July 30, 2024
LETTER OF APPROVAL
Virginia Electric and Power Company d/b/a Dominion Energy North Carolina
Attn: Mr. Kevin Fields,Authorized Representative
5000 Dominion Boulevard
Glen Allen, Virginia 23060
RE: Project Name: Line 105 Tarboro-Parmele Rebuild Phase 2
Project ID: Pitt-2023-021
County: Pitt
City: n/a Acres Approved: 43.81
Address: Price Road, multiple
River Basin: Tar-Pamlico
Date Received by LQS: July 16, 2024
Submitted By: C2 Environmental
Plan Type: Revision
Dear Sir,
This office has reviewed the subject erosion and sedimentation control plan. We find the
plan to be acceptable with modifications and hereby issue this letter of Approval with
Modifications.The Modifications Required for Approval are listed on the attached page.This
plan approval shall expire three (3) years following the date of approval, if no land-
disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOl) form requesting a Certificate of Coverage (COG) under the
NCG010000 Construction General Permit. After the form is reviewed and found to be
complete, you will receive a link with payment instructions for the $100 annual permit
fee. After the fee is processed, you will receive the COC via email. As the Financially
Responsible Party shown on the FRO form submitted for this project,you MUST obtain the
COC prior to commencement of any land disturbing activity. The eNOI form may be accessed
at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater
Program staff in the Raleigh central office. If the owner/operator of this project changes in
the future, the new responsible party must obtain a new COC.
). North Carolina Department of Environmental Quality I Division of Energy,,Mineral and Land Resources
�J Washington Regional Office 1943 Washington Square Mail I Washington North Carolina 27889
Naa+n'cTT1OUNAD
0•1.6,.m0'E'm'"'""^mo ,\ / 252.946.6481
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following
documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance-oriented,
requiring protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions
to the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances
or rules may also apply to this land-disturbing activity. This approval does not supersede
any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. This permit allows for a land-
disturbance, as called for on the application plan, not to exceed the approved
acres. Exceeding the acreage will be a violation of this permit and would require a revised
plan and additional application fee. You are requested to file an amended form if there is any
change in the information included on the form. In addition, it would be helpful if you notify
this office of the proposed starting date for this project.
Please be advised that a rule to protect and maintain existing buffers along watercourses in
the Tar-Pamlico River Basin became effective on January 01, 2000. The Tar-Pamlico River
Riparian Area Protection and Maintenance Rule (15A NCAC 2B .0734) applies to the 50-foot
wide zone directly adjacent to surface waters (intermittent streams,perennial streams,lakes,
ponds, and estuaries) in the Tar-Pamlico River Basin.
For more information about these riparian area rules, please contact the Division of Water
Resources Wetland/401 Unit at 919-807-6300, or DWR in our regional office at 252-946-
6481.
Sincerely,
Samir Dumpor, PE
Regional Engineer
Land Quality Section
cc w/o enc: Jennifer B. Johnson, C2 Environmental (email)
Lucas DuPont, Dominion Energy (email)
WaRO Division of Water Resources (email)
,.,- North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
Washington Regional Office 1943 Washington Square Mall I Washington,North Carolina 27889
t,o'TH GAPOI WA
Department au.. muu+m 252.946.6481
PROJECT INFORMATION SHEET
APPROVAL DATE: July 30, 2024
Virginia Electric and Power Company d/b/a Dominion
RESPONSIBLE PARTY: Energy North Carolina
PROJECT NAME: Line 105 Tarboro-Parmele Rebuild Phase 2
COUNTY: Pitt NO.: Pitt-2023-021
OFF-SITE BORROW
AND/OR DISPOSAL SITE: N/A NO.: N/A
START-UP DATE: August 12, 2024
CONTRACTOR: Linetec
ON-SITE CONTACT: Charles Schleicher
ON-SITE PHONE NO.: (804) 205-0287
OFFICE PHONE NO.: (804) 205-0287
COMPLETE &RETURN THIS FORM
PRIOR TO THE START OF CONSTRUCTION TO:
N.C.D.E.Q.
LAND QUALITY SECTION
ATTN: Bradley West
943 WASHINGTON SQUARE MALL
WASHINGTON, NORTH CAROLINA 27889
donald.west@ncdenr.gov
North Carolina Department of Environmental Quality I Division of Energy.Mineral and Land Resources
Washington Regional Office 1943 Washington Square Mall I Washington,North Carolina 27889
°a.:LN'A:1"0 wm au i / 252.946.6481
Dominion
Energy
Dominion Energy Services,Inc.
120 Tredegar Street,Richmond,VA 23219
DominionEnergy.com
Chris Pullinger
NCDEQ, Washington Regional Office
943 Washington Square Mall,
Washington, North Carolina 27889
July 10, 2024
Mr. Pullinger:
Dominion Energy North Carolina (Dominion) is pleased to provide the enclosed Erosion and
Sediment Control Plan modification for the Line 105 Tarboro— Parmele Rebuild Phase 2 project for
review and approval. Dominion is in the process of rebuilding an existing overhead electric
transmission line, Line 105, which extends approximately 8.0 miles from structure 105/87 to Parmele
Substation in Pitt County (Location Map, enclosed). The original Erosion and Sediment Control Plan
proposed 43.81 acres of land disturbance and was approved on December 2, 2022 (Pitt-2023-021).
Upon issuance of the original plan approval, the project was registered for coverage under the
Construction General Permit(NCG01) and construction commenced. Since that time, Dominion has
identified several needs that warrant a revision to the approved plans. The first change was the
removal of a construction entrance and access route and addition of a workpad, for which our
coordination with NCDEQ determined that no modification was needed. Dominion has now identified
the need to add mat access around an existing cemetery near Price Road/Route 1430 in Pitt County.
The proposed matting would provide access for forestry crews to remove danger trees without
disrupting the cemetery plat(Sheet 20 Area B).
The new total land disturbance area is 43.19 acres. As this is below the initial approved 43.81 acres,
no additional fee is included. If you have any questions or require any additional information, please
feel free to contact Lucas Dupont(Lucas.A.Dupont@dominionenergy.com or 434-981-0483) at your
earliest convenience.
NCDEQ Pitt-2023-021 Modification
July 10, 2024
Page 2 of 2
Regards,
—, 1'..f` j 'f--
Elizabeth (Tibby) L. Hester
Authorized Representative
Manager, Environmental & Sustainability
Attachments: Revised Erosion &Sediment Control Plan
FRO Form and Fee Check
Check if this project is ARPA-funded ❑
Attach a copy of the Letter of Intent to Fund
FINANCIAL RESPONSIBILITY/OWNERSHIP FORM
SEDIMENTATION POLLUTION CONTROL ACT
No person may initiate any land-disturbing activity on one or more acres as covered by the Act, including any
activity under a common plan of development of this size as covered by the NCG01 permit, before this form
and an acceptable erosion and sedimentation control plan have been completed and approved by the Land
Quality Section, N.C. Department of Environmental Quality. Submit the completed form to the appropriate
Regional Office. (Please type or print and, if the question is not applicable or the e-mail address or phone
number is unavailable, place N/A in the blank.)
Part A.
1. Project Name Line 105 Tarboro - Parmele Rebuild Phase 2
*If this project involves American Rescue Plan Act(ARPA)funds, list the Project Name or Project
Number(e.g., SRP-D-ARP-0121) below under which you were approved for funding through the
Division of Water Infrastructure (DWI).
2. Location of land-disturbing activity: County Pitt City or Township N/A
Highway/Street Multiple Latitude(decimaidegrees) Longitude(decimal degrees)
3. Approximate date land-disturbing activity will commence: 8/1/24
4. Purpose of development(residential, commercial, industrial, institutional, etc.): Electric Utility
5. Total acreage disturbed or uncovered (including off-site borrow and waste areas):43.19
6. Amount of fee enclosed: $ No additional fee.The application fee of$100.00 per acre (rounded up to
the next acre) is assessed without a ceiling amount (Example: 8.10-acre application fee is$900).
Checks should be addressed to NCDEQ.
7. Has an erosion and sediment control plan been filed? Yes El Enclosed ❑ No ❑
8. Person to contact should erosion and sediment control issues arise during land-disturbing activity:
Name James Eric Clay E-mail Address fames.e.clay@dominionenergy.com
Mobile# 804-335-9534
Phone: Office# N/A
9. Landowner(s) of Record (attach accompanied page to list additional owners):
Multiple, see enclosed plan N/A N/A
Name Phone: Office# Mobile#
N/A N/A
Current Mailing Address Current Street Address
N/A N/A
City State Zip City State Zip
10. Deed Book No. multiple Page No. multiple Provide a copy of the most current deed.
Part B.
1. Company(ies)who are financially responsible for the land-disturbing activity(Provide a comprehensive list
of all responsible parties on accompanied page.) If the company is a sole proprietorship or if the landowner(s)is
an individual(s), the name(s)of the owner(s)may be listed as the financially responsible party(ies).
Virginia Electric and Power Company d/b/a ET. Environmental@dominionenergy.corn
Dominion Energy North Carolina do Kevin Fields
Company Name E-mail Address
5000 Dominion Boulevard 5000 Dominion Boulevard
Current Mailing Address Current Street Address
Glen Allen VA 23060 Glen Allen VA 23060
City State Zip City State Zip
Phone: Office# 804-771-3769 Mobile# N/A
Note: If the Financially Responsible Party is not the owner of the land to be disturbed, include with this form
the landowner's signed and dated written consent for the applicant to submit a draft erosion and sedimentation
control plan and to conduct the anticipated land disturbing activity.
2. (a) If the Financially Responsible Party is a domestic company registered on the NC Secretary of State
business registry, give name and street address of the Registered Agent:
CT Corporation System N/A
Name of Registered Agent E-mail Address
160 Mine Lake Ct, Ste 200 160 Mine Lake Ct, Ste 200
Current Mailing Address Current Street Address
Raleigh NC 27615-6417 Raleigh NC 27615-6417
City State Zip City State Zip
Phone: Office# 888-724-9870 Mobile# N/A
Robert Ingato (Secretary)
Name of Individual to Contact(if Registered Agent is a company)
(b) If the Financially Responsible Party is not a resident of North Carolina, give name and street address
of the designated North Carolina agent who is registered on the NC Secretary of State business registry:
CT Corporation System N/A
Name of Registered Agent E-mail Address
160 Mine Lake Ct, Ste 200 160 Mine Lake Ct, Ste 200
Current Mailing Address Current Street Address
Raleigh NC 27615-6417 Raleigh NC 27615-6417
City State Zip City State Zip
Phone: Office# 888-724-9870 Mobile# N/A
Robert Ingato (Secretary)
Name of Individual to Contact(if Registered Agent is a company)
(c) If the Financially Responsible Party is engaging in business under an assumed name, give name under
which the company is Doing Business As. If the Financially Responsible Party is an individual, General
Partnership, or other company not registered and doing business under an assumed name, attach a copy
of the Certificate of Assumed Name.
Dominion Energy North Carolina
Company DBA Name
The above information is true and correct to the best of my knowledge and belief and was provided
by me under oath. (This form must be signed by the Financially Responsible Person if an individual(s)
or his attorney-in-fact, or if not an individual, by an officer, director, partner, or registered agent with
the authority to execute instruments for the Financially Responsible Party). I agree to provide
corrected information should there be any change in the information provided herein.
Kevin Fields Authorized Representative
Type or print name Title or Authority
7/9/24
Signature Date
1, at, 1ti't-c 411.�i/e-� s , a Notary Public of the County of H-.r,i.;c.a
Nij tri II'oft.
State of Nort , hereby certify that KW'v L. P.A.] cis appeared personally
before me this day and being duly sworn acknowledged that the above form was executed by him/her.
Witness my hand and notarial seal, this day of J , 20ay
•
Laura Paige Meadows 4.4..c."-/2_ I c_ L'YCommonwealth of Virginia ary
I Notary Public
`S Commission No.7937791 My commission expires 31 la- ;2.O �j
My CommissionExpi►es8/31/202a
1
' I N =
a' PROJECT LOCATION MAP
m
g wl
ci i; /� •m I Z 0A Line 105 Tarboro- Parmele Rebuild Phase 2
t
m p I 0
��o
Pitt County, North Carolina
.3 w 1 Q
0 12 e� Client:
a k, w o 1
�6 - � Dominion Energy North Carolina
prL 'a
Manning Rd ` I
c4i C2 Env Project: Prepared By: Date:
q S `ar�'y 6• �bP 0107 AJB 08/15/22
a't 441
=' �G I a G I I I I I
�., ror R fob ,� 0 0.5 1 2 Miles
�� I -ro,- 3
r a Scale is t IN=t MI when printed at original size of 11 xl7
I SITE DATA
I
r-- Transmission Line Length +/-8.0 MI
/ Crisp Creek I r' us
Parmele Nty
( — aY 64
- -� `
— I ,
I douse Fid f',.
I f,�`
Conetoe / a TT
c°, PF a
eks Rd
// �e iv,, I ¢ 1. ° PROJECT TERMINUS a
PROJECT START ' ��t•� us Hg 35.806828°,-77.317967°
35.805527°,-77.449070°'t°e Creek / R Jr —; - 5.��-1—s _ Parmele Rd
N _ _ Bethel 1 tT ` `
/ — — �N US h�hway 64A S.
� � d
// `�� = ==��—==rt=�t�m` Grindle Creek Fiat Swamp Church Rd -
/ pace Rd Z Q-a
T7
// to
/ ° to 49
/ vo`� O
c) d-f
rn IA
ry
m
�13 Grindle Creek
1:3n Lewis Rd n
xv.
in
U o-
U i
Notes:
1.Basemap from ESRI World Street Map and World Topographic Map 2021
n o Rd ,
c���
TnY Hill Rd ,Mt,tn R i d Approximate A
a Project Location
4
oRocky Mount
7.nt
Z
Wilson
Sark/Y R/age lea — t
Sources: Esri, HERE, Garmin,
USG.Sllhntermap, INCREMENT
-0 r D P,NRCan, Esri Japan,METI,
o8 Esri China(Hong,Kong), Esri
9
I
Sources: Esri;HERE, Garmin, Intermap,increment P Corp.,GEBCO,USGS, FAO, NPS,NRCAN,GeoBase, IGN,Kadaster ENVIRONMENTAL
NL,Ordnance Survey, Esri Japan,METI,Esri China(Hong Kong),(c)OpenStreetMap contributors,and the GIS User
Community I SHEET 1 OF 1
m$:\Projects\A166-Line'OS Tarboro-Parmele\sIS_cA00Mxd\0166_Iocation_deq pl.mxd
LINE 105 TARBORO - PARMELE REBUILD PHASE 2
Project Narrative: P I TT COUNTY, NORTH CA R O L I N A
The project involves rebuilding Line 105, an existing overhead 115 Site Description:
kV electric transmission line. Phase 2 extends from the Structure The project traverses rural, largely undeveloped land, and
105/87 in Pitt County, North Carolina to Parmele Substation.The some rural residential development.Areas outside of the
existing transmission line largely consists of wood H-frame I N ROW are mostly forested or agricultural.The project area
structures which will be replaced with new structures, and the terrain is flat with some steep slopes in close proximity to
overhead conductor and shield wires will be replaced. New —Gil t A— streams and highways.The soils in the project area are
structures that are located in wetlands will result in permanent generally characterized as having a slight erosion
wetland impacts(See SWPPP Appendix J). Existing access roads potential and a moderate to severe rutting potential.
