Loading...
HomeMy WebLinkAboutNCC242548_Site Plan or Location Map_20240822 FP�" CONSTRUCTION SCHEDULE / �/� . �� If,' I. Obtain all necessary permits and plan approvals.Erosion and Sediment Contra) I / ,Np� (B&SC)permit and a Certificate of Coverage(COC)must be obtained before any laud disturbing activities // f\_ In occur. of the E&SC permit,the COC ands hard copy of me plan moat be kept on site,preferably in �j/ �� permitsbox,andacussible during inspection. 1 1 J/ / / 1�� .. 'bafv 2 Inemllgm 1 first,b '1 fences, forcededtfncaoutlet�andwattles. I/ I / - zi "yltt4Maep 3 Finish 1 'g d8nrbb g y dry h 1 they are started //�� I ���_ _� -■ ` Ifs �� n0 4. BeginI grading d I V /�I� / 9i- \� C Ill \, / aR aoi> 5. Beg ti thh activities.-t / I / % % .� - �� ICI v 6. Find 1 rough installed.grading d M1construction.All disturbed for]days neetls to have temporary or pemranent l / /� \ O_ TES ROAD TT �e ...Mover — Y HARNE I I V"- ] Install d Ya walks and patios. / / �- -� —.. `- �� �� �a=,^r z� S' aT9°' COUNTY 9 Final grassing,8. Begin fine g mulching g d stabilizing of lot In most cases this will involve the installation of sod on the lot .,areas V �� / \ / +tenT� --.D om`=-- �� peP p9 The silt fence will remain in place until the lot is sodded or grossing is stabilized and takes hold ��/// ���rrr / --���� --'''-_..._!&,__----- ,,,VR v _----_ -�5-- ')'/��—� \ 10. The mntracmr shall conduct self inspections of the erosion and sedimentation control measures and complete / ..�� 0 \\`\ combined on the DEMLR website / % +'� '. �� _ _�� �\ WO"' me following anseenergy-inn f resod _ -�. _./r-..�-. \ ��/ \ Pa://www.eeG.nc env/abontlaivisions/mergv-mtoeral-one-Imo.resonrres/arormwaterhmrmwater-Program / �/�:" p, �_�_ -! wo�SITE hpdes-canstruaion- Twelve months ofcam late ins Minns shall be kept site and available / J ` � A 100 YEAR FL D =__� _ m Program. p inspection p � '.... k / \_- __ _ AOV'tp f inspection at all times.It is recommended a copy be kept in a permits box.Ref.G.S.113A-54.1 through G.S. ' / i OO�Ya' ............ ����� - 401 113A-57 Sections I5A NCAC 04A.0101 through I5A NCAC 04E.U504 General Permit NCG 010000 NPDE5 � ,j •"%" """�""""' / —>0 ���` — �I00-..- \ \� d f 1 ANON _ f !� �.... '::. ,� '�- �� UMBERR m P for Cons...Activities == /.- � / \-S° ��eTOB� ELO�_YR� �7�-'�m0 �\� `` `,N J 11. Self-inspections for erosion and sedimentation control measures are to be performed at least once every seven _ "0 _..l J. .+1.`---- .�. f�, a ��/�0 \\ CD calendar days and within 24 hours of eve f than inch.Any needed hall be _ - �Tr ! ,O Y every rain event o greaten Y nee pairs s e� made immediatelym as designed. b ESC measures shall be maintainedtfoo it s ecified in Wre iY..maintain measures gp _ � y�-. ..-....._...._..... e1lEs R the construction dctaile on this plan.A min gauge shall be installed sane project site for monitoring. .1 e'�....�.'.'���. _ i � �\ sR,f]� 12. Ins action and final acce Lance letters.Whin me le[q the shall cdvmc[DEMLR to �'L- f 'f' j \ � o � 5 100- the E&SCPIan.ABer DEMLR informs it an elee of project of inspection port, / �i� 7 �\ � � ..: ..rr stir. \ •. =) the ertnittee shall visit de.n ovMCG08 to submit an electronic Notice of termination a NO .A$120 .. ✓' 0 ` w § P q bell ( .i 8 \o\= e � �.1.ei annual general permit fee will be charged until the e-NOT M1az been filled out 0� /... �... .. 00 o o =r/�T.,�.r,�..yQ:r.. :.'. ,�.......... ... .r�........ :....r ---- ---- fife \N� Oq-YR°�.'.'.'.'.'..1Oq� ........................ .... 15'UTILITY EASEMENT 1 O ao1 GROUND STABILIZATION �m ;` / "` _— �� N VICINITY MAP SITE AREA STABILIZATION • sr y— -G win bate meet Air 11 (N.T.S.) EXCEPTIONS DESCRIPTION TIME FRAME \ \ \., j.. ..Dot ..... "....... o .. ... ... / 1 PERIMETER DIKES, 7 DAYS NONE o e` - - ��?.'!Tla=.yfr+S. "'""' J J...........v ��:.....:......................�� —1�`UTILITYEASEMENT-� -, �_ �p SWALES, DITCHES L_.:._.:. .aa .......�-.......... "M'../... .. .::' / \ P4r4 CA2 L &SLOPES -t I._._._..._?;QO`. ..... ..:ju '".:.:......-.: : . WEINFORCOE6 / 'HIGHQUALITY 7 DAYS NONE �v ' .I...2 . . . laq-YR r - , 59 58 \� A SELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY ' ..- CA2 a WATTLE '' / 61 11 58 �,\ \ ; \ SLOPES STEEPER 7 DAYS IF SLOPES ARE / �\ \ NCGS 113A-54.1`IS AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR � /-- y< �r /', / 55 4 4' \ 1� t00- THAN 3:1 10' OR LESS IN I �.' / �/� \ // ` ' ��a-� �j'� )RJ COMPLETED AS AN EXCEL SPREADSHEET. ,y AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED LENGTH AND ARE I- ,max _z SILT FENCE / e<.,-/ Vi_ 4, ` \' EROSION AND NOT STEEPER ��-1•-".'.y.'.'.'.'.'.'.'.''.'.'.'.'.'''''''.'.'..'.'.'.'.'.'.'.'.'.'.ram.'.'.'.'.'>.��Y w / / %/ �Fzkry\ lj'^� I . \ SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A THAN 2:1, 14 �t _ r�I ONSTRUCTION // 4 / CONSTRUCTION -- ENTRANCE lip / 54 6 __ a T NCAC 046.0131 STATES THAT....DOCUMENTATION SHALL BE ACCOMPLISHED BY DAYS ARE ky " ul _ / 47 . e� _ \I INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE ALLOWED y I '- �/ _. y LIMITS APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, y / 11��� L� 3 /•• / 44 45 46 SLOPES 3:1 OR 14 DAYS 7 DAYS FOR ".".".".".".".".".".".".".".". ".. ..-. . ..- ' 49 DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, N PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION FLATTER SLOPES GREATER .:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.: CA2-- oI I I / 5O 2c�=/// ' -53// r1I -- �� CONTROL PLAN." THAN LENGTH IN / 10'UTILI EMENT S J ---1g'lLTILtlY FASFMENL 0roi / / ' / / // / ALL OTHER AREAS 14 DAYS NONE(EXCEPT •• --'>, ���rrT / /51 / / WITH SLOPES FOR PERIMETERS ` / ' Vega Lane Vega Lane / / ¢I� FLATTER THAN 4:1 AND HQW ZONES) / 0 j e . G 1 _ - • // /1 _/ / 13 / \ V ega Lan ` ( l-6'DTILITYEAb`EMENT---~15'UTILITY EhGBM2Ni \ 4- / Qp DATE: PAGE D �_ -GeJC1- \ t�7 / / / C? //� p--Z- / s t Soak/Waffle Slt Sock/Wattle --_^ n' � / V 'mar Area to be •D iml pmteMon 7 ¢ 43 42 41 �40 39, / 38 — — 0i ted far-_ 'r g-- use in sin socks or wattles,.@wth mmcast ' t;iLANQ$ WETIANDS IN�ORCED �' / / / / / 37\ p,: in. --R: tiro - ............... � ,:............. ... .sl[Y FEFtC �1� _TO_ — - - / /�/�/I r^x" lengn m`��net rose as oat deman. / .. . .ouuET / 2".2' M talsonki am �.�...�- ::cGNsTRoN. / Sill aminimu e Stakes Ial snoule he installed parallel to � f......................................... ..L1MIT ..ZI `. „_ L`j i SECTION SECTION '- r to Leetbevond Ike roe ore 5 - reaecaedat(.eedge below y _ _4 l J Ilat areas should be« qt • — 4 J III RO ` f thee. anle(c)sholand disturbance.uld be turned slightly upcompe to //�- - �--� REINFORCEOy P WATTLE 12, i26 36 // Alp / //�/JJf / / M*. a.. Q ma a and a eat a .: 28 27 m �2� ) 29 /� 32 33 34 35 / /It j//se tills. SILT FENCES / 3D 31 / �� � 4- inch x 2 inch cross aection should be @en _ ri'SILT FENCE /vertically through the center of the silt .......... .. ............. w >y 2 o• / / //. .. _ LIMITS \ 12� B // / \ (ffp ��I of 8 feel if e sin aowwnNe placed in 10'-UTILRY NT �2--- 10 UTILITY EASEMENT I -- 16 III II l «Cam 6 r � . r g na a Min. I i WATTL�•L maximum i@rval of 4'e.t.a 6 eslau To tit/2 height or log a N TR TI N 1 r)),)),,„)))//,O S UC 0 1 meni heavy interval �D„TRa„LHEDI„aTALLATID„ _ 25 Collier Gate Street--, �/ ENTRANGE�- .'.. -J CONSTRUCTION nthee�m,�kngtingp� so�waW.aare ENTRENCHED INSTALLATION. concrete �BB, s000050Mwha q runoff events. TFENCE ENTRANCE soMaLmcVIEW 1. InspANCE: ��0'UTILITI EASEMENT ,. Inspect and after _ CA1 «x N pAL rLOW RATE (,--, each see se / accumulated sad ...'equate flow. _ Corels.Socks ac,LPaaT a a t . for Wrenched seeks Area id a. ednpmt wa °"`" ,z ncn to tiro a tiro • nasasamgow ea rep tesa'raospae Dr i .. .".�_ ":f -- 12 ' o<a n„enarer .sd„m .m w z snmenrwuma ...'. SIL Prorecma N gym) (zco„m)( )(coo ) m) tom. / - NI r \ ,spo 3. It pone.becomes names.,.sill Sheet Pl W«� f Silt eaek/Mktstn"'laxi i°ad`mi i�:a`mi (30'"I (S ri) (coo) re. a / :.._` — — ..4-�..T .� � .....ros 24 23 B 22� � 20 19 \ \ on o red meRo. ]s na zz.s toosoc .. 12 _ �Pd einouM ao ts.o P5 —_ _� _ ®mil a ecru/rt VI" ecru/a wan/n 'VS" °cma�e \.'. -yrei -,>� \--'l• �?y70 1`8 �_.126 \® (r, w, uea czeo cat. n'bin re�mananwd+att'�ea / / - "- _� �- �� `�1e�, /m/m) /m/m) /m/m) /m/m) /m/m) measure ha /Res ��". �� -_ 1-0 \\1 \ J SILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION �_ _ _ - � — = — ___ _--_��� _ _ 30 �� J / DATE: PAGE: // /.EA1� �\ �� �� �� s _ __ —7 In u v y > >))) T 4 Jl Na ll .—.Li iLi �. IL FF, ,HOUSE i ( Ho sous 6_3/ ❑ \ \ () / �� - - - r t) LI C ,1. �RO,�A4�IFi ,.•.. -OAWAY 1. .�L_ __/ / )) ' \ l . ) / //// eta.: OE""" Notes: * - ( (Pfeghllg the buffer zone,wetland / SILT FENCE /low /11\SILT FENCE OUTLET cCONSTRUCTION It I / � //fl/ \ CURB INLET control measures does not impact the septic system and repair area(s). I// / I/ I I / d.Al least one Construction Entrance/Exit is m be installed per lot / \ \ / I f ) // \ 5.Waste bins and other areas dedicated ee for managing building material waste shall be at \ \ \\ \ \ \ / `/\ /I//lees[50 feet away from storm drain inlets or drainage dkches unless It can be shown that \ / / no other alternative exists.If this separation cannot be achieved,these areas must be / ntained behindce,Fence. \ \ \ \ \ \ ♦ ` \ \ \ /// / 6.Inlets downstream of disturbances should be protected:streets should be swept when \ 1 1 \1 /�/(r\N sediment from the construction activity is present. / J /'I'(IIJ /..\NC-Environmenlel.jpeq T.Details for Gilt Fence,Silt Fence Outlets,ConstruCOUTWITH Entrances GUTTnd er measures era ( \ / \ \ \ \ \ \ 1 , I / / \ ) ) �/ ///// //// t provided on additional sheets.Erosion end sediment control details are not drawn to scale. /l I 1 1 ------------- TYPICAL LOT LAYOUT WITH CURB AND GUTTER DATE: PAGE: zPAGE of 4.26. MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION TOTAL DISTURBED ACREAGE: 1.35 ACRES Qoat �y�y LOT EROSION CONTROL PLAN � General-All measures will be inspected and corrections made after runoff producing rainfalls or at least once a week minimum.The builder will insure that the construction activities on an articular lot do not adverse) affect an of the installed erosion control measures.If lot construction dictates measures will be p p g p rany y y LOTS 4, 25 & 28 e0���' 0-10:-/:-/•''0:40, sa Mw.a- relocated on the lot to insure that the potential for sedimentation runoff is eliminated as much as possible.Silt fences and gravel construction entrances will be maintained as suggested in the erosion control manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. '~~~~~~~ �e/ COLLIER GATE •ryy+y+y+y+y+y+y y+y+11:0, "°� Gravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic topdressing with 2-inch stone.After each rainfall,inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all /-.*AU1P - -al Pal 1,e- - - - - - -al Pal Pal Pal Pal Pal�•ay, objectionable materials spilled,washed,or tracked onto public roadways. �' _ -+v Y�� �4,4,4,4,4,4,ti• Silt Fence-Sediment fences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.An sediment deposits that build u against the fence should be removed and disposed of/ _ Mn p y. y p p g p properly to insure ESTATES �y" 1�Y•''i�''ii''i•'77'"i���•''�� . that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during cleanout operations. i1.1 i 1 iii 011 FOR �+�' 't,,,e,,e.„,ij,4,-r.:0 "' Sodding-The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to close,since this could inhibit adequate growth / - - :? A.4' and stabilization of the root bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. A&G RESIDENTIAL, L L C -•• Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are germinating properly.Any bare areas should be CARVERS CREEK TOWNSHIP CU M B E RLAN D COUNTY Construction: Maintenance: repaired,and reseeded as soon as possible.If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass. 1.Clear the entrance and,it area of all vegetation,roots.and other objectionable 1.Per NCG-01 Inspect at least once a week and after each 1 Inch or SCALE:1"=120' J U LY 2024 material and properly grade k. greater rainfall:make any required repairs immediately. Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed GRAPHIC SCALE 2.Place the gravel to the specific grade and dimeneiona shown on the plans,and 2.Maintain the gravel pad in a condition to prevent mud or sediment sediment shall be deposited within the project in such a waythat the sediment is not subject to erosion bwind or water. smooth It. from leaving the construction site.This may require periodic l 120 0 60 120 240 480 3.Provide drainage to carry water to a sediment trap or other suitable outlet. topdressing with 2 inch stone, 11 4.Use aeotextile fabres in order to improve stability of the foundation in locations 3.Immediately remove all objectionable materials spilled,washed or Reinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout Remove and replace stone as necessary as it becomes clogged with sediment.Remove all subject to seepage or high water table. tracked onto public roadways, fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. ( IN FEET ) m 1 fit CONSTRUCTION ENTRANCE/EXIT MOORMAN,KIZER&REITZEL,INC.115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305 PHONE(910)484-5191 FAX(910)484-0388 LICENSE HF-0106 LAST SAVED:7/13/2024 11:30 AM LAST PLOTTED:7/13/2024 1:55 PM PLOTTED BY.Dennis Gilbert FILENAME:G\CURRENT JOBS\Aare RESIDENTIAL Use\23-2855-10 COLLIER GATE-EC\PLANS\COLDER EC-L0T5a,25&2s.DWG