' �liiable DViable? EViabie? 1 Viable? ®Deed purchase Agmt ElLease Election Minutes Not Suodw+ded:Deed 1:::1Subd+vision: Common Area Deed Paperwork • ®Application ' Eke. Els505(within Gmo) Check#(s): Z L 3 DNo Fee ®Supplement`(1 new form or for older forms:1 original per SCM) EIO&M2 ElSoiis Report(MP❑rFP) calculations(signed/sealed) Deed Restrictions, if subdivided2 I Project Narrative �USGS Map(or on file?) Subject to SA?: Y / Subject to ORW?: Y dip ®Plans{2 Sets) EP£Certification ❑Electronic Copies ;❑Easements, Recorded(2017 Rules) NOTES: 'Enter BIMS Acknowledged Date on this Sheet 2For New Projects-Enter New Permit#on Supplements& Deed Restiction Templates. 3If w/in 6 months and they are requesting a mod,STOP. Needs a renewal first. EMAILED ENGINEER DATE: Comments: REVIEWER NAME: I V� i4VClV••%,Ref3rence Carey\procedures\Check.ists Carnpieterress Review Checklist 2020 01 31 GSP CONSL.F-. - ,- N 6626 Gordon Road,Unit C LE CAI OF TRANS /�O II AL WILMINGTON,NORTH CAROLINA,28411 DATE 08/28/20 JOB NO. 2020-0005 (91o)442-7870 ATTENTION FAX(930)799-6659 PHONE# RE: Crossroads at Carolina Shores TO: Stormwater permit (Conventional) NC Division of Water Quality E E.r; - v 227 Cardinal Drive Ext. Wilmington, NC 28405 AUG 3 1 2020 WE ARE SENDING YOU ❑Attached ❑Under separate cover via the following items: ®Fee Check ®Permit Applications ® Plans ®Calculations ❑Specifications ❑Copy of Letter ❑Change order ❑Diskette El COPIES DESCRIPTION 2 Sets of plans & calculations for state stormwater permit 2 Stormwater Management Permit Application Forms (one original, one copy) 1 Wet Detention Basin Supplement i Wet Detention Basin Operation and Maintenance Agreement 1 Application fee for$505.0o for conventional review THESE ARE TRANSMITTED as checked below: ►/ For approval ❑Approved as submitted ❑ Resubmit copies for approval ❑ For your use ❑Approved as noted ❑Submit copies for distribution ❑As requested ❑ Returned for corrections ❑ Return corrected prints ❑For review and comment ❑ ❑FOR BIDS DUE ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS: COPY TO: File SIGNED: - Garry S. Pape, P.E. If enclosures are not as noted,kindlynotiil,,us at once. HIM�I �II 8'382 ne.a elP p Brunswick County, NC Register of Deeds page 1 of 2 Brenda M. Clemmons Register of Deeds 06-23-2020 14:21:33.000 Brunswick County, NC rn J/�_ Type �� NC REVENUE STAMP: $330.00 (#691117) etu to A ., otal Rev ( int.LC k$ 1 Ckfb 7770 Cash$ fefunc. Cash$ Finance rornons of document are illegible due to condition .)1.onyinal. Liuuulitent contains seals verified by original nstrur ent that cannot be reproduced or copied. This instrument prepared by BaxleySmithwick PLLC, licensed North Carolina Attorneys. Delinquent taxes, if any, to be paid by the closing attorney to the Brunswick County Tax Collector upon disbursement of closing proceeds. Revenue Stamps $330.00 Parcel No: P/O 2250006301 NORTH CAROLINA GENERAL WARRANTY DEED STATE OF NORTH CAROLINA COUNTY OF BRUNSWICK THIS DEED, made this the UZ day of June, 2020, by and between ROY DOZIER TREST and wife, DONNA D. TREST, of 9640 Ocean Highway West, Calabash, NC 28467, parties of the first part, hereinafter referred to as Grantors, and LIVE OAK NC, LLC, a North Carolina Limited Liability Company, of 5 Allen Avenue, Manchester, MA 01944, party of the second part, hereinafter referred to as Grantee; WITNESSETH : THAT Grantors, for a valuable consideration paid by Grantee, the receipt of which is hereby acknowledged, have and by these presents do grant, bargain, sell and convey unto Grantee, its successors and assigns, in fee simple, all that certain tract or parcel of land situated in Shallotte Township, Brunswick County, North Carolina, and being more particularly described as follows: BEING all of Parcel 3 containing 5.86 acres, more or less, as more fully described in a survey plat dated February 9, 2018 entitled "Recombination Survey of Portion of Tax Parcel No. 2250006301 into Parcel No. 2450001405, prepared by Samuel T. Inman, P.L.S., Bobby M. Long &Associates, and recorded in Map Cabinet 106 at Page 83, in the Office of the Register of Deeds for Brunswick County, North Carolina, to which plat reference is made and which is incorporated herein for greater certainty of description of said property. For back reference see Deed Book 3868 at Page 1323 of the Brunswick County Registry. In accordance with NCGS Section 105-317.2, the mailing addresses of Grantors and Grantee are as stated above. The property herein conveyed does not include the primary residence of Grantors. AUG 3I2 0 hi • BY• 11111 II II!Illill III I II I III IIII I NI III B438? P 129 ON Brunswick County, NC Register of Deeds page 2 of 2 TO HAVE AND TO HOLD the aforesaid tract or parcel of land and all privileges and appurtenances thereunto belonging to Grantee in fee simple. AND Grantors do hereby covenant with Grantee that Grantors are seized of the premises in fee simple, that they have the right to convey the same in fee simple, that title is marketable and free and clear of all encumbrances, and that Grantors will warrant and defend the title against the lawful claims of all persons, whomsoever, subject to the following exceptions: utility easements of record, road and street rights-of-way, restrictive covenants of record, and ad valorem property taxes for the current and subsequent years. IN WITNESS WHEREOF, Grantors have caused this instrument to be duly executed, the day and year first above written. Roy D zier Wrest Unna D. Trest STATE OF NORTH CAROLINA COUNTY OF BRUNSWICK I, a Notary Public of the County and State aforesaid, do hereby certify that the following persons personally appeared before me this day, acknowledging to me that they voluntarily signed the foregoing document for the purposes stated therein and in the capacity therein indicated: ROY DOZIER TREST and wife, DONNA D. TREST Date: June ZZ , 2020 ., ,,I N IIII„tiro a a�r9�MO K.JFti :• riOTq :y`�' `_. Regin . Jenkins, Not Public 'sue• "� : =� '.'�UBL%c : = My Commission Expires: 7-11-2023 �,c ••••e. as a,I,rrrr'''000 CROSSROADS AT CAROLINA SHORES STORMSTORMWATER EROSION CONTROL NARRATIVE & CALCULATTIONS August 27,2020 1,01 i; II/I riff C ,.�, AUG �, :4 zz s��t 031315 atig/e2e) GBP CONSULTING, PLLC. 6626 Gordon Road, Unit C Wilmington,North Carolina 28411 (910) 442-7870 STORMWATER NARRATIVE CROSSROADS AT CAROLINA SHORES TOWN OF CAROLINA SHORES, NC SITE DESCRIPTION This+/-23.04 acre site is located at the intersection of US Hwy 17 and Calabash Road(SR 1300) (PIN 102507585078) in the Town of Carolina Shores,Brunswick County,North Carolina. This project will drain to a proposed wet detention basin that will discharge to an existing ditch at the eastern corner of the site. This project will consist of the construction of a commercial development and related site appurtenances. The proposed drainage area draining to the Wet Detention Basin is 4.28 acres and the total amount of impervious area draining to the Wet Detention Basin is 62.1%. The proposed disturbed area for this development is approximately 4.12 acres. The site will be developed by Live Oak NC, LLC do Dean Scarafoni—Manager. Water& Sewer are available to the site via mains owned and operated by Brunswick County Utilities. SOILS The soils for this project consist of Goldsboro (Hydrologic Soil Group B) series soils. STORM DRAINAGE DESIGN The primary stormwater measures for this project consist of overland sheet flow and closed conduit systems that direct the runoff to the proposed wet detention basin that is designed to treat the first 1.5"of rainfall to meet NCDEQ Stormwater Regulations and to control the post development peak discharge for the 10, 25 & 50-year storm events so as not to exceed the pre- development peak runoff discharge rate to meet the Town of Carolina Shores Stormwater Regulations. An emergency spillway is provided to convey the 100-year storm event. The site drains to Persimmon Swamp(Classification C, Sw)that drains to the Lumber River. 