will be used wherever available.Where no existing access is o
present,temporary access will be installed and removed in its ill Project Data:
entirety upon completion of work. r ` Transmission Line Length: +/-8.0 Miles
_ Q� Project Area: +/-155.39 Acres
Jurisdictional impacts are proposed and a Pre-Construction s • ` Pa f Il1C I C � """� _ Area of Disturbance: +/-43.19 Acres
Notification has been submitted to the US Army corps of engineers r River Basin:Tar-Pamlico
for authorization under the Nationwide Permit Program and CO • f Hydrologic Unit Code(s):
corresponding NCDEQ Water Quality Certification. Relevant 030201030305 Lower Conetoe Creek
permits are to be included in SWPPP Appendix J in advance of .. Beene ______- 030201030601 Headwaters Grindle Creek
construction. NCDOT approval has been obtained (SWPPP \� ,� �� Receiving Waters, Classification, and Index:
Appendix J). Line 105 is an existing use and the proposed rebuild Suggs Branch(C;NSW 28-100-1)
STRUCTURE 105/87 ---_=�__-__= =--='," PARMELE SUBSTATION
activity is exempt from Tar-Pamlico Buffer rules in accordance with Grindle Creek(C;NSW 28-100)
15A NCAC 026.0734(6). The project is subject to the local 35.805527°,-77.449070° 35.806828°, 77.317967° Conetoe Creek(C;NSW 28-87-(0.5))
stormwater management ordinance in Pitt County and the State 1 ', Revisions:
Stormwater program in the Town of Bethel.The permanent Plan Contents: 1. Remove CE 32 and
topdressing of existing unimproved roads is expected to qualify for 1 Cover Sheet add structures 82C&
a stormwater exemption and documentation is included in SWPPP 2-8 Master Summary 82B, 8/25/23
Appendix C. Once Erosion and Sediment Control Plan approval is 1* 9-15 Sensitive Areas 2. Add access between
obtained,the project shall be registered for coverage under the 16-24 ESC Plan Sheets structures 128& 129,
Construction General Permit and inspections conducted in 25-28 Temporary Culvert Details 6/6/24
accordance with the permit. VICINITY MAP 29 Construction Entrance Schedule
0 0.5 1 2 30 Temporary Culvert Summary Table
General
contractor shall note the location of the on-site SWPPP, rain Miles
1. The Sou Corporation
Source 2D22Microa°flCo °rati°nand2022T°mT°m 31-32 NCDEQ Required Notes
33-39 Notes and Details
gauge, permits, and other required postings on the plans prior to
beginning land disturbance. The contractor shall also note the Owner/Developer: Plan Preparer: Plan Designer:
location of any sanitary facilities, concrete washout areas, Virginia Electric and Power Company C2 Environmental, Inc. Blossom Consulting and Engineering, Inc.
stockpiles,and vehicle fueling areas on these plans once identified. d/b/a Dominion Energy North Carolina 11846 Rock Landing Drive, Suite A 1101 Professional Drive, Suite G ELT H Op
All location must e a minimum of 50 FT from inlets and surface 10900 Nuckols Road,4th Floor Newport News,Virginia 23606 Williamsburg,Virginia 23185 $ P
waters,within the limits of disturbance. Glen Allen,Virginia 23060 Attn: Christine F. Conrad, Ph.D. NC License Number: C-4572 p� �Gs
2. Above ground and underground utilities are present within the Attn: Kevin Fields Office: 757-223-0071 Attn: Scott C. Blossom, P.E. by �'
project area.These features have not been survey located and Office: 804-771-3769 Mobile: 757-778-7857 Mobile: 757-870-4825
shall be properly marked and protected prior to construction. See U SCOTT C. BLOSSOM a
Erosion and Sediment Control Note 16 Sheet 33 for further L1C. No. 40287
information on required utility marking and contact information. �- Dominion 0,-/� BCE �� 6/6/2024 w�
3. Temporary guard structures for the protection of road and Energy 0. w
overhead utility crossings shall be installed as needed outside of ENVIRONMENTAL ,.s ���
the road right-of-way unless otherwise permitted.See Erosion and SIGNAL l'�
Sediment Control Note 17 Sheet 33 for further information on
structure placement and maintenance of controls. Data Sources:
4. All work shall be in conformance with the terms and conditions of 1. Base map from ESRI Street Map, NC OneMap aerial imagery. Microsoft Corporation and TomTom. EROSION & SEDIMENT
permits obtained for this project(See SWPPP Appendix J), 2. Substation, structure locations and right-of-way dimensions provided by Dominion Energy. CONTROL PLAN
including the National Pollutant Discharge Elimination System, 3. Wetlands and other waters of the U.S.within the project area were field delineated by C2 Environmental in September-November 2021 by means
North Carolina's Erosion and Sediment Control Law,and the of sub-meter GPS. These features have not yet been confirmed by the US Army Corps of Engineers.
Construction General Permit, as well as Dominion's Annual 4. Soils from NRCS Web Soil Survey. Line 105 Tarboro - Parmele Rebuild Phase 2
Standards and Specifications. 5. Parcel data from the Pitt County GIS Department. Pitt County, North Carolina
5. In case of conflict with these plans,or if errors or omissions are 6. Contours created from the USGS NED 1/3 arc-second DEM for Rocky Mount W, North Carolina. C2 Env Project: Prepared By:
discovered,the contractor shall notify the site coordinator 7. Roads, railroads, and building footprints provided by NC OneMap.
immediately. If work proceeds with the knowledge of errors or 8. All other utilities digitized based on aerials and field observations. Clearances have not been verified. 0166 MKG
A omissions,and without written determination from the site 9. 100-Year Floodplain from FEMA Flood Insurance Rate Map Panel numbers 3720475500K eff. 11/02/2004; 3720476400L and 3720478400K eff.
coordinator, such work shall not be considered to be compliant withT. 07/07/2014. SHEET 1 OF 39
these plans.
S:\PROJECTS\0166.LINE 105 TARBORO-PARMELE\GIS_CADD\CADD\PHASE 2\MOD 1\0166 COVER P2.DWG
MASTER SUMMARY
N
Line 105 Tarboro - Parmele Rebuild Phase 2
Pitt County, North Carolina
Owner/Developer:
Dominion Energy North Carolina
C2 Env Project: Prepared By:
0166 MKG
I 1 I 1 I
0 250 500 1000 Feet
Scale is 1 IN=500 FT when printed at original size of 11x17
SITE DATA
rJ Project Area(+/-155.39 AC)
® Existing Structure
® Proposed Structure
1%.
® Exisiting Gravel Construction Entrance(10)
illiii
O Temporary Gravel Construction Entrance(13)
SHEET 20 AREA A SHEET 20 AREA B - EP`-P' --''' �— Preferred Access,Existing Gravel(+/-0.2M1)
n } Preferred Access,No Existing(+/-7.99 MI)
11 ,.,.. 21 p --
I I 105/114 1 1 c,e 3 Preferred Access,Existing Unimproved(+/-0.03 MI)
II i�\\ 105/114A 1 sue,--'--
I I ` 105/801 105/800 1,-- 105/119 : Approximate Stream Channel Limits(+/-0.60 AC,1704 LF)
105/801A105/801 c-i 105/134
I 105/130A 105/115 1 -::u::: Approximate Wetland Limits +/-26.67 AC
II
105/120 105/122 105/123 105/125 105/126 105/129 105/130105/115A 105/131 105/132 105/133 / pp ( )
_105/107 105/121 105/108 _ 105/109 105/124 105/110 11105/111 105/127 105/112105/128 105/113t C E 4U 105/116'�- 105/117 105/118
® ® ® ®® ® ®® — — — ® — —® ® — ®® 0 — — IL 5 ~' — —� — — E Approximate Open Water Limits(+/-0.29 AC)
C-0 ,, f/4�11 Il l W
— — — — — — , _ - - - - - - - - - - - - - CE 39 — — 1,_ - - - - - Approximate Jurisdictional Ditch Limits(+/-1.31 AC,11,842 LF)
\` 11 I 105/802 0 \ 11
105/802 �I 8 Parcel Boundary See Sheet 38 for Ownership
II 105/803 11
II 1� I % USGS NHD Stream Centerline
I I BETHEL CAROLINA I 1
CE 38 I I SUBSTATION I Existing 2 FT Contour
U J
P.
o SCOTT C. BLOSSOM a
Lic. No. 40287
r'' �/6 6/6/2024 ,w�
A�u sIONAL ��C'�
' CE
ENVIRONMENTAL NC.License No.
Source:2022 Mlcrosofl Corporation,2022 Maxar,and ONES(2D22)Dis[nbwon Alrbus DS SHEET 5 OF 39
S'.\PROJECTS\0166-LINE 105 TARBORO-PARMELE\GIS CADD\CADD\PHASE 2\MOD 1\0166 MASTER SUMMARY P2.DWG
�___,- SENSITIVE AREAS
OcB N
A S(\t WaB (--'-'-------- Line 105 Tarboro - Parmele Rebuild Phase 2
ExA Pitt County, North Carolina
Owner/Developer:
Pglik
Dominion Energy North Carolina
xA pg
GoA
Ly C2 Env Project: Prepared By:
co
\ 0166 MKG
I I I I I
0 250 500 1000 Feet
�y Scale is 1 IN=500 FT when printed at original size of 11x17
SITE DATA
Ra
I Co
Lewig St/142g Ex6 r _J Project Area
WaB Lv ® Existing Structure
Proposed Structure
i
® Exisiting Construction Entrance
/� GoA
.....
r \ 0 Temporary Construction Entrance
- Existing Access
SHEET 20 AREA A GoA SHEET 20 AREA B m ) n - ---WaBimiimm - —>— Proposed Access
I""' Approximate Stream Channel Limits
I \ 105/114 I ExA - - / pp
I i 105/114A
I i 105/8( 105/800 I------ 105 119 . [ Approximate Wetland Limits
i I 105/80 105/801 . I NrB2 10 134
23 105/125 105/126 105-1 105/115 105" 1 105/132 105/133 Approximate Open Water Limits
105/107 _ 105/ Oat �105/109 _ 105/110 — i i 105/111 '` _105/112 105/113t C E 40(� 105/115A 105/116�_�105/117 - 105/118 << �J
I2►� ®4 / / �/ T ►. -��� �� ~— ' ./�I���•- : Approximate Jurisdictional Ditch Limits
- - - - - - - - - - - �"~ - 7: GI21o5/8SUBSTA0
- _ _ _ FEMA 100-Year Floodplain
02 % USGS NHD Stream Centerline
I % 8B NRCS Soil Series-See Sheet 37 for Details
I 6 A BETT EL CARO INA iCE38N I I i % Slopes 12%or Greater
u OcB. J
OcB %` - - W �:�; Approximate Location of Cemetery
% 11 C" - - -Other Existing Transmission Line
,' . /
ExA /
Ly /, / •
/ /
:•'`
NrA At/ / / /
Ra \ / ' / / // LTH OF
Ly / r / / / c)/ / i O° ;61B
/ / / / / / / �y~� y'/,,// / / `' —.i••r•�• + / / / / / / / / o G?
WaB 0c6 / / / / / / / / / / / / / / / / ° SCOTT C. BLOSSOM `"
/ 'vigil / / / / / / / / / / / / / / / / C.) Llc. No. 40287 a
/ / / / / / / / / / / / / / / 5 /
/ / / / / / / / / / / / / / / / / / / / / / / 7i..
/ / / / 6/6/2024 W`�
/ / / / / / / / / / / / / / / / / / / / / / / / / . / / / / a�, W
/ / / / / d/ / / / / / / / / / / / / / / / / / / / �� / / / / / ASS ��ti1s
/ / / / i / / / / / / / / / / / / / / / / / / / / / V / / / / / / ZONAL
/ / / / / / / / / / / / / / / / / / / / / / / as / / / /� � � BCFi
Q / / / / / / / / TT / / / / / / / / / / / / %"/ / / / / /• . / / / / / / /
/ / / / / / / / / / / -" / / / / / . / / / / / / / / / / / '/ / , /. / �/ / / / / / / OcB .1-, /-
g/ / / / / / / / / / / / / // / � / / �K / / / / / / / / / / NOTE:MANY SOILS IN THE PROJECT AREA ARE RATED SEVERE ENVIRONMENTAL NC License No.C-4572
/ / / / / / / / / j / / / / / / / / // /K / y / / / / / / /// RUTTING HAZARD.SEE SHEET 38 FOR ADDITIONAL SOILS INFORMATION SHEET 12 OF 39
( r �i n ELER'a_ 1c� ti S?z (pc i i i i i i i i ii i i i it �o��.<�«m���son,,omo�.��o��,<�«fl�...�..��o�n��«�«,��s.�o��o�„�,o�a„�
3APRAIEDTb`D1 L E T BOR P RM D DD\P PSE\M 1'D'oS N ''U
EROSION & SEDIMENT
( \ '37 N CONTROL PLAN
Line 105 Tarboro - Parmele Rebuild Phase 2
a Pitt County, th Carolina
4'
/ Nor eveloper:Dominion Energy North Carolina
EXISTING CULVERT TO REMAIN C2 Env Project: Prepared By:
48 ® ENSURE ADEQUATE COVER OR 4�, 0166 MKG
_- CROSS WITH MATS SEE SWPPP APPENDIX J CONSTRUCTION ROAD STABILIZATION \
MATS OR TEMPORARY GRAVEL
FOR APPLICABLE PERMIT(S) I 1 I 1
MATS RECOMMENDED FOR ACCESS IN AGRICULTURAL FIELD
el - - - - 49 - _ _ _ _ _ _ _ _ /: - - - - - - - - � 0 100 200 400 Feet
"=x=SY='x - —— ••%++0® — -- _ , Scale Is 1 IN=200 FT whenprinted at original size of 11x17
10 0 r on in
/�/ 105/107 105/121 ♦♦♦♦♦ ♦♦♦♦♦ ► -'��.. �ii ♦ ..i. : Q x
+ //��� -1I/�r.'. ►lab♦' I: SITE DATA
105/121 � ♦=��i. .: I�♦♦♦♦♦♦♦♦♦♦♦♦O�♦T!� : ,; :* . 1 5/12 ►4.♦tea♦♦ry+//1 ♦+'• l4`>s1.12.4 ;�♦-��♦ 105/110 /�/ 25 ..;`+° --
♦♦ ♦♦�♦ �� -. .♦1♦:���iT�"•AA 1� �:aAQ4�4�♦�4C!1��i♦
E7 ET ®... ==.�=-'. —® 1.4...,® 05/109 �'® l t ��'r -x.x..x..®x..x.. . ET ET....:, r - Project Area
H OH — OH — �H �on• _ _ .H - — -t_H— —nA_ _ OH— — OH OH . Uri- •�•OH H�` Limits of Disturbance
1 ;_• '\ MATS REQUIRED FOR MA S REQUIRED FOR is] Existing Structure
CONS R TION ROAD STABILIZATION ACCESS IN WETLANDS ACCESS HY IC SOILS 0 Proposed Structure
MATS b MPORARY GRAVEL(TYPO TYP. '. `. � s ce ® Existing Construction Entrance
SEE CE SCHt SEE SHEET 29 FOR
MAT• R OMMENDED FOR AO�C IN AGRICULTURAL FIELD . DETAILS AND ESC REQUIREMENTS ce O Temporary Construction Entrance
\..,
! Existing Gravel Access,Topdress As Needed
�d��" /I
Construction Road Stabilization(Mat Stabilization or
.G viD 8-- Permanent Gravel)
�48_ . �� Construction Road Stabilization(Mat Stabilization or
i43
0 Temporary Gravel)
�� pr ce�aI P�♦�♦j Mat Stabilization
—48
------- ----
AREA A \ \ Existing Paved/Impervious Surface
Approximate Stream Channel Limits
100-FT BUFFER OF CEMETERY LIMITS N :• ':' Approximate Wetland Limits
a)\-D ..--- GRAVE SITES OBSERVED WITHIN ROW o Approximate Open Water Limits
\ NO LAND DISTURBANCE ALLOWED
♦ WITHIN AREA NOTED ON PLAN / Approximate Jurisdictional Ditch Limits
MATS REQUIRED FOR ACCESS AND " .i,."':!.�
�'`��� �� \ EXISTING STRUCTURE TO BE ACCESSED / Approximate Location of Cemetery
WORK AREAS WITHIN CEMETERY BUFFER ♦�i!�'' c'4,4
/
�♦.. \ ON FOOT AND CUT TO GROUND LEVEL
VA � \ DISTURBANCE OF MARKERS AND b _ = Silt Sock SC Temporary Stream Crossing
MATS REQUIRED FOR ACCESS IN \\ �� � ���� MEMORIALS IS NOT PERMITTED
HYDRIC SOILS(TYP.) 'kVA ♦ ��. SA -0-0-Safety Fence Rolled Erosion Control Product
:- ��� SEE CE SCHEDULE SHE 9 F R
CONSTRUCTION ROAD STABILIZATION \ I t.i ♦ 4\\%*
DETAI -AND ESC IREME TS OMATS OR TEMPORARY GAVEL(TYP.) �� Railroad OS Outlet Stabilization Structure
MATS RECOMMENDED FOR ACCESS �� 1 Parcel BoundaryIN AGRICULTURAL FIELD �� , 0,4A CD Check Dam
105/126 , 'i xistin Fence
' 105/111 \ .,- 4 ♦ �♦♦♦♦♦♦♦� ��•® ft ®,105/130 105/130A
�,♦♦t\ .♦♦♦♦A,.•i♦�(t,` WM 105/801 �n5/R01A Existingg 2ft Contours
r,& ♦♦♦,>k :44 r��;�� ?r� " g♦♦` ♦♦♦1 ♦ A:A���!:i• :!�♦jam♦♦.�♦��♦♦♦♦♦S\: � 105/800 -OH
?K j/mil j�l�>'c I���/� 105/112 x♦ ♦♦�♦�♦�♦�♦�♦00' 105/128 �` '��.0'."♦�♦�♦'fr-.. '1�10►�•_4 a 105/115 105/13'' K/�/ Other Overhead Line
- ' �4.5(1 A:' ♦ ♦ ♦♦♦♦♦♦♦♦♦♦♦♦♦♦�♦♦♦♦ �� 105/125� 105/113,..1 `•' 105/114A` /�♦�., 105/115A 105/116 -ET Other Existing d Line is ion Line
:x-x-�-a .. . l �\ I� 105/114 J♦ //�♦♦�'. ,.............
