Loading...
HomeMy WebLinkAboutNCC242543_Site Plan or Location Map_20240822 I \ 1 � \ ' vase ^\ A SELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY Pv' 4 5a-' / / \ ` ^ \\\ \ \�// COGS COMPLETED 54.1 N AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR 1 �� CONSTRUCTION SCHEDULE TI AN EXCEL SPREADSHEET. \� I.obtain all necessary permits and Plan approvals.Erosion and Sediment Comrol(e&SC)permit avd a Core..of Coverage AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED (CAC)must be obtained before any land disturbing activities occur.Acopy of the E&SC permit,the COC and a hard copy of the EROSION AND � / \ \\ \\ / pmnmust be kept onsim,earemblyinncensil box,andazforcedeatfen inspection, SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A 2.Install graveland cttles,ore evtrabcesfir.wm si¢Gmes,re roes sib farce NCAC 04B.0131 STATES THAT"...DOCUMENTATION SHALL BE ACCOMPLISHED BY outlets and wattles, INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE _ a eg o l 1 \ 3.Finish clearing and grubbing any necessary areas on Me lots as they are started APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, "0 / / \ \ 1 / \\ \ 4.Begin 1°I grading avd excavation scliviries DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, �Fo'� \ iBegiv or evn0vue wtim Ho:di<ovsw:::71.,:::. PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION $' S4AS`6 10 / 6.Finish all mugM1 gradingd housareas nndisturbM rot T days needs mM1ave temporary or perrnlCONTROLPLAN.•Tt, ° • ,• p° 9 _ \ \� gmmmoverinaaled./ .mstuflmieeways,walksa ::ties.Q / B.Begi By grading oflm_ \ 9.Final graeemg,mulcM1ing stabili cases tM1iawill ivvolve tM1e ivatallation of andon the lot.TM1e silt kwilllacrit Nls otl0or ffiasshg is lized ants bold.O'� S' ---.... on eM aedirmnmtioncontralmwsures and compbk Mefallawing SODDING 9 combinedself-inspection form found an Me OEMLR websik • • �� / _:,,,,, ://www.deq.nc.gov/abovUdivisiovs/energy-mineralavd-laud-rcsomcd/slormwakr/smrmwamr-pro®am/vpdes-covsvucnov-pmgmm V• \-... II Il.6elr-inspections fgrerreion spa udimenn+ion control measures are ro be performed allure[once every seven wlendm days and ^^'•' within 24 hours ofvery min event of greater than 1 inch.Any needed repairs shall be made immediately m mainnin measures as MONTRO$B � L is.AD�1215OgLtOWAyRO� � I I �RO141 • uarvweE'yR-t3/y / I IPlan ARcrDEMLRmfmmsihepermbteofihe prude.close out,via inspection report the Permitted shall visitSi E caic o avmsaVro. ) r / 'Veq ve govMlC01'msubmit revelatroneNonce of termination(e N0'1)A3120 annual geverel permtf will be cM1arged M�s until[he eNOT has barn idled outSITE �' l � j , \� �13 // / /s I ( ( \ � J-�g i L : Ca�e/ AP ' " � / d ro \ y\. _ - -T _ - _ --op 15"• 15 / heCp / / / _ SPACE \ / 111111 FIRM `"1XEI;;g hm wA,aa,aaaaP,Ra..ACHIEVE , ' ll�7t wm,rxespa ter uloTM sower. x�oxla.al. a wee z4-7 Z \\� �_ J / 2 C'INSTRUCTION. omAP APPEARANCE set Tx I RANCE OF GOOD SOD Kx° Mar b .t.Uglxe \\ \ /1 -- �1\/ / LIMITS \ II/,II�Y�Y /�4�I III I4i�� x°xsmm. ry VICINITY MAP;' �RaW 6 , // _ // I 1 =�TMa' aIXe T-- d- Lotlan N.T.S. \\ \ - / " ./� - >\ 24 F.: eammmx DATE: PAGE: \ ) ) ;•4 / ( yII25 {..\� CONS RUCTION DATE: PAGE: !