Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout20221688 Ver 2_North Bend_AB-CR MITIGATION_20240805 (2)_20240808AS—B BUILT LIMITS
OF PLACE RIPRAP
701 4
n85o55
Mid 67 855
1005
1 055.35
5P IP5
DESIGN ZONE-1
PERM, IMPACT AREA-1357SF
CR BUFFER. ZONE 2 LIMIT
CR BUFFER, ZONE 1 LIMIT
TVPOBANKAVEYED
PRE—CCTION
��
A _ —
� Z9�
PALL=52�f
_ — 0
0
AS-B IL Z E-1 ds
TEMP. PACT=515sf
AS ILT ZON
- — PE f IMPACT=757s
1040
tsi( ZONE
PERM. IMPAC ARE ,6605 _
S- LILT E-1 _- _ �-
- IMP=1420sf 03
\ _ - �- - 5
AS-BIILT -2(( \ / �— = T
D OF FINISHED RAMP:
TEMP. IM PACT sf� 35.72746°, W81.81061°
AS- UILTZO ) �' - - L.-1036.0'
MP�fvl 9sf 1
/ DESIGN
TEMPORARY
IMPACT
AREAS
S
AE FLOOD ZONE
(NC FRIS GIS SHAPEFILE)
C
E—CONSTRUCTIONS
OHWM
EL.-1042.8'
20
0 0 40
Scale: 1" 20'
NORTH CAROLINA WILDLIFE RESOURCES COMMISSION
NORTH BEND BOATING ACCESS AREA
Date:05-AUG-2024
NORTH
ENGINEERING SECTION
AS -BUILT DRAWING FOR
CAROLINA
1720 MAIL SERVICE CENTER
File Name:
RALEIGH, NORTH CAROLINA 27699
CATAWBA RIVER BUFFER MITIGATION
NORTHBEND_AB.dwg
/ '
Surveyed: CMR, JCF, JAS
RESOURCES
COMMISSION
Phone: 919.707.0150
PLAN VIEW
Designed: JCF
Drawn: JCF
Fax: 919.707.0162
www.ncwildlife.org
Sheet No.
1 of 1