'Er EP E7 E7 / ET Et ET \ ET E• —ei.
S _/ `��� .i 105/801 ss ELT H Op
J,
��� �O �H O OH— OH OH \ OH �'OH ,�� tH— t � �• -12" v
� ' // 105/802;,4 ,. LOCKED GATE 58 O
CONFIGURE WORK AREA AS NEEDED' / 105/802=ti•-•= ® '�' "'
FOR ADEQUATE TURNAROUND WITHIN / `105/803 '~"• \ CRO S EXISTING PRIVAT p
THE LIMITS OF DISTURBANCE(TYP.) co \ / r ` GRA EL DRIVEWAY 1 SCOTT C. BLOSSOM ai
\ Cr) BETHEL CONFIGURE WORK AREAS Lic. No. 40287
ry ..i\
CAROLINA NEEDED TO AVOID GUY R d
sue\ ��,/ z // UBSTATIO� TRUCTUR�ACCESSED FROpg I SIDEc------t �0 6/6/2024 �W`�
�a.- .� V SUBSTATION D �� ��
e .; � S
Qt�G ANY TEMPORARY STOCKPILES RSULTING / h� _ ` S'10 .
/FROM STRUCTURE INSTALLATION SHOULD BE // .� NAL CE
e - PLACED IN UPLANDS AWAY FROM INLETS AND (( ��—<--
�� COVERED OR PERIMETER COrTROLS USED ��
J ENVIRONMENTAL NC.License No.C-4572
AREA B \1 \ SHEET20OF 39
S\PROJECTS\0166.LINE 165 TARBORO-PARMELE\GIS CADD\CADD\PHASE 2\MOD 1\0166 ESS PLAN P2.DWG
N SQ N EROSION & SEDIMENT
CONTROL PLAN
Line 105 Tarboro- Parmele Rebuild Phase 2
Pitt County, North Carolina
,\\ \, CIRIGINAL A
t,$/ Owner/Developer:
Dominion Energy North Carolina
EXISTING CULVERT TO REMAIN C2 Env Project: Prepared By:
8----Aj\ ENSURE ADEQUATE COVER OR 0166 MKG
/ CROSS WITH MATS SEE SWPPP APPENDIX J CONSTRUCTION ROAD STABILIZATION
FOR APPLICABLE PERMIT(S) MATS OR TEMPORARY GRAVEL I r I 200 r
MATS RECOMMENDED FOR ACCESS IN AGRICULTURAL FIELD
I — — - — — — — �� �G/ O le is 1 IN=2000 FT when printed at original size of 11x17
Feet
::ir:r:::i :::/
1 ,-z-. - ,__....X..i 1; 105/108 105/122 _ (�g�
■ :_ ♦♦♦:�--•vim ... .. .... '�y y®m�e4s�I♦, ® 'r x Y ♦♦♦♦♦♦�,01 8 �/
/120 Or 105/107 105/121 ♦♦♦♦♦♦ +.E ♦ ♦♦1♦♦♦ � / �V� • - ..•• • ... ATA
♦ 10 / 1 105/110 ♦ ♦♦♦4 ♦4 1 r 5/125 SITE D110 ♦♦♦ i ♦♦♦ ® a♦ i♦♦♦♦�♦.♦ \ . , 105/123.. 7.4441 , ♦ + 51241 IA'i♦♦♦�♦♦ ®`� --
♦��i♦i®iC� ♦��i♦' •-♦-♦♦�♦�1i♦��♦iG %" ::���:��iT�TiT 1��"piQ'A�O�O�♦®�!1�♦1 •• �°F 8♦♦�♦�♦♦ ? ♦♦ +:....
•
ET— ET - ;.•-- - -— "�' ET - 5/109 •.•••••. .,x..r ET •• r I P Project Area
... ® .:® 10 ...1® ® --J roe
® (i Limits of Disturbance
II1•H OH OH OH qH 4OH , •H OH OH OH OH OH OH OH OH , _
/
;• '\ MATS REQUIRED FOR MATS REQUIRED FOR ® Existing Structure
•
CONSTRUCTION ROAD STABILIZATION ACCESS IN WETLANDS ACCESS IN HYDRIC SOILS @ Proposed Structure
MATS OR TEMPORARY GRAVEL(TYP.) \ SEE CE SCHEDULE SHEET 29 FOR sc, ce J Existing Construction Entrance
MATS RECOMMENDED FOR ACCESS IN AGRICULTURAL FIELD DETAILS AND ESC REQUIREMENTS GO Temporary Construction Entrance
Existing Gravel Access,Topdress As Needed
S / Construction Road Stabilization(Mat Stabilization or
— 8, jj Permanent Gravel)
48 It
- Construction Road Stabilization(Mat Stabilization or
I \ \ V •• Temporary Gravel)
►-.4..•
pr--e - --4: ` .♦�♦�� Mat Stabilization
AREA A Existing Paved/Impervious Surface
\o` ......
