HomeMy WebLinkAboutNCC211000_NOT Closeout Documents_20240812 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 450 W. Hanes Mill Road, Suite 300,Winston-Salem,NC 27105
(336) 776-9800
County: Forsyth Project: Salem Lake Phase II River basin: Yadkin-PeeDee
Person financially responsible:City of Winston-Salem-Robert Prestwood Project#: FORSY-2021-021
Address: PO Box 2511,Winston-Salem,NC 27102
1. Project Location: Salem Lake Rd,Winston-Salem
Pictures: No
2. Weather and soil conditions: 80's,sunny,workable Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Title:
Inspection report: Sent Report Date given/sent: July 31,2024
9. Corrective action needed:
10. Comments: The site was inspected on July 31,2024 to facilitate a site closure.Permanent ground cover
sufficient to restrain erosion has been established.No additional self-monitoring or
self-inspections are required.Project is in compliance and released under the SPCA.
Termination of coverage under the NPDES General Stormwater Permit for Construction
Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).
The NOT is available at:https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note
that this correspondence must be uploaded as part of completing the NOT process.
If you have any questions,please contact the Winston Salem Regional Office or
nate.gainer@deq.nc.gov or 336-776-9660.
Reported by: Nate Gainer Others present:
Date of inspection: July 31,2024 Time arriving on site: 11:45 AM Time leaving site: 12:00 PM
CC: