Loading...
HomeMy WebLinkAbout20241098 Ver 1_Amended PCN SAW-2024-01471_20240821f .,� is V IL:I II 'W:H IV4 Lw&v„c nmrQ0a61f W016, "Yr)ur:w Office Use Only Corps Action ID no. I recently worked with Billy Sandridge to receive and complete project NWP-18, SAW-2024-00030 where a road was constructed to reach the back part of the property for creek accessstopping 50ft from the riparian buffer zone. Date received: [Click to enter.] DWR project no. [Click enter.] Date received: [Click to enter.] Site Coordinates: Latitude (DD.DDDDDD): 35.260169 Longitude (DD.DDDDDD): 77.283398 Form Version 4.3, February 22, 2024 Pre -Construction Notification (PCN) Form (Ver. 4.3, February 22, 2024) For Nationwide Permits and Regional General Permits and corresponding Water Quality Certifications Please note: fields marked with a red asterisk are required. The form is not considered complete until all mandatory questions are answered. The PCN help document may be found at this link: https://www. deg. nc. gov/water-resources/pcn-help-document-last-updated-1162024 Page 1 of 22 PCN Form Version 4.3- February 22, 2024 A. Processing Information County (counties) where project is located: * Pitt Additional (if needed). Is this an ARPA project? ❑ Yes Z No If yes, ARPA project number: * The project number can be found on the "Letter of Intent to Fund" (LOIF) or "Offer and Acceptance Letter". If you are unable to locate Click or tap here to enter text. your DWI ARPA Funding Project Number, please contact Corey Basinger at core y.basinger[ ncdenr.gov for further assistance. Is this a NCDMS project? * (Click yes only if NCDMS is the applicant or co- ❑ Yes ❑x No applicant) Is this a public transportation project? (Publicly funded municipal, state, or federal road, rail, ❑ Yes Z No or airport project) Is this a NCDOT project? ❑ Yes ❑x No If yes, NCDOT TIP or state project number: Click to enter. If yes, NCDOT WBS number: Click to enter. • Section 404 Permit (wetlands, streams, waters, Clean Water Act) la. Type(s) of approval sought from the Corps: • Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted? Z Yes ❑ No Please provide the date of the previous submission. 8/1/2024 ❑ Nationwide Permit (NWP) 1 b. What type(s) of permit(s) do you wish to seek ❑x Regional General Permit (RGP) authorization? ❑ Standard (IP) This form may be used to initiate the standard/ individual permit process with the USACE. Please contact your Corps representative concerning submittals for standard permits. All required items can be included as attachments and submitted with this form. 1 c. Has the NWP or GP number been verified by the Corps? ® Yes ❑ No NWP number(s) (list all numbers ): Click to enter. RGP number(s) (list all numbers ): 197800125 — Boat Ramps Are you a federal applicant? ❑ Yes ❑x No If yes, please provide a statement concerning compliance with the Coastal Zone Management Act Click to enter text 1d. Type(s) of approval sought from DWR (check all that apply): ❑ 401 Water Quality Certification — Regular ❑ 401 Water Quality Certification— Express ❑ Non-404 Jurisdictional General Permit ❑x Riparian Buffer Authorization ❑ Individual 401 Water Quality Certification Is this a courtesy copy notification ❑ Yes ❑x No Page 2 of 22 PCN Form Version 4.3- February 22, 2024 1 e. Is this notification solely for the record because written approval is not required? * For the record only for DWR 401 Certification: ❑ Yes 0 No For the record only for Corps Permit: ❑ Yes 0 No 1f. Is this an after -the -fact permit/certification application? * ❑ Yes 0 No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? ❑ Yes 0 No If yes, attach the acceptance letter from mitigation bank or in -lieu fee program. 1 h. Is the project located in any of NC's twenty coastal counties? * ❑ Yes 0 No 1 i. Is the project located within an NC DCM Area of Environmental Concern (AEC)? * ❑ Yes ❑ No 0 Unknown 1j. Is the project located in a designated trout watershed? * ❑ Yes 0 No If yes, you must attach a copy of the approval letter from the appropriate Wildlife Resource Commission Office. Trout information may be found at this link: http://www.saw.usace.army.miI/Missions/Regulatory-Permit- Program/Agency-Coordination/Trout.aspx Page 3 of 22 PCN Form Version 4.3- February 22, 2024 B. Applicant Information 1a. Who is the primary contact? Paul Oakley 1 b. Primary Contact Email: Pmo1266@gmail.com 1c. Primary Contact Phone: (###)###-#### 252-531-8017 1 d. Who is applying for the permit/certification? (check all that apply) 0 Owner ❑ Applicant (other than owner) 1 e. Is there an agent/consultant for this project? ❑ Yes 0 No 2. Landowner Information 2a. Name(s) on Recorded Deed: Paul Mitchell Oakley 2b. Deed Book and Page No.: 2936/601-603 2c. Contact Person (for corporations): Click to enter. 2d. Address Street Address: 3542 Craft Rd Address line 2: Click to entei. City: G rifton State/ Province/ Region: NC Postal/ Zip Code: 28530 Country: USA 2e. Telephone Number: * (###)###-#### 252-531-8017 2f. Fax Number: (###)###-#### Click to entei. 2g. Email Address: Pmo1266@gmail.com 3. Applicant Information (if different from owner) 3a. Name: Click to enter. 3b. Business Name (if applicable): Click to enter. 3c. Address: Street Address: Click to enter. Address line 2: Click to enter. City: Click to enter. State/ Province/ Region: Click to enter. Postal/ Zip Code: Click to enter. Country Click to enter. 3d. Telephone Number: * (###)###-#### Click to enter. 3e Fax Number: (###)###-#### Click to enter. 3f. Email Address: Click to enter. Page 4 of 22 PCN Form Version 4.3- February 22, 2024 4. Agent/ Consultant (if applicable) 4a. Name: * Click to enter. 4b. Business Name: Click to enter. 4c. Address: * Street Address: Click to enter. Address line 2: Click to enter. City: Click to enter. State/ Province/ Region: Click to enter. Postal/ Zip Code: Click to enter. Country: Click to enter. 4d. Telephone Number: * (###)###-#### Click to enter. 4e Fax Number: (###)###-#### Click to enter. 4f. Email Address: ' Click to enter. Agent Authorization Letter: Attach a completed/signed agent authorization form or letter. A sample form may be found at this link: https://www.saw. usace.army.mil/Missions/Regulatory-Permit-Program/Permits/2017-Nationwide-Permits/Pre- construction-Notification/ Page 5 of 22 PCN Form Version 4.3- February 22, 2024 C. Project Information and Prior Project History 1. Project Information la. Name of project: * Boat Ramp I Dock 1 b. Subdivision name (if appropriate): Contentnea Creek Estates 1 c. Nearest municipality/town: * Ayden 2. Project Identification 2a. Property identification number (tax PIN or parcel ID): 45988 2b. Property size (in acres): 1.447 2c. Project Address: Street Address: 5496 Contentnea Ln. Address line 2: Click to enter City: Grifton State/ Province/ Region: NC Postal/ Zip Code: 28530 Country: USA 2d. Site coordinates in decimal degrees (using 4-6 digits after the decimal point): Latitude (DD.DDDDDD): 35.260169 Longitude (-DD.DDDDDD):-77.283398 3. Surface Waters 3a. Name of nearest body of water to proposed project: Little Contentnea Creek 3b. Water Resources Classification of nearest receiving Nsw,sw,C water: The Surface Water Classification map may be found at this link: https:Hexperience.arcgis.com/experience/7073e9l 22ab74588b8c48ded34c3df55/ Neuse 3c. In what river basin(s) is your project located? * Choose additional (if needed) 3d. Please provide the 12-digit HUC in which the project is 030202030605 located: The Find Your HUC map may be found at this link: https:Hncdenr.maps.arcqis.com/apps/Publiclnformation/index.html?appid=ad3a85aOc6d644aOb97cdO69db238ac3 Page 6 of 22 PCN Form Version 4.3- February 22, 2024 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: I recently worked with Billy Sandridge to receive and complete project NWP-18, SAW-2024-00030 where a road was constructed to reach the back part of the property for creek accessstopping 50ft from the riparian buffer zone. The road acts as an ingress/egress to the bank which gradually slopes into the creek. The proposed project will attach to the road.The propertyis used for recreational purposes. 4b. Have Corps permits or DWR certifications been obtained for this ® Yes ❑ No ❑ Unknown project (including all prior phases) in the past? I recently worked with Billy Sandridge to receive and complete project NWP-18, SAW-2024-00030 where a If yes, please give the DWR Certification number and/or Corps road was constructed to reach the Action ID (ex. SAW-0000-00000): back part of the property for creek accessstopping 50ft from the riparian buffer zone. jClick to enter.] Attach any pertinent project history documentation 4b2. Is any portion of the work already complete? ® Yes ❑ No If yes, describe the completed work. The road has been constructed as per NWP-18 4c. List of other certifications or approvals/denials received from other federal, state or local agencies for work described in this application not related to the 404 or 401. Click to enter text. 4d. Attach an 8'/ x 11" excerpt from the most recent version of the USGS topographic map indicating the location of the project site. 4e. Attach an 8'/ x 11" excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. 4f. List the total estimated acreage of all existing wetlands on the acres property: .5 4g. List the total estimated linear feet of all existing streams (intermittent 150 linear feet and perennial) on the property: 4g1. List the total estimated acreage of all existing open waters on the 0 acres property: 4h. Explain the purpose of the proposed project: The purpose of the proposed project is to make a boat ramp to launch a boat in the creek for recreation and build a small dock. 4i. Describe the overall project in detail, including the type of equipment to be used: The project will be completed by using smaller equipment to slop the bank at approximately 12-15% grade 3-5 ft below the OHWM. Hogslats would be installed as the boat ramp approx..15ft. wide. Rip rap and gravel may be utilized to mitigate any potential erosion and help aid in overall safety of the ramp. The dock will be approx.. 10- 12ft wide by 20 ft. long startgin on high ground ending at the OHWM build from treated lumber concreted in the ground. 4j. Attach project drawings/site diagrams/depictions of impact areas for the proposed project. 4k. Will this activity involve dredging in wetlands or waters? ❑ Yes Z No Page 7 of 22 PCN Form Version 4.3- February 22, 2024 If yes, describe the type of dredging, the composition of the dredged material, and the locations of disposal area. Click to enter text Page 8 of 22 PCN Form Version 4.3- February 22, 2024 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or in ❑ Yes 0 No ❑ Unknown proposed impact areas? Comments: A Nationwide Permit No. 18 verification authorizing the filling of approximately 1,500 square feet of non -tidal wetlands was issued on December 23, 2023 for an approx. 15-foot-wide access path that terminates 50-feet from Little Contentnea Creek. 5b. If the Corps made a jurisdictional determination, El Preliminary El Approved ElEmailed concurrence what type of determination was made? F 0 Not Verified ❑ Unknown ❑ n/a Corps AID number (ex. SAW-0000-00000): Click to enter. Name (if known): Click to enter. 5c. If 5a is yes, who delineated the jurisdictional Agency/Consultant Company: Click to enter. areas? Other: .;lick to enter 5d. List the dates of the Corps jurisdictional determination or State determination if a determination was made by either agency. Click to enter. 5d1. Attach jurisdictional determinations. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes 0 No 6b. If yes, explain. Click to enter. Are any other NWP(s), regional general permit(s), or individual permit(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossings for linear projects that require Department of the Army authorization but don't require pre -construction notification. A previous NWP-18 permit for road that stopped 50 ft from buffer will attach to proposed new boat ramp project. 7. Addresses of adjoining property owners, lessees, etc. whose property adjoins the waterbody (if more than can be entered here, please attach a supplemental list) Click to enter. 8. Scheduling of activity: Click to enter. Page 9 of 22 PCN Form Version 4.3- February 22, 2024 D. Proposed Impacts Inventory Impacts Summary ❑ Wetlands 0 Streams - tributaries la. Where are the impacts associated with your project 0 Buffers ❑ Open Waters (check all that apply): ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, complete this table for each wetland area impacted. 2a. Site # 2a1. Impact Reason/Type 2b. Impact Duration* 2c. Wetland Type 2d. Wetland Name 2e. Forested ?* 2f. Jurisdiction Type* 2g. Impact Area (ac)* W1 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W2 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W3 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W4 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W5 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W6 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W7 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W8 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W9 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W10 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W11 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W12 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W13 Choose one Temp/ Perm Choose one Click to enter Y/N 0.hoose one Click to enter W14 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter W15 Choose one Temp/ Perm Choose one Click to enter Y/N Choose one Click to enter 2g1. Total temporary wetland impacts Click to enter. ac 2g2. Total permanent wetland impacts Click to enter. ac 2g3. Total wetland impacts Click to enter. ac 2h. Type(s) of material being discharged and the amount of each type in cubic yards: Click to enter text. 2i. Comments: Click to enter text. Page 10 of 22 PCN Form Version 4.3- February 22, 2024 3. Stream Impacts If there are perennial or intermittent stream/ tributary impacts (including temporary impacts) proposed on the site, complete this table for all stream/ tributary sites impacted. ** All Perennial or Intermittent streams must be verified by DWR or delegated local government 3a 3b. 3c. 3d. 3e. 3f. 3g. 3h. Site # Impact Impact Impact Type Stream Name Stream Jurisdiction Stream Width Impact length Reason Duration Type Type (avg ft) (linear ft) S1 Fill Permanent Fill (Incl. Little Perennial Both 80 8 Riprap) Contentnea Creek S2 Dock Permanent Other Little Perennial Both 80 5 Contentnea Creek S3 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S4 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S5 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S6 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S7 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S8 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S9 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S10 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S11 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S12 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S13 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S14 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S15 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S16 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S17 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S18 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S19 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter S20 Click to enter Temp/ Perm Choose one Click to enter Per/Int Choose one Click to enter Click to enter 3i1. Total jurisdictional ditch Click to enter. linear ft impact: 3i2. Total permanent stream 13 linear ft impacts: M. Total temporary stream Click to enter. linear ft impacts: 3i4. Total stream and ditch Click to enter. linear ft impacts: 3j. Comments: Approx. 8 linear ft of impact past the OHWM for the ramp and 5ft past the OHWM for the dock. Page 11 of 22 PCN Form Version 4.3- February 22, 2024 Page 12 of 22 PCN Form Version 4.3- February 22, 2024 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S., individually list all open water impacts in the table below. 4a. Site # 4a1. Impact Reason 4b. Impact Duration 4c. Waterbody Name 4d. Activity Type* 4e. Waterbody Type 4f. Impact area (ac) 01 Click to enter. Temp/ Perm Click to enter. Choose one Choose one Click to enter. 02 Click to enter. Temp/ Perm Click to enter. Choose one Choose one Click to enter. 03 Click to enter. Temp/ Perm Click to enter. Choose one Choose one Click to enter. 04 Click to enter. Temp/ Perm Click to enter. Choose one Choose one Click to enter. 05 Click to enter. Temp/ Perm Click to enter. Choose one Choose one Click to enter. 4g. Total temporary open water impacts Click to enter. ac 4g. Total permanent open water impacts Click to enter. ac 4g. Total open water impacts Click to enter. ac 4h. Comments: Click to enter. 5. Pond or Lake Construction If pond or lake construction is proposed, complete the table below. (*This does NOT include offline stormwater management ponds.) 5a. 5b. 5c. 5d. 5e. Pond ID Proposed use or Wetland Impacts (ac) Stream Impacts (ft) Upland # purpose of pond Impacts (ac) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one Click tL Click to Click to Click to Click to Click to Click to enter. enter. enter. enter. enter. enter. enter. P2 Choose one Click to Click to Click to Click to Click to Click to Click to enter. enter. enter. enter. enter. enter. enter. P3 Choose one Click to Click to Click to Click to Click to Click to Click to enter. enter. enter. enter. enter. enter. enter. 5f. Total Click to Click to Click to Click to Click to Click to Click to enter. enter. enter. enter. enter. enter. enter. 5g. Comments: Click to enter. 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no.: Click to enter. 5i. Expected pond surface area (acres): Click to enter. 5j. Size of pond watershed (acres): Click to enter. 5k. Method of construction: Click to enter. Page 13 of 22 PCN Form Version 4.3- February 22, 2024 6. Buffer Impacts (DWR requirement) If project will impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts. 6a. Project is in which protected basin(s)? (Check all that apply.) ❑ Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Jordan ❑ Goose Creek ❑ Randleman ❑ Other: Click to enter. Site #* 6b. Impact Type* 6c. Impact Duration* 6d. Stream Name* 6e. Buffer Mitigation Required?* 6f. Zone 1 Impact* (sq ft) 6g. Zone 2 Impact* (sq ft) 131 Fill (Ind. Riprap) Permanent Little Contentnea Creek No 450 300 132 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. 133 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. 134 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter 135 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. 136 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. 137 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. 138 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. 139 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B10 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. 1311 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B12 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B13 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B14 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B15 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B16 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B17 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B18 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B19 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B20 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. 6h. Total temporary impacts: Zone 1: Click to enter. sq ft Zone 2: Click to enter. sq ft 6h. Total permanent impacts: Zone 1: 450 sq ft Zone 2: 300 sq ft 6h. Total combined buffer impacts: Zone 1: Click to enter. sq ft Zone 2: Click to enter. sq ft 6i. Comments: Estimated Amount of impacts Please attach supporting documentation (impact maps, plan sheets, etc.) for the proposed project. Page 14 of 22 PCN Form Version 4.3- February 22, 2024 E. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts through project design: The project will be as small as we can make it to safely back a boat down the ramp. 1 b. Specifically describe measures taken to avoid or minimize proposed impacts through construction techniques: Smaller equipment will be used to avoid a larger project footprint. 2. Compensatory Mitigation for Impacts to Waters of the U.S., Waters of the State, or Riparian Buffers 2a. If compensatory mitigation is required, by whom is it required? * ❑ DWR ❑ Corps (check all that apply) 2b. If yes, which mitigation option(s) will be used for this ❑ Mitigation Bank project? (check all that apply) ❑ In Lieu Fee Program ❑ Permittee Responsible Mitigation 3. Complete if using a Mitigation Bank (Must satisfy NC General Statute143-214.11 (d1).) 3a. Name of mitigation bank: Click to enter. 3b. Credits purchased/requested: Type: Choose one Quantity Click to enter. Type: Choose one Quantity Click to enter. Type: Choose one Quantity Click to enter. Attach receipt and/or approval letter. 3c. Comments: 4. Complete if Using an In Lieu Fee Program 4a. Attach approval letter from in lieu fee program. 4b. Stream mitigation requested: Click to enter. linear feet 4c. If using stream mitigation, what is the stream temperature: Choose one NC Stream Temperature Classification Maps can be found under the Mitigation Concepts tab on the Wilmington District's RIBITS website: (Please use the filter and select Wilmington district) https://ribits. ops. usace. army. mil/ords/f?p=107:2:::::: 4d. Buffer mitigation requested (DWR only): Click to enter. square feet 4e. Riparian wetland mitigation requested: Click to enter. acres 4f. Non -riparian wetland mitigation requested: Click to enter. acres 4g. Coastal (tidal) wetland mitigation requested: Click to enter. acres 4h. Comments: Click to enter. Page 15 of 22 PCN Form Version 4.3- February 22, 2024 5. Complete if Providing a Permittee Responsible Mitigation Plan 5a. If proposing a permittee responsible mitigation plan, provide a description of the proposed mitigation plan, including mitigation credits generated. Click to enter. 5b. Attach mitigation plan/documentation. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — DWR requirement 6a. Will the project result in an impact within a protected riparian buffer ❑ Yes ❑x No that requires buffer mitigation? If yes, please complete this entire section — please contact DWR for more information. 6b. If yes, identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required in the table below. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 Click to enter. Click to enter. Choose one Click to enter. Zone 2 Click to enter. Click to enter. Choose one Click to enter. 6f. Total buffer mitigation required Click to enter. 6g. If buffer mitigation is required, is payment to a mitigation bank or -F ❑ Yes ❑ No NC Division of Mitigation Services proposed? 6h. If yes, attach the acceptance letter from the mitigation bank or NC Division of Mitigation Services. 6i. Comments: Click to enter. Page 16 of 22 PCN Form Version 4.3- February 22, 2024 F. Stormwater Management and Diffuse Flow Plan (DWR requirement) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers ❑ Yes 0 No identified within one of the NC Riparian Buffer Protection Rules? 1 b. All buffer impacts and high ground impacts require diffuse flow or other form of stormwater treatment. If the project is subject to a state implemented riparian buffer protection program, include a plan that fully documents how diffuse/dispersed flow will be maintained. All Stormwater Control Measures (SCM) must be designed in accordance with the NC Stormwater Design Manual (https://deg.nc.gov/about/divisions/energy-mineral-land-resources/energy-mineral-land-permit- guidance/stormwater-bmp-manual). Associated supplement forms and other documentation must be provided. ❑ Level Spreader What Type of SCM are you ❑ Vegetated Conveyance (lower seasonal high water table- SHWT) providing? ❑ Wetland Swale (higher SHWT) (Check all that apply) ❑ Other SCM that removes minimum 30% nitrogen ❑ Proposed project will not create concentrated stormwater flow through the buffer For a list of options to meet the diffuse flow requirements, click here. Attach diffuse flow documentation. 2. Stormwater Management Plan 2a. Is this an NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? ❑ Yes 0 No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? ❑ Yes 0 No To look up low density requirements, click here: http://reports.oah.state.nc. us/ncac/title%2015a%20-%20environmental%20guality/chapter%2002%20- %20environmental%20management/subchapter%20h/15a%20ncac%2002h%20.1003.pdf 2c. Does this project have a stormwater management plan (SMP) ❑ Yes ❑ No reviewed and approved under a state stormwater program or state - approved local government stormwater program? 0 n/a — project disturbs < 1 acre Note: Projects that have vested rights, exemptions, or grandfathering from state or locally implemented stormwater programs or projects that satisfy state or locally -implemented stormwater programs through use of community in -lieu programs should answer "no" to this question. 2d. Which of the following stormwater management program(s) apply? _F El Local Government (Check all that apply.) El State If you have local government approval, please include the SMP on their overall impact map. Local Government Stormwater Programs ❑ Phase II ❑ USMP ❑ NSW ❑ Water Supply Page 17 of 22 PCN Form Version 4.3- February 22, 2024 Please identify which local government stormwater program you are using. Click to enter. State Stormwater Programs ❑ Phase II ❑ HQW or ORW ❑ Coastal Counties ❑ Other Comments: Click to enter. Page 18 of 22 PCN Form Version 4.3- February 22, 2024 G. Supplementary Information 1. Environmental Documentation 1 a. Does the project involve an expenditure of public (federal/state/local) ❑ Yes ❑x No funds or the use of public (federal/state) land? * 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental El Yes El No Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the ❑ Yes ❑ No NEPA or SEPA final approval letter.) Comments: Click to enter. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), Federally Non -Jurisdictional Wetlands /Classified Surface Waters ❑ Yes ❑x No (15A NCAC 2H. 1400) DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. If you answered "yes" to the above question, provide an explanation of the violation(s): LACK to enter. 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby ❑ Yes Z No downstream water quality? 3b. If you answered "no", provide a short narrative description: No foreseeable future projects will be needed that would impact downstream water quality. 3c. If yes, provide a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWR policy. (Attach .pdo 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project? I ❑ Yes ❑x No ❑ N/A 4b. If yes, describe in detail the treatment methods and dispositions (non -discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant. Click to enter. Page 19 of 22 PCN Form Version 4.3- February 22, 2024 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected ❑ Yes 0 No species or habitat? (IPAC weblink: https://www.fws.gov/ipac/ ffws.govl) 5b. Have you checked with the USFWS concerning Endangered Species ❑ Yes 0 No Act impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. ;hoose one 5d. Is another federal agency involved? ❑ Yes ❑ No 0 Unknown If yes, which federal agency? Click to enter. 5e. Is this a DOT project located within Divisions 1-8? ❑ Yes 0 No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? ❑ Yes 0 No 5g. Does this project involve bridge maintenance or removal? ❑ Yes 0 No 5g1. If yes, have you inspected the bridge for signs of bat use such as staining, guano, bats, etc.? Representative photos of signs of bat use ❑ Yes ❑ No can be found in the NLEB SLOPES, Appendix F, pages 3-7. Representative photos of signs of bat use can be found in the NLEB SLOPES, Appendix F, pages 3-7. Link to NLEB SLOPES document: http:Hsaw-reg.usace. army.mil/NLEB/1-30-17-signed NLEB-SLOPES&apps.pdf If you answered yes to 5g1, did you discover any signs of bat use? * ❑ Yes ❑ No ❑ Unknown If yes, please show the location of the bridge on the permit drawings/ project plans 5h. Does this project involve the construction/ installation of a wind turbine(s)? ❑ Yes 0 No If yes, please show the location of the wind turbine(s) on the permit drawings/ project plans (attach .pdo 5i. Does this project involve blasting and /or other percussive activities that will be conducted by machines, such as jackhammers, ❑ Yes 0 No mechanized pile drivers, etc.? If yes, please provide details to include type of percussive activity, purpose, duration, and specific location of this activity on the property (attach .pdo 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? I PAC Attach consultation documentation. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat? El Yes 0 No Is there submerged aquatic vegetation (SAV) around the project vicinity? El Yes 0 No El Unknown Will this project affect submerged aquatic vegetation? ❑ Yes 0 No ❑ Unknown Page 20 of 22 PCN Form Version 4.3- February 22, 2024 Explain: Click to enter. 6b. What data source(s) did you use to determine whether your site would impact Essential Fish Habitat? EFH Mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data): http://qis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or El Yes x❑ No properties significant in North Carolina history and archaeology)? 7b. What data source(s) did you use to determine whether your site would impact historic or archeological resources? HPOWeb 7c. Attach historic or prehistoric documentation. 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https:Hmsc.fema.ciov/portal/search 8a. Will this project occur in a FEMA-designated 100-year floodplain? * ® Yes ❑ No 8b. If yes, explain how the project meets FEMA requirements. The project will not alter the elevation of the floodplain 8c. What source(s) did you use to make the floodplain determination? FIRMS H. Miscellaneous Comments: Click to enter. Attach pertinent documentation or attachments not previously requested Page 21 of 22 PCN Form Version 4.3- February 22, 2024 I. Signature * Z By checking the box and signing below, I, as the project proponent, certify to the following: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete, to the best of my knowledge and belief; • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time; • The project proponent hereby agrees that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • The project proponent hereby agrees to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • The project proponent hereby understands that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • As the project proponent, I intend to electronically sign and submit the PCN/online form. Full Name: Paul Oakley Signature: Date: 8/18/2024 Page 22 of 22 PCN Form Version 4.3- February 22, 2024