� 4'MIN. SILT FENCE I °'f \ IMITS/64iIIIIIIII IIIIIII IIIIII1 Q/ -„ I Z6 _// 30 / I ' I I I \ r1111t4IplIP, t / 20 ) / �� ll ll �4 ;� I ✓c ✓� `% % I TOP OFstTF FORD �// FENC / (47 ��///// RF NFOSG�D . RSI TLETED �// ' �O�e 19 ¶ QIt � II1MF ' pSous HOUSE I WIRE FENCE 27n) � , - . �u`af0 / Av/DG1FRorvT VIEW NBURY WIRE FENCE, .L CONSTRUCTION IIr C RB '13.0A AY / / u L uxa lrvLrr Ntes FILTER FABRIC. ATTLE / 46 / L / I 1f needed,Tree Protection fencing shouldb tall tl ngthe buffer zone wetland • cLorx NraeNcx / / ' .NSTRU ION cc.,, `l e / LEGEND bountlaryandlaramuntl protected tree providing radius of at least125 feet for each k 1 y APART e•� AND \ /p,A_.��� / ,rj ENT"rNCE 4.'• / inh f ktl' e FILTER of ry A,. 4. FLOW 1 ° S0-/ � `ti•r 2.In t II STt F n the low elevafOn r tl f h t. stall Slt Fence outets shown on • oN GaouxD NOTES: OHartlware cloth and gravel should overlay the silt fence at least 12O / ENCE \ -"'ya CONSTfjUCTION _dj Z9/ DIRECTION sch fGtl'g and Feld adjusted f necessary for placement at low po nta If lots ere .j�o A I \ / ENTRANCE ',YC: / contiguous and have different land owners or builders,each lot should have individual Silt fit , inches. / / Fences .....::ss:o°:.:.sit a:•i I 2.Stone outlets should be placed on low elevation areas of silt fence I / c ,/ 1 j SILT FENCE OUTLET no 3.Install required Silt Fence whin 10 feet of property line to ensure there is no conflict with `\ and based on field conditions. HARDWARE CLOTH BURY WIRE FENCE AND I eURv I / T J�� 30/ / cc INLET ENmaN septic system.It is the responsibility of the builder to ensure the installation of sediment MAINTENANCE: CON�5 UCTION (((111y... mnbol measures does not impact the septic system and repair area(sl. OF 1.Per NCG-01,Inspect outlet at lest once a week and after each 1 inch or I /- /" / /LIMTS 4.At least one Construction EnlrancelExa is to be installetl per lot. FILTER FABRIC IN TRENCH greater rainfall event.Complete any required repairs immediately. 5.Waste bins and other areas dedicated for managing building material waste shall be at 2.Freshen stone when sediment accumulation exceeds 6Inches. �W"/ 7 / / least 50 feet away from storm drain inlets or drainage ditches unless d can be shown that 3.Keep mesh free of debris to provitle adequate flow. / / / f� �_ - no other alternative exists.If this separation cannot be achieved,these areas must be 4.Remove sediment when half of stone outlet is covered. / T• A 00.1ined behind Silt Fence. 5.Replace stone as needed to facilitate de-watering 6.Inlats tlownsiream of tllsturbances shoultl be ANC-Envirpinleil uI./yey SECTION VIEW / / / / / protected:streets should be swept when L___-- J SILT FENCE OUTLET / / adimanto-emtha Gnatraebonaefiwyipreant. ,p / / y�' / ..\NC-Environmental.jpeg ].Details for Silt Fence,Silt Fence Outlets,Construction Entrances and other measures are \` /// /// - provided on additional sheets.Erosion and sediment control details are not drawn[o scale. / €11:12.'2020 TYPICAL LOT LAYOUT WITH CURB AND GUTTER \ \ // // / / -� / ' , DATE: PAGE: DATE PAGE: I I 55 / ,, '40 '� / s Slit S k/Wattle Silt S k/Wattle ATE: I \ aSI owe .I .I equivalentprotection I / Ga e.re -, agelnst erosive velocities may be sub.... n= , III II�I.. °unmmry Mtn compost I �J,fO .�.O go'Mdr.yro 11 11 1 I / 1 f ro � .Ir=n.II_ g. F - 12 2 2 t2 2 x 2 red length such that legs do net deform. 356 OPEN / Qs). 'M h,' Stakes Slakes > () d be ran ed parallelto -reu SECTION SECTION beyond�a�o GROUND STABILIZATION drFat are.should be located at the edge of theG SPACE �,� / / / , y land disturbance,The ends of the sin SITE AREA STABILIZATION e „1N.- Ab.• �° a,Ma.. sock/wattleII M DESCRIPTION TIME FRAME EXCEPTIONS / / / ,'-,r " .-ate silt t I PERIMETER DIKES, 7 DAYS NONE QJ I a•Mn "`-11 ' }F`l� III, Ill din.x2- SWALES,DITCHES 3' / / ZA 'e ti-7'� W W veto Ivw &SLOPES 4„, 3' / ~�ti i-~ e.^�i`� m n HIGH QUALITY 7 DAYS NONE - - hha}� Trenen n Mn rench.8 feet if te silt ° h WATER ZONES Wood Mulch or core st ground 4 To 1/2 height of o9 s. nmaevensareu-ado - 1- (HOW) 65r .� Construction: Meln[enence. urvTRErvcNED INSTALLATION socks/waffles are used° g j inspect at least once a week and after each 1 inch or ENTRENCHED INSTALLATION. I 1.Clear the entrance and exit area of all vegetation,rook,end other ob ecfonable 1 Per NCG-01 '""°"`""�`""°""°'°""" `�""'"'�""""' «°...mkt shall be place gro°eve..used behind the silt SLOPES STEEPER 7 DAYS IF SLOPES ARE 60 material and properly grader greater rainfall;make any required repairs immediately. ISOMETRIC VIEW THAN 3:1 10'OR LESS IN 2.Place the gravel to the specific grade and dimensions shown on the plans,and 2.Maintain the gravel patl In a contlition to prevent mud or sediment +. attar LENGTH AND ARE smooth it. hors leaving the construction site.This may require periodic MAwTENANCE: 3.un 9 drainage to carry water to a sediment or other suitable outlet. e r with 2 inch stone. Inspect silt socktwanle at Ieaatweeay one cogPosT s«x INma FLOW:Area °aorta info n,gexar rei°'aII.Ram°°` NOT STEEPER I a try p pd easing M"Ian nr cn:np°su needed Le ea seaor od aria any aenris as I�61 4.Use 9eo[extile fabrics in order to improve stability of the foundation in locations 3.Immetliately remove all objectionable materials s II spilled,washed or ter unaananaa seeks cogtornec SE' 1z Mm le rem Sin so marrow must be replaced THAN 2:1, 14 .___. ----.--- Pie SheetFl Proksea oxeno�mmet« �R0) (seanm)(asonm)(soo�m) rim) s. anlemusberaplaceen dogged w DAYS ARE / eubjacttoseepageorhighwatertable. trackedonbpublicroedweys. '° torn ALLOWED silt cek/° eu I Do 18rm1 1uarm) '+,° 'f«° 'r:« q SLOPES 3:1 OR 14 DAYS ES G FOR 35a �. CONSTRUCTION ENTRANCE/EXIT wo,xAd f wane (doe m) (see m) Iaao m1 - FLATTER SLOPES GREATER rono'.a rze. or:: ';in II" =.," ,..,,t s. gILtokatallwcma>an ee°i:^eied uellanN THAN 50'IN \ V ire) Ii'/0I Iim/m) /m/m) Iim/nil meaaureeeesb.111.P..1.permanently e�eolrreae ` LENGTH �� ALL OTHER AREAS 14 DAYS NONE(EXCEPT \ \ PA GE 1 of 2 L SILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION WITH OT SLOPES OR PERIMETERS �� FLATTER THAN 4:1 AND HOW ZONES) __ DATE: tare Fence Filter Fabric PAGE: OPEN TOTAL DISTURBED ACREAGE: 1.48 ACRES u alma 7 e Max.Exue bergmalOsoIcoaultwm,re fence Wee Fence Wire 6ockfill trench \/ SPACE LOT EROSION CONTROL PLAN ' I LOTS 47 & 50 Steel peat .... thoroughly General Erosion Control Notes CAROLINA CROSSING -� 1.Only the areas shown shall be disturbed t te-z4^ uwm 2 All disturbed Plastic or areas shall be grassed and ---- PHASE ONE mulched as possible and maintained r �� wre tea tA'o: °s Psse �J I / i Pemaneni aver obi ehea ` /I AN D �ry tam :n f • ..