Approximate Stream Channel Limits
;;� . .: Approximate Wetland Limits
6`6, 0 B GRAVE SITES OBSERVED WITHIN ROW CD NO LAND DISTURBANCE ALLOWEDA , Approximate Open Water Limits
60 WITHIN AREA NOTED ON PLAN • •
62 ;;;;:;;:•: Approximate Jurisdictional Ditch Limits
®��`" EXISTING STRUCTURE TO BE ACCESSED Approximate Location of Cemetery
\ ON FOOT AND CUT TO GROUND LEVELco
� � DISTURBANCE OF MARKERS AND I 49-=-x-Silt Sock SC Temporary Stream Crossing
MATS REQUIRED FOR ACCESS IN ��♦� MEMORIALS IS NOT PERMITTED O
HYDRIC SOILS(TYP.) - SA ��Safety Fence � Rolled Erosion Control Product
SEE CE SC -DULE SHE 9 F R
CONSTRUCTION ROAD STABILIZATION /►♦ DETAI - N C REQUIREME TS Railroad O
MATS OR TEMPORARY GAVEL(TYP.) OS Outlet Stabilization Structure
MATS RECOMMENDED FOR ACCESS
' ♦� Parcel Boundary
_ 105/111� SS - 49
,,♦♦.'\ ®`105/800 105/130A Existing Fence CD Check Dam
IN AGRICULTURAL FIELD ® 05/801A
u=x-x ... ,e _ - _ 4004, 1 Existing 2ft Contours
x�� ♦♦x0 tz^ `� 21 fir-- / :�♦♦♦ Q 0 :-- ,' / ��x 105I800 -
x•-VQ4•K d♦4 . 105/112.1 ��� 105/1 9 ',♦��!••••`' A-1 /j♦_♦_�'1Q 11 A 105/131 a(/1 -ET- Other Overhead Line
,1 ♦ ► ♦1: ♦' r
•
•
1R5/.t 7 1 /1 105/128 11 ♦ r . /1//,1- „i 5/115 —ET
1051114 ,5 10/116: .- .. ....... - Other Existing Transmission Line
A
_ -a.ET'- ET " T 1�Y• 1@T it. ET ET •` \_ E. 10511 Y'••• f 105/114 E J! 105/801 � """""""'.r ��x! � ����i cio
f p OH H��OH OH OH OH off �.� OH , H OH }` OHlik. OH OH `2 \\\\t I
\\,'C A�S/�O
CONFIGURE WORK AREA AS NEEDED I
��I� 105/802 '��'.` ® CKED GATE -58 �\Q_ d'44 1/ •O�/�
ADEQUATE TURNAROUND105/803•••. CRO S EXISTING PRIVATC� _; 2 ',-y
FO HE LIM TS OF DISTURBdA'NCE(TYPO ; // I% GRAVEL DRIVEWAY - :a SEAL 7•.
�� ro BETHEL . CONFIGURE WORKAREAAS , 054381
AL1 CAROLINA; NEEDED TO AVOID GUY WIRES 8/26/2022 ;
'. SUBSTATION STRUCTURE ACCESSED FROM INSIDE p� S FiL ��
, r- li lk 4 .4111
g 1 .:........ ••vr'n' •UBSTATION•NY TEMPORARY �j/c�T G I NE.S� \
/F-OM STRUCTURE NOSTALLATION SHOUCKPILES LD BE�� ��iii BLGS�\\\\
PLACED IN UPLANDS AWAY FROM INLETS AN �I .�\�I�—.
BCE
66 COVERED OR PERIMETER CONTROLS USED ENVIRONMENTAL NC.LicenseNo
j AREA B
�j SHEET 20 OF 39
S:\PROJECTS\0166-LINE 105 TARBORO-PARMELE\GIS CADD\CARD\PHASE 210166 E&S PLAN P2.DWG
PEDESTRIAN RECONNAISSANCE
4.
�' t ..^ -
si
ft *.A• a, �v 3 .L
- . ''",. • - Vililit' , 4.. t
. 0 o
0
661, 1
..r:l.H r4-..'
o O o
O O o o
0
0 •
y `
Price Road Cemetery 0 30 60 N -`
Meters A )
• Burial Fencing
0 Fence Corner I= Cemetery Limits 1
Figure 14: Planview of representative burial locations recorded by D+A archaeologists'.
'Note that not all observed burials were recorded and that the northern most area was not visited as it was at some
distance from the Dominion ROW and property access had not been coordinated. Burial makers were observed all
the way to the tree line from a distance.
19
APPENDIX B
GPR Grave Delineations r - e� I�
r y •
'
Subsurface Anomaly-Possible Burial . ,�Nth, ,
•`sa
GPR Pr ofles ,- ♦ t ' _ _ lir
` `` 0* w
. . .. . .
1 arm�, , J►-.�!-. • r1�•�!S�. ,it:r \ ♦ - _
t t•-• 1 ye`
a, . .1.1.4-3 do' - ....
_ i., ., k f �� GPR Grave Delineation
.f�• I /".. - Prices Road,Bethel.North Carolina
1S I bq ti _ e g 25 so rt
`.
IA Created By Jack R.Merdarae Scala:1:70R
. fill
bu000.us elocaddnsl g Gourceanomalies Radar mayMindimtiyeaf
• � , burlaly ec de4r%ed ucing Ground PenNradrg Radar(GPRJ.
k• GPR perrnma4 March 2029 by EPS Southeast.Sonmabas detected uelrg
geophys..methods where accessible aM dry.
Base Map Source Map data 62015 Gwgle
42
No vehicle or equipment access should be allowed in the cemetery and timber mats be
placed on the ground for any work or vehicular traffic occurring within 30 meters(100 8/8/24
Construction
feet)of the observe cemetery limits.
DE E&S will coordinate potential of installing signage at the limits of the cemetery to
delineate the extent. 8/8/24 DE E&S
Attendees: Facility/Responsible Party DEES/Other Signoffs:
Facility ECC/Responsible Party, DEES
Joe Kohler /Charles Schleicher NAME Luke DuPont