Loading...
HomeMy WebLinkAboutSW5240102_Response To Comments_20240813 (2) AT (,--,-;:cov:o,,,,s,„4,6 V \ ROY COOPER 11 4. _- gi Governor ■!,i``•. C ELIZABETH S.BISER "" _ ?'nun n., Secretary *f��owMns/10* WILLIAM E.TOBY VINSON,JR NORTH CAROLINA Interim Director Environmental Quality July 19, 2024 Gettle Engineering& Design, PLLC Attn: Keith P. Gettle, PE 4616 Waxwing Ct. Wake Forest,NC 27587 AND BF Properties IV, LLC Attn: R. Wayne Bailey, Manager 9000 Creedmoor Road Raleigh,NC 27615 Subject: Request for Additional Information Stormwater Permit No. SW5240102 Jeffery Way Commercial Franklin County Dear Mr. Gettle and Mr. Bailey: The Division of Energy, Mineral and Land Resources (DEMLR),received a Stormwater Management Permit Application for the subject project on January 12, 2024. A review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Plans a. The drainage area delineated on the plans does not include the SCM. Please ensure the drainage area includes all areas draining to the SCM, including the area of the SCM. 2. Supplement-EZ lx hard copy of the complete, original Supplement-EZ Form is required per Sections V& VI, 3 of the Application a. Cover i. Line 7-8: Please fill in. Per 15A NCAC 02H .1017 (10), the vegetated setback shall be at least 30 feet in width. b. Drainage Area Page i. The entire site column is an accounting of the entire project area. BUA that is located within the project area should be included within the entire site column, whether or not it drains to the SCM. D E�4,- om of o Quality I ,Md '�J/� 512 NorthNorthCar SalisburylinaDepart Street ent 1 1612 MailEnvir Servicenmental Center I RaleighDivision,Northof CarolinaEnergyineral 27699-16anLan12 d Resources NORTH CAROLINA v D.o.nm.m of Environmental Quality 919.707.9200 The drainage area columns (to the right of the entire site column) are an accounting of all of the areas draining to the SCM). c. Bioretention Cell Page i. Line 18: The provided SHWT report indicates a SHWT elevation of 419.0',please revise. ii. Line 19: Per previous comment,please ensure SHWT separation is achieved per Bioretention MDC 1 3. Calculations: a. 15A NCAC 02H .1002 (50) "Ten-year storm intensity" means the maximum rate of rainfall of a duration equivalent to the time of concentration expected, on the average, once in 10 years. Ten-year storm intensities are estimated by the National Oceanic and Atmospheric Administration(NOAA) Precipitation Frequency Data Server(PFDS), which is herein incorporated by reference, including subsequent amendments and editions, and may be accessed at no cost at http://hdsc.nws.noaa.gov/hdsc/pfds/. Please revise calculations as it appears the 10- year 24 hour storm was used. 4. Please provide a Response to Comments letter indicating, in a point-by-point manner, how each of the above comments has been addressed. This item is required per 15A NCAC 02H .1042(3)(b). 5. Provide PDFs of all revisions, 2 hardcopies of revised plan sheets, 1 hardcopy of other documents, and a response to comments letter briefly describing how the comments have been addressed. a. PDFs must be uploaded using the form at: https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload b. Hard copies must be mailed or delivered to the following address: i. For FedEx/UPS: Brianna Holland 512 N. Salisbury Street, Office 640E Raleigh,NC 27604 ii. For USPS: Brianna Holland 1612 Mail Service Center Raleigh,NC 27699-1612 iii. Hand Delivery: Please reach out to me prior to hand delivering a submission to make sure that I (or someone else in my group)will be able to receive the submission. Do not leave the package in the foyer with the security guard. NOTE: Hard copies should not be sent to a Regional Office. Doing so will delay the review process and the submission package may be lost while being sent from the Regional Office to me in the Central Office. - While not required, it is strongly recommended to provide pretreatment for the bioretention cell. Bioretention cells without pretreatment are more prone to failure than bioretention cells with pretreatment. Not providing pretreatment will require more frequent maintenance of the bioretention cell which will result in a higher cost of ownership over the lifetime of the SCM. Please consider revising the design to include pretreatment. To ensure a fair, timely, and transparent review process, any disagreement with provided comments will need to be addressed in writing as part of the requested information resubmission, within the required resubmittal window. The merits of the disagreement will be reviewed during the next scheduled technical review and, if applicable, will be addressed in further requests for additional information. If the resolution provided by the reviewer is found to be unsatisfactory, the applicant can agree in writing to a longer review period, during which the dispute will be brought to the technical review committee and a final determination will be made. Due to staffing limitations and to ensure an efficient project review, requests for individual meetings to discuss provided comments are decided at the discretion of the reviewer. We encourage you to carefully review the written feedback provided and the applicable rules. The NCDEQ Stormwater Design Manual provides additional insight into design criteria. Any questions or further requests for clarification should be submitted in writing in the requested information resubmission,within the required resubmittal window. We appreciate your understanding and cooperation in this streamlined process. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to August 18, 2024, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. Please reference the State assigned project number SW5240102 on all correspondence. If you need additional time to submit the information,please submit your request for a time extension to the Division at the contact below. The request must indicate the date by which you expect to submit the required information. The Division is allowed 30 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. If you have any questions concerning this matter please feel free to contact me at postconstruction@a deq.nc.gov or(919) 707-3646. Sincerely, 6 4.iA.,- j(0-ega/tAi Brianna Holland Environmental Engineer DEMLR Post-Construction Stormwater Program cc: Raleigh Regional Office