•. / / LOT 1 1 + / CAROLINA CROSSING Construction: 1 Filter Fabric I 2.1.Construct sediment barrier a extra synthetic R°SsaEGE°"VIEW MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION PHASE TWO sufficientmay irnpound velum.at water lure at the c e) Hig mnrna 3,Construct the securely fa.ntthe°fiI rdot only la a+u'Iwor post of a feet minimum oveineowhe next pint FOR arength naerfarc bvvdre mean fastened sawrely to the upstere sae or me posts-Extend General-All measures will be inspectedand corrections made after runoff producing rainfalls, per weeanyadverselyany a...re rt standard sin..to.bottom of Me trench.Fasten the v.reinforcement then fabric on Mean.. 1pro g rain�s,or at least once k minimum.The builder will insure that the construction activities on particular lot do not affect of the installed erosion control measures.If lot construction dictates,measures will be R� side of.fence ties should a minimum 50 k•vnm.gWed repalnim.alerely, relocated on the lot to insure that the potential for sedimentation runoff is eliminated as much as possible.Silt fences and gravel construction entrances will be maintained as suggested in the erosion control manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. A&G RESIDENTIAL LLC M1°...fenceIs used.spa.poets a maximum of a feet span Sulpports should be driven 2,shout,L.r.,r,of allseUmenifence wllapse.tear,decompose. secuGravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic topdressing with 2-inch stone.After each rainfall,inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all restreng""NIl ee,.5fooPsteceery does not repulrea.dde mesh support frca.Beeely objectionable materials spilled,washed,or tracked onto public roadways. QUEWHIFFLE TOWNSHIP HAKE COUNTY e.�BtenMeniterfabricdirectlytoposts.wireoroesncniptiesshouldhaveaminimumof50poundtensua ,teasevamar«thenetrainandreacemeasureonthe Silt Fence-Sedimentfencesshouldbeinspectedatleastonceaweekandaftereachrainfallevent.Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed of properly to insure SCALE: 1"=100' NE 2024 ovate m y inches retie and a inches v e proposed rine Srtn.ware a.a a fence. °rem°"°'e unearminre me fence agnn9 that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during cleanest operations. - JUNE Excavate ma thenbnapmosi kI di mRernoveSodding-The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to close,since this could inhibit adequate growth GRAPHIC SCALE .Place Inches off°Eabac along the bottom and side of the tren.. and bong theaea m greaeland stabill.it after the mnnbuting 100 0 50 100 200 400 soil placed over me filer fah.and compact Thorough compaction or me badmu is d drainage area nasbeen properly stablli:ca and stabilization of the root bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. ctit.I to silt fence performa.e. Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are germinating properly.Any bare areas should be 10.m rrc attach filter fabric mexisting s. repaired,and reseeded as soon as possible.If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass. Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height Removed ( IN FEET ) ..\NC-Envir,,m en tot.Jyeg� SILT FENCE sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water. t inch = 100 ft. JReinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout.Remove and replace stone as necessary as it becomes dogged with sediment Remove all MOORMAN,KIZER&REITZEL,INC.115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305 fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. PHONE(910)484-5191 FAX(910)484-0388 LICENSE lfF-0106 LAST SAVED:B/19/2024 3:50 PM LAST PLOTTED:6/19/2024 5D1 PM PLOTTED BM Dennis Gilbert FILENAME:G\CURRENT JOBS\Aare RESIDENTIAL LLC\23-2655-02 CAROLINA CROSSING-EC\PLANS\CAROLINAXIN EC-LOTST42&50.DWG