1 EROSION CONTROL PLAN FOR CROSSROADS AT CAROLINA SHORES Area to be disturbed: +/-4.12 acres This +/-23.04 acre site is located at the intersection of US Hwy 17 and Calabash Road (SR 1300) (PIN 102507585078) in the Town of Carolina Shores, Brunswick County, North Carolina. This project will drain to a proposed wet detention basin that will discharge to an existing ditch at the eastern corner of the site. This project will consist of the construction of a commercial development and related site appurtenances. The proposed drainage area draining to the Wet Detention Basin is 4.28 acres and the total amount of impervious area draining to the Wet Detention Basin is 62.1%. The proposed disturbed area for this development is approximately 4.12 acres. The primary stormwater measures for this project consist of overland sheet flow and closed conduit systems that direct the runoff to the proposed wet detention basin that is designed to treat the first 1.5" of rainfall to meet NCDEQ Stormwater Regulations and to control the post development peak discharge for the 10, 25 & 50-year storm events so as not to exceed the pre- development peak runoff discharge rate to meet the Town of Carolina Shores Stormwater Regulations. An emergency spillway is provided to convey the 100-year storm event. The site drains to Persimmon Swamp(Classification C, Sw)that drains to the Lumber River. EROSION CONTROL MEASURES: This project will primarily control erosion with the use of a temporary construction entrance, outlet protection at the ends of culverts, temporary silt fence surrounding the site and a sediment basin. The contractor shall install,maintain and remove upon completion the silt fence as necessary to prevent any sediment from leaving the project limits. This will include any temporary stockpile areas if necessary. Contractor shall clean and restore to pre- construction conditions any areas that may inadvertently be damaged due to the failure of the erosion control measures. SCHEDULING OF WORK: Clearing and grubbing shall be scheduled and performed in such a manner that fine grading operations and erosion control practices can follow immediately thereafter. Excavation and embankment operations will be conducted such that cuts and fills will be completed to final grades in a continuous operation. All construction areas not otherwise protected shall be planted with permanent vegetative cover in accordance with the specifications within 15 working days after completion of active construction. MINIMUM AREAS TO BE DISTURBED: Only those areas necessary for timely and proper completion of the project shall be stripped of native vegetation. The angle for graded sloped and fills shall be no greater than the angle which can be retained by vegetative cover or other adequate erosion control devices or structures. Slopes left exposed will, within 21 calendar days of completion of any phase of grading, be planted or otherwise provided with ground cover, devices, or structures sufficient to restrain etosiori. All other areas to be stabilized within 15 working days of cease of any phase of activity. PLACEMENT OF SEDIMENT CONTROL DEVICES: All devices(temporary diversions, sediment fences, construction entrances, etc.) for sediment control shall be constructed prior to beginning clearing and grubbing on the site. FINAL COVER: As soon as practicable after finished grades have been established, all operations in connection with establishing final ground cover shall be performed. Any inactive disturbed ground area to remain denuded more than 15 working days shall be temporarily seeded in accordance with the temporary seeding schedule as noted on the plans. All slopes to be stabilized within 21 calendar days. SEQUENCE OF CONSTRUCTION 1. Install temporary construction entrance as shown on erosion&sediment control plan. 2. Install perimeter controls (silt fence,tree protection fencing, etc.) as shown on the erosion & sediment control plan. This step needs to be completed prior to upslope land disturbing activities. 3. Once perimeter controls and sediment trapping measures are installed clear and grub site within limits of disturbance. 4. Upon bringing the site to rough grade, stabilize all areas with temporary vegetation if left undisturbed for 15 working days and all slopes within 21 calendar days. 5. Upon bringing the parking areas and roadways to subgrade elevations, stabilize the areas by placing stone base as early as possible. 6. For temporary vegetative stabilization of all denuded areas see note referencing the erosion control program and specifications. 7. After construction operations have ended and all disturbed areas have stabilized, mechanical sediment controls shall be removed. Sediment from temporary sediment trapping devices shall be disposed of by spreading on the site or hauling away if not suitable for fill. All denuded areas are to be permanently stabilized with permanent vegetation. 8. Prior to using the sediment basins as wet detention basins they shall be mucked out. CO a) � % k % k % % % U% % n # - coP 7 g N o o \ a a x- a & d � - n p CO - @ 10_ 2 a . k u) & E- a ■CU U) @ co g o C@ 2 0 o a) § c a 15 % § c 1- 2 co m O co m U 0- 2 u) = E 2 © ❑ o .° + 0 2 .2 / E m E 2 / 03 a) 0) % % CO % %% al C.) % r- � 0(NI R F- co Tr o 0 2 CD rED ® r d N CO 6 co n n N _� k cl To k a 2 La � w 2 0 k § A o § c 4 % § C ® k 0 � m ƒ U � ,to E CO ƒ 3 a) co ] E § 2 E O o - * 0 g . / k a. E k E k Q Q a) di SEDIMENT BASIN #1 CALCULATIONS Drainage Area= 4.28 Required Storage= 7,696 Provided Storage= 14,394 10-Year Peak Flow= 8.08 Required Area= 3,515 Provided Area= 13,329 Skimmer Size= 2.00 SKIMMER DEWATERING DISCHARGE CALCULATIONS SEDIMENT TRAP#1 STORAGE ORIFICE STORAGE OUTFLOW RELEASE ELEVATION ELEVATION VOLUME RATE TIME (FT) (FT) (CF) (CFS) (HOURS) 41.25 40.00 14,394 0.068 59.0 TOTAL HOURS 59.0 DAYS 2.5 CONTROL PIPE : 2.0 INCH ORIFICE HOLE USED ORIFICE EQUATION TO DETERMINE OUTFLOW RATE Q=Cd*A*(2gh)^1/2 Cd=0.60(Orifice Coefficient) A=Area of 1.3"Orifice=0.009 sf g=32.2ft/s^2 h=1/3 elevation difference between Storage Elevation&Orifice Elevation=0.23 CUSP C iNSULTING Velocity Control 25-Year Storm Event: FES#1 (36"PIPE INTO SWALE) Q= 16.64 cfs(See Hydraflow Report Storm 12-1) Velocity=5.28 fps Culvert size=36" New York DOT Dissipater Method For Use in Defined Channels: Zone 2 Upstream Width=9.0 ft Downstream Width= 12.0 ft Length= 18.0 ft Depth= 18 in 138 SF CLASS B RIPRAP PROVIDED FES#13(15"PIPE INTO SWALE) Q=3.46 cfs(See Hydraflow Report Storm 17-13) Velocity=3.83 fps Culvert size= 15" New York DOT Dissipater Method For Use in Defined Channels: Zone 2 Upstream Width=3.75 ft Downstream Width=5.0 ft Length=7.5 ft Depth= 18 in 138 SF CLASS B RIPRAP PROVIDED POND#1 (See Wet Detention Basin#1 25-Year Routing) Q=8.706 cfs(See 25-Year Storm Routing) Culvert size 15" V=Q/A A= 1.23 sf V=(8.706 cfs/1.23 sf) Velocity=7.08 fps New York DOT Dissipater Method For Use in Defined Channels: Zone 2 Upstream Width=3.75 ft Downstream Width 5.0 ft Length=7.5 ft Depth= 18 in 34 SF CLASS B RIPRAP PROVIDED 6626 Gordon Road,Unit C Wilmington,North Carolina 2841i tel:gio-442-787o fax:gio-799-6659 EXISTING 1 1 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2020 Hyd. Hydrograph Peak Time Time to I Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 9.667 2 724 30,899 ---- Existing Existing.gpw Return Period: 10 Year Thursday, 08/27/2020 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2020 Thursday,08/27/2020 Hyd. No. 1 Existing Hydrograph type = SCS Runoff Peak discharge = 9.667 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 30,899 cuft Drainage area = 4.275 ac Curve number = 55 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.00 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 Existing Q (cfs) Hyd. No. 1 — 10 Year Q (cfs) 10.00 I I I 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 - 2.00 \4444-1'*...............,... 0.00 -LEI I I I I i i IL 1- 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time(min) 3 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2020 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 12.69 2 724 39,513 Existing Existing.gpw I Return Period: 25 Year Thursday, 08/27/2020 ti i 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2020 Thursday,08/27/2020 Hyd. No. 1 Existing Hydrograph type = SCS Runoff Peak discharge = 12.69 cfs Storm frequency = 25 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 39,513 cuft Drainage area = 4.275 ac Curve number = 55 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.90 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 Existing Q (cfs) Hyd. No. 1 --25 Year Q (cfs) 14.00 I 14.00 12.00 12.00 10.00 10.00 8.00 - 8.00 6.00 6.00 4.00 - 4.00 2.00 2.00 0.00 -I I I I I ! - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time(min) 5 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2020 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 15.16 2 724 46,580 ----- Existing Existing.gpw Return Period: 50 Year Thursday, 08/27/2020 , i 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2020 Thursday,08/27/2020 Hyd. No. 1 Existing Hydrograph type = SCS Runoff Peak discharge = 15.16 cfs Storm frequency = 50 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 46,580 cuft Drainage area = 4.275 ac Curve number = 55 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.60 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 Existing Q (cfs) Hyd. No. 1 --50 Year Q (cfs) 18.00 18.00 15.00 15.00 12.00 - 12.00 9.00 9.00 6.00 6.00 3.00 3.00 [ . 0.00 - I I 1- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 - Hyd No. 1 Time(min) PROPOSED WET DETENTION BASIN#1 Drainage Area Drainage Area 186,232 sf Drainage Area 4.28 ac Impervious Area Calculation Buildings 2,392 sf Impervious Pavement 37,572 sf Impervious Concrete 3,862 sf Existing(CVS) 71,874 sf Total 115,700 sf Total 2.66 ac % Impervious 62.1% Volume/Storage Calculation Design Storm Depth(RD) 1.5 in Runoff Coefficient(Ru) 0.61 R„=0.05+0.9*IA Design Volume(DV) 14,180 cf DV=3630*RD*Rv*A #1' ' CONTOUR INCR ACCUM CONTOUR AREA VOL VOL [sq ft] [cu ft] [cu ft] 32.0 479 0 0 33.0 855 667 667 34.0 1,286 1,071 1,738 35.0 1,943 1,615 3,352 36.0 2,654 2,299 5,651 37.0 3,409 3,032 8,682 38.0 4,206 3,808 12,490 39.0 5,047 4,627 17,116 39.5 5,705 2,688 19,804 40.0 7,088 3,198 23,002 FOREBAY CONTOUR INCR ACCUM CONTOUR AREA VOL VOL [sq ft] [cu ft] [cu ft] 37.0 340 0 0 38.0 830 585 585 39.0 1,354 1,092 1,677 39.5 1,764 780 2,457 40.0 2,189 988 3,445 Abottom of shelf 5,705 Vperm pool Aperm pool Vshelf Pperm pool 472 Total 23,002 7,088 354 Wshelf submerged 3 PROVIDED FOR FOREBAY 15.0% Daverage 3.97 1.5"STORAGE CONTOUR INCR ACCUM CONTOUR AREA VOL VOL [sq ft] [cu ft] [cu ft] 40.0 9,277 0 0 41.00 12,943 11,110 11,110 41.25 13,329 3,284 14,394 186,232 DRAINAGE AREA 62.13 % IMPERVIOUS COVER 70 UPPER% 60 LOWER% 3.0' 5.22 UPPER DEPTH 4.35 LOWER DEPTH 4.0' 3.92 UPPER DEPTH 3.31 LOWER DEPTH 5.0' 3.22 UPPER DEPTH 2.78 LOWER DEPTH 6.0' 2.52 UPPER DEPTH 2.26 LOWER DEPTH 7.0' 1.83 UPPER DEPTH 1.74 LOWER DEPTH 8.0' 1.31 UPPER DEPTH 1.13 LOWER DEPTH 4.54 3.0' 3.44 4.0' 2.87 5.0' 2.32 6.0' 1.76 7.0' 1.17 8.0' POND SURFACE AREA(SF) 8,446 3.0' 6,406 4.0' 5,352 5.0' 4,312 6.0' 3,276 7.0' 2,176 8.0' POND RELEASE TIME FOR CONTROL PIPE: WET DETENTION BASIN #1 POND RELEASE TIME FOR CONTROL PIPE: STORAGE ORIFICE STORAGE OUTFLOW RELEASE ELEVATION ELEVATION VOLUME RATE TIME (FT) (FT) (CF) (CFS) (HOURS) 41.25 40.00 14,394 0.068 59.0 TOTAL HOURS 59.0 DAYS 2.46 CONTROL PIPE : 2 INCH ORIFICE HOLE USED ORIFICE EQUATION TO DETERMINE OUTFLOW RATE Q=Cd*A*(2gh)^1/2 Wet Detention Basin#1 Area CN Pre Developed Total Drainage Area 186,232 4.275 B-Soils(GoA) 186,232 4.275 55 186,232 4.275 55 Post Developed Impervious 115,700 2.656 98 B-Soils(GoA) 70,532 1.619 61 186,232 4.275 84 1 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2020 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow Interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 24.31 2 724 74,690 ----- ----- Wet Detention Basin 2 Reservoir 8.016 2 740 73,458 1 42,48 32,169 Wet Detention Basin Wet Detention Basin.gpw Return Period: 10 Year Thursday, 08/27/2020 f 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2020 Thursday,08/27/2020 Hyd. No. 1 Wet Detention Basin Hydrograph type = SCS Runoff Peak discharge = 24.31 cfs Storm frequency = 10 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 74,690 cuft Drainage area = 4.270 ac Curve number = 84* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.00 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 *Composite(Area/CN)=[(2.656 x 98)+(1.619 x 61)]/4.270 Wet Detention Basin Q (cfs) Hyd. No. 1 --10 Year Q(cfs) 28.00 I 28.00 24.00 - - 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 _ _ , _ _ _ . , . _ _ : _ ., , _ _ 0.00 - I 1_, • 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 Hyd No. 1 Time(hrs) 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2020 Thursday,08/27/2020 Hyd. No. 2 Wet Detention Basin Hydrograph type = Reservoir Peak discharge = 8.016 cfs Storm frequency = 10 yrs Time to peak = 12.33 hrs Time interval = 2 min Hyd. volume = 73,458 cuft Inflow hyd. No. = 1 - Wet Detention Basin Max. Elevation = 42.48 ft Reservoir name = Wet Detention Basin Max. Storage = 32,169 cuft Storage Indication method used. Wet Detention Basin Q (cfs) Hyd. No. 2--10 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 -I 0.00 0 6 12 18 24 30 36 42 48 54 60 Time(hrs) Hyd No. 2 Hyd No. 1 II I I I I I 1 Total storage used= 32,169 cuft Pond Report 4 Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2020 Thursday,08/27/2020 Pond No. 1 - Wet Detention Basin Pond Data Contours-User-defined contour areas.Conic method used for volume calculation.Begining Elevation=40.00 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cult) Total storage(cult) 0.00 40.00 9,277 0 0 1.00 41.00 12,943 11,058 11,058 2.00 42.00 14,510 13,718 24,776 3.00 43.00 16,133 15,313 40,089 4.00 44.00 17,813 16,964 57,053 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 15.00 2.00 0.00 0.00 Crest Len(ft) = 16.00 25.00 0.00 0.00 Span(in) = 15.00 2.00 0.00 0.00 Crest El.(ft) = 41.75 43.00 0.00 0.00 No.Barrels = 1 1 0 0 Weir Coeff. = 3.00 3.00 3.33 3.33 Invert El.(ft) = 40.00 40.00 0.00 0.00 Weir Type = 1 Broad -- --- Length(ft) = 35.00 0.00 0.00 0.00 Multi-Stage Yes Yes No No Slope(%) 1.00 0.00 0.00 n/a N-Value .010 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) 0.000(by Contour) Multi-Stage n/a Yes No No TW Elev.(ft) 0.00 Note:Culvert/Orifice outflows are analyzed under Inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage/Storage/Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 40.00 0.00 0.00 0.00 0.00 0.000 0.10 1,106 40.10 0.01 is 0.01 is --- 0.00 0.00 0.015 0.20 2,212 40.20 0.04 is 0.04 ic - 0.00 0.00 --- - 0.036 0.30 3,317 40.30 0.05 ic 0.05 is --- 0.00 0.00 --- 0.047 0.40 4,423 40.40 0.06 is 0.06 is 0.00 0.00 0.057 0.50 5,529 40.50 0.07 is 0.07 ic 0.00 0.00 0.065 0.60 6,635 40.60 0.08 ic 0.07 is 0.00 0.00 -- 0.073 0.70 7,741 40.70 0.08 ic 0.08 ic 0.00 0.00 --- -- 0.080 0.80 8,847 40.80 0.09 ic 0.09 ic --- - 0.00 0.00 0.086 0.90 9,952 40.90 0.09 ic 0.09 ic --- 0.00 0.00 --- 0.092 1.00 11,058 41.00 0.10 is 0.10 is --- -• 0.00 0.00 0.098 1.10 12,430 41.10 0.11 ic 0.10 is --- -- 0.00 0.00 --- - 0.103 1.20 13,802 41.20 0.11 is 0.11 ic 0.00 0.00 --- 0.108 1.30 15,173 41.30 0.12 is 0.11 ic --- -- 0.00 0.00 0.113 1.40 16,545 41.40 0.12 is 0.12 ic -- -- 0.00 0.00 -- 0.117 1.50 17,917 41.50 0.13 is 0.12 ic -- --- 0.00 0.00 --- 0.122 1.60 19,289 41.60 0.13 is 0.13 is -- --- 0.00 0.00 --- 0.126 1.70 20,661 41.70 0.14 is 0.13 is -- 0.00 0.00 --- 0.130 1.80 22,032 41.80 0.67 is 0.13 is 0.54 0.00 --- --- --- 0.662 1.90 23,404 41.90 2.90 i0 0.11 is -- 2.79 0.00 --- 2.895 2.00 24,776 42.00 6.06 ic 0.06 is - --- 6.00 0.00 -- -- --- 6.060 2.10 26,307 42.10 6.93 is 0.03 is --- 6.90 s 0.00 -- -- 6.933 2.20 27,838 42.20 7.29 ic 0.02 is --- --- 7.26 s 0.00 --- --- 7.287 2.30 29,370 42.30 7.57 ic 0.02 is --- 7.55 s 0.00 -- - 7.568 2.40 30,901 42.40 7.82 ic 0.02 is --- 7.80 s 0.00 --- --- 7.818 2.50 32,432 42.50 8.06 ic 0.01 ic --- 8.04 s 0.00 --- 8.057 2.60 33,963 42.60 8.28 is 0.01 ic --- --- 8.26 s 0.00 --- - --- 8.275 2.70 35,495 42.70 8.49 ic 0.01 is --- --- 8.45 s 0.00 --- -- --- 8.455 2.80 37,026 42.80 8.70 is 0.01 ic --- 8.67 s 0.00 --- 8.678 2.90 38,557 42.90 8.90 is 0.01 is --• 8.84 s 0.00 --- 8.852 3.00 40,089 43.00 9.10 is 0.01 is --- -- 9.07 s 0.00 --- -••• 9.079 3.10 41,785 43.10 9.29 ic 0.01 is --- 8.50 s 0.73 s -- --- 9.232 3.20 43,481 43.20 9.48 is 0.00 is --- 8.08 s 1.39 s --- 9.469 3.30 45,178 43.30 9.66 ic 0.00 is --- --- 7.71 s 1.93 s -- --- 9.644 3.40 46,874 43.40 9.84 is 0.00 ic --- --- 7.40 s 2.38 s -- --- 9.778 3.50 48,571 43.50 10.02 is 0.00 is -- --- 7.08 s 2.74 s - --- --- 9.821 3.60 50,267 43.60 10.19 is 0.00 is --- 6.86 s 3.06 s --- --- 9.924 3.70 51,964 43.70 10.36 is 0.00 is -- --- 6.87 s 3.43 s --- 10.30 Continues on next page... 5 Wet Detention Basin Stage/Storage/Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrtRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 3.80 53,660 43.80 10.53 ic 0.00 ic --- 6.27 s 3.43 s --- --- --- --- 9.708 3.90 55,357 43.90 10.69 ic 0.00 is --- -- 6.62 s 3.91 s --- --- --- -- 10.53 4.00 57,053 44.00 10.85 ic 0.00 is --- 6.36 s 4.02 s --- --- --- 10.38 ...End 6 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2020 Hyd. Hydrograph Peak Time lime to Hyd. Inflow Maximum Total Hydrograph No. type flow Interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cult) (ft) (cuft) 1 SCS Runoff 28.15 2 724 87,178 ----- ---- Wet Detention Basin 2 Reservoir 8.706 2 742 85,940 I 1 42.82 37,274 Wet Detention Basin Wet Detention Basin.gpw Return Period: 25 Year Thursday, 08/27/2020 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2020 Thursday,08/27/2020 Hyd. No. 1 Wet Detention Basin Hydrograph type = SCS Runoff Peak discharge = 28.15 cfs Storm frequency = 25 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 87,178 cuft Drainage area = 4.270 ac Curve number = 84* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.90 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 *Composite(Area/CN)=[(2.656 x 98)+(1.619 x 61)]/4.270 Wet Detention Basin Q(cfs) Hyd. No. 1 --25 Year Q(cfs) 30.00 1 30.00 25.00 25.00 20.00 20.00 , _ .._ _ ...._ J., _ „ . . __ ,... ___ . _ -. .-. - ..- -"... . _ „. . .. . , _ 15.00 -- - 15.00 10.00 10.00 5.00 5.00 ... W .. 0.00 _J 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 Time(hrs) Hyd No. 1 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2020 Thursday,08/27/2020 Hyd. No. 2 Wet Detention Basin Hydrograph type = Reservoir Peak discharge = 8.706 cfs Storm frequency = 25 yrs Time to peak = 12.37 hrs Time interval = 2 min Hyd. volume = 85,940 cuft Inflow hyd. No. = 1 -Wet Detention Basin Max. Elevation = 42.82 ft Reservoir name = Wet Detention Basin Max. Storage = 37,274 cuft Storage Indication method used. Wet Detention Basin Q (cfs) Hyd. No. 2--25 Year Q(cfs) 30.00 30.00 25.00 25.00 20.00 20.00 15.00 - 15.00 .. . ,,, ,,,,J,L_ „ . ., .. 0.00 _ _ . .I r ) L 0.00 0 6 12 18 24 30 36 42 48 54 60 Time(hrs) Hyd No. 2 • Hyd No. 1 II I I I I I II Total storage used =37,274 cuft 9 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2020 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) j 1 SCS Runoff 31.14 2 724 96,963 ---- Wet Detention Basin 2 Reservoir 9.166 2 742 95,721 1 43.06 41,053 Wet Detention Basin Wet Detention Basin.gpw Return Period: 50 Year Thursday, 08/27/2020 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2020 Thursday,08/27/2020 Hyd. No. 1 Wet Detention Basin Hydrograph type = SCS Runoff Peak discharge = 31.14 cfs Storm frequency = 50 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 96,963 cuft Drainage area = 4.270 ac Curve number = 84* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.60 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 *Composite(Area/CN)=[(2.656 x 98)+(1.619 x 61)]/4.270 Wet Detention Basin Q (cfs) Hyd. No. 1 --50 Year Q (cfs) 35.00 35.00 30.00 30.00 25.00 25.00 20.00 20.00 ..M . 15.00 15.00 10.00 10.00 5.00 5.00 0.00 I I ___ . A • 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 Hyd No. 1 Time (hrs) r 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2020 Thursday,08/27/2020 Hyd. No. 2 Wet Detention Basin Hydrograph type = Reservoir Peak discharge = 9.166 cfs Storm frequency = 50 yrs Time to peak = 12.37 hrs Time interval = 2 min Hyd. volume = 95,721 cuft Inflow hyd. No. = 1 - Wet Detention Basin Max. Elevation = 43.06 ft Reservoir name = Wet Detention Basin Max. Storage = 41,053 cuft Storage Indication method used. Wet Detention Basin Q (cfs) Hyd. No. 2--50 Year Q (cfs) 35.00 35.00 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 0.00 0 4 8 12 16 20 24 28 32 36 40 44 48 52 Time(hrs) Hyd No. 2 Hyd No. 1 11111110 Total storage used =41,053 cuft I 12 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2020 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 37.08 2 724 116,674 ----- Wet Detention Basin 2 Reservoir 9.825 2 744 115,425 1 43.50 48,644 Wet Detention Basin Wet Detention Basin.gpw Return Period: 100 Year Thursday, 08/27/2020 13 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2020 Thursday,08/27/2020 Hyd. No. 1 Wet Detention Basin Hydrograph type = SCS Runoff Peak discharge = 37.08 cfs Storm frequency = 100 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 116,674 cuft Drainage area = 4.270 ac Curve number = 84* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 10.00 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 *Composite(Area/CN)=[(2.656 x 98)+(1.619 x 61)]/4.270 Wet Detention Basin Q (cfs) Hyd. No. 1 — 100 Year Q(cfs) 40.00 30.00 30.00 20.00 - -- 20.00 10.00 10.00 0.00 -� l i • 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 Hyd Na. 1 Time(hrs) , 14 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2020 Thursday,08/27/2020 Hyd. No. 2 Wet Detention Basin Hydrograph type = Reservoir Peak discharge = 9.825 cfs Storm frequency = 100 yrs Time to peak = 12.40 hrs Time interval = 2 min Hyd. volume = 115,425 cuft Inflow hyd. No. = 1 -Wet Detention Basin Max. Elevation = 43.50 ft Reservoir name = Wet Detention Basin Max. Storage = 48,644 cuft Storage Indication method used. Wet Detention Basin Q (cfs) Hyd. No. 2-- 100 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 -- 20.00 10.00 - 10.00 ter. 0.00 I I I I ' I I _._��_ 0.00 0 4 8 12 16 20 24 28 32 36 40 44 48 Time(hrs) Hyd No. 2 Hyd No. 1 11 1 l 1 1 1 1 Total storage used =48,644 cuft co o o co c a o E m c o co J i N M I u) N n M O ' N € N CO se CO CD I- CO 0) T O 8 N CO O d 4 et tt CO CO et et et 0 et r- E0 tt a cci v v co v v 00 v CCGG3OOO e) 9 O of et CO et er et O et C CI In c e cE0G o W et et d e 4 v v et v CO CCOO CO I,. COO In CD COO CO CO CO D C et v et et 'U 'V et et et et et m Ili J Ctn OT N CD CMO CO N ID n coO = Q V sr v v ui v v e T COCO ili CO en 0 0 N et CO O.f0 0) 00) N. C CV M CV 0) C') CV CV CV CV CV N C E et V V' et et et et et ee 'U O m W N Si o 0 CO It) CD CO CD CO I) CO 0 co E o O T CC) CD 0) T N IO CD CO CD 7 C 0 0 et et Net et CNI a a �'CNI et et et et Z a 0) 0 0) 0 0) 0 0 0 0 N CO N M N M CO CO M CO M �y aE 0 C7 0 0 O O O O O O O F. 1� CO N In CO it) an 1- N N N to M •C N CO 'Cl'CD CO 0 co. et O a CNI 4 4 et in '- d g IO ' M T T N T C1) C+) M T 9 x O C`') O N C‘iO d O.O i CO v a 63 N CO Y II 0 w M M M M P) CM r M IDQ 0 . CD a` n Of � ' O O O eF II .V.. M CV N I- U C .0 CD n I. O 0) 0 T II a` N- N: N. co n ao CO O) ao III C N CO5. CUD Eno o O et T O O dJ •E N. N ti It) IC) CO in in It) U) Ij) } u 0 I- m o 0 0 0 0 0 0 0 0 0 0 o c •E Iri It) in It) IC) It) it) Cri It) 1() Iw•) a E CNO, V. N '- - N. M CM+). CM+), r d C.,) N T C] O O O O T T T 6Ce O x CO 0 co O 0 O O r sue- r O 0 CMS) O • <Q c o 0 0 0 0 0 0 0 0 0 CU 0 N NNNNNNNNONN CO C COO CO CO CO CO CO CO O CO CO N ar V (,1 O O O O O O O O O O O + if y E 3 to 0 i 0) 0 co N N CD N ill le) N M N co co CO. N C C O 7 G C 7 C E h v CO 0 0 CO CO N ' N O O CND. N q COi I D D T CV � C v O O O O O O a O O O T fir) W T O CO O O 0) CO n n n O co T CO O M N N N N O Q' II Cl) C N h co O O CO �// m v r CD CA n N (D O O A' J ICJ M M N CO et n T N CO CT) C C C ismI'D D W T N COet T CD N CO 0) N') 4' 0 O N i_ 4.0 'w a 2 A N I J T N 0) it) CD n CO 0) TO T a Z CO O. B ■c n e CO«k k § § $ o ! ■ « ', § al m E ■ ■ ■ $ E iS ■ a a f f CI $ C3 E d ■ CO ■ r2 8 q q a M E ggg $ » w -I q q CO 0) I g ci £ • $ ¢ 4 o co r co B o. E sr g U s & _ k a S o G w ) c 0 £ 4 g sr 7 2 O. 0 0 0 o CO d o 2 : ■ a ■ e LC)- - e ■ k 2 2 CO § er 2 a 6 ( & - . Is cc) 2 0▪a . § % 2 tsi .0 . $ i-J §§ § sr - a, 2 E N- 0) o II - ix 2 k K R cd c •- m i CO 2 / ) E 2 2 2 $ co - — . o • R m ) .) � 0 0 0 d Ir O ® < } 0 0 0 0 } CU 7 © § @ § CO x0 Ce% d a d a + 76- k 0 0 0 0 V E p Im « ��. » 0 I ) k 0 0 0 0 ., k § 7 _ $ 2 G § § , # A § coco a E © 2 c iii 2 § w — IN 0, \ 2 ■ o F. & (N CO 1 0. F. CROSSROADS AT CAROLINA SHORES STORMWATER & EROSION CONTROL NARRATIVE & CALCULATIONS August 27,2020 �y�,�' Fes' A�,�'y By. [C�; A1 i;\ ,\‘1I ''i/III/ • •4 SEAL r--, 031315 1:64?yI,s�, V \' 1-11,261 GSP CONSULTING: PLLC. 6626 Gordon Road, Unit C Wilmington,North Carolina 28411 (910)442-7870 STORMWATER NARRATIVE CROSSROADS AT CAROLINA SHORES TOWN OF CAROLINA SHORES, NC SITE DESCRIPTION This+/-23.04 acre site is located at the intersection of US Hwy 17 and Calabash Road (SR 1300) (PIN 102507585078) in the Town of Carolina Shores, Brunswick County,North Carolina. This project will drain to a proposed wet detention basin that will discharge to an existing ditch at the eastern corner of the site. This project will consist of the construction of a commercial development and related site appurtenances. The proposed drainage area draining to the Wet Detention Basin is 4.28 acres and the total amount of impervious area draining to the Wet Detention Basin is 62.1%. The proposed disturbed area for this development is approximately 4.12 acres. The site will be developed by Live Oak NC, LLC do Dean Scarafoni—Manager. Water& Sewer are available to the site via mains owned and operated by Brunswick County Utilities. SOILS The soils for this project consist of Goldsboro (Hydrologic Soil Group B) series soils. STORM DRAINAGE DESIGN The primary stormwater measures for this project consist of overland sheet flow and closed conduit systems that direct the runoff to the proposed wet detention basin that is designed to treat the first 1.5"of rainfall to meet NCDEQ Stormwater Regulations and to control the post development peak discharge for the 10, 25 & 50-year storm events so as not to exceed the pre- development peak runoff discharge rate to meet the Town of Carolina Shores Stormwater Regulations. An emergency spillway is provided to convey the 100-year storm event. The site drains to Persimmon Swamp(Classification C, Sw)that drains to the Lumber River. 1 EROSION CONTROL PLAN FOR CROSSROADS AT CAROLINA SHORES Area to be disturbed: +/-4.12 acres This+/-23.04 acre site is located at the intersection of US Hwy 17 and Calabash Road (SR 1300) (PIN 102507585078) in the Town of Carolina Shores, Brunswick County, North Carolina. This project will drain to a proposed wet detention basin that will discharge to an existing ditch at the eastern corner of the site. This project will consist of the construction of a commercial development and related site appurtenances. The proposed drainage area draining to the Wet Detention Basin is 4.28 acres and the total amount of impervious area draining to the Wet Detention Basin is 62.1%. The proposed disturbed area for this development is approximately 4.12 acres. The primary stormwater measures for this project consist of overland sheet flow and closed conduit systems that direct the runoff to the proposed wet detention basin that is designed to treat the first 1.5" of rainfall to meet NCDEQ Stormwater Regulations and to control the post development peak discharge for the 10, 25 & 50-year storm events so as not to exceed the pre- development peak runoff discharge rate to meet the Town of Carolina Shores Stormwater Regulations. An emergency spillway is provided to convey the 100-year storm event. The site drains to Persimmon Swamp (Classification C, Sw)that drains to the Lumber River. EROSION CONTROL MEASURES: This project will primarily control erosion with the use of a temporary construction entrance, outlet protection at the ends of culverts, temporary silt fence surrounding the site and a sediment basin. The contractor shall install,maintain and remove upon completion the silt fence as necessary to prevent any sediment from leaving the project limits. This will include any temporary stockpile areas if necessary. Contractor shall clean and restore to pre- construction conditions any areas that may inadvertently be damaged due to the failure of the erosion control measures. SCHEDULING OF WORK: Clearing and grubbing shall be scheduled and performed in such a manner that fine grading operations and erosion control practices can follow immediately thereafter. Excavation and embankment operations will be conducted such that cuts and fills will be completed to final grades in a continuous operation. All construction areas not otherwise protected shall be planted with permanent vegetative cover in accordance with the specifications within 15 working days after completion of active construction. MINIMUM AREAS TO BE DISTURBED: Only those areas necessary for timely and proper completion of the project shall be stripped of native vegetation. The angle for graded sloped and fills shall be no greater than the angle which can be retained by vegetative cover or other adequate erosion control devices or structures. Slopes left exposed will,within 21 calendar days of completion of any phase of grading,be planted or otherwise provided with ground cover, devices, or structures sufficient to restrain erosion. All other areas to be stabilized within 15 working days of cease of any phase of activity. PLACEMENT OF SEDIMENT CONTROL DEVICES: All devices (temporary diversions, sediment fences, construction entrances, etc.)for sediment control shall be constructed prior to beginning clearing and grubbing on the site. FINAL COVER: As soon as practicable after finished grades have been established, all operations in connection with establishing final ground cover shall be performed. Any inactive disturbed ground area to remain denuded more than 15 working days shall be temporarily seeded in accordance with the temporary seeding schedule as noted on the plans. All slopes to be stabilized within 21 calendar days. SEQUENCE OF CONSTRUCTION 1. Install temporary construction entrance as shown on erosion& sediment control plan. 2. Install perimeter controls (silt fence,tree protection fencing, etc.) as shown on the erosion &sediment control plan. This step needs to be completed prior to upslope land disturbing activities. 3. Once perimeter controls and sediment trapping measures are installed clear and grub site within limits of disturbance. 4. Upon bringing the site to rough grade, stabilize all areas with temporary vegetation if left undisturbed for 15 working days and all slopes within 21 calendar days. 5. Upon bringing the parking areas and roadways to subgrade elevations, stabilize the areas by placing stone base as early as possible. 6. For temporary vegetative stabilization of all denuded areas see note referencing the erosion control program and specifications. 7 After construction operations have ended and all disturbed areas have stabilized. mechanical sediment controls shall be removed. Sediment from temporary sediment trapping devices shall be disposed of by spreading on the site or hauling away if not suitable for fill. All denuded areas are to be permanently stabilized with permanent vegetation. 8. Prior to using the sediment basins as wet detention basins they shall be mucked out. % k % % � % � % � % % % % 03 k q r- co k co N k k Cal 2 2 \ F % ® 2 N. IC‘i CD © _ — — c 2 .6 3 § c § 2 § ka) c k mcu & a) Cu U§ D. as m ■ U 0_ o§ • / CO o .CI * 2 o. a_ E2 E — al CO % C.) % CO CO C.) % 0 % % % % C3 0 0 0 o N 00 N CO % q I- C % C) CD 2 a 2 \ F co 7 ® r c 2 n N m 4iH ■0.25 @ c% % § k c mwU eL la as n) 3 a) 2 CO q E k 2 C § 2 O 0 • / p 0 • * o_ a_ E k E k q ez CO m SEDIMENT BASIN #1 CALCULATIONS Drainage Area= 4.28 Required Storage= 7,696 Provided Storage= 14,394 10-Year Peak Flow= 8.08 Required Area= 3,515 Provided Area= 13,329 Skimmer Size= 2.00 SKIMMER DEWATERING DISCHARGE CALCULATIONS SEDIMENT TRAP#1 STORAGE ORIFICE STORAGE OUTFLOW RELEASE ELEVATION ELEVATION VOLUME RATE TIME (FT) (FT) (CF) (CFS) (HOURS) 41.25 40.00 14,394 0.068 59.0 TOTAL HOURS 59.0 DAYS 2.5 CONTROL PIPE : 2.0 INCH ORIFICE HOLE USED ORIFICE EQUATION TO DETERMINE OUTFLOW RATE Q=Cd*A*(2gh)^1/2 Cd=0.60(Orifice Coefficient) A=Area of 1.3"Orifice=0.009 sf g=32.2ftls^2 h=1/3 elevation difference between Storage Elevation&Orifice Elevation=0.23 GEP CDNSULTING Velocity Control 25-Year Storm Event: FES#1 (36"PIPE INTO SWALE) Q= 16.64 cfs(See Hydraflow Report Storm 12-1) Velocity=5.28 fps Culvert size=36" New York DOT Dissipater Method For Use in Defined Channels: Zone 2 Upstream Width=9.0 ft Downstream Width= 12.0 ft Length= 18.0 ft Depth= 18 in 138 SF CLASS B RIPRAP PROVIDED FES#13(15"PIPE INTO SWALE) Q=3.46 cfs(See Hydraflow Report Storm 17-13) Velocity—3.83 fps Culvert size= 15" New York DOT Dissipater Method For Use in Defined Channels: Zone 2 Upstream Width=3.75 ft Downstream Width=5.0 ft Length=7.5 ft Depth= 18 in 138 SF CLASS B RIPRAP PROVIDED POND#1 (See Wet Detention Basin#1 25-Year Routing) Q—8.706 cfs(See 25-Year Storm Routing) Culvert size= 15" V=Q/A A= 1.23sf V=(8.706 cfs/1.23 sf) Velocity=7.08 fps New York DOT Dissipater Method For Use in Defined Channels: Zone 2 Upstream Width=3.75 ft Downstream Width=5.0 ft Length=7.5 ft Depth= 18 in 34 SF CLASS B RIPRAP PROVIDED 6626 Gordon Road,Unit C Wilmington,North Carolina 28411 tel:910-442-787o fax:910-799-6659 EXISTING 1 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2020 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow Interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) I 1 SCS Runoff 9.667 2 724 30,899 Existing Existing.gpw Return Period: 10 Year Thursday, 08/27/2020 i i 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2020 Thursday,08/27/2020 Hyd. No. 1 Existing Hydrograph type = SCS Runoff Peak discharge = 9.667 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 30,899 cuft Drainage area = 4.275 ac Curve number = 55 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.00 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 Existing Q (cfs) Hyd. No. 1 --10 Year Q (cfs) 10.00 l 10.00 8.00 r 8.00 6.00 6.00 4.00 4.00 ..... ... .., __ 2.00 2.00 0.00 _I I- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time(min) • Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2020 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow Interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 12.69 2 724 39,513 --- Existing 1 I Existing.gpw Return Period: 25 Year Thursday, 08/27/2020 1 I I I 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2020 Thursday,08/27/2020 Hyd. No. 1 Existing Hydrograph type = SCS Runoff Peak discharge = 12.69 cfs Storm frequency = 25 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 39,513 cuft Drainage area = 4.275 ac Curve number = 55 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.90 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Existing Q(cfs) Hyd. No. 1 --25 Year Q (cfs) 14.00 — 114.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 F0.00 - I I I I I- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time(min) Hyd No. 1 • Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2020 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 15.16 2 724 46,580 ----- Existing Existing.gpw Return Period: 50 Year Thursday, 08/27/2020 I 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2020 Thursday,08/27/2020 Hyd. No. 1 Existing Hydrograph type = SCS Runoff Peak discharge = 15.16 cfs Storm frequency = 50 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 46,580 cuft Drainage area = 4.275 ac Curve number = 55 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.60 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Existing Q (cfs) Hyd. No. 1 -50 Year Q(cfs) 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 I ' ' ' I- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time(min) - Hyd No. 1 PROPOSED WET DETENTION BASIN#1 Drainage Area Drainage Area 186,232 sf Drainage Area 4.28 ac Impervious Area Calculation Buildings 2,392 sf Impervious Pavement 37,572 sf Impervious Concrete 3,862 sf Existing(CVS) 71,874 sf Total 115,700 sf Total 2.66 ac % Imperious 62.1% Volume/Storage Calculation Design Storm Depth(RD) 1.5 in Runoff Coefficient(Rv) 0.61 Rv=0.05+0.9*IA Design Volume(DV) 14,180 cf DV=3630*RD*Rv*A . . DPINTION . ..... e& CONTOUR INCR ACCUM CONTOUR AREA VOL VOL [sq ft] [cu ft] [cu ft] 32.0 479 0 0 33.0 855 667 667 34.0 1,286 1,071 1,738 35.0 1,943 1,615 3,352 36.0 2,654 2,299 5,651 37.0 3,409 3,032 8,682 38.0 4,206 3,808 12,490 39.0 5,047 4,627 17,116 39.5 5,705 2,688 19,804 40.0 7,088 3,198 23,002 FOREBAY CONTOUR INCR ACCUM CONTOUR AREA VOL VOL [sq ft] [cu ft] [cu ft] 37.0 340 0 0 38.0 830 585 585 39.0 1,354 1,092 1,677 39.5 1,764 780 2,457 40.0 2,189 988 3,445 Abottom of shelf 5,705 Vperm pool Aperm pool Vshelf Pperm pool 472 Total 23,002 7,088 354 Wshelf submerged 3 PROVIDED FOR FOREBAY 15.0% Daverage 3.97 1.5"STORAGE CONTOUR INCR ACCUM CONTOUR AREA VOL VOL [sq ft] [cu ft] [cu ft] 40.0 9,277 0 0 41.00 12,943 11,110 11,110 41.25 13,329 3,284 14,394 186,232 DRAINAGE AREA 62.13 % IMPERVIOUS COVER 70 UPPER% 60 LOWER% 3.0' 5.22 UPPER DEPTH 4.35 LOWER DEPTH 4.0' 3.92 UPPER DEPTH 3.31 LOWER DEPTH 5.0' 3.22 UPPER DEPTH 2.78 LOWER DEPTH 6.0' 2.52 UPPER DEPTH 2.26 LOWER DEPTH 7.0' 1.83 UPPER DEPTH 1.74 LOWER DEPTH 8.0' 1.31 UPPER DEPTH 1.13 LOWER DEPTH 4.54 3.0' 3.44 4.0' 2.87 5.0' 2.32 6.0' 1.76 7.0' 1.17 8.0' POND SURFACE AREA(SF) 8,446 3.0' 6,406 4.0' 5,352 5.0' 4,312 6.0' 3,276 7.0' 2,176 8.0' POND RELEASE TIME FOR CONTROL PIPE: WET DETENTION BASIN#1 POND RELEASE TIME FOR CONTROL PIPE: STORAGE ORIFICE STORAGE OUTFLOW RELEASE ELEVATION ELEVATION VOLUME RATE TIME (FT) (FT) (CF) (CFS) (HOURS) 41.25 40.00 14,394 0.068 59.0 TOTAL HOURS 59.0 DAYS 2.46 CONTROL PIPE : 2 INCH ORIFICE HOLE USED ORIFICE EQUATION TO DETERMINE OUTFLOW RATE Q Cd*A*(2gh)^1/2 Wet Detention Basin#1 Area CN Pre Developed Total Drainage Area 186,232 4.275 B-Soils(GoA) 186,232 4.275 55 186,232 4.275 55 Post Developed Impervious 115,700 2.656 98 B-Soils (GoA) 70,532 1.619 61 186,232 4.275 84 1 H yd ro g ra p h Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2020 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) I 1 SCS Runoff 24.31 2 724 74,690 ----- -- Wet Detention Basin 2 Reservoir 8.016 2 740 73,458 1 42.48 32,169 Wet Detention Basin Wet Detention Basin.gpw Return Period: 10 Year Thursday, 08/27/2020 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2020 Thursday,08/27/2020 Hyd. No. 1 Wet Detention Basin Hydrograph type = SCS Runoff Peak discharge = 24.31 cfs Storm frequency = 10 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 74,690 cuft Drainage area = 4.270 ac Curve number = 84* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.00 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 "Composite(Area/CN)_[(2.656 x 98)+(1.619 x 61)]/4.270 Wet Detention Basin Q (cfs) Hyd. No. 1 — 10 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 _ . 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 J I I 1 _ 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 Hyd No. 1 Time (hrs) 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2020 Thursday,08/27/2020 Hyd. No. 2 Wet Detention Basin Hydrograph type = Reservoir Peak discharge = 8.016 cfs Storm frequency = 10 yrs Time to peak = 12.33 hrs Time interval = 2 min Hyd. volume = 73,458 cult Inflow hyd. No. = 1 -Wet Detention Basin Max. Elevation = 42.48 ft Reservoir name = Wet Detention Basin Max. Storage = 32,169 cult Storage Indication method used. Wet Detention Basin Q(cfs) Hyd. No.2 --10 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 .. _. _ _ _ _ ..._. ._. _ __... _ . 16.00 16.00 12.00 12.00 8.00 8.00 4.00 - 4.00 0.00 0 6 12 18 24 30 36 42 48 54 60 Time(hrs) Hyd No. 2 Hyd No. 1 11111111 Total storage used= 32,169 cuff Pond Report 4 Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2020 Thursday,08/27/2020 Pond No. 1 - Wet Detention Basin Pond Data Contours-User-defined contour areas.Conic method used for volume calculation.Begining Elevation=40.00 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 40.00 9,277 0 0 1.00 41.00 12,943 11,058 11,058 2.00 42.00 14,510 13,718 24,776 3.00 43.00 16,133 15,313 40,089 4.00 44.00 17,813 16,964 57,053 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 15.00 2.00 0.00 0.00 Crest Len(ft) = 16.00 25.00 0.00 0.00 Span(in) = 15.00 2.00 0.00 0.00 Crest El.(ft) - 41.75 43.00 0.00 0.00 No.Barrels 1 1 0 0 Welr Coeff. = 3.00 3.00 3.33 3.33 Invert El.(ft) = 40.00 40.00 0.00 0.00 Weir Type 1 Broad --- Length(ft) = 35.00 0.00 0.00 0.00 Multi-Stage = Yes Yes No No Slope(%) 1.00 0.00 0.00 n/a N-Value .010 .013 .013 n/a Orifice Coeff. 0.60 0.60 0.60 0.60 Exfil.(in/hr) 0.000(by Contour) Multi-Stage n/a Yes No No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows ere analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(id and submergence(s). Stage/Storage/Discharge Table Stage Storage Elevation Civ A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 40.00 0.00 0.00 0.00 0.00 --- --- 0.000 0.10 1,106 40.10 0.01 ic 0.01 ic --- 0.00 0.00 --- -- 0.015 0.20 2,212 40.20 0.04 is 0.04 ic 0.00 0.00 -- 0.036 0.30 3,317 40.30 0.05 is 0.05 ic --- -- 0.00 0.00 -- 0.047 0.40 4,423 40.40 0.06 ic 0.06 is --- - 0.00 0.00 --- 0.057 0.50 5,529 40.50 0.07 ic 0.07 is •-- - 0.00 0.00 --- -- --- 0.065 0.60 6,635 40.60 0.08 is 0.07 ic --- 0.00 0.00 - --- --- 0.073 0.70 7,741 40.70 0.08 ic 0.08 ic 0.00 0.00 --- -- --- 0.080 0.80 8,847 40.80 0.09 ic 0.09 ic --- -- 0.00 0.00 --- -- -- 0.086 0.90 9,952 40.90 0.09 ic 0.09 ic --- -- 0.00 0.00 -- -- --- 0.092 1.00 11,058 41.00 0.10 is 0.10 is --- --- 0.00 0.00 --- --- --- 0.098 1.10 12,430 41.10 0.11 ic 0.10 ic --- --- 0.00 0.00 -- --- -- 0.103 1.20 13,802 41.20 0.11 ic 0.11 ic --- --- 0.00 0.00 -- --- --- 0.108 1.30 15,173 41.30 0.12 ic 0.11 ic --- -- 0.00 0.00 -- -- --- -- 0.113 1.40 16,545 41.40 0.12 is 0.12 ic -- --- 0.00 0.00 --- -- --- 0.117 1.50 17,917 41.50 0.13 is 0.12 ic -- 0.00 0.00 --- --- -- -- 0.122 1.60 19,289 41.60 0.13 is 0.13 is --- 0.00 0.00 --- --- --- --- 0.126 1.70 20,661 41.70 0.14 is 0.13 is 0.00 0.00 --- - --- 0.130 1.80 22,032 41.80 0.67 is 0.13 is •-• 0.54 0.00 --- --- -- --- 0.662 1.90 23,404 41.90 2.90 is 0.11 is --- 2.79 0.00 --- --- --- --- 2.895 2.00 24,776 42.00 6.06 ic 0.06 ic 6.00 0.00 --- --- -- --- 6.060 2.10 26,307 42.10 6.93 is 0.03 is 6.90 s 0.00 -- -- --- -- 6.933 2.20 27,838 42.20 7.29 is 0.02 is 7.26 s 0.00 -- --- --- 7.287 2.30 29,370 42.30 7.57 is 0.02 is --- -- 7.55 s 0.00 --- -- --- --- 7.568 2.40 30,901 42.40 7.82 ic 0.02 is --- 7.80 s 0.00 --- --- --- 7.818 2.50 32,432 42.50 8.06 is 0.01 is --- --- 8.04 s 0.00 --- --- --- --- 8.057 2.60 33,963 42.60 8.28 is 0.01 ic --- --- 8.26 s 0.00 --- --- -- --- 8.275 2.70 35,495 42.70 8.49 is 0.01 ic 8.45 s 0.00 -- --- 8.455 2.80 37,026 42.80 8.70 is 0.01 ic --- --- 8.67 s 0.00 --- --- -- --- 8.678 2.90 38,557 42.90 8.90 le 0.01 ic -- 8.84 s 0.00 --- --- 8.852 3.00 40,089 43.00 9.10 ic 0.01 ic -- --- 9.07 s 0.00 --- -- --- 9.079 3.10 41,785 43.10 9.29 is 0.01 ic 8.50 s 0.73 s -- -- --- -- 9.232 3.20 43,481 43.20 9.48 ic 0.00 is --- --- 8.08 s 1.39 s --- -- --- -- 9.469 3.30 45,178 43.30 9.66 ic 0.00 is --- --- 7.71 s 1.93 s --- --- 9.644 3.40 46,874 43.40 9.84 ic 0.00 is --- 7.40 s 2.38 s --- -- 9.778 3.50 48,571 43.50 10.02 is 0.00 is 7.08 s 2.74 s --- -- --- -- 9.821 3.60 50,267 43.60 10.19 is 0.00 ic 6.86 s 3.06 s - -- --- -- 9.924 3.70 51,964 43.70 10.36 is 0.00 is --- --- 6.87 s 3.43 s -- -- --- --- 10.30 Continues on next page... 5 Wet Detention Basin Stage/Storage/Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfll User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 3.80 53,660 43.80 10.53 ic 0.00 is --- 6.27 s 3.43 s --- -- -- --- 9.708 3.90 55,357 43.90 10.69 ic 0.00 ic -- -- 6.62 s 3.91 s -- --- -- 10.53 4.00 57,053 44.00 10.85 is 0.00 ic 6.36 s 4.02 s -- 10.38 ...End r 6 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2020 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 28.15 2 724 87,178 Wet Detention Basin 2 Reservoir 8.706 2 742 85,940 1 42.82 37,274 Wet Detention Basin Wet Detention Basin.gpw Return Period: 25 Year Thursday, 08/27/2020 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2020 Thursday,08/27/2020 Hyd. No. 1 Wet Detention Basin Hydrograph type = SCS Runoff Peak discharge = 28.15 cfs Storm frequency = 25 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 87,178 cuft Drainage area = 4.270 ac Curve number = 84* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.90 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 *Composite(Area/CN)=[(2.656 x 98)+(1.619 x 61)]/4.270 Wet Detention Basin Q (cfs) Hyd. No. 1 —25 Year Q (cfs) 30.00 30.00 25.00 25.00 20.00 20.00 15.00 ________ 15.00 10.00 10.00 5.00 5.00 ,j: ::J . 1 T► 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 Hyd No. 1 Time(hrs) 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2020 Thursday,08/27/2020 Hyd. No. 2 Wet Detention Basin Hydrograph type = Reservoir Peak discharge = 8.706 cfs Storm frequency = 25 yrs Time to peak = 12.37 hrs Time interval = 2 min Hyd. volume = 85,940 cuft Inflow hyd. No. = 1 -Wet Detention Basin Max. Elevation = 42.82 ft Reservoir name = Wet Detention Basin Max. Storage = 37,274 cuft Storage Indication method used. Wet Detention Basin Q (cfs) Hyd. No. 2--25 Year Q (cfs) 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 - 5.00 0.00 - - 0.00 0 6 12 18 24 30 36 42 48 54 60 Time(hrs) Hyd No. 2 Hyd No. 1 11 1 1 1 1 1 0 Total storage used=37,274 cuft 9 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2020 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) I 1 SCS Runoff 31.14 2 724 96,963 ----- ----- Wet Detention Basin 2 Reservoir 9.166 2 742 95,721 1 43.06 41,053 Wet Detention Basin Wet Detention Basin.gpw Return Period: 50 Year Thursday, 08/27/2020 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2020 Thursday,08/27/2020 Hyd. No. 1 Wet Detention Basin Hydrograph type = SCS Runoff Peak discharge = 31.14 cfs Storm frequency = 50 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 96,963 cuft Drainage area = 4.270 ac Curve number = 84* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.60 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 *Composite(Area/CN)=[(2.656 x 98)+(1.619 x 61)]/4.270 Wet Detention Basin Q(cfs) Hyd. No. 1 --50 Year Q(cfs) 35.00 35.00 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 - 10.00 5.00 5.00 0 2 4 6 8 10 12 14 16 18 20 22 24 Hyd No. 1 Time (hrs) 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2020 Thursday,08/27/2020 Hyd. No. 2 Wet Detention Basin Hydrograph type = Reservoir Peak discharge = 9.166 cfs Storm frequency = 50 yrs Time to peak = 12.37 hrs Time interval = 2 min Hyd. volume = 95,721 cuft Inflow hyd. No. = 1 -Wet Detention Basin Max. Elevation = 43.06 ft Reservoir name = Wet Detention Basin Max. Storage = 41,053 cuft Storage Indication method used. Wet Detention Basin Q (cfs) Hyd. No. 2--50 Year Q(cfs) 35.00 35.00 30.00 30.00 25.00 25.00 20.00 - 20.00 15.00 15.00 10.00 10.00 5.00 - 5.00 0.00 0.00 0 4 8 12 16 20 24 28 32 36 40 44 48 52 Time (hrs) — Hyd No. 2 Hyd No. 1 II 1 1 1 1 1 0 Total storage used=41,053 cuft 12 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2020 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) eft) (cuft) 1 SCS Runoff 37.08 2 724 116,674 ---- ----- Wet Detention Basin 2 Reservoir 9.825 2 744 115,425 1 43.50 48,644 Wet Detention Basin Wet Detention Basin.gpw Return Period: 100 Year Thursday, 08/27/2020 I I 13 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2020 Thursday,08/27/2020 Hyd. No. 1 Wet Detention Basin Hydrograph type = SCS Runoff Peak discharge = 37.08 cfs Storm frequency = 100 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 116,674 cuft Drainage area = 4.270 ac Curve number = 84* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 10.00 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 484 *Composite(Area/CN)=[(2.656 x 98)+(1.619 x 61)]/4.270 Wet Detention Basin Q(cfs) Hyd. No. 1 -- 100 Year Q(cfs) 40.00 30.00 30.00 20.00 - 20.00 10.00 10.00 _.,. :, {_ �, .,I.. . _ 0.00 -1 1 I E— I • o.00 0 2 4 6 8 10 12 14 16 18 20 22 24 Time(hrs) — Hyd No. 1 W - 14 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk,Inc.v2020 Thursday,08/27/2020 Hyd. No. 2 Wet Detention Basin Hydrograph type = Reservoir Peak discharge = 9.825 cfs Storm frequency = 100 yrs Time to peak = 12.40 hrs Time interval = 2 min Hyd. volume = 115,425 cuft Inflow hyd. No. = 1 -Wet Detention Basin Max. Elevation = 43.50 ft Reservoir name = Wet Detention Basin Max. Storage = 48,644 cuft Storage Indication method used. Wet Detention Basin Q (cfs) Hyd. No. 2--100 Year Q (cfs) 40.00 i 40.00 30.00 3Q.00 20.00 --_- 20.00 10.00 10.00 0.00 - I L 10.00 0 4 8 12 16 20 24 28 32 36 40 44 48 Time(hrs) Hyd No. 2 Hyd No. 1 11 1 1 1 1 I 0 Total storage used=48,644 cuft r M - 0) o COCA a N O. N a 0 co G a) O 4 J N C7 4 I In ti N n M O N m CD e- a- e- N N O N m �' at M M •V at a' 0 et N a 0, 0 8 E n v a v v .. v 0 a 9 O at at v el st 00 C G vvvv v0 O v v v Ce CO C0 0.0 0) Is. COn I[) COCC) COM 00 co CCD 0. V v v v . . v v v v CD J M CO N to O N. S. N U) Ins. co I p V a v 'a ' v ' ar v V v CO to m CO Co N a CO 00) CD n C N C • W a d0 O CoO to co OO)) a- N !�co CO W CCDD 7 C 0 NV Cai at et Cai Cal N V' CV 'V ' Z a C N Cc) N O07 N M cm cm M C0+) C0+) co) 0 O O O O O O O O O O a) O. CO•) N 0 0 0 0 0 N N N 0 F. N C Cq Cr.. CoLiii CO 0 CO 7 0 7 N V at 7 m e U) nt M e- e- N e- M M M e- O nr C_ M (0 1 CO p N. CO CD U) et O 11 CO cc; CV V w N cmM cm M M c`ia- tNia- M a is 3 S O ti COi, `d0-, 0. 00 n n W 0 II N 0 Ct CO a- M N- •e-- N O O O y U C J CO Ia. n O 0 O e- - II 'a E N. r N. CO Co N. Cd Co CoCoad Co ct to N a N. N N. to IC G CD N O 00 0 0 a e- O O LIl CA •E ) CD to Id U I ) U }) Ir) IpI 1- C O 0 O O OC) CC O O 0 0 0 0 •G C •E Co Cp C ) CC) to to Cn 0 CO 0 C. C t C) N CO CO I- e- N. C'7 01 I 7 '- Co ' N a... CI a- elC+) d re N — 0 0 0 O 0 e- e- e- O Cp Co ■� CD 0 0 N. N. r N. 0 O CM'J N. 0 a C O O O O O O O O O a- O CU O N MIMI S ft N N N N NNNNONN CC 8co CO co 00 CO CO Co OO O OO CO N f� tl Cr( O O O O O O O O O O CO + CO N. N CA 0 CO e- (0Cc) N T E .7 � � v 0 N U) M N M N CO m m N � w+ Q - Cr CV N O O C) O 0 O E C CA , N. O CO 0) e- n 0 N e- '- M O O O O N e- N O 0 CO N - a p� a IG S. O O O O O O O O O O O i[ii CO 0 co 0 0 co N N N fin{ O IY 'A G E. v M N O I. 0) O O CO O) I. 0 1� (I) i9 - Co 0) N. N Cl) O) I- _I CA M M N CO 4 N. e- N Cl) C E m V C INf J W e- N CI �' e- CO N CO CD M Z W O G - F O 0 { O` 0 Cl) J — N COact U) CD N. CO CO e- d Z r to 0 1.3 } e e k k k § ' N 0) ■ f .- ,- Q iu E $ ■ co= B ■ E ■ ] o « a- a § $ 2 E 2 $ ■ B ce § q co § m E g Q ■ o -I § CO p co 12 E g g@ - o S p § 2 _ 0 - Q sr 7 \ 2 CIS a) o o G 1.0 E 1 0 £ sr g Q g 2 g 0 0 CO 0 d a d a2i e ■ e - « 2 i0 k 01 CD N CD 7 co N- COa d w 0 � n Jco.) u § CI 2 o. To o ` 0 p $ % sr II 12 a 01 n n . ® 2 'aE k 0 II N - N- U) 2 2 { £ q g g 9 .m I E in © lei © k E 2 to■ m m I u © d d d o IX 142 O J N- 0 \ k 2 2 a o ECU § § § § §% C.) CU k 1 . 2 ..... CO k d CO a e _ o 0 0 o E - S. « - - - � ...� a / ° § 0 N CO } g E jk \ d a d a w CaO) 52 2 m & , $ G 0 0 _ E R , § E - $ i-§ U - ( 0 L § 0 o 0 ¥ co & '- N Cl2 2