Loading...
HomeMy WebLinkAboutNCC211000_NOT Closeout Documents_20240812 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 450 W. Hanes Mill Road, Suite 300,Winston-Salem,NC 27105 (336) 776-9800 County: Forsyth Project: Salem Lake Phase II River basin: Yadkin-PeeDee Person financially responsible:City of Winston-Salem-Robert Prestwood Project#: FORSY-2021-021 Address: PO Box 2511,Winston-Salem,NC 27102 1. Project Location: Salem Lake Rd,Winston-Salem Pictures: No 2. Weather and soil conditions: 80's,sunny,workable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Title: Inspection report: Sent Report Date given/sent: July 31,2024 9. Corrective action needed: 10. Comments: The site was inspected on July 31,2024 to facilitate a site closure.Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT). The NOT is available at:https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. If you have any questions,please contact the Winston Salem Regional Office or nate.gainer@deq.nc.gov or 336-776-9660. Reported by: Nate Gainer Others present: Date of inspection: July 31,2024 Time arriving on site: 11:45 AM Time leaving site: 12:00 PM CC: