HomeMy WebLinkAboutNCC242414_ESC Approval Submitted_20240812 Iauren.thomas@eagleonline.net
From: SVC_DoNotReply-DEQPermits <DoNotReply-DEQPermits@deq.nc.gov>
Sent: Tuesday, January 30, 2024 8:49 AM
To: Peak Resources, Inc; Matthew Kirchner
Cc: Peterson, Kathryn S
Subject: NC DEMLR - FROF Application Approval with Modifications Needed CRM:0186011
Attachments: Certificate of Approval -Tuesday, January 30, 2024 834 AM.docx; NCG01-Fact-Sheet.pdf
STATE ,
MAY 2q 17,s ^'a
Qt
plk‘ 1,„
%y er1''47 12. 1776 f
'- QUAM Vld
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
Roy Cooper
Governor
Elizabeth S. Biser
Secretary
William Vinson Jr. (Acting)
Director
January 30, 2024
Peak Resources, Inc
101 Baines Court
Cary, NC 27511
RE: Project Name:South Battleground Property
Acres Approved: 11.69
Application ID: PA-002087
Permit Number: CLEVE-2024-0101
1
Address:726 South Battleground Ave
City: Kings Mountain
County:Cleveland
River Basin: Broad
Stream Classification: C:Aquatic Life,Secondary Contact Recreation, Fresh water
Plan Type: New Plan
Dear Peak Resources, Inc,
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with
modifications and hereby issue this Letter of Approval with Modifications. The Modifications Required for Approval are
listed on the attached page.The Certificate of Approval must be posted at the job site. This plan approval shall expire
three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title
15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent(eNOI)
form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit.After the form is
reviewed and found to be complete, you will receive a link with payment instructions for the $120 annual permit fee. After
the fee is processed, you will receive the COC via email.As the Financially Responsible Party shown on the FRO form
submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity.The eNOl form
may be accessed atdeq.nc.gov/NCG01. Please direct questions about the eNOl form totheStormwater Program staff in the
Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a
new COC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job
site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with
the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural
resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation
control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina
General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to
insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,
regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing
activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility/Ownership Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. This permit allows for a land-disturbance, as called for on the application and plan,
not to exceed the approved acres. Exceeding the acreage can be a violation of this permit and may require a revised plan
and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting date for this
2
project.
Modifications Required for Approval:
1. Ensure that the excavated sediment storage pit at the base of Phase 2 slope, located at the toe and lined
with NAG P300, is adeptly designed to efficiently accommodate the drainage area.
2. Additional measures may be required - The applicant is responsible for the control of sediment on-site. If
the approved erosion and sedimentation control measures prove insufficient, the applicant must take those
additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115]
Your cooperation is appreciated.
Sincerely,
Kathryn S. Peterson
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
Enclosures: Certificate of Approval
NCGO1 Fact Sheet
Modifications Required for Approval
North Carolina Department of Environmental Quality I Division of Energy,
�1 1 ili E Q�\v Mineral and Land Resources
Mooresville Regional Office 1610 East Center Avenue, Suite 301 I Mooresville
NC, 28115
704-663-1699
Departrneot of Enryomolestil Ordly
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized
state official.
3