HomeMy WebLinkAboutNCC242441_ESC Approval Submitted_20240812 Dennis Gilbert
From: I SVC_DoNotReply-DEQPermits <DoNotReply-DEQPermits@deq.nc.gov>
Sent: Friday, August 09, 2024 9:55 AM
To: Onsite Homes, LLC
Cc: Dennis Gilbert; Debra Ensminger
Subject: NC DEMLR - FROF Application Approval CRM:0177120
Attachments: Application Report - Friday, August 9, 2024 948 AM.pdf; Certificate of Approval - Friday,
August 9, 2024 948 AM.docx; Letter of Approval - Friday, August 9, 2024 948 AM.docx
I , * ,.. Zip
5''alAliie, IP)c'
4 QUAM`,,,
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
Roy Cooper
Governor
Elizabeth S. Biser
Secretary
William Vinson Jr. (Acting)
Director
08-09-2024
LETTER OF APPROVAL
Onsite Homes, LLt
2931 Breezewood Avenue, Suite 202
Fayetteville, NC 28303
RE: Project Name: Seven Lakes West, Lakeview Section—Lot 4097
Acres pproved: 0.51
Applic tion ID: PA-006373
Permit umber: MOORE-2025-0187
Address: 128 Shaw Drive
City: Mineral Springs Township
County. Moore
River asin: Lumber
1
L
Stream lassification: HQW: High Quality Waters; WS-II: Water Supply II
Plan T pe:New Plan
Dear Onsite Homes, LLC,
,This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and
hereby issue this Letter of Approval. The Certificate of Approval must be posted at the job site. This plan approval shall
expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by
Title 15A NCAC 48 .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent
(eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General
Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the
$120 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party
shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land
disturbing activity. The eNOl form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOl form
to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future,
the new responsible party must obtain a new COC.
Title 15A NCAC 4 .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site:
1. The app oved E&SC plan as well as any approved deviation.
2. The NC 01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with
the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural
resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation
control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina
General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to
insure compliant with the Act.
Acceptance and a proval of this plan is conditioned upon your compliance with Federal and State water quality laws,
regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing
activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility/Ownership Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting
date for this project. Please notify us if you plan to have a preconstruction conference.
Your cooperation jis appreciated.
Sincerely,
Chris Baker, Assistant Regional Engineer
cc:
Dennis Gilbert, P. E., Moorman, Kizer & Reitzel, Inc.
Debra Ensminger, Moore County Inspection Office
Fayetteville Regional Office
2
North Carolina Department of Environmental Quality Division of Energy. Mineral and Land Resources
Fayetteville Regional Office 225 Green Street.Suite 714 Fayetteville NC.28301-5095
ice; , 910-433-3300
Email correspondence ti and from this address may be subject to the North Carolina Public Records I..aw and may be disclosed to third parties by an authorized
state official.
3