Loading...
HomeMy WebLinkAboutNCC232284_Annual Fee NOD Letter (2024 Fee)_20240816ROY COOPER Cnvernnr ELIZABETH S. BISER Serrrfary WILLIAM E. TOBY VINSON, JR Intenm DfrKw 8/16/2024 Ridgeline Corporation Attn: W Kendall Foster PO Box 39 Cornelius, NC 28031-7049 �M1 `f t1tw1�' NOR CAROLINA, Environmental Quality Subject: Notice of Deficiency - Failure to Pay Annual Fee Invoice No. NCC232284-2024 Dear Permittee: You are receiving a Notice of Deficiency because the annual fee of $120 for coverage under NPDES General Stormwater Permit NCG010000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4). The annual fee was billed on 7/1/2024 and was due on 8/1/2024. The annual fee applies to the following construction site: Adalyn Park 295 Kistler Farm Rd, Mooresville, NC Iredell County Certificate of Coverage No. NCC232284 NC Reference No. NCG01-2023-2284 If the project was closed out prior to the invoice due date, please request a Notice of Termination. Follow the instructions on the NPDES Construction Program website (deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice due date, please pay the permit fee using the Stormwater ePayment website (deq.nc.gov/SW-ePayments). Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil penalty assessment of up to $25,000 per day for failing to maintain permit coverage. If you have any questions or concerns, please contact Kieu Tran at kieu.tran@deq.nc.gov. Sincerely, i-g' �L( William E. Vinson, Jr., PE, CPESC, CPM Interim Director Division of Energy, Mineral, and Land Resources 0-11 Q North Carolina Department of Environmental Quality I Division of Energy. Mineral and lend Resources _ SR North Salisbury Street 1 1012 Mail Service Center Rough, North Carolina Z7699 1612 w n..��....w� V 919.702.9200